Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹37.4 L
EMD Value
₹38,000
Closing Date
23 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Nadiad Irrigation Division Nadiad
Construction of new CC Lining with Restoration work of 14 L SM & Canal Syphone at Ch. 23250 ft. of Uttarsanda Distry.
353787
Tender Notice No. 08 of 2026-2027
Open
Civil - All
Works
Kheda
13 documents required · 12 mandatory · 1 optional
₹1,500
Executive Engineer Nadiad Irrigation Division Nadiad
₹38,000
9 Oct 2026
9 Oct 2026
9 Oct 2026
23 Oct 2026
9 Oct 2026
BILL OF QUANTITIES
Name of work - Construction of new CC Lining with Restoration work of 14/L SM & Canal
Syphone at Ch. 23250 ft. of Uttarsanda Distry.
Item Item of work Unit Qty. Rate Amount (Rs.)
Clearing the shrubs, like akadas, weeds and other
vegetables including depositing the same outside
1a and burning etc. complete from canal bed, top and Km 0.64 5776.00
both slopes of the banks, for canal with discharge.
(a) For Canals Below 20 Cusecs
Clearing the shrubs, like akadas, weeds and other
vegetables including depositing the same outside
and burning etc. complete from canal bed, top and
1b both slopes of the banks, for canal with discharge. Km 0.24 8664.00
(b) For Canals Between 21 to 250 Cusecs
Clearing the silt from the canal/drain bed by a
digging the same to the required bed level and
gradient including depositing the excavated earth
regularly in spoil bank for utilizing the same
preparing the banks after breaking clods as and
where directed for all leads and lifts. For Canals
Below 20 Cusec. & 0 to 1.5 m lift.
Dismantling the existing brick masonry including
sorting out and stacking the useful material and
3 removing the debris and making good the damages Cu.M 102.00 750.90
etc. complete as directed. In Cement Mortar
Dismantling the existing RCC Pipes including sorting
out and stacking of the useful materials of the
4a following diameters including refilling the trenches Meter 7.50 1270.70
etc. complete as directed. (i) NP-2 Pipes For
Dismantling the existing RCC Pipes including sorting
out and stacking of the useful materials of the
following diameters including refilling the trenches
4b etc. complete as directed. (i) NP-2 Pipes For 450 mm Meter 17.50 577.60
Dismantling the existing RCC Pipes including sorting
out and stacking of the useful materials of the
following diameters including refilling the trenches
4c etc. complete as directed. (i) NP-2 Pipes For 150 mm Meter 5.00 346.60
Item Item of work Unit Qty. Rate Amount (Rs.)
Removing of exiting disturbed C.C. Block lining
including opening of joints, stacking the same and
5 disposing of stuff as directed etc. complete with all Sq.M 984.00 29.90
leads and lifts.
Excavation for foundation in all sorts of soil inclu.
yellow sandy gravelly soils, soft & hard murrum etc.
in dry condition inclu. depositing the excavated stuff
6 in uniform layers in banks or as and where directed Cu.M 205.00 102.40
etc. complete for lead up to 500 m and all lift. (BY
MACHINERY) Excluding dewatering
Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C./R.C.C
work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete Without
Dewatering and excluding cost of steel
reinforcement. (A) For Foundation concrete /
General purpose (c) C. C. Nominal Mix, M-15 and
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the
cost of steel reinforcement. (B) For Pier and
Abutments / Wing wall / Head wall / Return wall /
Dowel Wall etc. (g) Concrete grade M-15 and MSA-
Providing and placing in position reinforcement bars
including cutting, bending, welding, joints where
9 necessary, hooking etc. complete as per drawing for Qtl 46.00 7194.00
all leads and lifts. (b) TMT bars
Providing and fixing in position(different diameter)
NP-2 RCC pipe with colllar including filling and
caulking the joints with cement mortar 1:1
10a proportion, finishing to design grade and levels Meter 17.50 1366.60
curing etc. complete for all leads and lifts. NP-2 class
600 mm dia pipe
Item Item of work Unit Qty. Rate Amount (Rs.)
Providing and fixing in position(different diameter)
NP-2 RCC pipe with colllar including filling and
caulking the joints with cement mortar 1:1
10b proportion, finishing to design grade and levels Meter 5.00 635.70
curing etc. complete for all leads and lifts. NP-2 class
300 mm dia pipe
Providing and fixing in position ( different diameter )
I.S.,NP-3 class reinforced pipe with caulking the
joints with cement mortar 1:1 proportion,using jute
string soaked in cement slurry, finishing joints and
11 laying pipes to the designed grade and levels, curing Meter 7.50 5955.30
etc. complete for all leads and lifts.
Earth work in embankment using selected soil, soft
& hard murrum excavated from approved borrow
area / village tanks etc. Including conveying,
spreading in uniform layers, breaking clods and
12 dressing to the designed canal section etc. with lead Cu.M 941.00 110.80
upto 500m and all lifts
(for canals having capacity up to 300 Cusec) ( By
Compaction for making embankment for canal by
laying in regular layers of 15 cm in thickness
including breaking clods to 25 mm size incl. light
13 rolling by suitable rollers with slight watering to Cu.M 941.00 27.70
facilitate rolling and dressing the side slopes etc.
Providing and laying plain/reinforced cement
concrete lining of M 15 (MSA 20 mm) in bed, side
slopes and curvature including batching, mixing,
transporting, placing, vibrating, smooth finishing,
14 curing including dewatering where required. Sq.M 4415.00 327.90
(MACHINERY BASED by "FLORI" - WITHOUT PAVER
WATER CURING) (A) 7.5 cm thick lining in bed/slope
Item Item of work Unit Qty. Rate Amount (Rs.)
Providing groove and filling expansion joint of size
12 mm wide and 25 mm deep in canal lining during
construction with two coats of primer and filled with
15 bituminious and fine sand in proportion of 2:1 as Meter 1347.00 34.70
directed etc. complete.
Manufacture, supply and erection of vertical gate
consisting gate leaf, stiffeners, rubber seal,
embedded parts as shown in drawings inclu. cost of
materials, fabrication, painting, errection in position
16a with all accessories second stage concreting etc. Nos. 3.00 43329.00
complete as per drawing and specifications. Minor
Manufacture, supply and erection of vertical gate
consisting gate leaf, stiffeners, rubber seal,
embedded parts as shown in drawings inclu. cost of
materials, fabrication, painting, errection in position
with all accessories second stage concreting etc.
complete as per drawing and specifications. Outlet
Rs. Thirty Seven Lac Forty Thousand Thirty Eight Only
I/ We am/ are willing to carry out the work at……………………………. % above/ below percent (Should be written in
figures and words) of the estimated rate mentioned above. Amount of my/ our tender works out as under.
Estimated amount Estimated amount
Deduct : ______ % Below Rs. _______________ Add: ______ % above Rs.
Net Tender amount Rs. ______________ Net Tender amount Rs.
Note 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
Note 2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC 10/ 2017/ CementConsumption/ 16/ C, Date. 11/05/2017 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design, the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer
Nadiad Irrigation Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 - Front Page.pdf
2 - Tender Notice.pdf
3 - SBD Book.pdf
4 - BOQ.pdf
5 - Cement.pdf
6 - Steel.pdf
7 - PA.pdf
8 - Other Specations.pdf
9 - Itemwise Spec _14L SM.pdf
10 - Test Schedule.pdf
Tender Notice No. 08 of 2026-2027.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .