| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.8 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹43.0 L+₹1.2 L (2.87%)Rejected-Finance 79 O P ROAD NAYABASTI P O P S BARRACKPORE DIST NORTH 24 PARGANAS PIN 700 120 WB | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | L2 | Rejected-Finance Higher bid value | |
| 3 | L3₹44.1 L+₹2.4 L (5.68%)Rejected-Finance 32 GOLA MAHAL P O BARRACKPORE DIST NORTH 24 PARGANAS PIN 700 120 WB | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | L3 | Rejected-Finance Higher bid value | |
| 4 | L4₹44.2 L+₹2.4 L (5.75%)Rejected-Finance | L4 | Rejected-Finance Higher bid value | |
| 5 | L5₹44.7 L+₹3.0 L (7.10%)Rejected-Finance | L5 | Rejected-Finance Higher bid value |
| Sl No | Description | Qty | Unit | SENCO L3 | MAZUMDER AND CO L4 | M/S PAUL CONSTRUCTION L1 | ALOKE ENGINEERING AND COMPANY L2 | DAS ENTERPRISE L7 | K. K. CONSTRUCTION L5 | TAMALIKA ENTERPRISE L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | PART-I : (B/R WORKS)
Demolition of cement concrete (un-reinforced) in ground floor and paving n.exc 15cm thickness (below or above) ground level complete all as specified and directed. | 17.5 | CUM | 1,400 ₹24,500 | 1,380 ₹24,150 | 1,300 ₹22,750 Lowest | 1,350 ₹23,625 | 1,570 ₹27,475 | 1,465 ₹25,637.5 | 1,569 ₹27,457.5 |
| 2.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 52 | SQM | 98 ₹5,096 | 95 ₹4,940 | 85 ₹4,420 Lowest | 90 ₹4,680 | 190 ₹9,880 | 95 ₹4,940 | 182 ₹9,464 |
| 3.00 | Surface excavation in soft /loose soil not exceeding 30cm deep and averaging 15 cm deep and getting out complete all as specified and directed. | 120 | SQM | 30 ₹3,600 | 32 ₹3,840 | 20 ₹2,400 Lowest | 25 ₹3,000 | 120 ₹14,400 | 65 ₹7,800 | 101 ₹12,120 |
| 4.00 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth for foundation or for shafts, well, cesspits, pier holes etc not exceeding 10 Sqm on plan and not exceeding 1.5 mtr in depth and getting out in soft/loose soil complete all as specified and directed. | 53.32 | CUM | 430 ₹22,927.6 | 410 ₹21,861.2 | 400 ₹21,328 Lowest | 410 ₹21,861.2 | 570 ₹30,392.4 | 452 ₹24,100.64 | 557 ₹29,699.24 |
| 5.00 | Removing surplus excavated materials to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting points in soft/loose soil complete all as specified and directed. | 28.9 | CUM | 320 ₹9,248 | 280 ₹8,092 Lowest | 300 ₹8,670 | 310 ₹8,959 | 425 ₹12,282.5 | 352 ₹10,172.8 | 405 ₹11,704.5 |
| 6.00 | Returning, filling in, including spreading leveling, watering and well ramming in layers not exceeding 25cm, soil complete all as specified and directed. | 24.42 | CUM | 170 ₹4,151.4 | 140 ₹3,418.8 Lowest | 150 ₹3,663 | 160 ₹3,907.2 | 235 ₹5,738.7 | 163 ₹3,980.46 | 223 ₹5,445.66 |
| 7.00 | M&L for broken stone or boulders hardcore of gauge not exceeding 63mm, deposited spread and levelled in layers not exceeding 15cm thick, watered and rammed to a true surface complete all as specified and directed. | 32.7 | CUM | 3,000 ₹98,100 | 2,900 ₹94,830 | 2,800 ₹91,560 Lowest | 2,900 ₹94,830 | 3,250 ₹1,06,275 | 3,100 ₹1,01,370 | 3,238 ₹1,05,882.6 |
| 8.00 | M&L for PCC (1:3:6) type C-2 (using 40 mm graded crushed stone aggregate) as in foundation filling and mass concrete complete all as specified and directed. | 6 | CUM | 7,700 ₹46,200 | 7,800 ₹46,800 | 7,000 ₹42,000 Lowest | 7,500 ₹45,000 | 8,500 ₹51,000 | 7,850 ₹47,100 | 8,298 ₹49,788 |
| 9.00 | M&L for PCC (1:4:8) type D-2 (using 40 mm graded crushed stone aggregate) as in foundation filling and mass concrete complete all as specified and directed. | 19 | CUM | 6,800 ₹1,29,200 | 6,700 ₹1,27,300 | 6,500 ₹1,23,500 Lowest | 6,700 ₹1,27,300 | 7,500 ₹1,42,500 | 6,900 ₹1,31,100 | 7,388 ₹1,40,372 |
| 10.00 | M&L for PCC (1:2:4) type B-2 (using 40 mm graded crushed stone aggregate) as in foundation filling and mass concrete complete all as specified and directed. | 3 | CUM | 8,000 ₹24,000 | 8,200 ₹24,600 | 7,500 ₹22,500 Lowest | 7,700 ₹23,100 | 8,900 ₹26,700 | 8,550 ₹25,650 | 8,906 ₹26,718 |
Tender Value
₹42.5 L
EMD Value
₹85,100
Closing Date
20 Aug 2025, 6:00 pmClosed
GE BARRACKPORE
Office of the GE BARRACKPORE, KOLKATA - 700120
PROVN OF FLOOR TILING OF BLDG NO. 08 PERS LINE OF BH, PROVN OF OVERHEAD SHELTER ALONG WITH HARD STANDING AT ARO BARRACKPORE, PROVN OF ENTRY GATE SEPARATELY FOR FOUR AND TWO WHEELER ON ROAD NEXT TO GAS GODOWN ALONG WITH SENTRY POST AND SPECIAL REPAIR
2025_MES_723521_1
8136/E8
Open Tender
Civil Works
Item Rate
180 days
Barrackpore
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹500
GE BARRACKPORE
₹85,100
Yes
1 Nov 2025
30 Jul 2025
22 Aug 2025
30 Jul 2025
20 Aug 2025
13 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .