| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹48.6 LAccepted-AOC | 1 | Accepted-AOC AOC |
Tender Value
Refer Docs
EMD Value
₹99,000
Closing Date
22 Dec 2022, 5:00 pmClosed
Executive Engineer
Office Of The Executive Engineer, Construction Division, Uttarakhand Peyjal Nigam, Pauri
construction of source, C.W.R., laying, jointing and testing of G.I. pipe line and other appurtenant works in KISMOLIYA water supply scheme along with handing over the works after commissioning to maintenance agency under Jal Jeevan Mission.
2022_MDPEY_51655_2
3443/Vivdha-23/297 Dated 9-11-2022
Open Tender
Civil Works - Water Works
Item Wise
210 days
kaljikhal
As per Tender Document
3 documents required · 3 mandatory
₹3,540
Executive Engineer, C.D. Peyjal Nigam Pauri
₹99,000
Pauri
11 Oct 2023
6 Dec 2022
24 Dec 2022
6 Dec 2022
22 Dec 2022
10 Dec 2022
6 Dec 2022 - 9 Dec 2022
9 Dec 2022
Amount
Construction of RCC Intake chamber (1.0x1.0x1.5) m in M20 at source including supply of all material, labour, T & P etc. including all testing are done, certificate by NABL Labs as per drawing and design instructions given by Engineer-In-Charge.
Construction of R.C.C. Cross Wall at sources including supply of all material, labour, T & P etc. including all testing are done, certificate by NABL Labs as per drawing and desgin instructions given by Engineer-In-Charge
Construction of RCC Roughening Filter including supply of all material, labour, T & P etc. including all testing are done, certificate by NABL Labs as per drawing and desgin instructions given by Engineer-In-Charge
Providing of all materirals, Carting, laying, jointing & testing of following screwed GI (M) pipes IS code 1239 done by any certified NABL Lab, including supply of all material, labour,T &P etc. for supply main and distribution network as per drawing and design instructions given by Engineer-In-Charge. For supply mains & FHTC
40 mm dia
32 mm dia
25 mm dia
20 mm dia
15 mm dia
Earth work in Excavation for trenches of reguired width for pipes including excavation, dressing of sildes and disposal excavted soil as directed by Engineer in Charge within a lead of 50 m.
For SMB
For MR
Construction of RCC CWR all testing are done, certified by NABL Lab including outlet, overflow, washout pipe, painting with approved water proofing(appex)/enamal paint & MS ladder outside and inside of the tank etc supply of all material, labour,T&P etc. as per drawing and design instructions given by Engineer-In-Charge.
Supply, Carting and Fixing of Following sizes of Wheel Valve including supply of all material, labour, T & P etc. as per drawing and design instructions given by Engineer-In-Charge.
40 mm dia
32 mm dia
Construction of Masonary chamber of 45X45 cm for above Wheel Valve including supply of all material, labour, T & P etc. as per drawing and desgin instructions given by Engineer-In-Charge
Supply, Carting and Fixing of Following sizes of Air Valve including supply of all material, labour, T & P etc. as per drawing and desgin instructions given by Engineer-In-Charge
25 mm dia
Construction of Masonary chamber of 45X45 cm for above Air Valve including supply of all material, labour, T & P etc. as per drawing and desgin instructions given by Engineer-In-Charge
Supply and fixing of 25 liter capacity bucket type chlorinator over the top of above CWR for chlorination of water
RR 1:6 Stone Masonary for Protection of Pipe line and CWR
RR Dry Stone Masonary for Protection of Pipe line
Providing and laying position cement conceret of specifed grade PCC 1:4:8
Providing and laying position cement concrete of specifed grade PCC 1:2:4
100 mm dia GI medium class perforated pipe having 10 mm dia holes 25 mm apart including supply of all material , labour, T&P etc Complete.
Filling pebbles or stone 25 to 50mm size in gallery for water interception around perforated pipe including supply of all materials,labour, T&P etc Complete.
Providing and filling large stone pitching including supply of all materials,labour, T&P etc Complete.
Providing and fixing 50mm GI medium pipe with plug for washout including supply of all materials,labour, T&P etc Complete.
Supply of all materials carting, laying, jointing etc & making connection with GI(M) pipe, making ferrule connection to provide FHTC and providing and fixing of C.P. brass Bib Cock.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_63289.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .