| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 LAccepted-AOC ALAPATKIZHAKKUDAN HOUSE ATTORE KUTTUR P O THRISSUR | THRISSUR | THRISSUR | KERALA | ₹30.3 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹33.0 LRejected-AOC | ₹33.0 L | L2 | Rejected-AOC First |
| 3 | L3₹34.2 LRejected-AOC | ₹34.2 L | L3 | Rejected-AOC Second |
| Sl No | Description | Qty | Unit | NIJO L3 | M V Devassy L2 | JOSE K C L1 |
|---|---|---|---|---|---|---|
| 1.00Improvement work | ||||||
| 1.00 | 14.83:Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge. | 425 | sqm | 3.47 ₹1,474.75 | 3.35 ₹1,423.75 | 25 ₹10,625 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 837.5 | sqm | 371.1 ₹3.1 L | 357.97 ₹3.0 L | 330 ₹2.8 L |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 85 | cum | 8,875.76 ₹7.5 L | 8,561.74 ₹7.3 L | 7,900 ₹6.7 L |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 4,094.92 | kilogram | 108.05 ₹4.4 L | 104.22 ₹4.3 L | 95 ₹3.9 L |
| 1.00 | OD11719/2025-2026:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 10 mm nominal size) as per the direction of Departmental officers in charge. | 13 | cum | 7,994.12 ₹1.0 L | 7,711.29 ₹1.0 L | 7,110 ₹92,430 |
| 1.01 | OD28712/2025-2026:Washing of surface with clean water spray / pressure jet to remove dust, dirt, algae, loose particles etc., including labour, equipment, water, fuel and consumables, complete as directed by the Engineer-in-Charge. | 2,295 | sqm | 11.46 ₹26,300.70 | 11.05 ₹25,359.75 | 8.91 ₹20,448.45 |
| 1.01 | 26.32.2:Providing, mixing and applying SBR polymer (of approved make) modified
Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with
polymer minimum 2% by wt. of cement used) as per specifications and
directions of Engineer-in-charge.
Note: Measurement and payment: The pre-measurement of thickness shall be
done just after the surface preparation is completed and Payment under this
item shall be made only after proper wet curing has been done and surface
has been satisfactorily evaluated by sounding / tapping with a blunt metal
instrument and/or the 75mm size cube crushing strength at the end of 28 days
to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers. | 2,295 | sqm | 615.17 ₹14.1 L | 593.41 ₹13.6 L | 540 ₹12.4 L |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 7.5 | cum | 247.57 ₹1,856.78 | 238.82 ₹1,791.15 | 222 ₹1,665 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.5 | cum | 7,623.51 ₹57,176.33 | 7,355 ₹55,162.50 | 6,840 ₹51,300 |
Tender Value
₹35.6 L
EMD Value
₹50,000
Closing Date
7 Nov 2025, 6:00 pmClosed
executive engineerIrrigation Division thrissur
executive engineerIrrigation Division thrissur
PSM 2025-26-Improvement works to RBMC in between Ch. 29/100 to 30/000 km
2025_Irrig_817683_1
IRR/IA/TR/2490/2025_5_12_11/1
Open Tender
Civil Works - Others
270 days
Pandiparambu
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
8 Jan 2026
31 Oct 2025
10 Nov 2025
31 Oct 2025
7 Nov 2025
31 Oct 2025
Amount
Improvement work
14.83:Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge.
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD11719/2025-2026:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 10 mm nominal size) as per the direction of Departmental officers in charge.
OD28712/2025-2026:Washing of surface with clean water spray / pressure jet to remove dust, dirt, algae, loose particles etc., including labour, equipment, water, fuel and consumables, complete as directed by the Engineer-in-Charge.
26.32.2:Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
M V Devassy (BID ID -2432151)
NIJO (BID ID -2431562)
Bidder Name
JOSE K C
M V Devassy
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1370097.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1370097.xls
BOQ • 0.30 MB
sbdnit1.pdf
Tender Documents • 1.96 MB
fot.pdf
Tender Documents • 0.27 MB
EPayment.pdf
Other Document • 0.01 MB
preliminaryagt.pdf
Tender Documents • 0.40 MB
affi.pdf
Other Document • 0.25 MB
inte.pdf
Other Document • 0.18 MB
Download all tender documents and submit your bid