Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-AOC | ₹22.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.3 LRejected-Finance | ₹22.3 L | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | manoj singh latwal L1 | MAHESH SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | 52.23 | cum | 264.22 ₹13,800.21 | 265.28 ₹13,855.57 |
| 2.00 | Filling available excavated earth in trenches, plinth in layers consolidating by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 30.97 | cum | 230.03 ₹7,124.03 | 230.96 ₹7,152.83 |
| 3.00 | P/L in position CC 1:4:8 (1 Cement : 4 c/sand : 8 st. agg. 40 mm size) excluding the cost of c/shuttering - All work upto plinth level. | 16.72 | cum | 6,063.16 ₹1.0 L | 6,087.56 ₹1.0 L |
| 4.00 | P/L in position CC 1:3:6 (1 Cement : 3 c/sand : 6 st. agg. 40 mm size) excluding the cost of c/shuttering. | 16.39 | cum | 8,082.94 ₹1.3 L | 8,115.47 ₹1.3 L |
| 5.00 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) in walls (any thickness), all work above i.e. columns, etc. ex. cost of c/shuttering, finishing and reinf. | 3.78 | cum | 9,745.71 ₹36,838.78 | 9,784.93 ₹36,987.04 |
| 6.00 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) beams,s/shades,shelf ,stair case,door bend and suspended slabs etc. ex. cost of c/shuttering, finishing and reinf. | 24.85 | cum | 10,225.14 ₹2.5 L | 10,266.29 ₹2.6 L |
| 7.00 | Centering and shuttering i/c strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 44.1 | sqm | 298.31 ₹13,155.47 | 299.51 ₹13,208.39 |
| 8.00 | Centering and shuttering i/c strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. | 154.67 | sqm | 725.8 ₹1.1 L | 728.72 ₹1.1 L |
| 9.00 | Centering and shuttering i/c strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 98.02 | sqm | 578.14 ₹56,669.28 | 580.47 ₹56,897.67 |
| 10.00 | Centering and shuttering i/c strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. | 50.4 | sqm | 768.37 ₹38,725.85 | 771.46 ₹38,881.58 |
Tender Value
₹22.3 L
EMD Value
₹44,700
Closing Date
26 Jun 2024, 3:00 pmClosed
EE RWD ALMORA
EE RWD ALMRA
Reconstruction work of GPS Barshimi under the item of construction of new classroom
2024_RES_72476_1
313 Dated 11-06-2024
Open Tender
Civil Works - Buildings
270 days
Barshimi
Reconstruction work of GPS Barshimi under the item of construction of new classroom
2 documents required · 2 mandatory
₹2,360
2000 D.H. Aan 360 GST No
₹44,700
3 Feb 2026
19 Jun 2024
27 Jun 2024
19 Jun 2024
26 Jun 2024
19 Jun 2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid