Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.4 LAdmitted-Fee/PreQual/Technical/Finance 1ST FLOOR 15147D ALMANAC MANJERI MALAPPURAM 67 6123 | MANJERI | MALAPPURAM | KERALA | 676123 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹26.4 L+₹3,280.90 (0.12%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹28.2 L+₹1.8 L (6.93%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹28.7 L+₹2.3 L (8.64%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹29.6 L+₹3.2 L (12.0%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MOHAMMED KAYANIKKARA L2 | Mohamed Fazal L7 | Varghese.K.T L5 | ALMANAC ENGINEERING CONSULTANCY LLP L1 | ARDEN INFRATECH PRIVATE LIMITED L4 | YEM FOUR CONSTRUCTION AND SOLUTIONS L6 | L AND I BUILD SOLUTIONS LLP L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Repair works of bridge proper | ||||||||||
| 1.00 | OD100997/2025-2026:Providing and fixing double scaffolding system(cup lock type)on the exterior side, up to seven story height made with 40mm dia. M.S tube | 138 | sqm | 254.7 ₹35,148.6 | 313 ₹43,194 | 350 ₹48,300 | 254.38 ₹35,104.44 Lowest | 276 ₹38,088 | 400 ₹55,200 | 272.01 ₹37,537.38 |
| 1.00 | OD100999/2025-2026:Removing damaged concrete:
Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm. | 87.26 | sqm | 366.3 ₹31,964.8 | 437 ₹38,134.37 | 400 ₹34,905.6 | 365.84 ₹31,924.66 Lowest | 397 ₹34,643.81 | 400 ₹34,905.6 | 391.2 ₹34,137.68 |
| 1.00 | OD100998/2025-2026:Polymer Modified Mortar (Pre-Packed):
Providing and Applying single component, high strength, fibre reinforced, thixotropic cementitious patch repair mortar that achieves compressive strength minimum of 15 MPa at 1 day and 45 MPa at 28 days and capable of applying upto 50mm thick in single layer such as Renderoc SP40 of Fosroc or Master Emaco S 348 of BASF or equivalent, to the prepared concrete area for thickness up to 50mm, after applying epoxy resin based bonding coat as per manufacturers specification, before the bonding agent becomes tack free, initially by hand and finally finishing the same with trowel carefully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns, slabs, beam etc. at all heights, where the thickness of application is less than 50 mm in patches as per specification. Item rate is inclusive of all material including the bond coat, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete and as directed by Engineer-in-charge and/or consultant. (Payment to be made in Sq.M for thickness up to 50mm of PMM for patch area repaired) | 87.26 | sqm | 3,424.91 ₹2,98,871.35 | 4,187 ₹3,65,374.37 | 3,250 ₹2,83,608 Lowest | 3,420.63 ₹2,98,497.86 | 3,715 ₹3,24,185.76 | 3,800 ₹3,31,603.2 | 3,657.67 ₹3,19,182.91 |
| 1.00 | OD101001/2025-2026:Microconcrete Reinstatement for thickness more than 50mm for RCC members:-
Providing and laying of special repair material micro-concrete for reinstatement of members having thickness of repair more than 50mm and jacketing, using Single component, high strength, high flow cementitious micro-concrete having compressive strength minimum of M40 at 28 days such as MasterEmaco 346 or Renderoc RGL / RGS of Fosroc or equivalent, blended with washed saturated surface-dry (SSD), graded, low absorption, high density, aggregates of size 3mm to 10mm at 50% by weight of micro concrete (if thickness is 100mm or more) and water as per data sheet and pouring into the shuttering if required than use birds beak type form work using suitable arrangement or if required using pumping device for uniform flow of Microconcrete. The side shuttering can be removed after Minimum of 24 hours, preferably 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant. (Payment shall be made in Sq.M for thickness up to 100mm of Microconcrete of area repaired, ) including shuttering work (Only steel reinforcement shall be paid in other relevant items) | 8 | sqm | 4,992.05 ₹39,936.4 | 6,127 ₹49,016 | 5,000 ₹40,000 | 4,985.8 ₹39,886.4 Lowest | 5,416 ₹43,328 | 6,100 ₹48,800 | 5,331.31 ₹42,650.48 |
| 1.00 | OD101000/2025-2026:Providing drainage spout with 63mm PVC pipe 100cm long including all cost conveyance and lobour charges etc. complete | 36 | metre | 113.11 ₹4,071.96 | 135 ₹4,860 | 350 ₹12,600 | 112.97 ₹4,066.92 Lowest | 122.74 ₹4,418.64 | 1,000 ₹36,000 | 120.8 ₹4,348.8 |
| 2.00Painting of bridge proper and berm protection | ||||||||||
| 2.00 | 2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm | 10 | each | 550.03 ₹5,500.3 | 637 ₹6,370 | 2,200 ₹22,000 | 549.34 ₹5,493.4 Lowest | 596 ₹5,960 | 1,500 ₹15,000 | 587.41 ₹5,874.1 |
| 2.00 | OD100995/2025-2026:Removing damaged concrete:
Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm. | 21.02 | sqm | 366.3 ₹7,699.99 | 453 ₹9,522.51 | 1,350 ₹28,378.35 | 365.84 ₹7,690.32 Lowest | 397 ₹8,345.34 | 450 ₹9,459.45 | 391.2 ₹8,223.42 |
| 2.00 | OD100996/2025-2026:Polymer Modified Mortar (Pre-Packed):
Providing and Applying single component, high strength, fibre reinforced, thixotropic cementitious patch repair mortar that achieves compressive strength minimum of 15 MPa at 1 day and 45 MPa at 28 days and capable of applying upto 50mm thick in single layer such as Renderoc SP40 of Fosroc or Master Emaco S 348 of BASF or equivalent, to the prepared concrete area for thickness up to 50mm, after applying epoxy resin based bonding coat as per manufacturers specification, before the bonding agent becomes tack free, initially by hand and finally finishing the same with trowel carefully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns, slabs, beam etc. at all heights, where the thickness of application is less than 50 mm in patches as per specification. Item rate is inclusive of all material including the bond coat, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete and as directed by Engineer-in-charge and/or consultant. (Payment to be made in Sq.M for thickness up to 50mm of PMM for patch area repaired) | 21.02 | sqm | 3,424.91 ₹71,995.03 | 4,144 ₹87,111.02 | 3,250 ₹68,318.25 Lowest | 3,420.63 ₹71,905.06 | 3,715 ₹78,093.02 | 3,800 ₹79,879.8 | 3,657.67 ₹76,887.88 |
Tender Value
₹33.1 L
EMD Value
₹50,000
Closing Date
19 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/o Executive Engineer PWD Bridges division Palakkad.
G E N E R A L - B r i d g e s a f e t y w o r k s o f Kavilmumbil Kadavu Bridge-Bridge safety works and painting works of Kavilmumbil K a d a v u B r i d g e i n V e n g a r a L A C i n Malappuram district-General Civil Work-1
2026_PWD_887364_1
PWD/BR/TR/13825/2025_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
Vengara LAC
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
25 Nov 2026
9 Nov 2026
23 Nov 2026
9 Nov 2026
19 Nov 2026
9 Nov 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair works of bridge proper | |||||
| 1.001 | OD100997/2025-2026:Providing and fixing double scaffolding system(cup lock type)on the exterior side, up to seven story height made with 40mm dia. M.S tube | 138 | sqm | - | - |
| 1.002 | OD100999/2025-2026:Removing damaged concrete:
Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm. | 87.26 | sqm | - | - |
| 1.003 | OD100998/2025-2026:Polymer Modified Mortar (Pre-Packed):
Providing and Applying single component, high strength, fibre reinforced, thixotropic cementitious patch repair mortar that achieves compressive strength minimum of 15 MPa at 1 day and 45 MPa at 28 days and capable of applying upto 50mm thick in single layer such as Renderoc SP40 of Fosroc or Master Emaco S 348 of BASF or equivalent, to the prepared concrete area for thickness up to 50mm, after applying epoxy resin based bonding coat as per manufacturers specification, before the bonding agent becomes tack free, initially by hand and finally finishing the same with trowel carefully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns, slabs, beam etc. at all heights, where the thickness of application is less than 50 mm in patches as per specification. Item rate is inclusive of all material including the bond coat, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete and as directed by Engineer-in-charge and/or consultant. (Payment to be made in Sq.M for thickness up to 50mm of PMM for patch area repaired) | 87.26 | sqm | - | - |
| 1.004 | OD101001/2025-2026:Microconcrete Reinstatement for thickness more than 50mm for RCC members:-
Providing and laying of special repair material micro-concrete for reinstatement of members having thickness of repair more than 50mm and jacketing, using Single component, high strength, high flow cementitious micro-concrete having compressive strength minimum of M40 at 28 days such as MasterEmaco 346 or Renderoc RGL / RGS of Fosroc or equivalent, blended with washed saturated surface-dry (SSD), graded, low absorption, high density, aggregates of size 3mm to 10mm at 50% by weight of micro concrete (if thickness is 100mm or more) and water as per data sheet and pouring into the shuttering if required than use birds beak type form work using suitable arrangement or if required using pumping device for uniform flow of Microconcrete. The side shuttering can be removed after Minimum of 24 hours, preferably 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant. (Payment shall be made in Sq.M for thickness up to 100mm of Microconcrete of area repaired, ) including shuttering work (Only steel reinforcement shall be paid in other relevant items) | 8 | sqm | - | - |
| 1.005 | OD101000/2025-2026:Providing drainage spout with 63mm PVC pipe 100cm long including all cost conveyance and lobour charges etc. complete | 36 | metre | - | - |
| 2Painting of bridge proper and berm protection | |||||
| 2.001 | 2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm | 10 | each | - | - |
| 2.002 | OD100995/2025-2026:Removing damaged concrete:
Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm. | 21.02 | sqm | - | - |
| 2.003 | OD100996/2025-2026:Polymer Modified Mortar (Pre-Packed):
Providing and Applying single component, high strength, fibre reinforced, thixotropic cementitious patch repair mortar that achieves compressive strength minimum of 15 MPa at 1 day and 45 MPa at 28 days and capable of applying upto 50mm thick in single layer such as Renderoc SP40 of Fosroc or Master Emaco S 348 of BASF or equivalent, to the prepared concrete area for thickness up to 50mm, after applying epoxy resin based bonding coat as per manufacturers specification, before the bonding agent becomes tack free, initially by hand and finally finishing the same with trowel carefully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns, slabs, beam etc. at all heights, where the thickness of application is less than 50 mm in patches as per specification. Item rate is inclusive of all material including the bond coat, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete and as directed by Engineer-in-charge and/or consultant. (Payment to be made in Sq.M for thickness up to 50mm of PMM for patch area repaired) | 21.02 | sqm | - | - |
stage.html
html • 0.03 MB
finance_1514451.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.66 MB
BOQ_1514451.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .