Loading…
Loading…
Tender ID
Tender Value
₹49.9 L
EMD Value
₹49,900
Closing Date
17 Feb 2026, 4:00 pmClosed
Executive Engineer, MGVCL Nadiad City Division
ARC for Laying of underground 11 KVXLPE cables of any rating from 95 to 240 sq.mm including beneath road crossing as per specification / scope of work, terms and condition of tender including the liaison work with government authority as per attached schedule for Nadiad East Sub Division / other Sub Division under ND & Other scheme.
268779
MGVCL/NCD/UG/EAST/JAN-2026/04 DTD. 22.01.2026
Open
Power/Energy Projects/Products/Services
Works
Kheda
2 documents required · 2 mandatory
₹1,770
Yes
NADIAD
₹49,900
Yes
22 Jan 2026
22 Jan 2026
22 Jan 2026
17 Feb 2026
22 Jan 2026
4 Estimated cost in Rs. (in lakhs) Excluding GST 18% = 4987495/-
5 Earnest Money Deposit amount in Rs. Rs.49,900/-
Last Date of Bid Documents Downloading Date up to
Last Date for Online Bid submission up to 16.00 17.02.2026
hours(This is mandatory)
Date of opening of “Tender Fee and EMD” Online Bid 18.02.2026
Documents at 11.00 Hours. (If possible)
Date of on – line opening of Price bid,(if possible), at Preferably within 7 days
1 Year (Extendable for
11 Time Limit of Contract
another one Year)
AS PER THE NOTICE OF THE INVITATION OF TENDER (NEWS PAPER ADVERTISEMENT), THE
TENDER IS INVITED BY E-TENDERING (ON – LINE) SYSTEM, FOR WHICH FOLLOWING
CONDITIONS ARE MANDATORY OTHERWISE THETENDER / OFFER WILL BE OUTRIGHTLY
REJECTED AND NO ANY FURTHER COMMUNICATION IN THE MATTER WILL BE
[A]All the relevant documents as per tender are required to be submitted in ONLINE mode only.
Tender fee &EMD to be paid through RTGS only. In cases, where EMD need not to be paid, valid
exemption certificates duly notarized has to be uploaded. No physical document requires to be
submitted. Online payment receipt of tender fee & EMD/exemption certificate to be uploaded on
Preliminary Stage. This is mandatory.
1 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Documents submitted in online mode only will be considered for evaluation. No Documents are
submitted physically.
[B] Bidders are requested to submit price – bid (Schedule –B) in on-line (e-tendering form) only
and not to submit the price bid in physical form. This is mandatory. If price bid is submitted in
physical form, same will not be opened and only on-line submitted price bid will be considered for
[D] The Earnest Money Deposit and tender fee will be accepted only by RTGS / NEFT.
Tender without EMD and tender fee shall be rejected.
Any technical questions, information and clarifications that may be required pertaining to
this enquiry should be referred to Executive Engineer NADIAD CITY Division Office, MGVCL,
MGVCL reserves the right of reject any OR all tenders without assigning any reasons thereof.
Executive Engineer (O&M)
MGVCL, Nadiad City Division
Tender Documents in (PDF Format) which consists of:
(1) Tender Notice & General Instructions
(2) Pre Qualification Criteria / Eligibility Criteria for Technical Qualification
(3) Scope & Specification of Work and General Terms and conditions
(4) Commercial Terms and Conditions
(5) Schedule -A
(6) Schedule-B: Price Bid
(7) Drawing for erection of O/H & U/G network
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe
In case bidder needs any clarification or if training required for participating in online tender, they
can contact the following office:
(n) Procure Cell
(n) Code solutions-A division of GNFC Ltd., 403, GNFC Info tower, S.G. Road, Bodakdev
Ahmedabad – 380054 (Gujarat) Toll Free: 1-800-233-1010 (Ext. 501, 512,516, 517, 525)
Email: [email protected]
Other terms & conditions are as per tender documents
GENERAL INSTRUCTION:
ARC for Laying of underground 11 KVXLPE cables of any rating from 95 to
sq.mm including beneath road crossing as per specification / scope of work, terms
and condition of tender including the liaison work with government authority as
per attached schedule for Nadiad East Sub Division / other Sub Division under ND
& Other scheme..
First the “Online payment receipt of tender fee & EMD/exemption certificate will be
verified in Preliminary Stage of Tender. Tender Fee and E.M.D [i.e. (a) & (b) here under] are
found OK, the online Technical Bid documents will be considered for evaluation which may please be
2 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
noted. Otherwise bid / e-tender will not be considered for further evaluation & will be out rightly
rejected and no correspondence in this regard will be entertained.
The price bid of the bidder/s who are qualified in preliminary stage (i.e. Qualified for Tender Fee
and EMD documents as well as for technical bid documents) will only be opened.
Tender fee including GST (Non-refundable) as notified in the tender notice
should invariably paid by RTGS/NEFT/online payment and Receipt to be uploaded
on Preliminary Stage; otherwise bid shall be ignored out rightly.
(c) Bidder / contractor have to pay E.M.D. at a rate of 1 % of the total cost of the
Tender. It should be paid by RTGS/NEFT/online and payment receipt to be
upload on Preliminary Stage.
You can pay tender fee and EMD by RTGS/NEFT/online on below mentioned details.Details of
RTGS/NEFT are shown below.
-: Performa of R.T.G.S. Details:-
Sr. No. Particulars Requisite Details
1. Name of Bank BANK OF BARODA
2. Name of Branch MISSION ROAD NADIAD
5. IFSC Code BARB0DBMISS
6. Name of Account Madhya Gujarat Vij Company Limited
7. Type of Account CURRENT
No Interest will be allowed / paid against payment of E.M.D.
All the Bidders shall be required to pay EMD, except those who are exempted as per
Industries & Mines Department, GoG New Purchase Policy Resolution No.:
SPO/1095/2636(97)/CH dated 23.09.1997 for Small and Micro Scale Industries.
The Micro and Small Scale Industrial (Service) Units registered under Small Scale Industries of
Gujarat State and holding subsequent registration with CSPO/NSIC/DGS&D, Registration
Certificates for the item under Tender will be eligible for exemption from payment of EMD
on submission of duly notarized copies of their UDYAM REGISTRATION CERTIFICATE only
out of SSI/MSME Part-II/Udhyog Aadhar/ Udyam Registration Certificate shall remain valid
from 1st April 2022 OR from the date as amended in future with time to time
Notification issued from Ministry of Micro, Small & Medium Enterprises (MSME), Govt of
lndia& CSPO/NSIC/DGS&D Registration Certificates in EMD Cover.
"In case of UDYAM REGISTRATION CERTIFICATE / Udyog Aadhar Memorandum, the certificate
should indicate the service of related group of item(i.e. Section M. Division 71 or 74, Group
711 or 749 having NIC 5-digit code of 71100(Architectural and engineering activities and
related technical consultancy)or 74909(Other professional, scientific and technical
3 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
activities n.e.c.) '[It is to be noted thatout of SSI/MSME Part- II/UdhyogAadhar/Udyam
Registration Certificate-only UDYAM REGISTRATION CERTIFICATE shall remain validfrom
1st April 2022 OR from the date as amended in future by the with time to time Notification
issued from Ministry of Micro, Small & Medium Enterprises (MSME), Govt of India]"
No relaxation shall be given to the bidders having valid SSI/NSIC certificate of Outside
Gujarat State. No relaxation shall be given to the bidders having only one registration
number from Government of Gujarat but no subsequent registration with NSIC
registration certificates for the item under tender.
If, Small, Cottage & Tiny industrial units registered under small scale industries of Govt.
of Gujarat and also holding subsequent registration with NSIC/CSPO/DGS&D registration
certificates submit SSI and NSIC/CSPO/DGS&D registration certificates for the item / works
/ services under tender subject against EMD, then they should be authenticated from
notary. NSIC/CSPO/DGS&D certificate more than 03 years old will not be considered and the
validity of the same should cover at least the validity period of the tender and thereafter it
has to be renewed and submitted immediately.
All the “SSI” and “NSIC/CSPO/DGS&D” registration certificates Documents furnished along
with the tender submitted by the bidders having Small, Cottage & Tiny industrial units
registered under small scale industries of Govt. of Gujarat should have clear validity as per
the tender and should invariably be renewed as per the norms of “SSI” and
“NSIC/CSPO/DGS&D” registration certificates Otherwise they shall have to pay E.M.D. and
no exemption will be granted.
Tenders submitted without Earnest Money Deposit by the contractor/firms, who are not
eligible for any exemption, will be rejected without entering in to further correspondence in
this regard and no reference will also be made. Tender submitted without EMD shall be
rejected out rightly.
The SSI & NSIC certificate should indicate the name of works / services of tender.
Provisional Registration Certificates are NOT allowed.
EMD will be released only on payment of security deposit in respect of successful bidder
whereas the same will be refunded to others on finalization of the tender / placement of
order to successful bidder.
Wherever in the tender, the rate for security deposit and performance guarantee isStipulated
as 10% & 5%, the same shall be relaxed to 6% & 3% respectively for Small, Cottage and Tiny
works units registered with Govt. of Gujarat (DIC) and also holding Subsequent registration
with NSIC/CSPO/DGS&D registration certificates for the Work/services and complying the
conditions as above.
(1 ) Technical Bid Submission:
The following documents to be submitted in online form only with Technical Bid. In case of
non-submission of Technical Bid documents in online form, bid will not be opened and bid will
be rejected/ignored out rightly.
(1) Tender notice & General Instructions
(2) Documents mentioned in Pre-qualification / eligible criteria (List given under)
(3) Scope & Specification of Work and General Terms and conditions
(4) Commercial Terms and Conditions
NOTE: Each document / paper of above (1) to (4) shall be submitted / uploaded in online
form only otherwise bid will be rejected out rightly. Physically submitted documents shall
4 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
not be considered for evaluation. Bid Documents should be upload in Preliminary Stage
Seal & Signature Executive Engineer (O&M)
Of Contractor MGVCL Nadiad City Division.
5 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
1. PRE QUALIFICATION CRITERIA / ELIGIBLE CRITERIA FOR TECHNICALQUALIFICATION[TO BE
SUBMITTED IN ONLINE FORM]
The bidder must submit the following all details / all documents (as mentioned hereunder)
with Technical bid through online mode only. It is mandatory. Non Submission of any
details / any document as per requirement in online form, the bid will be rejected out
rightly. All the documents shall be uploaded in preliminary stage. Physically submitted
documents shall not be considered for evaluation.
1. for erection & maintenance of Overhead network:
A. For experienced / Regular Contractor:
Contractor must have experience of erection of overhead HT/LT lines & Transformers along
with satisfactory work completion certificate regarding execution of work from order issuing
authority of any DISCOM ofGUVNL or any Govt. / private DISCOM of any state of India, any
electricity utility/agencies who have worked under NHAI, agencies who have worked
under Railway dept., agencies who have worked under option-2 for HT/EHT connection,
substation work for overhead line work of EHT, HT, LT & TC.
The documents for considering the experience such as Work order copies, experience
certificate indicating order number and value has to be submitted. However, the work
executed through open/ advertised tender shall only be considered. The work done through
limited tender shall not be considered for experience.
B. for Un-experienced /New contractor:
Bidder/contractor shall be considered as NEW contractor if,
(i) Contractor not having experience of erection of overhead network.
(ii) Contractor having an experience with Disco of GUVNL, any Govt/PVT DISCOM of any
state of India, any electricity utility / agencies who have worked under NHAI,
agencies who have worked under Railway Dept., agencies who have worked under
option-2 for HT/EHT connection, substation work for overhead line work of EHT,
HT, LT & TC but not fulfilling the criteria no.3 of prequalification criteria.
Both contractors mentioned in above sr no.(i) & (ii) can participate in tender as a new
contractor for erection of overhead network provided they fulfill other eligibility criteria
at sr no.5 to 9 of existing SBD.
Note: For sr no. (i) contractor will have to submit electrical contractor’s license of any
state Govt. in their own name/name of firm.
The fresh contractor participating for the first time shall be considered as NEW-1
contractor. The contractor participating second time shall be considered as NEW-2
contractor after successfully completion of first contract as NEW-1 contactor with
submission of duly supported documents thereof.
6 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
The quantity allocation among NEW-1 & NEW-2 contractor will be mentioned in
commercial Terms & Condition point no, 7B(a).
2. For erection & maintenance of HT/LT underground network:
2(A) Bidder/contractor shall be consider as regular contractor if
(i) Contractor must have experience of Laying of HT/EHT/LT underground Power cable
along with satisfactory work completion certificate regarding execution of work from
order issuing authority of DISCOM of GUVNL, any Govt./PVT DISCOM of any state of
India, anyelectricity utility / agencies who have worked under NHAI, agencies who
have worked under Railway Dept., agencies who have worked under option-2 for
HT/EHT connection, substation work for Laying underground HT/EHT cable ONLY.
(ii) Contractor having experience of laying of any type of underground pipe line
(GAS/OIL/Water/ sewage etc) with satisfactory work completion certificate regarding
execution of work of laying pipe line form order issuing Govt/PVT authority.
Note: For sr no. (ii) Contractor will have to submit electrical contractor’s license of any
state Govt in their own name/ name of firm.
Qty. Allocation shall be as per commercial terms & condition point no. 7C(a).
However, Contractor has to offer tender qty. in his bid and such bidders must submit
certificate of work experience issued by Engineer in charge showing length of calbe/pipe
line in KM along with order copy form DISCOM of GUVNL, any Govt./PVT DISCOM of any
state of India, anyelectricity utility / agencies who have worked under NHAI, agencies
who have worked under Railway Dept., agencies who have worked under option-2 for
HT/EHT connection, substation work/ Govt./PVT authorities ofGAS/OIL/Water/ sewage
etc subject to verification by MGVCL.
2(B) Bidder/contractor shall be consider as NEW contractor if
(i) New contractor not possessing any experience of laying of underground HT/EHT/LT
(ii) Experience of laying of any type of underground pipe line (GAS/Oil/Water/Sewage etc)
not fulfilling the criteria no.3 of prequalification criteria.
(iii) Experience of laying of HT/EHT/LT cable with DISCOM of GUVNL, any Govtany
Govt./PVT DISCOM of any state of India, any electricity utility / agencies who have worked
under NHAI, agencies who have worked under Railway Dept., agencies who have worked
under option-2 for HT/EHT connection, Substation work and not fulfilling the criteria no.3
of prequalification criteria.
For all contractor/bidders mentioned under Sr no.(i) to (iii) shall participate as new
contractor provided they fulfill other eligibility criteria at sr no 5 to 9 of existing SBD.
NOTE: For bidders/contractors mentioned in sr no. (i) & (ii) above will have to submit
electrical contractor’s license of any state Govt. in their own name/ name of firm.
7 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
The fresh contractor participating for the first time shall be considered as NEW-1
contractor. The contractor participating second time shall be considered as NEW-2
contractor only after successful completion of work as NEW-1 contractor. After successfully
completion of second contract as NEW-2 contractor with submission of duly supported
documents thereof the NEW-2 contractor to be considered as Regular contractor by fulfilling
the criteria as per prequalification criteria point no.3 of existing SBD.
QTY. allocation shall be as per commercial terms & condition point no.7C(a).
However, Contractor has to offer tender qty. in his bid and such bidders must submit
certificate of work experience issued by Engineer in charge showing length of calbe/pipe
line in KM along with order copy form DISCOM of GUVNL, any Govt./PVT DISCOM of any
state of India, any electricity utility / agencies who have worked under NHAI, agencies
who have worked under Railway Dept., agencies who have worked under option-2 for
HT/EHT connection, substation work/ Govt./PVT authorities ofGAS/OIL/Water/ sewage
etc subject to verification by MGVCL.
3. Regular contractor must submit Experience of having successfully completed similar
works through open/advertised tender anywhere in India only during last 7 years ending
last day of month previous to the one in which tenders are invited should be either of
the following:-
a. Three similar completed works costing not less than the amount equal to 40% of the
estimated cost.
b. Two similar completed works costing not less than the amount equal to 50% of the
estimated cost.
c. One similar completed works costing not less than the amount equal to 80% of the
estimated cost.
The work done through limited tender shall not be considered for experience criteria.
Definition of “Similar work” for overhead network:
For purpose of satisfaction of Technical requirement, similar works refers to:
1. DISCOM of GUVNL or any GOVT/PVT DISCOM of any state of India.
2. Any electricity utility
3. Agencies have worked under NHAI (National highway authorities of India)
4. Agencies work under Railway Department.
5. Agencies worked under option-2 for HT/EHT connection, substation work
In above sectors, type of works undertaken should be of the nature of one or more of the
4. Distribution transformers.
8 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Definition of “Similar work” for underground network:
For purpose of satisfaction of Technical requirement, similar works refers to:
1. DISCOM of GUVNL or any GOVT/PVT DISCOM of any state of India.
2. Any electricity utility
3. Agencies have worked under NHAI (National highway authorities of India)
4. Telecom License holder
5. Agencies work under Railway Department.
6. Agencies worked under option-2 for HT/EHT connection, substation work
7. Agencies worked with any Govt/Pvt. Authorities related to laying of any type of
Underground pipe line (GAS/Oil/Water/Sewage etc.)
In above sectors, type of works undertaken should be of the nature of one or more of the
1. Laying of EHT Underground cable.
2. Laying of HT Underground cable.
3. Laying of LT Underground cable.
4. Laying of any type of underground pipe line. (GAS/Oil/Water/Sewage etc)
4. Average Annual financial turnover during last 3 years, ending 31st March of the previous
financial year, should be at least 30% of the estimated cost. The above Average Annual
financial turnover be supported by certificate of Chartered Accountant.
5. Copy of valid E. P. F. Registration in the name of bidder.
6. Copy of valid GST Registration Certificate in the name of bidder
7. Copy of valid PAN card in the name of bidder
8. Copy of valid Labour Insurance Policy in the name of bidder
9. Latest bank solvency certificate from any nationalized bank for a sum of Minimum 20%
9 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Schedule showing approximately the materials to be supplied from the Departmental Store
for work entrusted to any contractor for execution and the rate at which they are charged
Sr. Particular Rate at Which Delivery Place
No Material will be
1 The materials such a fabricated Free of Cost Divisional Store
items, Conductors, Guy wires,
GI Wires,Transformers, Dist.
Box, insulators, steel poles
Except PSC etc. earthing plate.
2 Tools & Tackles & Paints For To be procured by
Painting of Poles & Fabrication. Contractor Rates are
3 Sand, Gravel, water etc To be procured by
required for concreting & Contractor Rates are
muffing. inclusive.
4 MS Bolts and nuts with washers To be procured by
of required sizes Contractor. Rates are
5 Salt and coal for earthing. To be procured by
Contractor Rates are
6 GI Wire SWG: 8 & rigid PVC Free of Cost Divisional Store
pipe of 20mm dia meter.
Note: The Nut Bolts Procured by Contractors should be Standard & ISI Marked and should be
approved from Engineer In charge.
10 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Scope of work & General Terms & Conditions
(To be submitted in Technical Bid in ONLINE form & it is mandatory)
For every item in the Price Bid Schedule –B, sub-order will be issued as and when required
for any sub division office under MGVCL Nadiad CityDivision Office.
The scope of work of extension of: As per Annexure attached herewith and
as per Schedule-B., condition of contract, technical specification therein and
construction drawing released from time to time as per requirement and as
per engineer in charge’s directions . The work covered by the specifications
shall include furnishing all materials including cement, labour supervision,
plants and equipments and tools, tackles etc., as may be required for the
execution and satisfactory completion of the work.
You shall be required to perform the work accordance with the final
construction and /or additional and general drawings, specification etc., and
in a manner acceptable to EIC (Engineer in charge) who shall have power
to reject any work or materials which in his judgment is not in fully
conformity therewith. You should not make any alteration in the drawings
without, prior written approval of EIC. In case of any conflict regarding
interpretation of meaning of the drawings or specifications, the EIC shall
interpret such meaning which will be final and binding to you. In no case,
work shall be preceded with any uncertainty. All doubts must be clarified
with the EIC at once.
You shall rectify & make good all defective work during the
guaranteeperiod as mention in the tender from the date of successful
completion of the work.
All other work not specifically mentioned above/in Schedule-B but indicated
in the drawings, which are necessary for the satisfactory completion of the
works as a whole.
Erection & Maintenance work of HT , LT & TC shall be executed as per MGVCL
standard terms and conditions / REC Construction Standard, MGVCL U/G cable
drawing as per IS: 1255 for U/G cable laying under the supervision of Dy./ Jr.
Engineer of concerned Sub-Division / Division which also includes following:
1. Work shall be required to be executed under any Sub-Division of Nadiad
CityDIVISION Office under any scheme.
2. Any amount of sub-order for any Sub-Division will be issued which shall be
acceptable to the contractor and accordingly work shall be done within the time
frame as mentioned in sub work order.
11 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
3. Execution Permission from all local body/Govt./pvt./concerned departments will
be in the scope of contractor.
4. No damages shall be done to any existing utilities having already executed / laid
underground equipments / pipes / cables etc. i.e. Water/ Telephone/
OFC/Gas/Drainage/TV Channel &InternetCable of other departments otherwise
necessary claim charges shall be borne and settled by contractor.
5. All required materials like Conductors Drums, Transformers & fabrication
materials from MGVCL will be issued from divisional stores of MGVCL for which no
extra payment towards transportation will be made to the contractor.
6. Necessary shutdown for connection/jumpering of Newly Erected lines with
existing network will be provided as per availability or convenience of the MGVCL
which shall be acceptable to the contractor & contractor shall try to complete the
work in minimum time.
7. All erection shall be done properly in good alignment with details marked on it
8. Work may be required to be executed in any 66/132/220KV Sub-Stations also.
9. Contractor must get the requisition, three days well in advance before they
require the material on site, from Engineer-in-charge.
10. Utilization of material procured by contractor must of ISI mark / standard when
no ISI / BIS certification available & must be got examined from the Engineer In
charge before utilization.
11. Length quantity and distance mentioned may vary site to site. The scope of work
at site in all respects as per Schedule -B / Sub work order.
12. All safety precautions must be taken while working by your personnel /
supervisor/ any staff / labors, to avoid any accident at site.
13. Any claim arising due to accident at site will be borne and settled by contractor.
No claim will be entertained by MGVCL.
14. Contractor shall deploy qualified Supervisors at site during execution of work at
site for day-today coordination with the MGVCL Engineer’s.
15. Only experience labors shall be deployed by contractor at site. Copy of “Labour
license” issued by the licensing authority under the provision Contract Labour
(Regulation and Abolition) Act, 1970 will be submitted if applicable.
16. Required machinery shall be used for execution of work.
17. As per RE Standards and safety norms generally 30-40mtr span should be kept on
HT/LT line in such a way as to have minimum sag.
17 All road crossings must be provided with guarding arrangement and minimum
feet clearance must be kept between conductor and road level
12 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
18 D.E. /J.E of MGVCL will inspect the work at site
19 Work Progress report / information should be submitted timely.
20 No excess work shall be carried out without prior approval of the competent
21 Delay on account of getting permission from any department no extra charges
will be paid by MGVCL.
22 For Live Electric line crossing & on the line work, work should be carried-out
after Power Cut-off and both side earthing of line & under supervision of local
S/Dn staff only & follow all safety measures.
23 In case of any ambiguity, discrepancy or dispute the decision of Supdt. Engineer
(O &M), MGVCL, Nadiad City circle, Nadiad will be final and shall be binding to
24 The payment to the contractor through R.A. bill will be to the extent of 100% of
the value of the work done provided the contractor furnishes the material
account in respect of the previous R.A. Bill before the next R.A. Bill is paid. If
this is not complying by the contractor, the payment through R.A. Bill shall be
made only to extent of 80% of the total value of the work done. The amount so
with held will be released on furnishing by the contractor the materials account
of the relative R.A. bill.
25 Far annual contracts, the contractor will be given separate order for each work
on the basis of the rate contract order. The date of commencement and date of
completion of work will stipulated in the order which the contractor has to agree
otherwise the penalty will be leviable for late completion of work as per
company’s standard condition.
26 Any other items not specifically mentioned in the specifications but which are
required for installation, testing, commissioning and satisfactory operation of the
system as per Indian standards / IE Rules / IE Act and local authority regulations
are deemed to be included in the scope of the specification and no deviation in
this regard shall be accepted.
27 The Contractor shall also be responsible for the overall co-ordination with
internal / external agencies, project management, training of Company’s
manpower, loading,unloading, handling, moving to final destination for
successful erection, testing and commissioning of the 11 KV HT/LT Line, TC &
28 Contractor will have to provide complete technical supervision during installation
of Lines / cables, right from transport up to testing and commissioning. The
contractor shall arrange for the services of fully qualified and competent
supervisors / engineers for monitoring the whole job. Competent and well versed
Semi skill laborers shall be deployed for execution.
13 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
29 Contractor shall charge any commissioned work / erection work in
presence of Engineer-In-Charge or MGVCL representative.Any
consequences / damaged caused by charging such network in absence of
MGVCL representative shall be recovered from the contractor.
SPECIFICATION AND GENERAL CONDITION FOR ERECTION OF
H.T. / L.T. LINE & LAYING OF UG CABLE
The work entrusted as per the contract should be speedily executed in accordance
with the best practice & should be present neat appearance when completed. All the
works have to be carried out according to the drawing and specifications and as per
the instructions of Engineer-in-charge. There should not be any damage to Company’s
material or to other’s property during transport or erection otherwise damages will
be at the cost of contractor & decision of the Ex.Engr. will be final.
Before commencing erection of lines the contractor will provide with the pole
schedule and layout map of the area, which will give one of the location marked, in
the layout map. The pole, guy and earthing locations will be shown by Engineer-in-
charge. Other drawings referred to the pole schedule will be available for
consultation with the Company’s staff at the site or at the S/Dn, Office. Cutting of
tree branches which come in the way of the line will have to be arranged by the
contractor at no extra cost.
Marshy or water logged locations must be avoided as far as possible. If it becomes
inevitable to locate poles at such point, special precautions about foundations will
have to be taken and work carried out as per instructions of the Engineer-in-charge
by the contractor at the tendered rate.
The spans shall be as specified in the pole schedule and the between the power
conductors and neutral shall be as shown in approved drawing.
1) SUPPLY OF MATERIAL:
(a) All material such as rails, RS joints, or other poles {except PSC} fabricated
material, All aluminum alloy conductor, insulators, Guy wire, etc. required
for erections will be supplied at MGVCL’s store at Nadiad. PSC poles for line
supports will be transported and stacked by the Company’s along road side for
HT/LT line and at one place near the site of work within a range of 5kms.
(b) The line supports may be Rail/Girder, PSC or any other type and be 8 Mtr to
13 Mtr in length and weight 200 to 650 Kgs. The conductor will be different
sizes of all aluminum alloys& different sizes of LT AB/PVC& HT AB Cables. The
conductor /cable will be supplied in coils or in drums as per standard packing
received from suppliers. The rolls/ Drums should be returned to the Store and
14 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
stacked at the directed place. For damaged or lost empty crates/drums of
conductor recovery @ applicable scrap rates for each will be affected. Anti-
climbing device like GI barbed wire & Danger Board should be supplied by the
contractor. Lugs will be supplied by the Company.
2) POLE ERECTION:
(a) The work includes carting / transferring of supports particularly PSC poles
from the stacking place, to the site of actual work excavation of pit, fixing of
top insulator fitting, cross arms, clamps numbering etc. complete inclusive of
painting, fixing of danger board caution plates and fitting anti-climbing
devices for double or four, pole structures, Railway or River crossing
ortrans- former structures etc. The work further includes fixing cross
arms packing cross bracing etc., mounting of AB switch DO or HG type fuse
units. Poles must not be erected along the edge of cutting or embankments
or where the soil is liable to be washed away, unless, special precautions are
taken to ensure durable foundation when setting the pole. The pit shall be of
ample size to allow easy entrance of the pole and base plate without any
damage to it. After pole is erected vertically the pit is to be refilled with the
excavated earth and properly rammed. The erection, cost, of single or double
pole structures, stay sets and pipe or plate type earthing is inclusive of
excavation of pit refilling of excavated earth and cost of coke & salt in
earthing arrangement as specified. All the poles must be in plumb, fabrication
fitting on pole must be tightas per REC Standard.
3) PAINTING AND NUMBERING:
RAIL Poles, RSJ, Steel tubular poles or all the, steel mounting shall be, given
one coat of brandedmanufacturer’sred oxide paint and two coats of branded
manufacturer’saluminum paint. There should be sufficient interval between every
coat, of paint. The bolts and nuts shall be dipped in anti-corrosive liquid before
insertion, and all over-lapping surface of steel should be given a fine coat, of red
oxide paint before bolting. For the rails and RSJ/Steel tubular poles the lower portion
up to three feet above ground level shall be cleared of rust. Where concreting is
not to be done, this ground surfaces should be given a base coat of red oxide and
additional coat of black bitumen paint which should extend up to 3ft, above ground
level of muffing before inserting in ground. The rest of the surface of the rails of
RSJ/Tubular pole shall be cleaned of all rust and painted with one coat of red oxide
and two finishing coats of approved aluminum paint. The paint which should be ISI
marked should be got approved by the Engineer-in-charge before using on works and
will have to be arranged by the tenderer, as painting is included in the offer. Every
pole after erections shall be numbered in bold black figures both in English and
Gujarati at a height of about 8ft. from the ground level as per instruction of
Engineer-in-charge. PSC poles need not be painted but they should be properly
cleaned and fabrications on PSC need be only painted as specified above.
4) CONCRETING/MUFFING:
15 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
The proportion of concrete mixture and the quality of the sand metal should as
a)Cement concrete proportion for concreting of Rail/RSJ/Tubular steel poles should
be cement one part, sand three parts 1 ½% “ metal six parts{1:3:6}
Dimension of Concreting:Providing cement concrete foundation for above poles of
size is 0.8 mtr. x 0.6 mtr. x 2.15 mtr. deep with 1:3:6 cement concrete ratio with
duly plastered plinth. Muffing from ground may at height of 12” dia x 24” total height
{12” below 12” above ground level} or as per instruction of Engineer-in-charge. The
plastering should be done with approved quality cement with proper curing etc.
complete. The work should be carried out as per the instructions of the Engineer.
b) The sand shall be clean, grippy and composed of hard, strong & durable grains, it
shall be free from-clay or organic matter. If there is any trace of earthy matter, the
sand must be washed, before using sand for concreting work it should be got
approved from the Engineer-in-charge.
c) Metal should be hard and durable stone, to pass through a mesh of 1 ½ as far as
possible. All metal must be perfectly clean, being washed, necessary and free from
any Sulphur. Size of metal must be got approved from the Engineer-in-charge.
d)Unless otherwise specified the concrete shall be mixed in the above proportions
and should be thoroughly mixed at least three times in a dry state before water is
added, and finally wet mixture be used. All concrete must be mixed on a water tight
platform. In vessel any case, finished work, must be absolutely true inline and level
and finished-off smooth. One finishing coat of cement paste should be applied on
outer surface of the muffing. The concrete block must be kept wet continuously for a
period of seven days.
e) If the Engineer-in-charge of the works or the. Supervisors, finds that cement
concrete is not of the quality and as specified, the same will be rejected.
f) The contractor should procure metal, and sand himself as specified above. Only
steel poles are to be muffed and the size of muffing far steel poles should be
12” dia x 24” total height {12” below 12” above ground level} or as per instruction of
Engineer-in-charge.
5) STRINGING OF CONDUCTOR:
Stringing of standard All Al. Alloy conductor include the erection of necessary HT &
LT strain and pin insulators, jumpering& binding wire, jointing etc. The rate quoted,
should be per conductor route kilometer inclusive of the above. Appropriate, tools
should be used and proper scientific methods are to be applied to protect against
cuts, scratches or kinks, He should particularly follow the instructions of Engineer-in-
charge while making jumper, joints and bindings. While executing this work
equipments& tools like turn table or draw vice etc, should be arranged by the
contractor. For stringing of All aluminum alloy conductor, aluminum or wooden pulley
must be used for supporting contact on poles. Generally 30-40 meter span should be
kept on HT/LT line.
16 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
6) ERECTION OF STAY SET:
The erection of stay set may be completed with stay clamp, binding of GI stay wire at
either end turn buckle, anchor plate with rod. The binding of stay wire for guy
insulator at both the ends should be done properly. The stay shall be erected suitably
for local conditions. The rate-should be quoted for erection of complete set inclusive
of excavation of pit and refilling of earth and painting. Stay Rod pit must be as per
The earthing device shall be of the coil type or pipe type or plate type as indicated in
the pole schedule. The work of earthing must be carried out as per instructions of
Engineer-in-charge and at the places selected by the field Engineer. The coke or
charcoal powder and salt will have to be procured by the contractor should
preferably use earth augur excavation of earth pit. The contractor should satisfy
himself as well as to supervisor for satisfactory earthing by carrying out test using
earth tester. All earthing is to be covered up to 2 mtr from ground-level by earthing
pipes, the earthing to be provided in a separate pit i.e. other than that of pole. All
conductors, earth wire and stay sets must be tight.
Guard cradle will be provided below HT line/LT line. The guarding must also be
provided where railway trucks, telephone line, and licensees HT, LT lines are passing
below Company’s HT lines. The guarding for the above comprises of GI main bearer
wire GI lacing wire and GI binding wire, etc, complete. The work has to be carried
out as per instruction of Engineer-in-charge. The cradle guard consists of 2 Nos., of
SWG No.8 GI wire for binding, guarding for railway crossing is to be carried out as per
instruction of the Engineer-in-charge. All road crossings must be provided with
guarding arrangement and minimum 22 feet clearance must be kept between
conductor and road level.
9) ERECTION OF TRANSFORMER SUBSTATION:
Transformer sub-station will be of outdoor type & will consist of the following
a) 05 to 500KVA transformer complete with its accessories.
b) One set of HT distribution type lightning arrestors.
c) One distribution box with necessary wiring.
d) The contractor should lay the cable as per instruction of Engineer-in-charge & use
crimping lugs for termination of cable as per requirement and the crimping tools to
be arranged by contractor.
e) One set of DTR meter along with meter box for accounting of energy.
Pipe earthing should be provided on either side of the transformer center, providing earth
wire for lightning arrestor, transformer body and Dist. Box and two separate wires of
distinct earthing for neutral with T/C SWG-8 copper or GI Wires. The rate should be quoted
inclusive of painting of structure & transportation from the Company’s Store to the site of
erection.Separate earthing pit should be provided for neutral earthing.
10) LAYING OF SINGLE PHASE SERVICE LINES AND THREE PHASE LINES.
This will consists of lying of over head service line with G.I. bearer wire, pipe fixing or fixing
of meter, MMB, earthing etc.
17 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
1 The twin or single core wire will have to be utilized with G.I. Wire No.8 or 10 and reel
insulator would be provided at equal intervals & at both side of GI wire Egg insulator shall
2. There should not be any joints in the service line. Meter should be earthedproperly.
3. Conduit PVC pipe should be fixed in decent way in the premises of the consumer and
damage occurring to the promises due to fixation of pipe of taking the service line into
premises shall be borne by the contractor.
4. In case of 1 PH / 3 Ph service line would have to be laid up to meteringpoint only.
The metal meter box should be fixed up as per directive of Engineer-In-Charge& provided
11) Laying of Under Ground Cable:
1. All cables before lay shall be tested with megger. The cable cores shall be
tested for continuity absence of cross phasing, insulation resistance between
conductor to earth/sheath/armor and insulation resistance between conductors.
2. Length quantity and distance mentioned may vary site to site. The scope of
work at site in all respects as per Schedule -B / Sub work order.
3. Cables shall be charged by Contractor satisfactorily after completion of work &
testing in consultation with MGVCL. The completion of work shall be recognized only
after charging of cable.
4. For Cable kit Make (Brand) you have to submit C.P.R.I./ERDA Lab Type test
certificate not older than Seven years and as per IS 13573:2011.
5. The sealing of cable ends during the storage, execution till jointing work is
completed, shall be in the scope of Contractor. In no circumstances, the cable ends
shall be kept open. The damages done because of water / moisture ingress or
penetration in the cables / conductors during execution shall be recovered from the
Contractor. It will be the responsibility of the Contractor to make them good or
replace free of cost without affecting the completion schedules.
6. The cables shall be completely surrounded by a layer of sand having low thermal
Resistivity (selected sand) about 300 mm throughout the width of cable Trench as per
Drawings of MGVCL.
7. The new cable end seals shall be applied before starting of laying cable and shall
be checked after laying and if found damaged shall immediately be resealed.
Sufficient number of heat shrinkable cable end sealing caps shall be stocked at site
stores for testing and jointing work. Cable end caps shall be in the scope of the
8. The Contractor shall have total responsibility for the entire materials stored,
loose, Semi assembled and/or erected by him at site in his custody. The Contractor
shall make suitable security arrangements at his own cost to ensure the protection of
all materials, equipment and works from theft, fire pilferage and any other damages
18 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
and loss. It shall be the responsibility of the contractor to arrange for security till
the works are finally taken over by the Company.
12. TRENCHING:-
The trench excavation and filling–in shall be so executed that all walls, roads,
sewers, drains, pipes, cables, structures, places and things shall be reasonably
secured against risk of injury and shall be carried out to the satisfaction of the
authorities concerned. However, if any, damages to existing services made,
Contractor shall arrange and pay for any necessary repair, to make good the
The excavated material shall be properly stored to avoid obstruction to public
and traffic movement. Where, owing to traffic or for reasons of safety the excavated
material shall be removed from the site and returned for refilling the trench on
completion of lying. The contractor at his own cost shall disposeoff surplus material.
The bottom of the excavated trench should be leveled flat and free from any
object, which would damage the cables. Any gradient encountered shall be gradual.
When the excavation of the trenches has been accurately executed, the
contractor shall inform engineer in-charge for approval. Lying of cables shall not be
started until engineer in-charge approves the trench.
13. REINSTATEMENT:-
A pre-warning PVC yellow tape 8-Inch wide and 300 microns thick (LDPE) shall
also be laid as per the Drawing. The warning tape shall be printed in RED letter (IN
ENGLISH AS WELL AS GUJARATI) as “CAUTION: 11000 VOLTS MGVCL CABLE” and to be
placed at about 300 mm To 450 mm depth from ground level along the route of
14. CABLE ROUTE/JOINT MARKER/IDENTIFICATION:-
Permanent means of indicating the position of joints and cable route shall be
Supplied and lay as per Schedule-B. Pre –cast RCC markers shall be placed as per
the field requirement, if the route passes through open fields, markers should be
conspicuously visible and above ground surface. The marker should incorporate
the following relevant information:
1) The name of the owner – MGVCL.
2) Voltage – 11 KV Cable
3) Distance of cable from the marker.
The interval should be maximum 50 meters between two markers. It should be put
at bends, curves, road crossing, etc. of cable route.
15. TESTS AFTER INSTALLATION:-
Pre-commissioning tests on site, to be undertaken by the successful Tenderer shall
include the following.
a) Insulation Resistance of each cable drum length after laying and beforejointing.
b) Before laying of cable, tests for detection of damage to outer sheath, if any.
c) After laying each cable with end termination shall withstand a voltageof 10KV
DCfor one minute between each phase to phase & phase to cable earth.
d) Continuity & Phase confirmation.
19 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
16. JOINTING AND TERMINATION OF CABLES:
The joint bay should be of sufficient dimensions to allow jointers to work with as
much freedom of movement and comfort as possible.
An enclosure or suitable protection cover shall be used in all
circumstanceswherever jointing work is carried out in the open irrespective of the
weather conditions. The joint shall be in dust free, moisture free and clean
If the cable ends seals or cable ends are found to have suffered damage the cable
should not be jointed, without tests and rectification.
Sufficient length of spare cable shall be left in the ground, for future needs.
The cable shall be fixed properly using non-metallic clamps to be supplied by
Contractor through GI pipe dia 4”.
All the pre commissioning tests shall be carried out by the Bidder If any
abnormality found during testing; bidder will have to rectify the same at no extra
17. List of Sub Division under Nadiad City Division:
(1)Nadiad East, (2) Nadiad West, (3) Nadiad Rural, (4) Vaso, (5) Chaklasi (6) Piplag
Seal & Signature Executive Engineer (O&M)
of Contractor MGVCL Nadiad City Division.
20 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
MADHYA GUJARAT VIJ COMPANY LIMITED
NADIAD CITY DIVISION OFFICE, NR. HINDU ANATH AASHRAM, NADIAD – 387
Ph. No-0268-2532906,Web Site : www.mgvcl.com E-mail : [email protected]
Fax No : 0268 -
COMMERCIAL TERMS AND CONDITIONS(For Works/Service)
Tender fee (Non-refundable) as notified in the tender notice should be paid Tender fee &EMD to
be paid through RTGS only. In cases, where EMD need not to be paid, valid exemption
certificates duly notarized has to be uploaded. No physical document requires to be submitted.
Online payment receipt of tender fee & EMD/exemption certificate to be uploaded on
Preliminary Stage. This is mandatory.
2 EARNEST MONEY DEPOSIT: (E.M.D.)
Bidder / contractor have to pay E.M.D. at a rate of 1 % of the total cost of the Tender. It
should be paid by RTGS/NEFT/online and payment receipt to be upload on
Preliminary Stage.
All the Bidders shall be required to pay EMD, except those who are exempted as per Industries &
Mines Department, GoG New Purchase Policy Resolution No.: SPO/1095/2636(97)/CH dated
23.09.1997 for Small and Micro Scale Industries.
In cases, where EMD need not to be paid, valid exemption Certificates duly notarized has to be
produced / attached in EMD Cover in physical form as per the Tender Terms and Conditions.
The Micro and Small Scale Industrial (Service) Units registered under Small Scale Industries of
Gujarat State and holding subsequent registration with CSPO/NSIC/DGS&D, Registration
Certificates for the item under Tender will be eligible for exemption from payment of EMD on
submission of duly notarized copies of their UDYAM REGISTRATION CERTIFICATE only
out of SSI/MSME Part-II/UdhyogAadhar/Udyam Registration Certificate shall remain valid from
1st April 2022 OR from the date as amended in future with time to time Notification issued
from Ministry of Micro, Small & Medium Enterprises (MSME), Govt of lndia&
CSPO/NSIC/DGS&D Registration Certificates inEMD Cover.
"In case of UDYAM REGISTRATION CERTIFICATE / UdyogAadhar Memorandum, the certificate
should indicate the service of related group of item(i.e. Section M. Division 71 or 74, Group
or 749 having NIC 5-digit code of 71100(Architectural and engineering activities and related
technical consultancy) or 74909(Other professional, scientific and technical activities n.e.c.) '[It
is to be noted thatout of SSI/MSME Part- II/UdhyogAadhar/Udyam Registration Certificate-only
UDYAM REGISTRATION CERTIFICATE shall remain valid from 1st April 2022 OR from the
date as amended in future by the with time to time Notification issued from Ministry of Micro,
Small & Medium Enterprises (MSME), Govt of India]"
No relaxation shall be given to the bidders of Outside Gujarat State even though having
above certificate.No relaxation shall be given to the Gujarat based bidders having only one
registration number from Government of Gujarat but no subsequent registration with NSIC
registration certificates for the item under tender.
All the “SSI” and “NSIC/CSPO/DGS&D” registration certificates Documents furnished along
21 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
with the tender submitted by the bidders having Small, Cottage & Tiny industrial units
registered under small scale industries of Govt. of Gujarat should have clear validity as per
the tender and should invariably be renewed as per the norms of “SSI” and
“NSIC/CSPO/DGS&D” registration certificates Otherwise they shall have to pay E.M.D. and no
exemption will be granted.
Tenders submitted without Earnest Money Deposit by the contractor/firms, who are not eligible for
any exemption, will be rejected without entering in to further correspondence in this regard and no
reference will also be made. Tender submitted without EMD shall be rejected out rightly.
The above certificates should indicate the name of works / services of tender. Provisional
Registration Certificates are NOT allowed.
EMD will be released only on payment of security deposit in respect of successful bidder whereas
the same will be refunded to others on finalization of the tender / placement of order to successful
Wherever in the tender, the rate for security deposit and performance guarantee is
Stipulated as 10% & 5%, the same shall be relaxed to 6% & 3% respectively for Small, Cottage
and Tiny works units registered with Govt. of Gujarat (DIC) and also holding Subsequent
registration with NSIC/CSPO/DGS&D registration certificates for the Work/services and complying
the conditions as above.
E.M.D. of the unsuccessful tenderer’s willbe returned within 60 days of placing of the LOA (Letter
of Acceptance) on the successful Tenderer, subject to the Tenderer returning the original receipt
of the EMD together with the advance stamped receipt, to tender inviting authority of MGVCL.
E.M.D. will be returned to the successful bidders, only on their submission of performance
guarantee towards execution period (i.e. security deposit) and execution of agreement against
LOA released on them.
“NO STAGEWISE BANK GUARANTEES WILL BE ACCEPTABLE IN ANY CASE.”
CORPORATE GUARANTEES ARE NOT ALLOWED.
3 TENDER SPECIFICATIONS:
Specification framed out by MGVCL shall be separately brought out in the tender documents. No
deviation in specification shall be allowed and MGVCL decision shall be final. The technical
scrutiny committee of MGVCL shall evaluate the techno-commercial view of the tender. MGVCL
reserves the right to open or not to open the price bid of the bidders on the basis of their past
performance of their works carried out.
Tender should be in two bids.
a) Preliminary Bid-Technical bid and b) Price Bid.
Incomplete bids and amendments and additions to bids after opening of the bids will be ignored
The price bid of those who are techno-commercially qualified shall be opened. After technical bid
is opened, for modification, if any, all shall be given equal chance.
4 PRICE EVALUATION:
No price preference shall be given on any account. All tenders will be evaluated with loading
GST, unless otherwise mentioned in the tender documents. If more than one party is to be
considered for placement of order, they will have to match their price with L-1 price, (new or
regular as the case may be)which is technically acceptable. MGVCL may go to the price L-2
depending upon the exigency. If MGVCL feels that there is lack of serious competition or any
other reasons, MGVCL may negotiate with the L-1 party. MGVCL’s decision shall be final and
22 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
binding on all the parties.
5 PERFORMANCE GUARANTEE (PG) TOWARDS EXECUTION OF CONTRACT PERIOD:
(i.e. SECURITY DEPOSIT):
THE SECURITY DEPOSIT AMOUNT SHOULD BE PAID BY THE SUCESSFUL BIDDER
WITHIN 15 DAYS FROM THE DATE OF RECEIPT OF LETTER OF ACCEPANCE.
The successful bidder will be required to pay an amount equivalent to 5% of the value of the LOA
as a Security Deposit for satisfactory performance of the execution of Contract. If the full Security
Deposit amount is not paid within 15 (Fifteen) days after the receipt of the LOA (Letter of
Acceptance), then the LOA will be out rightly cancelled at the risk & cost of the Bidder (at the
discretion of MGVCL) and EMD amount paid will be forfeited without entering into any
correspondences and this will be binding on the Bidder and MGVCL will take necessary action
against bidders. Such Security Deposit will be payable either by RTGS / NEFT/ Bank
Paid Security Deposit will be returned on successful execution of contract& after submission of
PBG (Performance Bank Guarantee).
The successful tenderer except the Gujarat bidders having Small, Cottage and tiny Industrial
units of Gujarat State having the registration number under Small Scale Industries of Government
of Gujarat will be required to pay an amount equivalent to 5% (Five) of the value of the order as a
Performance Guarantee (Security Deposit) for successful execution of the contract.
Such Performance Guarantee (Security Deposit) for satisfactory/successful execution will be
payableRTGS / NEFT / Bank Guarantees only. Bank Guarantees from Scheduled / Nationalized
Banks will be acceptable if the amount of security deposit payable exceed Rs.5, 000/-. The Bank
Guarantees will be executed on the standard form prescribed by MGVCL.
ONLY FOR GUJARAT BIDDER/S:
The Small, Cottage and tiny Industrial units of Gujarat State having the registration number under
Small Scale Industries of Government of Gujarat have to submit the security deposit of (i.e.
performance Guarantee towards execution) 3% of total value of order instead of5 % of order
The above relaxation in payment of performance Guarantee towards execution period (Security
Deposit) shall be given to the small, cottage & Tiny industrial Units registered under small scale
industries of Govt. of Gujarat and holding subsequent registration with CSPO/NSIC/DGS&D
registration certificates for the item under tender. It is mandatory for the bidders of Gujarat state
to submit the notarized copy of valid SSI certificate or applicable valid acknowledgement of
memorandum filed by Small, cottage and tiny industrial units with the District Industrial Centre
(DIC) of Gujarat State and notarized copy of subsequent registration certificate of
CSPO/NSIC/DGS&D otherwise bidder have to pay the security deposit 5% of order value. No
relaxation shall be given to the bidders having only one registration numbers from
Government of Gujarat but no subsequent registration with CSPO/NSIC/DGS&D
registration certificates for the item under tender.
No exemption as well as relaxation shall be given to outside Gujarat based parties.
In case of the Bank Guarantees furnished / submitted, they should have clear one time validity till
the completion of the order in all respects. Bank Guarantee for Interim period will not be allowed.
If by any reasons the contract period is extended then contractor should undertake to renew the
Bank Guarantee at least one month before the expiry of the validity (i.e without vacuum period
and without waiting for MGVCL’s intimation seeking extension) failing which MGVCL will be at
23 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
liberty to encash the same.
CORPORATE GUARANTEES AND STAGEWISE BANK GUARANTEES ARE NOT ALLOWED.
The Performance Bank Guarantee covering execution of contract will be returned only on
successful execution of contract and on receipt of the Bank Guarantee towards
warranty/guarantee.
The successful bidder shall have to furnish PG (i.e. Performance Guarantee) against warranty /
Guarantee (as per condition no.6 of this tender commercial terms & condition) of the contract
value separately as applicable as per this tender condition.
GUVNL and their any subsidiary company viz. MGVCL / DGVCL / PGVCL / UGVCL / GETCO /
GSECL has discontinued the registration of contractor as class A, B, & C and as such it will not
be applicable for the current tender under issue.
“If the full Performance Guarantee towards Execution Period (Security Deposit) amount is not
paid within 15(Fifteen) days after the receipt of the LOA, then the LOA will be out rightly cancelled
at the risk & cost of the Tenderer (at the discretion of MGVCL) without entering into any
correspondences and this will be binding on the Tenderer and no final Work Order will be placed
and if placed, it will also be out rightly cancelled and EMD shall be forfeited.
6 PERFORMANCE GUARANTEE: The security deposit will be converted into performance
Guarantee on completion of execution of order of 12 Months. However performance
Guarantee/Warranty of the work shall be for 12 months on completion/execution of last date of
work completed & accordingly the performance Guarantee will be valid up to 12 Months on
completion of work.
7 Quantity Distribution:
7A Reservation for Gujarat based Parties:
50% quantity of work / 50% of tender amount shall be reserved for Gujarat based parties who are
techno-commercially qualified and who match the L-1 end cost with GST and Cess of New /
Regular contractor (if they themselves are not L-1). The firm shall be considered as ‘Gujarat
base’ on submission of his license of Govt. of Gujarat on their own name.
The benefit of Gujarat based reservation is applicable where the quoted Unit End Cost with GST
and Cess as applicable of Gujarat based bidder is not higher than 15% of the quoted Unit End
Cost with GST and Cess as applicable of L-1 New / Experienced bidder, as the case may be. If
difference is higher than 15%, then reservation benefit of Gujarat based parties may not be
7B QUANTITY DISTRIBUTION For Erection & Maintenance work of HT/LT/TC:
The Contractors whether non-experienced / New or experienced / Regular who have confirmed
/fulfilled pre eligibility criteria will only be considered for price evaluation. MGVCL will not consider
the price bid of any contractor who does not confirm / fulfill the eligibility criteria.
[a] While placing the order, the quantity distribution to each new-1 contractor/ firms shall be
restricted up to 10% of the tender amount or Rs 1.0 Lac whichever is higher while for each
new-2 contractor/firm shall be restricted up to 25% for of the tender amount or Rs.2.0 Lac
whichever is higher subject to ceiling of 40% of tender amount for all such new-1 & new-2
bidders provided the price of New contractor is lower than the regular/experienced contractor.
New-2 contractor / new firm will be considered as a regular contractor only after full filing
experience criteria as mentioned in Bidders pre-qualifying criteria as per point no.
[b] The new contractor will be asked to match the L-1 prices of the new contractor only and the
Regular contractor has to match the L-1 price of the Regular/experienced contractor only.
24 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
But if there are no Regular contractor OR if the rate of Regular contractor is very high, the above
condition no. (a) shall be suitably relaxed by MGVCL. MGVCL would not place order on more
than 50% of the total parties who are bidding for the order. L-1 regular contractor however will get
heavy weight age in order placement.
The contractor, who have not submitted any documents in support of his experience OR are not
meeting prequalification criteria of experience as mentioned in point no. 3, shall be considered as
New contractor. No correspondence in this regard shall be entertained after opening of bid.
7C QUANTITY DISTRIBUTION For laying of Under Ground Cable work:
The Contractors who have confirmed /fulfilled pre eligibility criteria will only be considered for
price evaluation. MGVCL will not consider the price bid of any contractor who does not confirm /
fulfill the eligibility criteria.
New contractor not possessing any experience of laying underground cable in any DISCOM of
GUVNL can also participate in tender having experience with any electricity utility/telecom license
holder/agencies who have worked under NHAI/Agencies who have worked under Railway
Dept./agencies who have worked under Option-2 for HT connection, substation work for
underground HT cable/overhead line work of HT, LT & TC.
[a]While placing the order, the quantity/work distribution TO each new-1 contractors /firms
shallrestricted up to10%of the tender amountor minimum Rs 1.0 Lac whichever is
higherwhile for each new-2 contractor /firms shall be restricted up to 25% of the tender
amount or RS.2 Lac whichever is higher subject to ceiling of 40% of the tender amount for
all such new-1 & new-2 bidders provided the price of new contractor is lower than
regular/experienced contractor.New-2 contractor / new firm will be considered as a regular
contractor only after full filing experience criteria as mentioned in Bidders qualifying criteria as per
point no. 3. Of prequalification criteria.
[b] The new contractor / new firms will be asked to match the L-1 prices of the new contractor
only and the regular contractor has to match the L-1 price of the regular contractor only.
But if there are no Regular contractor OR if the rate of Regular contractor is very high, the above
condition no. (a) shall be suitably relaxed by MGVCL. MGVCL would not place order on more
than 50% of the total parties who are bidding for the order. L-1 regular contractor however will get
heavy weight age in order placement.
The contractor, who have not submitted any documents in support of his experience OR are not
meeting prequalification criteria of experience, as mentioned in above point no. 3, shall be
considered as New contractor. No correspondence in this regard shall be entertained after
opening of bid.
The price should be inclusive of all applicable taxes/cess if any&as per prevailing
GSTasapplicable from time to time on given taxable goods and/or services.
The rates are asked for only on percentage basis against estimated amount e.i.e. item wise rates
stated in the Schedule "B". The tender offer must specify andthe percentage either above or
below to the estimate amount. And it should be clearly specified both in figure and words. The
rates so acceptedwill be applicable during the operative period of contract and quoted / ordered
price shall remain firm during entire execution of of the contract.
The bidders, whose prices are found almost equal, the quantity distribution limiting to few of such
bidders will be decided at the sole discretion of MGVCL.
9 The quantities mentioned in the tender schedule are only approximate. Actual quantities may
25 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
increase or decrease according to the site condition. The Company reserve the right of revising or
deleting any of the quantities to be erected during the execution of the contract and the final
quantities actually erected by the contractor will be calculated and paid at the rate in contract
10 VALIDITY OF THE OFFERS:
The offers will have to be kept valid for a period of 120 days from the date of opening of
technical bids. In case of finalization of the tender is likely to be delayed, the tenderer will be
asked to extend the same without change in the prices or any terms and conditions of the offer. If
any change is made, original or during the extended validity period, the offers will be liable for
outright rejection without entering into further correspondence in this regard and no reference will
11 Goods & Services Tax (GST):
MGVCL GST Registration No. is 24AADCM7439H1ZE
The firm prices are exclusive of Goods & Service Tax as applicable. The amount and rate (%) of
GST as applicable should clearly be indicated separately. (GST means all applicable
Tax/Cessunder GST Laws. GST Laws means IGST Act, GST (Compensation to the State for
Loss of Revenue) Act, CGST Act, UTGST Act and SGSCT Act, 2017 and all related ancillary
Contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance of
tender only and any deviation in the same shall not be accepted. Further, any additional liability of
GST (later on due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.)
over and above as charged in the invoice shall be borne by the Contractor. However, any refund
received by the contractor on account of GST charged from the Company; such refund shall have
to be passed on to the Company, along with interest if any. Such refund along with interest needs
to be passed on suo-motu by the contractor.
Further, the Company has a right to recover the amount Of GST along with penal interest at the
rate of 15% per annum or interest/fees and penalty charged under GST Law, whichever is higher
if GST charged is not paid / short paid to the government or failed to upload the details or uploads
inaccurate particulars on GSTIN portal by the Contractor within the stipulated time limit.
12 STATUTORY VARIATION:
Any statutory increase or decrease in GST as applicable or in the event of introduction of new
tax/cess or cessation of existing tax/cess subsequent to the offer if it takes place within the
original contractual completion date will be to COMPANY’s account subject to the claim being
supported by documentary evidence. However, if any decrease takes place after the contractual
delivery date, the advantage will have to be passed on to COMPANY.
13 PAYMENT TERMS:
Payment of works shall be made in 30 Days after scrutinizing of Bill at division level
iffound in order.
14 REPEAT/ADDITIONAL ORDERS:
MGVCL reserves the right to place repeat orders / additional orders on the successful tenderer up
to 25% of the original order value of the Work order at the same prices terms and conditions
stipulated in the original contract during contractual period. In special circumstances MGVCL will
reserve the right to place repeat order / additional order up to 100% of the original order valueas
26 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
mutually agreed upon.
15 CONTRACT PERIOD:
The contract will remain in force for the period of one year from commencement of the first work.
The contractor is bound to complete the work within the specified period for each work given by
the Engineer-in-charge.
Priority of works would be decided by the Sub division Deputy Engineer (O&M) and he the
contractor shall carry out the work within stipulated time for order issued by Deputy Engineer.
15 Minimum Manpower requirement :
The contractor shall provide minimum 2 (two) gangs per ARC / work order [wherein each gang
should comprise of minimum 8 persons or number of persons as specified in sub work order by
Engineer-in-charge of Sdn along with name of each labour with valid identy proof (Adharcard,
voter ID)] till completion of ARC / work order. For non providing required persons as mentioned in
sub-order or providing less number of persons; following action shall be initiated against the
On the First instance: notice shall be issued to contractor to provide required persons.
On the Second instance: Show cause notice shall be issued to contractor to comply within
days. If complied satisfactorily then allow with penalty of 10% of sub work order value.
On the Third instance: termination notice shall be issued and process for completion of work at
risk & cost of the contractor shall be initiated by giving contract to next bidder of tender
subject to price matching with the ordered price(if available) or by way of inviting new
16 PENALTY FOR LATE COMPLETION OF WORK:
The time limit allowed for carrying out the work as entered in the tender shall strictly
observed by the contractor and shall be reckoned from the date on which the order to
commence the work is given to the contractor. The work shall throughout the stipulated
period of contract be proceeded with due diligence (time being essence of contract) and
for delay. The contractor shall pay penalty for an amount equal to 0.5% (half percent) per
one week for the contract amount of work order subject to ceiling of 10% of order value
plus applicable GST.
The penalty will be invariably deducted from contractor’s bill payable either from
this contract or from any other contract with the Company or from EMD or Security
deposit amount and no refund will be given unless the competent authorities
approves the reduction with the reasons for delay attributable to MGVCL as well
as to party will be brought out clearly while putting the proposal for waiver /
reduction in penalty to competent authority.
For Annual Rate Contract (ARC):
Annual Rate contracts, the contractor will be given separate sub work order for
each work on the basis scheduled rate of the contract. The date of
commencement and date of completion of work shall be stipulated in the sub work
order, which the contractor has to agree otherwise the penalty will be charged for
delay in completion of work for an amount equal to 0.5% (half percent) per one
27 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
week subject to ceiling of 10% of Sub work order value plus applicable GST
“D.G.S & D. FORCE MAJEURE CLAUSE”
If, at any time during the continuance of this contract, the performance in whole or
in part by either party of any obligation under this contract shall be prevented or
delayed by reason of any war, hostility, act of the public enemy, civil commotion,
sabotage fires, floods, explosion, epidemics, quarantine restrictions, strikes
lockouts or acts of God (hereinafter referred to as event), then provided notice of
the happening of any such event is given by either party to the other within twenty
one days from the date of occurrence thereof, neither party shall by reason of
such event be entitled to terminate this contract nor shall either party shall have
any claim for damages against the other in respect of such non-performance of
delay in performance, and deliveries under the contract shall be resumed as soon
as practicable after such event has come to end or ceased to exist, and the
decision of the Managing Director as to whether the deliveries have been so
resumed or not shall be final and conclusive.
Provided further that if the performance in whole or part of any obligation under
this contract is prevented or delayed by reasons of any such event for a period
exceeding 60 days, either party may at its option terminate the contract provided
also that if the contract is terminated under this clause, the MGVCL shall be at
liberty to take over from the contractor at a price to be fixed by the Managing
Director of the company, which shall be final, all unused undamaged and
acceptable materials bought out components, and stores in course of manufacture
in the possession of the contractor at the time of such termination or such portion
thereof as the MGVCL may be deem fit excepting such materials, bought out
component and stores as the contractor may with concurrence of the MGVCL
elect to retain”.
17 COMPLETION CERTIFICATE:
On completion of the work the Contractor shall be furnished with Completion Certificate by the
Executive Engineer of such completion but no such certificate shall be given nor shall be the work
considered to be complete until works are taken over and/or duly tested and put to operative as
the case may be, nor until the work have been measured by the Engineer-In- Charge or where
the measurement have been taken for his subordinate until they have received the approval of
the Executive Engineer for the said measurement being binding and conclusive against the
18 Extension In Contractual Completion Date:
It will be contractor’s responsibility to ensure the completion of work within the stipulated time
limit. However, on account of reasons beyond ones control as laid down in the DGS & D Force
Major Conditions; MGVCL may consider extension of time limit with or without statutory
However, extension of time limit will be considered only after execution of the work order fully and
upon submission of documentary evidence for the reasons of delay.
28 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Such extension will be subject to the following conditions shown hereunder.
(a) That no increase in price on account of any statutory increase in or fresh
imposition of any type of tax on or after the contractual work completion date of
the W. O. referred to above shall be admissible after the original contractual
work completion date and
(b) That notwithstanding any stipulation in the contract for increase in price on any
other ground, no such increase which has become effective on or after the
contractual work completion date of this said W. O. shall be admissible after the
original contractual work completion date.
(c) But nevertheless, MGVCL shall be entitled to the benefit of any decrease in
price on account of reduction in or remission of any type of tax or on any
other ground as stipulated in the W.O., which takes place or on after the
contractual work completion date of the said W.O.
If the contractor desire an extension of the time limit for completion of the work on the
ground of his having been unavoidably hindered in its execution or on any other ground,
he shall apply in writing to the Executive Engineer and the Executive Engineer may, if in
his opinion there are reasonable grounds for granting extension, recommend such
extension as he may think necessary or proper. The decision of the competent authority
in this regard shall be final and binding to the contractor. Any delay attributed to
Company shall be compensated only by way of extending the limit.
The work shall be completed within the period stipulated in the contract. However it may
be noted that drawings shall be released progressively & site clearance arranged
accordingly to the progress of work at site. Therefore the contractor has to organize &
coordinate the works to suit these. In the event of any delay due to the above or due to
any other reason not attributable to the contractor, reasonable extension in the
completing the work may be given at the discretion & as decided by the Company but no
compensation or idle charges will be paid to the contractor on this account under any
19 POST TENDER CORRESPONDENCE / ENQUIRIES:
Any correspondence or enquiry subsequent to opening of Technical and Commercial bids is not
desirable, if the same is indulged into, it will be considered for disqualifying the tender. The
Tenderer will be required to abstain from pursuing / canvassing the matter, directly or indirectly
with any Officers of MGVCL, as otherwise the same would also amount to disqualification of the
20 TEST CERTIFICATES:
Test Certificatefor the materials asperrelevant BSS / ISS shall be submitted in triplicate (if
applicable) for our approvalprior to use and should be utilized only after the test certificates are
approved. Contractor will be responsible for any expenditure that consigneeMGVCL might incur if
the material stand rejected on this account. Further, MGVCL will not be responsible for any delay
in payment on this account.
21 MGVCL shall have the right to make any changes, additions / deletions or modifications in any
terms / conditions of the tender and / or specifications as may be deemed necessary by MGVCL
at its sole discretion at any time before the due date of opening of the tender.
29 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
22 Tenderer should furnish a copy of work orders for similar items executed by them
23 The work should be carried out strictly confirming to tender specifications given in the tender. If
the tenderer’s desires to quote with any technical deviations they should specifically quote the
deviation & the ISS or BIS Nos. in the body of the tender itself separately.
If technical deviations furnished by the Tenderer are not agreeable to MGVCL, the offers may be
ignored. However it will be solely at MGVCL discretion to consider the technical deviations OR
not for considering the Tenderer. No correspondences of the Tenderer after opening of the bid
will be entertained in this matter.
Normally after issue of material to the Contractor, the work is to be completed within 15 from the
date of last material issue for sub work order, depending upon the quantum of work and
clearance of way leave issues. Once the work is completed for 2/3rd amount of ARC, the
Contractor has to intimate in writing to the Sub division about work completion.
Once the intimation is received from the Contractor, SDO shall inform the Contractor three
tentative dates for taking joint inventory of the work, clearly indicating that if he does not come for
Joint Inventory recording on any of the three dates, the inventory shall be taken ex-party, which
shall be binding upon him. The inventory of the completed work is to be taken within 15 days
from the date of intimation by the Contractor.
During the Joint Inventory recording in presence of Contractor, if any discrepancies are observed
regarding the quality of work, then same may be communicated to the Contractor immediately by
making a joint site inspection report on the spot, which is to be signed by both the parties, i.e.
MGVCL as well as Contractor.
The Contractor is to be asked for rectification of such discrepancies within a reasonable time
depending upon the type and nature of the rectification work. However in any case such
rectification is to be completed within 15 Daysfrom the date of joint Inventory.
Once the Rectification work is completed by the Contractor, again it is to be jointly verified and
joint Inventory sheet be corrected accordingly.
After receipt of the bill against Sub WO, the SDO shall verify the same and ensured that whatever
the work is claimed by the Contractor, is actually executed without any defects. After ensuring this
and also after taking inventory of such partial work, whatever the work is executed, shall be
recorded in Measurement Book (MB) by authorized officer as per Delegation of Power (DoP) and
requisite percentage cross check of the work execution shall also be done by the Competent
Authority as per DoP. No running bill given.
When the work is fully executed as per Sub Work order and Joint Inventory is also taken, it is the
responsibility of Contractor to prepare and submit the Final bill within10 days from the date of
work completion / rectification of work if any. Along with Final Bill, the Contractor shall also submit
the Joint Inventory Sheet, Material Reconciliation statement for materials issued/used/balance
material along with supporting required documents.
On receipt of Bill from the Contractor, the concern DE/JE at sub division shall check the bill for
any discrepancies and also verify the material Reconciliation statement submitted by the
Contractor for particular Sub Work order. If there are any excess/shortfall materials, the
adjustment MR/CR shall be prepared. If the quantum of excess material is more than 20% of
material issued, then Contractor shall be asked to credit the material to the Sub division/Division
store and credit note/CR shall be prepared and be attached along with final bill.
Within 15 days from the date of submission of RA Bill / Final Bill by the Contractor, the SDO shall
record the work in MB and submit the bill to the Division for approval and bill passing.
30 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
While submission of bill Release Number, Receipt number, IR, CR, MR, various Certificate
as per work order, Objection documents if any, Sub work order copy, NOC from HR for PF,
GST Tax Invoice prescribed by GST Department, GSTR 2-A filed Documents of earlier
payment, bill forms, inventory sheets, accounting form, calculation form, and other
documents as per requirement as per order should be submit with R A and Final Bill.
24 Audit Inspection
MGVCL reserves its right to carry out random and surprise inspection at any time of the
ongoing work / completed work for ensuring its quality and compliance with the REC standards
OR CEA construction standards OR any Indian Standard OR Technical specifications of MGVCL.
If during such audit inspection, any violation of Standards OR Safety regulation is observed,
which may be unsafe for the general public or for the employee of Distribution licensee, MGVCL
shall intimate the Contractor immediately by any written communication medium (either through
mail / sms / whatsapp / letter) and on such intimation, the contractor shall rectify such defects,
within such period, (as may be specified by the MGVCL, depending upon the quantum of such
defects) and shall submit the written report along with site photographs indicating such
rectification to the Engineer In-Charge. Nevertheless, following actions shall be taken against the
Contractor on detection of substandard work.
1. On first instance,a stringent penalty of 3% of value of Sub-work order shall be
imposed. In addition to the above,if the contractor fails to rectify the
substandard work despite being served the legal notice under clause 24 B,
MGVCL shall get the work rectified through the other contractor and shall
recover the total expense incurred for such rectification including labour
and any other amount paid to the other contractor as the case may be
which it has to incur for such rectification.
2. On detection of second instance of Substandard work in the same work order
OR in different work order(s) under jurisdiction of MGVCL, the
defective/substandard orders shall be terminated by following procedure as
mentioned in tender terms and conditions in addition to the actions as
mentioned above in Clause 24 B (1).
3. On detection of third instance of Substandard work in jurisdiction of entire
MGVCL by same contractor during the last three years, the Contractor shall be
stop-dealed after following due procedure and after giving opportunity to
represent as per principles of natural justice.
Definition of Substandard work
The work executed by the contractor, which is not in compliance to the REC construction
standards or CEA Construction Standards or any Indian standards (IS) OR violates the provisions
of GERC Distribution Code or Grid Code or CEA Safety regulations or in contradiction to any
tender condition as amended time to time, shall be considered as Substandard work.
25 SUPPLY OF MATERIALS TO CONTRACTOR
If the specification of the estimated work provides for use of any special description of
material to be supplied from the Company’s Stores or if it is required that the contractor
shall use certain stores to be provided by the Engineer-in-charge (such material and
31 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
stores and the prices to be charged thereof as here in after mentioned being so far as
practicable for the convenience of contractor but not so as in any way to control, the
meaning or effect of the contract specified in the schedule or memorandum here to
annexed the contractor shall be supplied with such materials and stores as may be
required from time to time be used by him for the purpose of the contract only and the
value of the full quantity of materials and stores so supplied shall be set off or deducted
from any sum due to thereafter to become due to the contractor, under the contract or
otherwise or from the security deposit or the proceeds of sale thereof if the deposit is
held in Government Securities the same or a sufficient portion thereof, shall be sold for
the purpose. All materials supplied to the contract shall remain the absolute property of
Company and shall on no account be removed from the site of the work and shall at all-
time be open to inspection by the Engineer-in-charge. Any such materials un -used and
in perfectly good condition at time of completion or determination of the contract shall be
returned to the Company’s store if the Engineer-in-charge so requires by notice in writing
given under his hands but the contractor shall not be entitled to return any such materials
except with consent and he shall have no claim for compensation on account of any such
materials supplied to him as aforesaid but remaining unused by him or for any wastage in
or damage thereto. The contractor shall be responsible for the loss, destruction or
deterioration of the materials, stores or articles supplied to him by the Company even if
such loss, destruction or deterioration has occurred under any circumstances whatsoever
beyond his control as if the materials, stores or articles so supplied were his property.
Further, Once the Material is issued to the Contractor, it will be sole responsibility of
Contractor to keep it in safe custody. Even after installing / providing material on the
line/Transformer, if it is stolen from the site/line then it shall be sole responsibility of
Contractor to make up the losses on account of such theft of material, provided such
network / line, which is erected by the Contractor is not handed over to MGVCL or
charged by the MGVCL.
26 WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS, DRAWINGS,
The contractor shall execute in whole and every part of work in the most substantial and
workmanlike manner and both as regarding materials and in every other respect in strict
accordance with the specification. The Contractor also shall confirm exactly, fully and
faithfully to the designs, drawings and instructions in writing relating to the work signed by
the Engineer- in-charge and lodged in his office and to which the contractor shall be
entitled to have access for the purpose of Inspection at such office, or in the site of the
work, during office hours and the contractor shall, also if he so requires, be entitled at his
own expenses to make or cause to be made copies of the specification, and of all such
designs, drawings and instructions as aforesaid.
27 ALTERATION IN SPECIFICATIONS AND DESIGNS NOT TO INVALIDATE CONTRACTS:
The Executive Engineer shall have powers to make any alteration, or addition to the
original specification designs, and instructions that may appear to him to be necessary
or advisable during the progress of the work and the contractor shall be bound to carry
out the work in accordance with any instructions in this connection which may be given
to him in writing, signed by the Engineer-in-charge and such alterations shall not
invalidate the contract. Any additional work which the contractor may be directed to do in
the manner above specified as part of the work shall be carried out by the contractor on
32 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
the same conditions in all respect on which he agreed to do the main works, and at the
same rates as are specified in the tender for the main work.
Where, however, the works is to be executed according to the designs, drawing and
specifications recommended by the contractor andaccepted by the competent authority,
the alteration above referred to shall be within the scope of such designs, drawings, and
specifications appended to the tender.
28 RATES FOR WORKS NOT ENTERED IN ESTIMATE OR SCHEDULE OF RATE OF THE
If the additional and altered work includes any class of work for which no rate is specified in this
contract, then such class of work shall be carried out the rates entered in the Schedule of Rates
of the Division or at the rate mutually agreed upon between the Executive Engineer and the
contractor, whichever are lower. If the additional or altered work for which no rate is entered in the
Schedule of Rates of the Division is ordered to be carried out before the rates agreed upon then
the contractor within seven days of date of receipt by him of the order to carry out the work inform
the Executive Engineer for the rate which in his intension to charge for such class of work and if
the Executive Engineer does not agree to this rate he shall be noticed in writing be at liberty to
cancel his order to carry out such class of work and arrange to carry it out in such manner as he
may consider advisable provided always that if the rates shall have been determined as lastly
here in before mentioned then in such case he shall only be entitled to be paid in respect of the
work carried out or expenditure incurred by him prior to the date of the determination of the rate
as aforesaid according to such rate or rates as shall be fixed by the Executive Engineer. In the
event of dispute, the decision of the Executive Engineer of theDivision will be final.
29 TIME LIMIT FOR COMPENSATION CLAIMS
Under no circumstances, whatsoever, shall the contractor be entitled to any
compensation from Company on any account unless the contractor has claimed in writing
to the Chief Engineer within one month of the cause thereof.
30 CONTRACT AGREEMENT:
Successful bidder shall have to execute the contract agreement within 10 days of submission of
security deposit on non-judicial stamp paper of Rs. 300.00 & the cost of the same will be borne by
The prices should be inclusive of all applicable taxes/cess excluding prevailing GST payable
It will be the responsibility of bidder / contractor to cover sufficient amount of insurance of their
personnel involved in the erection work of tender item/s during execution of works. MGVCL shall
in no way be responsible for any injury, damages, accident etc. to their personnel execution /
erection work, supervision etc. under the contract.
33 FAILURE TO EXCEUTE THE CONTRACT:
On failure to execute the order placed on successful bidder, under the terms & conditions set
forth therein, to the satisfaction of MGVCL, the contractor will be liable to make good the loss
sustained by MGVCL. Under such circumstances, MGVCL shall cancel the order and forfeit the
SD. MGVCL may also go for fresh order on other party at the risk & cost of successful tendered
or may carry out departmentally, debiting the cost to the successful bidder / contractor.
33 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
34 TERMINATION OF CONTRACT:
The MGVCL, upon written notice of default to the contractor, shall terminate in the circumstances
detailed as under:
1. If, in the opinion of the MGVCL, the contractor fails to complete the work
specified in the scope of works given in Schedule-B within the time specified for
the same in the contract or within the period for extension has been granted by
MGVCL to the contractor.
2. If, in the opinion of the MGVCL, the contractor fails to comply with any of the
other provision of the contract the MGVCL shall also be empowered to cancel
the contract, if any deficiency in erection work and or bad performance is
noticed the work specified in the scope of works given in Schedule -B within the
time specified for the same in the contract or within the period for extension has
been granted by MGVCL to the contractor.
35 The MGVCL shall have the rights to make any changes /addition / deletions or
modification in any terms / conditions of the tender and / or specifications as may be
deemed necessary by MGVCL at its sole discretion at any time before the due date of
opening of the tender. The quantities mentioned in the accompanying Schedule are only
approximate. Actual quantities may increase or decrease according to the requirements. The
Company reserves the right of revising or deleting any of the quantities to be executed against
the contract and final quantities actually executed by the contractor will be calculated and paid
at the rate given in contract schedule of rates.
36 The erection work shall be carried out strictly as mentioned in Schedule-B and as per standard
specification relevant IS & approved by MGVCL authority & Concern authority i.e. PWD, NHAI,
Western-Railway, BSNL, Local Gram Nagar Panchayat/Nagarpalika Municipality, etc.
37 MGVCL reserves the right to cancel any or all the offer / bids or to accept any offer without
assigning any reasons. MGVCL reserves the right to place the order by splitting the tender items /
quantity by awarding to more than one contractor.
38 JURISDICTION: All questions, disputes or differences arising under out of or in connection with
the Tender / Contract if concluded shall be subject to the exclusive jurisdiction of the court under
whose jurisdiction the place from which the tender / Acceptance of tender is issued, is situated.
MGVCL as well as supplier / contractor will be bound by rules and regulation of Indian Contract
39 Income Tax (TDS), GST TDS whenever applicable will be deducted / recovered as per Govt.
rules and regulation.
40 Contractors must have valid solvency certificate as per Company’s rules. Bank Solvency,
Registration of line / cable laying work & Experience certificate to be attached as per requirement
41 Bidder shall mention Registered GST No., E.P.F. & I.T. Dept Pan-Card etc. in his offer and
submit the photocopy of certificate of each; otherwise Tender shall not be considered for
42 No tools will be supplied by the department. The work if found inferior and not up to standard of
34 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
the Company’s is liable to be rejected at the risk and cost of the contractor. Any expenditure
incurred for rectification work carried out departmentally or by employing hangami labor will be
recovered from his R.A bills, if the contractor fails to rectify the inferior work done by him in spite
of the instructions to rectify the same. So long as the line is not handed over to the company, the
responsibility of its safe custody and of all fixture and materials etc. lying with that of the
43 PERIOD OF CONTRACT: The contract will be remained in force for period of 12 Month. The
contractor shall call / indent the required material from S/dn / Dn Store in advance & on
completion of the work, prepare and render the final detailed material account of the received by
him from the SDn./Dns store within one month from the date of completion of work. If however, the
contractor does not render the material account, notice will be issued to the contractor to render
the material account within 10 days from the date of notice, failing which the material
account, will be finalized and recoveries will be made as per the MGVCL’s procedure which
shall have to be accepted by the contractor and dispute if any raised shall not be entertained.
A. For Overhead Network:
Within 12 Calendar months from the date of handing over of electrical network
(Certificate to be submitted by Contractor duly signed by contractor & Engineer-in-charge after
completion of work), if the works are found defective in poor workmanship /poor quality of material
supplied by contractor, the same shall be rectified by the contractor free of cost or otherwise
performance guarantee deposit will be encashed / forfeited. This does not prohibit MGVCL or its
staff to verify & take action as per existing rules & provisions beyond 1 year where there is
deviation in work reported and actual done.
B. For UG Cable work:
Within 12 Calendar months from the date of handing over of electrical network
(Certificate to be submitted by Contractor duly signed by contractor & Engineer-in-charge after
completion of work), if the works are found defective in poor workmanship /poor quality of material
supplied by contractor, the same shall be rectified by the contractor free of cost. If any joints / cable
box / material supplied by the contractor, fails/damages within guarantee period of 12 months due
to any reason not attributable to MGVCL, the same will have to be replaced free of cost by the
contractor or otherwise performance guarantee deposit will be encashed / forfeited. This does not
prohibit MGVCL or its staff to verify & take action as per existing rules & provisions beyond 1 year
where there is deviation in work reported and actual done.
45 INDEMNITY BOND:
The contractor will have to executed an indemnity bond on stamp paper of Rs.300/- at his
cost before commencement of work stating the matter conversing that for any accident to
the contractor’s staff/equipment or any person, either fatal or non-fatal, due to non-observing
of safety measures, MGVCL, shall not be responsible.
46 CONTRACTOR LIABILITY:
For any accident either fatal or non-fatal to the workers / any third party due to non-
observances of the safety measures as per rules or due to lack of proper care by the
contractor’s labor, MGVCL shall not be responsible.
47 CONTRACTOR LIABLE FOR ALL DAMAGES
Compensation for all damage done intentionally or unintentionally by contractor’s
labourer, whether in or beyond the limit of Company’s property, shall be estimated by the
Executive Engineer, or such other office, as he may appoint and the estimate of the
35 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Executive Engineer, subject to the decision of the Chief Engineer, on appeal, shall be
final and the contractor shall be bound to pay the amount of the assessed compensation
demand, failing which, the same will be recovered from the contractor as damages or
deducted by the Engineer in charge from any sums that may be due to or become due
from Company to the contractor under this contract or otherwise.
The contractor shall bear the expenses of defending any action or other legal
proceedings that may be brought by any person for injury sustained by him owing to
neglect of precautions to prevent the spread of fire and he shall also pay any damage
and costs that may be awarded by the court if in consequence.
48 ACTION WHERE NO SPECIFICATIONS:
In the case of any class of work for which there is no such specifications as is mentioned in
clause 1. such work shall be carried out in accordance with the divisional specifications and in
there event of there being no divisional specifications, the work shall be carried out in all respects
in accordance with the instructions and requirements of the Engineer-in-charge / consultant of the
49 Workmen’s Compensation Fund And Employers Liability Insurance: -
The contractor shall cover all his employees under Workmen’s
Compensation Fund and under the Liability Insurance.
The contractor shall employ adequate number of experienced staff at site for daily
supervision and for maintenance of various registers and records required under
the law and contract. No payment for supervision shall be admissible.
Contractor to Indemnify the Company
The contractor shall indemnify and keep indemnified the Company and every
officer and employees of the Company and also Engineer-In-Charge and his staff
against all actions, proceedings, claims, demands, costs and expenses
whatsoever arising out of or in connection with the matters referred in above
clauses and elsewhere and against all actions, proceedings, claims, demands,
costs and expenses which may be made against the Company by any workman/
employee of the contractor or any sub contractor and / or from any liability may
arise to any workman / employees of the contractor or any sub contractor under
any laws, rules or regulation having the force of law including but not limited to
claims against the owner under workman’s compensation Act, 1923. The
employee’s Provident Act 1952, and / or the contract Labour (Abolition and
Regulation) Act 1979. The Company shall not be liable for or in respect of or in
consequence of any accident or injury to any workmen or other person in the
employment of the contractor or his sub-contractors, and the contractor shall
indemnify and keep indemnified the Company against all such damage and
compensation and against all claims, demands, proceedings costs, charges and
expenses whatsoever in respect thereof or in relation thereto.
Workmen’s Compensation And Employer’s Liability Insurance: -
Insurance shall be affected for the entire contractor’s for all the contractor’s employees
engaged in the performance of this contract. If any of the work is sublet to the sub-
36 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
contractor, the contractor shall require that he or his sub-contractor to provide workmen’s
compensation and employer’s liability insurance for the latter’s employees unless such
employees recovered under the contractor’s insurance.
The Company reserves the right to terminate this rate contract at any time during its
tendency without giving notice of termination or any reasons thereof.
The Company will be entitled to deduct directly from the bills, to be paid to the Sub-
contractor and Laborers any sum or sums payable by contractor and which sum/sums
the Company is required to pay as a principal employer on account of contractor’s
default in respect of all liabilities referred to in above clauses.
Nothing in the contract document stated shall any wise constitute any workmen/
employees of the contractor or any sub-contractor as or to be workmen/employee of the
power, or place obligation or liability in respect of any such workmen/ employee upon the
NOTE: -The prevailing Act at the time of execution of work over and above act specified
herein shall be binding to the contractor
50 LIABILITY FOR DAMAGE TO WOKS & MATERIALS:
The contractor shall during, the progress of the work, properly protect the works & the existing
electrical infrastructure & materials placed at his disposal or acquired for him by the Company, &
shall remain answerable & liable for all accidents, damages. Loss etc. & shall be made good in
the most complete & substantial manner by & at the sole cost of the contractor & to the
reasonable satisfaction of the Company’s Engineers. If the contractor fails to make good such
losses, damages within the specified time given by the Company, the Company shall be at liberty
to recover the amount towards such expenses fixed by the Company’s Engineers & shall be
recovered from the amount due under this contract to the contractor.
If the Engineer considers that the work, asked for in the aforesaid Para, is not sufficiently &
satisfactorily protected by the contractor, on requests made for, the Company shall be entitled to
arrange for such protection at his discretion & recover the cost thereof from the contractor.
Until the work shall be or deemed to be taken, over as aforesaid, the contractor shall also be
liable for &shall be deemed to have indemnified the Company in respect of all damage or injury to
any person or any property of the Company or of others in villages nearby, occasioned by the
negligence of the contractor or his workmen, or his subcontractor, or by defective /ill methods of
51 INDUSTRIAL LABOUR LAWS
Wages to be paid and time of payment etc. by the Contractor:-
The contractor shall pay minimum wages as prescribed by Labour Department
Person below the age of 18 years shall not be employed for the work.
No female worker shall be employed in the night shift between 7.00 p.m. to6.00 a.m.
Identity cards as prescribed under the factories Act with photo affixed thereto, the same for
identification of labour
52 No Claim For Compensation for Delay in staring work
No compensation shall be allowed for any delay caused into starting of work on account of ROW
(right of way) or any delay in according sanction to estimates.
53 MGVCL shall issue the required materials under the contractfrom any store of MGVCL and the
37 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
contractor has to carry out all the transportation at their cost up to the site/s.
54 MGVCL reserves the right to cancel any or all the offer/bids or to accept any offer without
assigning any reasons.
55 MGVCL reserves the right to cancel any or all the offers / bids or to accept any offer
without assigning any reasons.
Also in case MGVCL finds that there is an attempt of cartel in the prices, MGVCL reserves the
right to consider or reject any or all the parties offers without assigning any reasons thereof.
56 MGVCL reserves the right to increase or decrease the quantum of work against each item/s while
placing the order.
57 The tenderer should invariably write the Tender no., Due date of opening of tender, name and
address of the Company / bidder, on sealed covers of EMD Cover Documents, otherwise the
tender covers without these details will not be opened which may please be noted.
58 If the Tenderer fails to pay the Security Deposit or defaults in execution of the orders
placed or if MGVCL suffers any financial loss due to this, then MGVCL will be at liberty to
adjust the amount from other orders of the same firm or by encasing the Bank
59 Please note that any additional conditions / deviations, if any, found in the Commercial
terms & conditions (except reference under clause no.23 of this tender document), then
the Price Bids of such tenderer will not be opened and no further correspondences in the
matter will be allowed.
60 Conflict of interest:
A bidder shall not have conflict of interest With other bidder for particular quoted item.
Such conflict of interest can lead to anti- competitive practices to the detriment of
procuring Entity’s interests. The bidder found to have a conflict of interest shall be
disqualified. A bidder may be considered to have a conflict of interest with one or more
parties in this bidding process for particular quoted item, if:
(a) they have proprietor/ partner (s) Director (s) in common; or
(b) they receive or have receive any direct or indirect subsidy/ financial stake from
(c) they have the same legal representative/ agent for purposes of this bid;
(d) they have relationship with each other , directly or through common third parties, that
puts them in a position to have access to information about or influence on the bid of
another bidder;
(e) bidder participates in more than one bid in this bidding process. Participation By a
bidder in more than one bid will result in the disqualification of all bids in which the
parties are involved. However, this does not limit the inclusion of the components/
sub –assembly/ assemblies from one bidding manufacturing in more than one bid.
(f) in cases of agents quoting in offshore procurement, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their
behalf in a particular tender enquiry. One manufacturer can also authorize only one
38 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
agent / dealer there can be only one bid from the following:
1 The principal manufacturer directly or through one Indian agent on his behalf; and
2 Indian / foreign agent on behalf of only one principal
(g) a Bidder or any of its affiliates participated as a consultant in the preparation of the
design or technical specifications of the contract that is the subject of the Bid;
(h) in case of a holding company having more than one independently manufacturing
units, or more than one unit having common business ownership/ management, only
one unit should quote , similar restrictions would apply to closely related sister
companies. Bidders must proactively declare such sister/ common/ management units
in same/ similar line of business.
(i) Bidder shall not act in contravention/ violation to the provisions of competition
act, as amended from time to time.
The bidders have to submit the declaration of clause no. 60 (Conflict of interest) on their
letter head at the time of submission of bid.
61 Line Erection with supply of PSC Pole.
The contractor has to execute the work along with supply of PSC pole as mentioned in
schedule-B as per directive of tender inviting authority.
62 Relationship with employee :
Every bidder should, at the time of submission of bid, give a declaration as under,
“If in any Bidder Company/firm, the interest(i.e. shareholding in company and share in
partnership firm) of any employee of the tendering company or his/her relative as defined
in section 2(77) of the company’s Act 2013 is 10% or more, the tendering Company will not
deal with such Company/Firm at all.
Tenderer therefore, must specifically disclose this fact in his technical bid. Non –disclosure
of such facts would immediately disqualify the tenderer for further dealing with the
tendering Company”
63 Usage of “Call Before you Dig” application :
“Permission letters granted online/offline for enforcing use of ‘Call Before U dig’
mobile application for any work involving excavation activity.” (Contractor/Bidder has
to register themselves as Excavator/Digger in “Call before you Dig” application and for any
excavation/digging work , contractor has to take permission/NOC from “Call before you
Dig” application). Copy of registration certificate is to be enclosed along with tender
documents. Also submit Certificate / screenshot that Contractor has to take
permission/NOC from “Call before you Dig” application before starting work. (GUVNL O. L.
No. GUVNL/SE T-3/DE-2/CBuD/1398 dtd. 17.11.2025.)
64 The contractor shall ensure that all poles shall be erected using pole erection devices or machines
wherever technically and practically feasible. Manual erection of poles shall only be permitted in
locations where machine access is not possible, and hard rock area. This must be certified by the
concerned field officer. Non-compliance with this condition will attract penalties as per contract term
and may lead to disqualification from future tenders. This clause is mandatory and forms an
essential part of the quality assurance mechanism for all HT / LT lines and DTR-related works.
65 Dispute Resolution Mechanism:
39 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
- Work contracts and Composite contracts- Arbitration under the Work Tribunal
Constituted under the Gujarat Public Works Contracts Disputes Arbitration Tribunal
a. Ambical Settlement: Any dispute, difference, controversy or claim between the parties
arising out of or relating to this contract with reference to the construction, interpretation,
breach, termination or validity thereof (hereinafter referred as “the Dispute”) shall, upon
the written request of either Party be referred to the authorized representatives of the
Disputing Parties for resolution. The authorized representatives shall promptly meet and
attempt to negotiate in good faith a resolution of the Dispute within thirty days of the
service of the request.
b. Arbitration: If the Parties fail to amicably resolve the disputes or differences or contrary
claims as indicated herewith in sub clause (1) of Clause ……. arising under or in
connection with the present works contracts whether pertaining to works contracts alone
or works and procurement both, the same shall be referred to arbitration under the
“Gujarat Public Works Contracts Disputes Arbitration Tribunal Act, 1992.”
- Procurement / Non-Works Contract – Arbitration thorugh the Arbitration Centre
(Domestic and International) High Court of Gujarat at Ahmedabad.
c. Amicable Settlement: Any dispute, difference, controversy or claim between the
parties arising out of or relating to this contract with reference to the construction,
interpretation, breach, termination or validity thereof (hereinafter referred as “the
Dispute”) shall, upon the written request of either Party be referred to the authorized
representatives of the Disputing Parties for resolution. The authorized representatives
shall promptly meet and attempt to negotiate in good faith a resolution of the Dispute
within thirty days of the service of the request.
a. Arbitration: If the Parties fail to amicably resolve the disputes or differences or contrary
claims as indicated herewith in sub clause (1) of Clause ……. arising under or in
connection with the present agreement, the same shall be referred to the Arbitration
Center (Domestic and International) High Court of Gujarat at Ahmedabad (“the Center”
for short), currently functioning in the High Cout Complex, Sola, Ahmedabad for
appointment of arbitrator and thereupon, the Centre shall appoint a sole arbitrator and
conduct the arbitration proceedings in accordance with its rules. If the parties
unanimously agree to appoint three arbitrators, then in that case, each party shall
appoint one arbitrator from the panel of arbitrators of the Centre, and the Centre shall
appoint the third arbitrator, who will act as the Presiding Arbitrator. Such arbitration shall
be the sole and exclusive remedy between the parties for all disputes arising under or in
connection with this agreement. The arbitration shall take place at the Arbitration
Centre, Ahmedabad, High Court Complex, Sola Ahmedabad, Gujarat in accordance
with the provisions of the Arbitration and Conciliation Act, 1996 as amended frim time to
time, and the proceedings shall be conducted in English. The arbitration award shall be
final and binding on the parties.
Signature of authorized Representative of Company / Agency
Status______________
SEAL & SIGNATURE
OF BIDDER Name of bidder Company / Agency
40 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Certificate of Conflict of interest
This is to certify that…
A bidder shall not have conflict of interest With other bidder for particular quoted item. Such conflict of interest can lead to anti- competitive
practices to the detriment of procuring Entity’s interests. The bidder found to have a conflict of interest shall be disqualified. A bidder may
be considered to have a conflict of interest with one or more parties in this bidding process for particular quoted item, if:
(a) they have proprietor/ partner (s) Director (s) in common; or
(b) they receive or have receive any direct or indirect subsidy/ financial stake from any of them;
(c) they have the same legal representative/ agent for purposes of this bid;
(d) they have relationship with each other , directly or through common third parties, that puts them in a position to have access to
information about or influence on the bid of another bidder;
(e) bidder participates in more than one bid in this bidding process. Participation By a bidder in more than one bid will result in the
disqualification of all bids in which the parties are involved. However, this does not limit the inclusion of the components/ sub –
assembly/ assemblies from one bidding manufacturing in more than one bid.
(f) in cases of agents quoting in offshore procurement, on behalf of their principal manufacturers, one agent cannot represent two
manufacturers or quote on their behalf in a particular tender enquiry. One manufacturer can also authorize only one agent / dealer
there can be only one bid from the following:
1 The principal manufacturer directly or through one Indian agent on his behalf; and
2 Indian / foreign agent on behalf of only one principal
(g) a Bidder or any of its affiliates participated as a consultant in the preparation of the design or technical specifications of the contract that
is the subject of the Bid;
(h) in case of a holding company having more than one independently manufacturing units, or more than one unit having common
business ownership/ management, only one unit should quote , similar restrictions would apply to closely related sister companies.
Bidders must proactively declare such sister/ common/ management units in same/ similar line of business.
(i) Bidder shall not act in contravention/ violation to the provisions of competition act, as amended from time to time.
Authorized Signatory:
Firm Name & Stamp:
41 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Certificate for Relationship with employee:
Relation with Employee” Declaration
This is to Declare that Mr./Ms_______________________________________, employee Of MGVCL at
This is to declare that none of the Proprietors/Partners/Directors are having any relatives employed
or working with Madhya Gujarat Vij Company Limited. At any of its office or its parent Department
i.e. Energy & Petrochemical department. Govt. of Gujarat.
Our Company/firm, the interest (i.e. Shareholding in company and share in partnership firm) of any
employee of the Madhya Gujarat Vij Company Limited or our relatives as defined in Section 2(77) of
the Company’s Act. 2013 is not more than 10%.
Authorized Signatory:
Firm Name & Stamp:
42 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Blacklisting Declaration
The Executive Engineer,
Nadiad City Division Office,
Sardar NAagr Road, Opp. Hindu Anath Ashram
Nadiad – 387002 Gujarat
Subject: Declaration of Non-Blacklisting
Dear Sir/Madam,
We, the undersigned, hereby declare that our firm, ______________________________, is not
blacklisted or debarred by any Government department, DISCOM, PSU, or any other Government
agency as of the date of this declaration.
We also declare that there are no pending investigations or inquiries against our firm regarding
issues of dishonesty, fraud, misconduct, or violation of laws and regulations that could lead to
blacklisting or debarment.
We understand that if it is found that our firm has been blacklisted or debarred by any authority, we
will be disqualified from the current tender process, and our bid may be rejected.
This declaration is being submitted as part of the tender for
Tender No. ______________________, to the Nadiad City Division.
Authorized Signatory:
Firm Name & Stamp:
43 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
MADHYA GUJARAT VIJ COMPANY LIMITED
NADIAD CITY DIVISION OFFICE, SARDARNAGAR ROAD, NADIAD – 387
Ph. No-0268-2532906,Web Site : www.mgvcl.com E-mail : [email protected]
Fax No : 0268 -
Excavation of trench 0.5mtr wide and 1mtr
deep for laying of HT/LT underground cable of
sizze upto 300sq.mm PILC or XLPE .(The cable
should be laid on bed sand and to cover cable
with half round RCC pipe 6" internal dia and
length of one meter along with each bottom
and top.) The entire trench there after should
be refilled with earth dully rammed up to
ground level As per Drg. No MGVCL/Tech/UG
Cable/01/2012-13
Excavation of trench 0.75mtr wide and 1mtr
deep for laying of double HT/LT underground
cable of size upto 300sq.mm PILC or XLPE .(The
cable should be laid on bed sand and to cover
cable with half round RCC pipe 6" internal dia
and length of one meter along with each
bottom and top.) The entir trench there after
should be reffiled with earth dully rammed up
to ground level as per Drg. No
MGVCL/Tech/UG Cable/02/12-13
Laying/relaying of cable in cable trench and
3 9913000038 from ground level to pole structure for MTR 950 60
providing outdoor cable joints.
Laying /Relaying XLPE/PILC cable by digging of
4 9913000039 pits, removal of old cable and laying of new MTR 100 181
cable on sand bad as per item no.1 above.
Widening & refilling with earth dully rammed
5 9913000040 the tranch for laying additional No. of cable . MTR 100 60
For item no. 1 above.
Add: charges for digging of tar road for laying of
6 9913000020 cables over and and above digging of pit in MTR 500 50
normal soil as per Sr. No.
laying of U/G 11KV XLPE Cable by push & Pull
method (Mannual/By Horizontal Directional
Machine) thru with HDPE pipe 110mm
Diameter 5.3 to 6mm thickness or 4" diameter
GI Pipe without damaging surface of the road
by horizontal boring/ drilling method (Excluding
cost of HDPE pipe or 4" GI pipe ) as per
drawing and specification.
Moulding of cable joint (St.joint, indoor and
8 9902050002 outdoor) for XLPE Cable -labour charges for No. 225 3258
Moulding of cable joint (St.joint, indoor and
9 9902050001 outdoor) for XLPE Cable -labour charges for No. 50 3957
44 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Preparing of Digital map underground network
by capturing Geographical co-ordinates with
GPS Instrument (having accuracy within
Mtr.) and superimposing the
Supply & fixing olabour charge for providing
Brick (Size 9"x4"x3")layer (4" side layer 10 Nos
of Bricks per meter length of cable Top side +
9" side layer 4.5 nosx 2 side =10+9=19
11 9501060079 Nos/Running meter ) for 11KV XLPE cable No. 500 5
Mechanical protection (only top side layer) at
cable ring (loop) location , as per instruction of
Engineer in Charge @Rs.4/- per Bricks current
market rate FOR site delivery.
Supply & laying in cable trench at 300 mm to
450 mm deep from ground level Warning Tape
of 8" eight inch width of 300 micron LDPE
material for protection of U/G Cable laid
12 9911000023 underground during any excavation work as per RMTR 750 11
instruction of Engineer in Charge (Rs. 5 .5 per
mtr Material cost + Rs. 1.5 per mtr. FOR site &
laying labour charge above cable in excavated
trench= Rs. 7.00 per meter.)
Supply of HDPE pipe for laying 11KV XLPE cable
13 0302000077 110mm nominal Diameter & 5.3 to 6 mm RMTR 3000 296
thickness as per IS:4984
supply of half round RCC hume pipe 6" internal
dia & length of 1Mtr.
supply of medium grade GI Pipe of size 4" dia (
Including Clmaping the cable with pole.) G.I.
pipe at ground end to be banded outside (Bell
Shape) to prevent damage of cable.
Supply of sand 0.300X0.500X1.00mtr (Layer at
16 9913000049 bottom of cable trench apprx. 0.15cmt) as per RMTR 550 114
Drg. No. MGVCL/Tech/UG Cable/01/12-13
Supply of sand 0.300X0.750X1.00mtr (Layer at
17 9913000050 bottom of cable trench apprx. 0.225cmt) as per RMTR 200 172
Drg. No. MGVCL/Tech/UG Cable/02/12-13
Providing and supplying, fixing route makker of
concrete stone ( MGVCL Marked with approved
yellow colour) embedded in earth at lest
18 1599000011 300mm below the G.L. & 450mm above G.L. at No. 415 143
distance approx. 100mtr or as dierected by
Engineer in Charge, along the length of
cable.(This includes material & labour charge
for excavation & refilling)
Providing & laying C.C.(1:4:8) for
foundation & plinth with gravel or picked
up metal or hand broken stone of size
mm to 60 mm as coarse aggregate
including mixing, watering, ramming,
consolidating etc., complete as directed
by E.I.C 100mm thickness to be
maintained by contractor.
45 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
Providing & laying M-15 grade of concrete
with minimum cement content 320 kg/M3
and keeping maximum free water cement
ratio as 0.60, for plain structure
foundation using 12 mm to 20 mm size
black trap machine crushed metal
20 9503010005 including necessary centering for all sides CMT 10 3400
as required, mixing the concrete in mixer
machine, ramming with kuba & finishing
the exposed honey combed surface if any,
curing, etc., complete as per directed by
E. I. C. 100mm thickness to be maintained
Supply of 11KV Out door Cable Box for XLPE
Supply of 11KV Out door Cable Box for XLPE
Supply of 11KV Out door Cable Box for XLPE
Supply of 11KV Straight through joints for
XLPE 240 mm2 Cable
Supply of 11KV Straight through joints for
XLPE 185mm2 Cable
Supply of 11KV Straight through joints for
XLPE 95mm2 Cable
Supply of 11KV In door Cable Box for XLPE
Supply of 11KV In door Cable Box for XLPE
TOTAL ESTIMATE AMT.
Seal & Sign of Executive Engineer
Contractor with Rubber Stamp MGVCL, Nadiad City Division
46 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
47 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
PR NO. 223163, 1ST ATTEMPT
48 D:\E drive\Tech\Tenders\N Procurement\UNDER GROUND\UG CABLE JAN-26\01 UG CABLE EAST SDN, TID NO\00 Tender UG
CABLE EAST TID No..docx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 TENDER COPY - 268779.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .