Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹84.4 CrAccepted-Finance D 1 1 GILLANDER HOUSE 8 N S ROAD KOLKATA 700001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | ₹84.4 Cr | 1 | Accepted-Finance Lowest Bidder |
| 2 | 2₹89.9 Cr+₹5.5 Cr (6.53%)Accepted-Finance 15 GANESH CHANDRA AVENUE 7TH FLOOR KOLKATA WEST BENGAL 700013 | KOLKATA | WEST BENGAL | 700013 | ₹89.9 Cr+₹5.5 Cr (6.53%) | 2 | Accepted-Finance 2nd lowest bidder |
| 3 | Not Admitted-Fee/PreQual/Technical KIRIBURU KIRIBURU KIRIBURU KIRIBURU WEST SINGHBHUM JHARKHAND 833222 UDYAM JH 24 0000129 | WEST SINGHBHUM | JHARKHAND | 833222 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹75.5 Cr
Closing Date
3 Mar 2022, 3:00 pmClosed
Chief Executive Officer
Office of the Chief Executive Officer Agartala Smart City Limited UD Bhavan, Shakuntala Road, Agartala
DEVELOPMENT OF HAORA RIVERFRONT IMPROVING THE RIVER BANK AND BED PROTECTION AND CONSTRUCTION OF PEDESTRIAN BRIDGES ROADS AND ARCHITECTURAL WORKS AND POST COMPLETION OPERATION AND MAINTENANCE FOR FIVE YEARS INCLUDING DLP OF ONE YEAR
2022_CEO_26165_1
ASCL / RFP / HRFD / 08-2021
Open Tender
Composite Works
Item Rate
540 days
Agartala
As per DNIT
8 documents required · 8 mandatory
₹5,000
Exempted
Agartala
30 Aug 2022
9 Feb 2022
4 Mar 2022
9 Feb 2022
3 Mar 2022
9 Feb 2022
9 Feb 2022 - 15 Feb 2022
16 Feb 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SITE CLEARING | |||||
| 1.01 | Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per
direction of the Engineer- in-charge:- Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 112 | Cum | 1,070.7 | ₹1,19,918.4 |
| 1.02 | Demolishing reinforced cement concrete manually / by mechanical means including stacking of steel bars properly and disposal of unserviceable material
with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge. | 655.1 | Cum | 1,556.4 | ₹10,19,597.64 |
| 1.03 | Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials with all lifts and upto a lead of 50m etc.
complete as per direction of the Engineer- in-charge:- In cement mortar. | 493.35 | Cum | 854.1 | ₹4,21,370.24 |
| 1.04 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :Of area 3 sqm and below | 64 | Each | 161.7 | ₹10,348.8 |
| 1.05 | Dismantling steel work in built up section in channels, angles, tees, flats including all gusset plates, bolts, nuts, cutting rivets, welding including
dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc. complete as per
direction of the Engineer- in-charge. | 17,500 | Kg | 2.4 | ₹42,000 |
| 1.06 | Dismantling GS sheet roofing including ridges, hips, valleys, gutters wind ties etc. including dismembering and stacking of serviceable materials
and unserviceable materials separately with all lifts and upto a lead of 50 m etc.complete as per direction of the Engineer- in-charge. | 634 | Sqm | 70.4 | ₹44,633.6 |
| 1.07 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges,retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRT&H Technical Specification Clause 202.
(ii) Dismantling brick / tile work
B) In cement mortar | 665 | Cum | 324.1 | ₹2,15,526.5 |
| 1.08 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges,retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRT&H Technical Specification Clause 202.
(II) By Mechanical Means
B)Prestressed / Reinforced Cement Concrete grade M-20 & above | 72 | Cum | 899.8 | ₹64,785.6 |
| 1.09 | Dismantling of Kerb Stones by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per MoRT&H Technical Specification Clause 202 | 100 | Rm | 12.7 | ₹1,270 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
dNIThrfd.pdf
Tender Notice • 1.59 MB
dNITtechspec.pdf
Tender Notice • 16.35 MB
dNITlistdrg.pdf
Tender Notice • 0.40 MB
BOQ_26535.xls
BOQ Document • 0.61 MB
92211963.pdf
Tender Document • 0.27 MB
drg1.rar
Tender Document • 24.89 MB
drg2.rar
Tender Document • 18.12 MB
drg3.rar
Tender Document • 21.97 MB
drg4.rar
Tender Document • 14.62 MB
drg5.rar
Tender Document • 15.22 MB
drg6.rar
Tender Document • 23.48 MB
drg7.rar
Tender Document • 15.73 MB
drg8.rar
Tender Document • 26.32 MB
drg9.rar
Tender Document • 18.52 MB
drg10.rar
Tender Document • 22.45 MB
drg11.rar
Tender Document • 19.68 MB
92211966.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .