RAJEEV KUMAR RATHI, EXECUTIVE ENGINEER NAGAR
NAGAR NIGAM BAREILLY
In Ward-59, construction of a concrete road from Tausifs house to Morpals house on the Milak to Rotha road, and further concrete road construction from Morpals house to the Shiva temple.
2026_DOLBU_1123765_1
129/PA/NCAP/NNB/25-26 (21 To 38) Sr No 24 Tender List 38 Date-08.03.2026
Open Tender
Civil Works
Percentage
180 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Bareillye-tender.com
₹3.3 L
11 Mar 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
Dismantling manually/ by mechanical Bituminous road means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge
Earth work for cuitting or embankment in ordinary soil earth work in filling or embankment to be in 20 cm layers, including ,watering ,Dressing ,compacting ,ramming the soil to achive 95% proctor density ,and dressing the surface to be required levels and slope and also including 1.50m lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance as directed by the Engineer-in-charge. (Excluding Royalty) Analysis rate (32.50+160+122.30-33=281.80)
Disposal of surplus earth upto 5 km
Supply of Earth for filling or embankment in ordinary soil earth work in filling or embankment to be in 20 cm layers, including ,watering ,Dressing ,compacting ,ramming the soil to achive 95% proctor density ,and dressing the surface to be required levels and slope and also including 1.50m lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance as directed by the Engineer-in-charge. (Excluding Royalty) Analysis rate
First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour T&P etc required for proper completion of work.
12 mm thick plaster in 1:4 cement & c'sand mortor over brick work minimum thickness not less then 10 mm including all supply of meterial , Labour T&P etc required for proper completetion of the work.
Providing laying C.C with 2cm gauge approved stone ballast, approved coarse sand and cement in praportion of 1:2:4 including supply of all materials, labour and T&P etc required for proper completetion of the work.
RCC 1:1.50:3 with cement c'sand stone grit of 20 mm gauge in Columns excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work.
RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in Slabs excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work.
Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as directed by E/I.
Construction of Granular sub (G.S.B.) by providing, laying, spreding and compacting speciffied graded crushed stone in sub base coarse including premixing the materials at O.M.C. in mechanical mixer (Plug Mill) including carriage of mixed msterials, laying in uniform layers with power roller to achieve the desired density including all materials, labour, machinery, lighting gaurding, barricading and maintance of diversion complete of as per MoRT & HT technical specification clause No. 404B.
P/L of 125 micron Plastic Sheet
Supply and Laying of C.C Interlocking Tiles 80mm thick in road pavement having a compressive strength not lass than 300 kg / cm2 including 40 mm thick bed of fine sand of F/M 1.25 with a specification ratio of coarse material stone grit of size 8 mm to 12 mm in ratio 2:3 and fine material port land cement & coarse sand 1 : 1 -1/2 and mix it coarse material with ratio 3:2 and top sarface of tile at least 5mm thick with mix of cement and marble dust with ratio 1:1 provide the machanical pressure of 380 kg/cm2 at the time of manifacture of tile. In the manifacture of tiles the use of cement 7.5 begs of 50 kg to 8.5 bages per m,3 and labour, including supply of all material, T&P for proper completion of the work, and joint filled with fine sand, also including as per direction of E/I (zig-zag and 20% coloured tiles)
Cement concrete with 2 cm. gauge approved stone, ballast, approved coarse sand and cement in the proportion of 3:1.50:1 including supply of all materials, labour and T&P etc. required for proper completion of the work
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 32.54 MB
BOQ_2093761.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .