Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 LAccepted-AOC ARUNODAYAM H KAYANNA BAZAR PO 673525 | KOZHIKODE | KERALA | 673525 | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.1 L+₹13,004.75 (0.73%)Rejected-AOC KERALA KL KERALA | L2 | Rejected-AOC L2 | |
| 3 | L3₹18.4 L+₹51,832.72 (2.89%)Rejected-AOC DOOR NO 148 KURUDIMUKKU ARIKKULAM PO KOYILANDY KERALA | L3 | Rejected-AOC L3 |
Tender Value
₹23.7 L
EMD Value
₹50,000
Closing Date
1 Jun 2023, 6:55 pmClosed
Executive Engineer
KyIP Division Perambra
Rectification of Irrigation canal
2023_Irrig_578135_1
EE/KyIP/27/2023-24
Open Tender
Civil Works - Canal
Item Rate
180 days
nochad
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
16 Aug 2023
25 May 2023
3 Jun 2023
25 May 2023
1 Jun 2023
25 May 2023
25 May 2023 - 1 Jun 2023
Amount
Canal Lining
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
VK BALAN
ARIKKULAM LABOUR CONTRACT AND CONSTRUCTION CO-OPERATIVE SOCIETY
Bidder Name
VK BALAN
CHANDRAN.C.H
ARIKKULAM LABOUR CONTRACT AND CONSTRUCTION CO-OPERATIVE SOCIETY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_853773.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .