Loading…
Loading…
Tender Value
₹37.8 L
EMD Value
₹75,692
Closing Date
10 Jul 2026, 1:00 pmClosed
Executive_Engineer_Kolkata_North_Division_PWD
O/O_Executive_Engineer_Kolkata_North_Division_PWD 166_10 BT Road Dunlop Kolkata_108
Rehabilitation work of existing moderately bridge over Sonai Khal at Chainage 4_040 km on Tarun Sengupta Sarani during the year 2025_26
2026_WBPWD_5015810_1
WBPWD/EE/KND/NIeT-05/2026-2027
Open Tender
CIVIL WORKS
Percentage
Tarun Sengupta Sarani
Please refer Tender documents.
5 documents required · 5 mandatory
₹75,692
Yes
3 Jul 2026
22 Jun 2026
13 Jul 2026
27 Jun 2026
10 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (a) Depth upto 1.5 m. | 186 | M2 | 386 | ₹71,796 |
| 1.01 | (b) For additional depth beyond 1.5 m. and upto 3.00 | 186 | M2 | 439 | ₹81,654 |
| 1.02 | c) For additional depth beyond 3.00 m. | - | M2 | 498 | - |
| 2 | Supplying empty Cement bags in good condition | 7,086 | each | 3.3 | ₹23,383.8 |
| 3 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. | 7,086 | each | 3.5 | ₹24,801 |
| 4 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. | - | Cum | 936.21 | - |
| 5 | Bailing or pumping out water from foundation trenches. | - | Cum | 20.88 | - |
| 6 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 186 | M2 | 24 | ₹4,464 |
| 7 | Cleaning and removing conservancy garbage mixed with rubbish & other filthy materials from the road side flank, drain and compound including cutting, loading, unloading to and from truck or cart by Mathor labour & removing the same to any distance. | 54 | Cum | 56.62 | ₹3,057.48 |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (e) Extra for staging beyond 4 m in any floor (Mode of measurement: area in plan x mean height of staging upto soffit of shuttering above initial 4 m) | 64 | Cum | 61 | ₹3,904 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.10 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_5084834.xls
BOQ • 0.35 MB
2911iiason01122019.pdf
Tender Documents • 0.54 MB
AnnexureXnew.pdf
Additional Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .