| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr Quoted ₹3.8 Cr | L1 | Accepted-AOC Accepted-Finance |
| Sl No | Description | Qty | Unit | Sadar Singh Rawat L1 |
|---|---|---|---|---|
| 1.00 | Excavation in hill side cutting for construction of motor road in all type of soil and rocks as meet at site true to lines as per L-section,Plan and cross section,camber ,superelevation as required also including uprooting and cutting of bushes dressing of road surface to the required level and slopes with all lead upto dumping places and all lift for safe disposal of surplus excavated materials including clearance of slips and keeping the road open to traffic and inspection to all vehicle in all seasons including cost of all material labour,T&P explosives etc required for proper completion of workand as per directions of Engineer-in-Charge. | 1 | 1 Job | - |
| 2.00 | Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kanker/Moorum. Placing tipper at loading point, loading with front end loader, dumping, turning forreturn trip, excluding time for haulage and return trip Taking ot put 5.5 cum | 67,359 | Cum | - |
| 3.00 | Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in -charge | 4,604 | Cum | - |
| 4.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. iing supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 2,062 | Cum | - |
| 5.00 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupperetc. Including supply of all materials,labour,t & p& royality etc,required for propercomplition of work.(As per PWD Uttarakhand specifications) | 2,914 | Cum | - |
| 6.00 | H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. Complete | 1,135 | Cum | - |
| 7.00 | Providing and laying of wire crates 3.00x1.50x1.50 in size with a 10 gauge BWG GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stoneboulders weighing not less than 25 kg each.(As per PWD Uttarakhand Specification) | 2,424 | Cum | - |
| 8.00 | Cement plum masonry with 40% plum & 60% 1:3:7 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work (As per PWD Uttarakhand specifications) | 300 | Cum | - |
| 9.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.Nominal mix 1:3.6 (Nominal mixing) | 245 | Cum | - |
| 10.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.Hand mix 1:3.6 . | 8 | Cum | - |
Tender Value
₹4 Cr
EMD Value
₹8 L
Closing Date
14 Aug 2019, 3:00 pmClosed
Superintending Engineer, 8th circle PWD, Tehri
Office of the Superintending Engineer, 8th circle PWD, Tehri
New Construction of Chamiyala Indrawangaon Kangra Motor Km. 1.00 to 10.00
2019_pwd_19342_1
5102/04Cash-Tender-8/2019 Dated 24-07-2019
Open Tender
Civil Works - Roads
545 days
Near Lata Chamiyala Ghansali
As per NIT and Technical Bid
2 documents required · 2 mandatory
₹5,900
EE TD PWD Ghansali
₹8 L
Yes
8th Circle, PWD, New Tehri.
19 Dec 2025
30 Jul 2019
14 Aug 2019
30 Jul 2019
14 Aug 2019
2 Aug 2019
2 Aug 2019
Amount
Excavation in hill side cutting for construction of motor road in all type of soil and rocks as meet at site true to lines as per L-section,Plan and cross section,camber ,superelevation as required also including uprooting and cutting of bushes dressing of road surface to the required level and slopes with all lead upto dumping places and all lift for safe disposal of surplus excavated materials including clearance of slips and keeping the road open to traffic and inspection to all vehicle in all seasons including cost of all material labour,T&P explosives etc required for proper completion of workand as per directions of Engineer-in-Charge.
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kanker/Moorum. Placing tipper at loading point, loading with front end loader, dumping, turning forreturn trip, excluding time for haulage and return trip Taking ot put 5.5 cum
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in -charge
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. iing supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)
Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupperetc. Including supply of all materials,labour,t & p& royality etc,required for propercomplition of work.(As per PWD Uttarakhand specifications)
H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. Complete
Providing and laying of wire crates 3.00x1.50x1.50 in size with a 10 gauge BWG GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stoneboulders weighing not less than 25 kg each.(As per PWD Uttarakhand Specification)
Cement plum masonry with 40% plum & 60% 1:3:7 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work (As per PWD Uttarakhand specifications)
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.Nominal mix 1:3.6 (Nominal mixing)
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.Hand mix 1:3.6 .
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5.R.C.C M 25
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2.4 P.C.C. grade M 20
Hill side deffect cutting work from km-1 to km-4
Excavation in soil in Hilly Area by mechanical means Withoutuseinng Dozer including cutting and trimming of side slopes anddisposing of excavated earth with a lift upto 1.5 m and a lead upto20 m as per Technical Specification Clause 1603.1
Excavation in hilly area in ordinary rock notrequiring blasting bymechanical means without using Dozer including cutting andtrimmingof slopes and disposal of cut material with a lift upto 1.5 m and leadupto 20 m as per Clause 1603.2.
Excavation in hilly areas in hard rock requiring blasting, bymechanical means without using Dozer , lift upto 1.5 m anddisposal of excavated rock upto a lead of 20 m as per Clause 1603.2.
Maintenance for Three years
1st year 1-Trimming of grass and weeds from the shoulders/Berms and disposing of the same to suitable locations as per technical specification clause 1914. 2-Maintenance of road side drain including minor slip clearence reshaping, deepening and regrading as well as catch water drains as per technical specification clause 1907. 3-Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per technical specification clause 1903. 4- Maintenance of scuppers & culverts by way of clearing, cleaning, erosion repair, repair to crack, parapet walls and protection works as per technical specification clause 1908. 5- Maintenance of Causeway by way of minor surface repairs, replacing guide posts, repair of fixed gauges, removal of debris providing boulders and protection works and painting as per technical specification clause 1909. (0.5% of Total amount)
IInd year 1-Trimming of grass and weeds from the shoulders/Berms and disposing of the same to suitable locations as per technical specification clause 1914. 2-Maintenance of road side drain including minor slip clearence reshaping, deepening and regrading as well as catch water drains as per technical specification clause 1907. 3-Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per technical specification clause 1903. 4- Maintenance of scuppers & culverts by way of clearing, cleaning, erosion repair, repair to crack, parapet walls and protection works as per technical specification clause 1908. 5- Maintenance of Causeway by way of minor surface repairs, replacing guide posts, repair of fixed gauges, removal of debris providing boulders and protection works and painting as per technical specification clause 1909. (1% of Total amount)
IIIrd year 1-Trimming of grass and weeds from the shoulders/Berms and disposing of the same to suitable locations as per technical specification clause 1914. 2-Maintenance of road side drain including minor slip clearence reshaping, deepening and regrading as well as catch water drains as per technical specification clause 1907. 3-Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per technical specification clause 1903. 4- Maintenance of scuppers & culverts by way of clearing, cleaning, erosion repair, repair to crack, parapet walls and protection works as per technical specification clause 1908. 5- Maintenance of Causeway by way of minor surface repairs, replacing guide posts, repair of fixed gauges, removal of debris providing boulders and protection works and painting as per technical specification clause 1909. (1.5% of Total amount)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid