Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.0 LAccepted-AOC | L1 | Accepted-AOC L1,Hence accepted | |
| 2 | L2₹83.8 L+₹9.9 L (13.3%)Rejected-AOC MAYURAM PAYANCHERY IRITTY KANNUR PIN 670001 | IRITTY | KANNUR | KERALA | 670001 | L2 | Rejected-AOC L2,Hence rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical L3Hence reject |
| Sl No | Description | Qty | Unit | PRINCE PM L3 | PRAVAH INFRATECH LLP L2 | ASHIF PK L1 |
|---|---|---|---|---|---|---|
| 1.00GROUND FLOOR | ||||||
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 625 | sqm | 35.9 ₹22,437.5 | 34.21 ₹21,381.25 | 10 ₹6,250 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 136.04 | cum | 365.96 ₹49,785.56 | 348.67 ₹47,433.42 | 320 ₹43,533.12 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 31.13 | cum | 8,070.39 ₹2,51,263.52 | 7,689.09 ₹2,39,392.13 | 7,400 ₹2,30,391.6 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 35.97 | sqm | 392.85 ₹14,129.24 | 374.29 ₹13,461.71 | 320 ₹11,509.12 Lowest |
| 1.00 | OD256644/2025-2026:Modified 5.33.1 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Minimum cement content considered for this items is 330 kg/cum of concrete. Note : - Cement content obtained as
per mix design shall be used by the contractor at the site to obtain the required
strength. Excess cement used as per design mix is not payable separately as per
circular no.CE/BL/GL/6541/2015 dated 30.08.2017 of Chief Engineer,
Buildings,PWD . All works up to plinth level. | 8.2 | cum | 11,078.31 ₹90,808.91 | 10,554.89 ₹86,518.43 | 10,200 ₹83,609.4 Lowest |
| 1.01 | OD260565/2025-2026:Modified 5.33.2 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note. The minimum cement content considered for this item is 340kg/cum Note:- Cement content obtained as per mix design shall be used by the contractor at the site to obtain the required strength. Excess cement used as per design mix is not payable separately as per circular no.CE/BL/GL/6541/2015 dated 30.08.2017 of Chief Engineer, Buildings, PWD- All works between plinth level and floor V. | 37.75 | cum | 13,148.07 ₹4,96,339.64 | 12,526.85 ₹4,72,888.59 | 12,000 ₹4,53,000 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 7.58 | sqm | 392.85 ₹2,977.02 | 374.29 ₹2,836.37 | 320 ₹2,424.96 Lowest |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 6.45 | sqm | 1,026.03 ₹6,622 | 977.55 ₹6,309.11 | 950 ₹6,131.3 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 142.37 | sqm | 776.1 ₹1,10,493.36 | 739.43 ₹1,05,272.65 Lowest | 750 ₹1,06,777.5 |
Tender Value
₹80.7 L
EMD Value
₹50,000
Closing Date
11 Mar 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Regional Manager
KSCC Ltd, Regional Office Kannur
GENERAL-NAM 2023-24-Construction of OP Block at Govt. Ayurveda Hospital, Payyannur- Kannur District-General Civil Work
2026_KSCC_842845_1
PWD/KS/TR/19068/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
365 days
PAYYANNUR
Please refer tender documents
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
19 Jun 2026
3 Mar 2026
13 Mar 2026
3 Mar 2026
11 Mar 2026
3 Mar 2026
3 Mar 2026 - 11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1GROUND FLOOR | |||||
| 1.001 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 625 | sqm | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 136.04 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 31.13 | cum | - | - |
| 1.004 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 35.97 | sqm | - | - |
| 1.005 | OD256644/2025-2026:Modified 5.33.1 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Minimum cement content considered for this items is 330 kg/cum of concrete. Note : - Cement content obtained as
per mix design shall be used by the contractor at the site to obtain the required
strength. Excess cement used as per design mix is not payable separately as per
circular no.CE/BL/GL/6541/2015 dated 30.08.2017 of Chief Engineer,
Buildings,PWD . All works up to plinth level. | 8.2 | cum | - | - |
| 1.006 | OD260565/2025-2026:Modified 5.33.2 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note. The minimum cement content considered for this item is 340kg/cum Note:- Cement content obtained as per mix design shall be used by the contractor at the site to obtain the required strength. Excess cement used as per design mix is not payable separately as per circular no.CE/BL/GL/6541/2015 dated 30.08.2017 of Chief Engineer, Buildings, PWD- All works between plinth level and floor V. | 37.75 | cum | - | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 7.58 | sqm | - | - |
| 1.008 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 6.45 | sqm | - | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 142.37 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1422292.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_1422292.xls
BOQ • 0.48 MB
viewsbd.pdf
Tender Documents • 2.15 MB
Tenderdescription.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .