| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 CrAccepted-AOC | ₹9.6 Cr Quoted ₹9.4 Cr | L1 | Accepted-AOC Lowest quoted bidder |
Tender Value
₹9.5 Cr
EMD Value
₹19.0 L
Closing Date
13 Jun 2024, 11:00 amClosed
Deputy Chief Engineer, Electrical Circle Haripad
Office of the Deputy Chief Engineer, Electrical Circle Haripad-690514
Development of Distribution Infrastructure at Alappuzha Districts (Haripad Circle) -Package 2 of Kerala under RDSS Scheme. (Reconductoring 40.19km 11Kv line using HT ABC 120sqmm cable) (Package-2)
2024_KSEB_672887_1
Re-E Tender No.07/DCE/ECH/2023-24 Dated-16/05/2024
Open Tender
Electrical Works
Turn-key
270 days
Under Electrical Circle, Haripad
Please refer tender documents
9 documents required · 9 mandatory
₹11,800
₹19.0 L
Yes
Deputy Chief Engineer, Electrical Circle Haripad
22 Feb 2025
16 May 2024
19 Jun 2024
16 May 2024
13 Jun 2024
23 May 2024
16 May 2024 - 23 May 2024
23 May 2024
Reconductoring of 11KV OH Line
using ABC 3x120+1x95 sqmm cable
Aerial Bunched Cable HT 3x120 + 1x95 sq.mm (Insulated Messenger)
Pole PSC 9 M
A pole 11 m
A pole 12 m
Anchoring /Dead end Clamp Assembly for HT AB Cables up to 120 sq.mm
Suspension Clamp Assembly for HT AB Cables up to 120 sq.mm
Stainless Steel Strap 20mmX0.7mm along with Stainless steel Buckles [20.5 mm x 1.5 mm; thickness 1.2 mm] as per requirement
MVT Kit For HT ABC- 1 set = 3 Nos
Heat Shrinkable Termination Kit (3 Nos) for 120 Sq.mm Three phase Aerial Bunched Cable
Channel cross arm GI 75 x 40 x 6mm 2.4 m with GI- Clamp Bolt & Nut with washers
Lightning Arrester 9 kV,10 KA (Station class) Composite Polymer Housing 1 set = 3 nos with LA Supporting plate GI of size 500x300x3MM
CROSS ARM GI CHANNEL 2 LINE (2 Line Channel Cross Arm) with Clamp, Bolt & Nut and washers
CROSS ARM GI CHANNEL 4 LINE (4 Line Channel Cross Arm) with Clamp Bolt & Nut and washers
Composite type polymeric PIN INSULATOR 415V
SHACKLE INSULATOR 415V (WITH STRAP BOLT&NUT)
GI Stay Set includes ( HT) 1. Stay Insulator Porcelain 11k V - 2 Nos 2. Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI) 3. STAY TIGHTNER HT 4. Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) 5. Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) 6. Helically formed Guy-Grip HT 7. Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT) 8. Stay clamp (GI ) etc as required as per technical specification, approved drawings and scope of work.
G.I.WIRE. 4MM (8 SWG)
Coil Earth set includes 1. Earthing Coil GI 115 Turns 50 mm internal Dia 2. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. 3. Ferrules 5 SQ.MM - GI etc as required as per technical specification, approved drawings and scope of work.
GI Pipe Earthing set includes 1. Pipe GI 40 mm dia - 2.5 m Length( Earth Pipe) 2. Earth Chamber (RCC) with RCC Covering Slab 3. Earth Connector 95 Sqmm 4. Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) 5. Stainless Steel strap and Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. etc as required as per technical specification, approved drawings and scope of work.
Bolt & Nut (GI ) with washers of various sizes as per requirement
RDSS Sign Board as per approved spec
Description of Work / Item(s)
Reconductoring of 11KV OH Line
using ABC 3x120+1x95 sqmm cable
Survey of line using GPS, route alignment and , preparation of survey report and uploading in the web portal after approval of project manager.
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in all classes of soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing.
Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items, drawing sufficient length of GI earth leads to the ground for earthing etc complete including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in all classes of soil , fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Providing concrete muffing for A pole of size 0.45x0.45x1.5m (0.5 m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5 sides
Fitting and providing one HT Stay for 11kV pole - excavation of stay pit in all classes of soil and back filling including erection of complete stay set along with with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings etc. .
Renewal of existing damaged/old 11kV Stay with complete stay set along with excavation of stay pit in classes of soil with GI stay wire ( 7/3.15 mm dia), binding of stay wire, providing guy stay insulator ( 2 Nos) and .2 cum concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips ( 1:3:6) as per technical specification, approved drawings & backfilling of pit, dismantling, refitting of all items in place including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Fitting and providing one Strut using HT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Renewal of any type of existing damaged/old 11kV Strut with new PSC strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items including the conveyance of the taken back materials to KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Dismantling (without damage) 11 kV line (Three conductors) /LT line including dismantling cross arm, insulators, disc, spacers, disconnecting jumper connection etc & disconnection of service connection where ever necessary & rolling the conductor and stacking the materials and then transporting safely to the KSEBL store and stacking the same with proper documentation as directed by KSEBL.
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with insulated Messenger through existing poles/ newly inserted pole providing loop where ever necessay and tieing the cables using UV plastic tie -Heavy Duty of Length as per standard( including cost of plastic tie).The work also includes 1. Touching clearance where ever necessary. 2. Erection of Anchoring clamp / suspension clamp 3. Installation of MVT and its terminal connections where ever necessary 4.Straightening of poles wherever necessary 5. Re erection of dismantled LT lines and all associated materials ( including street light fittings) / re connection of dismantled service connections whereever necessary etc
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm
Erection of 11kV LA set ( 3 Nos) with supporting plates and giving all connections etc including cost of earth strip- GI ( 25 x 3mm) and its drawal.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in all classes of soil & backfilling.
Providing one Earth using GI earth pipe of size 40mm dia,2.5 m length including digging separate pit (0.45X0.45X2.5 m) at standard distance (1.5m) away from the pole/structure in all classes of soil and backfilling the pit with Bentonite powder and other accessories for improving earth resistance and providing earth chamber with covering slab complete.(includes the cost of adeqaute earth enhancing compound- Bentonite powder etc)
Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle)
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
Labour charges for loading HT 'A' type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Transfering LT 3phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting same on the new pole, binding etc, complete
Transporting HT line materials (excluding poles)
Description of Work / Item(s)
Materials( Total Ex-work price of Materials + Total Transportation cost ) excluding GST.
Installation / Erection Charges (Excluding GST)
TOTAL AMOUNT [1+2] (Excluding GST)
Discount offerred by Bidder(If any)
BOQ 3 : GRAND TOTAL (3-4)
GRAND TOTAL INCLUDING GST
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .