Tender Value
₹24.4 L
EMD Value
₹48,787
Closing Date
28 Sept 2026, 4:00 pm
Executive Engineer ED Baramulla
Executive Engineer ED Baramulla
PDD2627100246 Augmentation of Sub Stations for Critically overloaded DTs for winter preparedness for various division of KPDCL falling under the jurisdiction of P and AO KPDCL sopore (ED Baramulla) under UT Capex 2026-27
2026_PDD_323581_1
EDB/51
Open Tender
Electrical Works
Percentage
45 days
PDD2627100246 Augmentation of Sub Stations for Cri
Please Refer to Tender Documents
5 documents required · 5 mandatory
₹1,007
Yes
Executive Engineer ED Baramulla
₹48,787
Yes
5 Sept 2026
5 Sept 2026
30 Sept 2026
5 Sept 2026
28 Sept 2026
7 Sept 2026
5 Sept 2026 - 7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
Augmenetation of 63KVA to 100KVA at Naikoo Mohalla Zehanpora of ESD Mohura
(Complete Job)
(Detailed Estimate Enclosed) | 1 | Job | 3,44,513.13 | ₹3,44,513.13 |
| 2 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
Augmenetation of 25KVA substation by 63KVA near post office at Khawajabagh Baramulla of ESD Baramulla 1st
(Complete Job)
(Detailed Estimate Enclosed) | 1 | Job | 2,03,653.06 | ₹2,03,653.06 |
| 3 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
Augmenetation of 63KVA substation by 100KVA at Rangwar near Firing Range of ESD Baramulla 1st
(Complete Job)
(Detailed Estimate Enclosed) | 1 | Job | 2,45,324.83 | ₹2,45,324.83 |
| 4 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
Augmenetation of 63KVA substation by 100KVA at Ahangerpora Pakhwara of ESD Watergam
(Complete Job)
(Detailed Estimate Enclosed) | 1 | Job | 3,40,081.92 | ₹3,40,081.92 |
| 5 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
Augmenetation of 63KVA substation by 100KVA at Rather Mohalla Bosso of ESD Wagoora
(Complete Job)
(Detailed Estimate Enclosed) | 1 | Job | 2,39,192.55 | ₹2,39,192.55 |
| 6 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
Augmenetation of 63KVA substation by 100KVA at Sofi Mohalla Sheikhpora Kawcheck of ESD Wagoora
(Complete Job)
(Detailed Estimate Enclosed) | 1 | Job | 2,90,542.65 | ₹2,90,542.65 |
| 7 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
Augmenetation of 63KVA to 100KVA at Persitan Kamalkote of ESD Mohura
(Complete Job)
(Detailed Estimate Enclosed) | 1 | Job | 3,45,231.27 | ₹3,45,231.27 |
| 8 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
Augmentation of 100kVA transformer by 200kVA transformer at Sadiqi Mohalla Gantamulla Payeen of ESD Baramulla 2nd
(Complete Job)
(Detailed Estimate Enclosed) | 1 | Job | 4,30,828.72 | ₹4,30,828.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
DrawingsCumSpecification.pdf
Additional Documents • 18.28 MB
Estimate.pdf
Other Document • 0.26 MB
BOQ_1089588.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .