| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Finance 46C 1P PONGHAT PUL DEFENCE INCLAVE COLONY BAMRAULI PRAYAGRAJ UTTAR PRADESH 211012 | PRAYAGRAJ | UTTAR PRADESH | 211012 | -8.90% | ₹8.2 L | L1 | Admitted-Finance |
| 2 | L2₹8.2 L+₹7,342.74 (0.90%)Admitted-Finance C O GK POWER TECH ENTERPRISES VILL DOKRU PO ROHAL TEHSIL JHANDUTTA DISTT BILASPUR H P | -8.08% | ₹8.2 L+₹7,342.74 (0.90%) | L2 | Admitted-Finance |
| 3 | L3₹9.6 L+₹1.4 L (17.5%)Admitted-Finance VILL BHANTREHED PO BAROTI SUB TEH DEHAR MANDI HP 175030 | MANDI | HIMACHAL PRADESH | 175030 | +7.00% | ₹9.6 L+₹1.4 L (17.5%) | L3 | Admitted-Finance |
| 4 | L4₹9.7 L+₹1.5 L (18.6%)Admitted-Finance VILL BAROTA JATTAN P O BERI RAJDIYA TEHSIL SADAR DISTT BILASPUR HP | +8.00% | ₹9.7 L+₹1.5 L (18.6%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical DALHOUSIE HIMACHAL PRADESH | - | - | - | Rejected-Technical Technical and Commercial Non Responsive |
Tender Value
₹9.0 L
EMD Value
₹8,955
Closing Date
8 Sept 2026, 11:00 amClosed
Sr. Executive Engineer
Electrical Division HPSEBL, Ghumarwin.
Tender for prov. 63 KVA 11/0.4 KV S/Stn. Tared-2nd alongwith 11 KV HT line and LT in (E) section Chandpur under ESD HPSEBL, Kandrour.
2026_HPSEB_141972_1
NIT-73/2026-27
Open Tender
Electrical Works
Percentage
30 days
Ghumarwin
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
₹8,955
11 Sept 2026
28 Aug 2026
8 Sept 2026
28 Aug 2026
8 Sept 2026
28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Erection of 63 KVA ,11/.4 KV Sub-Station | |||||
| 1.01 | Digging of pits for poles(size1800x1200x1500mm), stay set (size 900x 700x 1900mm), Earthing set (2 Mtr. Dia & 3 Mtr. Depth),drilling of holes in poles and x-arms, preparation of plateform str. Members, CI, AI x-arms and x-bracing set, erection of double poles with RCC muff, erection of plate form,X-Arms, dropout fuse unit, lightening arrestor, MCCB, Switch L.T. Box, energy meters etc,erection of transformers, erection of GO switch, transformer lightining arrester etc., erection of stay set, erection of 63 KVA, 11/.4KV sub station, filling and ramming of pits, erection of jumpers, pipe earthing, LT cable, and fixing of barbed wire and painting of sub-station structure etc. complete in all respect. | 1 | Job | - | - |
| 1.02 | Mannual carriage of 63 KVA, 11/.4 KV Sub-station alongwith material for an average lead of 0.150 KM from road head to site of work. Km (Rate to be quoted for 1 KM lead only) | - | KM | - | - |
| 2Erection of H.T. Line | |||||
| 2.01 | Erection of HT steel tubular pole 11 mtr. Long (Double pole structure):-Digging of pit for poles, Concreting of Muff, drilling of holes in poles and X-arms and X-bracing set,fixing of insulators,X-arms and X-bracing set,erection of poles, fixing of barbed wire,danger plate, filling of pit and ramming .painting of poles erection of muff etc complete in all respect. | 5 | No. | - | - |
| 2.02 | Erection of HT steel tubular pole 11 mtr. Long (Double pole structure):-Digging of pit for poles, Concreting of Muff, drilling of holes in poles and X-arms and X-bracing set,fixing of insulators,X-arms and X-bracing set,erection of poles, fixing of barbed wire,danger plate, filling of pit and ramming .painting of poles erection of muff etc complete in all respect. | 6 | No. | - | - |
| 2.03 | Stay set (HT):- Digging of pit (size 0.9x0.7x1.5 M),fixing of stay rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. | 16 | Set | - | - |
| 2.04 | Earthing set (HT):- Digging of pit (0.9x0.7 x1.5m), fixing of G.I wire to earth system, filling and ramming of pit, etc. complete in all respect. | 15 | Set | - | - |
| 2.05 | Laying, stringing and sgging of AAAC/ACSR 50 mm, (3 wire) of 11 KV HT line:-Laying of conductor, stringing and sagging, binding with insulator, making jumpers on dead poles etc., complete in all respect.(Rate to be quoted per Km per wire) | 1 | KM | - | - |
| 2.06 | Laying, stringing and sgging of G.I. wire,(1 wire) of 11 KV HT line:-Laying of G.I.Wire, stringing and sagging, binding with insulator, making jumpers on dead poles etc., complete in all respect.(Rate to be quoted per Km line) | - | KM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
Biddocument72.pdf
Tender Documents • 0.38 MB
BOQ_210758.xls
BOQ • 0.39 MB
Corrigendum72.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .