Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance FARIDABAD | HARYANA | 121004 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹4.6 L+₹21,969.70 (5.06%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹4.7 L+₹32,838.22 (7.56%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | NA L1 | VIJAYAKUMAR L3 | SHAMSUDHEEN .T.U L2 |
|---|---|---|---|---|---|---|
| 1.00Civil works | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 241.88 | cum | 203.52 ₹49,226.4 Lowest | 218.98 ₹52,965.79 | 213.83 ₹51,720.13 |
| 1.00 | OD2616/2026-2027:Engaging hydraulic excavator for levelling up sand /silt/ removal of Debris / Kulavazha in accordance with requirements of lines , grades and cross sections , and transporting to the Nearby Dips within all lifts and lead up to 1000m | 58 | hour | 1,159.76 ₹67,266.08 Lowest | 1,247.85 ₹72,375.3 | 1,218.49 ₹70,672.42 |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 752.5 | sqm | 14.37 ₹10,813.43 Lowest | 15.46 ₹11,633.65 | 15.1 ₹11,362.75 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 22,340 | sqm | 7.32 ₹1,63,528.8 Lowest | 7.87 ₹1,75,815.8 | 7.69 ₹1,71,794.6 |
| 1.00 | OD2615/2026-2027:Engaging coolie for removing floating bodies and branches of trees, slipped earth , water hyacinth, shutter and sluice operation, night canal watching and all other water distribution related works as per the direction of departmental officers at site. | 152 | each | 854.92 ₹1,29,947.84 Lowest | 919.85 ₹1,39,817.2 | 898.21 ₹1,36,527.92 |
| 1.01 | OD2617/2026-2027:Supplying and laying earth filled cement bags to lines and levels including cost of cement bags charges for filling , tying in position all leads and lift and incidental charges etc | 80 | each | 42.14 ₹3,371.2 | 45.34 ₹3,627.2 | 26.32 ₹2,105.6 Lowest |
| 1.01 | OD2618/2026-2027:Supplying mobil oil for lubrication of mechanical arrangements in the canal system during water distribution period | 3 | Litre | 421.49 ₹1,264.47 Lowest | 453.5 ₹1,360.5 | 921.3 ₹2,763.9 |
| 1.01 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 20 | each | 435.13 ₹8,702.6 Lowest | 468.18 ₹9,363.6 | 457.16 ₹9,143.2 |
Tender Value
₹5.5 L
EMD Value
₹13,740
Closing Date
8 Aug 2026, 6:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
O/o THE ASSISTANT EXECUTIVE ENGINEER, KPIP SUBDIVISION No. 1 OTTAPPALAM
Jungle clearance Silt removal and canal cleaning works of Karumanamkurissi Kulakkad distributaries and Kuttanassery minor distributary - including water distribution of all distributaries between Ch33/000km to 42/000 km for the year 2026-27
2026_Irrig_863191_1
IRR/PI/TR/2580/2026_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
365 days
Karumanamkurissi Kulakkad and Kuttanassery
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,215
₹13,740
24 Aug 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
8 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | OD2616/2026-2027:Engaging hydraulic excavator for levelling up sand /silt/ removal of Debris / Kulavazha in accordance with requirements of lines , grades and cross sections , and transporting to the Nearby Dips within all lifts and lead up to 1000m | - | hour | - | - |
| 1.003 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.004 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.005 | OD2615/2026-2027:Engaging coolie for removing floating bodies and branches of trees, slipped earth , water hyacinth, shutter and sluice operation, night canal watching and all other water distribution related works as per the direction of departmental officers at site. | - | each | - | - |
| 1.006 | OD2617/2026-2027:Supplying and laying earth filled cement bags to lines and levels including cost of cement bags charges for filling , tying in position all leads and lift and incidental charges etc | - | each | - | - |
| 1.007 | OD2618/2026-2027:Supplying mobil oil for lubrication of mechanical arrangements in the canal system during water distribution period | - | Litre | - | - |
| 1.008 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | - | each | - | - |
stage.html
html • 0.02 MB
finance_1460087.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Affidavit.pdf
Tender Documents • 0.10 MB
epaymentformnew.pdf
Tender Documents • 0.11 MB
Formoftender.pdf
Tender Documents • 0.07 MB
FormatIntegritypact.pdf
Tender Documents • 0.20 MB
preliminaryagreement.pdf
Tender Documents • 0.30 MB
BOQ_1460087.xls
BOQ • 0.30 MB
SBDKUTTANASSERY.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .