Tender Value
₹46.1 L
EMD Value
₹46,200
Closing Date
3 Jul 2026, 6:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Panchayat R&B Division BOTAD
Construction of Bubavav to Military Road (NP) Km. 0/000 to 4/500 (Sec. Km.0/000 to 2/500) Ta. Ranpur Dist. Botad (Remaining Work)
317482
Nivida 08 Second Attempt
Open
Civil Works - Roads
Botad
7 documents required · 0 mandatory · 7 optional
₹1,500
Executive Engineer Panchayat R AND B Division Botad
₹46,200
24 Jun 2026
24 Jun 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
Name of Work :- Construction of Bubavav to Military Road (NP) Km. 0/000 to 4/500 (Sec.
Km.0/000 to 2/500) Ta. Ranpur Dist. Botad (Remaining Work)
Memorandum showing items of works to be carried out
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
1 0.006 Hect Clearing and grubbing of road land 32361.67 Rupees Thirty One
incl.uprooting rank vegetation, grass, Two Thousand
bushes, shurbs, saplings and trees Sixty One and
girth upto 300mm removal of stumps Paise Sixty Seven
of trees cut earlier and disposal of only
unserviceable materials © By
mechanical means in area of Light
2 0.000 Cum Earthwork for embankment 69.46 Rupees Sixty One
including breaking clods, dressing Nine and Paise
with all lead and lift (Excluding metre
watering and consolidation) (A)
Selected soil should be From borrow
area within land width and should
have CBR not less than 6.00%.
3 0.000 Cum Earthwork for embankment 160.24 Rupees One One
including breaking clods, dressing Hundred Sixty
and Paise Twenty
with all lead and lift (Excluding Four only metre
watering and consolidation) (A)
Selected soil should be From borrow
area with all lead and lift and should
have CBR not less than 6.00%.
4 105.080 Cum Earthwork in cutting in all sorts of 85.16 Rupees One
soil and soft Murrum including Eighty Five and
Paise Sixteen only
conveying and spreading the suff metre
embankment as and where directed
within 200 meters from the end of
the cutting with all required lead and
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
5 1284.160 Cum Granular Sub-base with Black trap 584.54 Rupees Five One
crushed stone well Graded Material Hundred Eighty
(Table.400.1) by Mix in place Fifty Four only metre
Method. Construction of Granular
Sub-base by Providing Black Trap
cruhsed stone well greded material,
spreading in uniform layers with
motor graded on prepared surfce,
mixing by mix in place method with
rotavator at OMC, and compacting
with Vibratory roller to achieve the
desired density, complete as per
Technical Specification Clause-401.
For Grading-1 Materials.
6 229.240 Cum WBM Grading-2 726.19 Rupees Seven One
Providing, laying, spreading and Hundred Twenty
compacting stone agg. Of 63mm to Ninteen only metre
45mm size to water bound macadam
specification including spreading in
uniform thickness, hand packing,
rolling with smooth wheel roller 80-
100 KN in stage to proper grade and
camber, applying and brooming,
stone screening/binding material to
fill-up the intersties of coarse agg.,
watering and compacting to the
required density as per Technical
Specification Clasue.404 By menual
7 187.490 Cum Rolling of earthwork in layers with 18.67 Rupees One
power roller including filling in Eighteen and
Paise Sixty Seven
depression which occur during the only metre
process and watering of earthwork
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
8 690.000 MT Providing and laying bitumenous 1859.36 Rupees One One
grout 37.50mm thick using bulk Thousand Eight
Emulsion RS1 for tack coat at the Nine and Paise Ton
rate of 4.0kg/10sqm on WBM Thirty Six only
Surface and using BT chips for
required gradation with the asphalt
of grade VG-30 at the rate of 1.99%
i.e 19.90kg/MT by weight of mix
including heating and mixing in
drum mix plant , transporting the
mix and spreading the same by paver
finisher and consolidation as per
MOST specification including cost
of all materials fuel, labours, tools
and plants etc. using contractor's
own drum mix plant etc. complete.
9 483.000 MT Providing, laying and rolling of 2522.43 Rupees Two One
25mm thick open graded premix Thousand Five
bituminous carpet with B.T Two and Paise Ton
aggregates as specified and using Forty Three only
bulk Emulsion RS1 for tack coat at
the rate of 2.50kg/10sqm on
B.T.Surface (As per IRC-16) and
using bitumen VG-30 for mixing
with aggregate at the rate of 3.36%
i.e 33.60kg/MT. of total mix
including heating and mixing in
drum mix plant, spreading the same
with paver finisher and
consolidation with vibratory roller
including necessary firewood, oil,
lubricants, labour charges etc. using
equipment tools etc. completed in
accordance with the requirement of
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
10 251.000 MT Providing and laying seal coat using 2883.40 Rupees Two One
Bitumin grade VG-30 with B.T. Thousand Eight
aggregate as specified using Three and Paise Ton
aggregate at the rate of Forty only
0.18cum/10sqm. And bitumen for
mixing with aggregate at the rate of
4.5% i.e 45.00kg/MT of total mix
including heating and mixing in
drum mix plant and spreading the
same by paver finisher and
consolidation with vibratory roller
including necessary using
contractor's own drum mix plant,
machineries and equipment, tools
etc. complete in accordanace with
the requirement of specification.
11 36.630 Cum Excavation for foundation upto 1.5m 161.19 Rupees One One
depth including sorting out and Hundred Sixty
stacking of useful materials and Ninteen only metre
disposing of the excavated stuff upto
all lead. Dense or hard soil.
12 20.040 Cum Excavation for foundation upto 1.5m 274.66 Rupees Two One
depth including sorting out and Hundred Seventy
stacking of useful materials and Sixty Six only metre
disposing of the excavated stuff upto
all lead. Hard Murrum
13 48.320 Cum Providing and casting in situ 2823.75 Rupees Two One
ordinary cement concrete M-150 mix Thousand Eight
and providing necessary pin headers Three and Paise metre
including shuttering, scafilding, Seventy Five only
laying vibrating, curing and finishing
complete Without V-Grooves For all
14 5.130 Cum Providing and filling in foundation 2216.44 Rupees Two One
with ordinary cement concrete M- Thousand Two
Hundred Sixteen
100 mix and providing necessary and Paise Forty metre
vertical pin headers incl. Formwork, Four only
vibrating, ramming and curing
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
15 0.000 No Providing and laying weep hole in 39.02 Rupees Thirty One
Abutment and returns by using A.C Nine and Paise
pipe of 100mm. Incl. laying in
proper grade and jointing the
complete as per detailed
16 0.395 MT Providing and laying in Position FE - 71636.86 Rupees Seventy One
500/500D TMT bar reinforcement One Thousand Six
including cutting, bending, hooking Six and Paise Ton
and tying complete as per detailed Eighty Six only
drawings for the following (A) Piers
(B) Abutments (C) Returns (D)
17 56.670 Cum Filling available excavated earth 88.85 Rupees One
(excluding rock ) in trenches plinth Eighty Eight and
Paise Eighty Five
sides of foundation etc. in layers not only metre
exceeding 20cm in depth
consolidating each deposited layer
by ramming and watering.
18 5.000 Rm Supplying and fixing reinforced 3862.79 Rupees Three One
concrete heavy duty non presure Thousand Eight
pipes with collars for culverts Two and Paise metre
carrying heavy traffic as per IS 458- Seventy Nine only
1991 specification including setting
and joinng the pipes in C.M. 1:2
watering and laying (to level or
slope) of I.S. Class NP-3 of
following internal diameter with all
lead and lift. (i) 900mm Dia.
19 15.000 Rm Supplying and fixing reinforced 6267.86 Rupees Six One
concrete heavy duty non presure Thousand Two
pipes with collars for culverts Seven and Paise metre
carrying heavy traffic as per IS 458- Eighty Six only
1991 specification including setting
and joinng the pipes in C.M. 1:2
watering and laying (to level or
slope) of I.S. Class NP-3 of
following internal diameter with all
lead and lift. (i) 1200mm Dia.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
20 10.000 No Providing and fixing Precast cement 321.63 Rupees Three One
concrete Hectometer as per IRC type Hundred Twenty
design incl. painting, lettering etc. Sixty Three only
fixing in C.C. 1:5:10.
21 180.000 No Providing and fixing Precast cement 218.46 Rupees Two One
concrete Guard stone as per I.R.C. Hundred Eighteen
and Paise Forty
type design including white washing Six only
etc. complete. Fixing in C.C.1:5:10.
22 3.000 No Providing and fixing ordinary 594.94 Rupees Five One
Kilometer stone of pre-cast C.C. Hundred Ninety
1:2:4 including necessary Ninety Four only
reinforcement as per I.R.C. type
design in C..C. 1:4:8 including
painting lettering etc. complete.
23 112.000 No Providing and fixing Indicator stone 118.77 Rupees One One
of approve stone as per I.R.C. type Hundred Eighteen
and Paise Seventy
design in C.C. 1:4:8 including white Seven only
washing etc. complete Fixing in
24 1.000 No Supplying and fixing Junction 5472.18 Rupees Five One
Boards of M.S. plates and angles as Thousand Four
Hundred Seventy
per I.R.C. design incl;. Fixing in Two and Paise
C.C. 1:4:8 with necessary excavation Eighteen only
painting, figuring, lettering on
boards etc. complete.
25 2.000 No Providing and fixing Village name 3943.44 Rupees Three One
Boards as per standard I.R.C. type Thousand Nine
design of steel plate incl. painting, Three and Paise
lettering etc. complete with fixing in Forty Four only
C.C. 1:4:8 block with necessary
excavation etc. complete
26 6.000 No Providing and fixing Road sign of 3511.09 Rupees Three One
M.S. plate and angle iron incl. Thousand Five
painting, lettering etc. complete. and Paise Nine
fixing in C.C. 1:4:8 block with only
necessary excavation etc. complete
as per IRC type design (i) Reflective
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
27 0.000 No Village/Bump Ahead sign. : Providing 5257.20 Rupees Five One
and fixing sign boards made out of Thousand Two
2mm Aluminium sheet size 90x60 cms.
Seven and Paise
Rectangle as per the design of IRC-67-
1977 pre treated with phospheting
process and acid etching coated with
one coat of apoxy primer and two coats
of best quality epoxy paint reflectorised
with retro reflective sheeting as per
latest MOST specification letter and
numbers should be as per IRC:30-1968,
3.1 Mt. long (2 nos) stand post and
frame fabricated from suitable size iron
angle of 50x50x5mm, painted with best
quality epoxy coating in black and white
bends, the details of symbole on
inscription/ numerals for each board
shall be as per the instruction of the
Engineer in charge. The fixing at site
shall be in C.C 1:2:4 block of size
45x45x60cms. for each leg including
excavation curring etc. complete under
the supervision of engineer in charge
(A) Engineer Grade.
28 2.000 No Railway crossing sign:Providing & 5484.93 Rupees Five One
Fixing sign boards made out of 2mm Thousand Four
aluminium sheet, size 90x90x90cms.
triangle plus 90 x 30cms additional
Ninety Three only
plate as per the attached drawing (IRC)
pre treated with phospheting process &
acid etching. coated with one coat of
epoxy primer and two coats of best
quality epoxy paint reflectorised with
retro sheeting as per latest M.O.S.T.
Specifications 3.1. long stand post and
frame fabricated from iron angle of 35 x
35 x 3mm , 75 x 75 x 6mm as required
painted with best quality epoxy coatings
in black and white bends. The fixing at
site shall be in 1:2:4 CC block of size
45 x 45 x 60 cms for each leg. including
excavation curing etc. complete the
supervision of engineer in charge.(A)
Engineer Grade(VR)...
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
29 1.000 No Citizen's information Board. Providing 8296.14 Rupees Eight One
and fixing of typical MMGSY Thousand Two
information board as per instruction.
Two MS sheets of 3 mm thick, of
mm x 750mm size fixed at top &
bottom duly rivetted with MS angles of
25 x 25 x 5 mm thick M.S angle shall be
welded by two vertical M.S angle of
mm thick to 75 mm x 75 mm of
SWG square tubes posts duly embedded
in cement concrete M-15 grade blocks
of 600mm x 600mm x 750mm, below
ground level. The letters & figure of any
shade reflectorised with High Intensity
Prismatic Grade Retro Reflective
Sheeting of Type-4 as per ASTM D-
4956 and latest MORD specifications;
All sections of framed posts and steel
tube will be painted with primer and
two coats of epoxy paints as per
drawing Clause 1701 and Annexure
1700.1 (10.16). (A) Class-B High
intensity Grade Retro Reflective
30 60.000 Sqm Road Marking with Hot Applied paints 298.96 Rupees Two One
with reflectorising glass beads on Hundred Ninety
Eight and Paise
bitumin surface providing and laying a
Ninety Six only metre
hot applied thermoplasting compund
2.5mm thick including reflectorising
glass beads @250 gm per sq.mtr area,
thickness of 2.5mm is excluding of
surface applied glass beads as per
IRC:35-2015 the finished surface to be
level, uniform and free from streaks and
holes, zebra patta/bump/centerline/edge
line/ cut patta. the while color marking
should provide liminance coefficient on
cement road shall be min.
mcd/m2/lux and asphalt road shall be
min 100 mcd/m2/lux during the survice
life during the date the marking should
meet the performanace criteria for night
time reflectivity, wet reflectivity and
skid resistance as mentioned in the
section-15 of IRC 35-2015 warranty for
retroreflectivity shall be two years.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
31 60.000 No Cate eye / road stud/ RPM : Supplying 364.61 Rupees Three One
Raised Pavement markers of Hundred Sixty
polycarbonate and ABS moulded body
and reflective panels with micro
prismatic lens (No glass bead lens)
capable of providing total internal
reflection of the light entering the lens
face and shall support a load of
kgs. tested in accordanace to ASTM D
4280 type H and complying to
specification of category A of MORTH
circular No RW/NH/33023/10-97-DO
III Dt. 11-06-1997. the height, width
and length shall be exeed 20mm,
130mm and 130mm and with minimum
reflective area of 13sqcm on each side
and the slope to the base shall be 35+/-5
degree. the body of the marker should
having finger grip for easy and accurate
placement and application with epoxy
/bituminous adhesive as recommended
by the manufacturer of the marker. the
colour of the marker should be as per
the IRC:35-2015 and as directed by
Engineer-in-charge.
Rupees Forty Six Lakh Eleven Thousand Eight Hundred One and Paise Forty Two only
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow percent ( Should be
written in figures and words ) of the estimated rate mentioned above. Amount of My \ Our tender works put as
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Belowe Rs…………..….…… Add……..……..% Above Rs….….…….
In words………………….……………… In words………………….………………
Note : 1 All work shall be carried out as per Public Works Department Handbook and other specifications of
Division or as directed.
GM\Wv! AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0JLhGGL ALHL BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note : 2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be
struck by the contractor under this signature.
GM\W o Z VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL SMg8=FS8Z[ 5MTFGL ;CL SZJLP
Note : 3 Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
GM\Wv# o 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5}~ YFI T[ JBT[fNZ[S ZLT[ ;FO;}OL SZJFGM\ ;DFJ[X YFI K[4 VG[ T[ NZ TDFD 5lZl:YlT4 :Y/4
E[H4 CJFDFG JU[Z[ C[9/ SFD VD,DF\ ZC[X[P
Note : 4 To be continued on additional sheets, if found necessary.
GM\Wv$ o H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division Panchayat R.& B. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
7 cement Consumpation.pdf
8 Ashphalt Consumpation.pdf
B-1 Bubavav to Military Road Remaining Work.pdf
Schedule B Babuvav.pdf
Speci Bubavav to Military Road Remaining Work.pdf