| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC 825 GANDHI CHOWK RANIKHET 263645 DISTRICT ALMORA | RANIKHET | ALMORA | UTTARAKHAND | 263645 | ₹2.3 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.8 Cr+₹49.3 L (21.3%)Rejected-Finance POLICE LINE ROAD KUMOUR PITHORAGARH | ₹2.8 Cr+₹49.3 L (21.3%) | L2 | Rejected-Finance Reject |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
15 Mar 2023, 3:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle Ranikhet
Construction of 11KV/LT line releasing NSC for Ranikhet Gram Samuh Pumping Scheme (different Stages) under Jal Jeewan Mission under EDD, Ranikhet on turnkey basis
2023_UPCL9_54803_1
EDD(R)-35/2022-23
Open Tender
Electrical Works
Turn-key
90 days
Ranikhet
As per Tender Document
3 documents required · 3 mandatory
₹11,800
Executive Engineer
₹4.3 L
23 Sept 2023
10 Feb 2023
16 Mar 2023
10 Feb 2023
15 Mar 2023
10 Feb 2023
Amount
CENTRALIZED ITEM
Steel Tubular pole SP-23 8.5 meter long.(BPHDG)
11 Kv. Disc Insulator Polymer B&S Type
11 Kv. Pin Insulater with pin Polymer
11 Kv. DiscFittng B&S Type 45 KN
ACSR weasal Conductor for earth.
ACSR Rabbit Conductor
Stay Set GI 16x1800 mm.
Stay Wire GSS 7/10 SWG
MS Earthing Rod 20 x 2500 mm.
GI Wire 8 SWG for earthing.
MS Angle 50x50x6mm.for Bracing set.
MS Channel 100x50x6mm.for Top/T Off.
11 KV VCB Feeder 350/500 MVA, 400/200/5 A, 110 V AC
11 KV PRMC
LT PRMC
Cable Al 3x120 sq mm XLPE Cable 11 KV
Heat Shrinkable kit for 3x120 sq mm Indoor
Heat Shrinkable kit for 3x120 sq mm Outdoor
NON CENTRILIZED ITEM
PP & clamp for ST pole SP-23 with Nuts & Bolts.
Stay Clamp for Single ended SP-23 with Nuts & Bolts.
Stay Clamp for Double ended SP-23 with Nuts & Bolts.
Bracing Clamp Top for SP-23 with Nuts & Bolts.
Bracing Clamp Bottom for SP-23 with Nuts & Bolts.
Earth Wire clamp SP-23 with Nuts & Bolts.
E Clamp
LABOUR CHARGE
Cartage of ST poles from store centre to constrution site with loading ,unloading at both points and proper stocking. distance 110 km
T/F 11/0.4 KV 100 KVA
Head load cartage of following poles from road to site (Average lead 3 km )
STP SP-23 Pole
Small material
T/F 11/0.4 KV 100 KVA
Excavation of earth for pole pit of size 0.9*0.6*1/6 of full length of pole in all type of soil including propoer dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
STP SP-23 Pole(0.9*0.6*1/6*8.5=0.76 cum per pole
Erection of following support pole in proper level an dalingment alongwith fixing of all accessories , as per RESPO constrution Manual
STP SP-23 Pole
STP DP-23 Pole
Grouting of pole in size 0.45*0.45*1/9 of the support in cc ratio 1:4:8(1cement :4 graded stone 20mm nominal size :8 coarse sand) block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alingment ,leve;ing as per RESPO constuction Manual.(0.45*0.45*1/9*8.5=0.191 cum per pole
STP SP-23 Pole (0.45*0.45*1/9*8=0.19 cum per pole )
Muffing of poles size0.45cm*0.60cm radius with CC 1:3:6(1 cement:3 coarse sand :6 graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement ,stone and sand etc.
Excavation of earth for stay of size 0.6*0.6*1.2 mtr in all type of soil including pro[per dressing of sides and ramming of bottom including getting out the excavated soil and disposl of surplus excavated soil as directed complete work. (0.6*0.6*1.2 mtr =0.432 cum per stay )
Fixing tighting and nozzeling of stay with pole and stay rod on required tension as per drawing/RESPO manual
Grouting of stay in size 0.6*0.6*0.3 in CC ratio 1:4:8( 1 cement :4 graded stone 20mm nominal size :8 coarse sand ) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alingment,leveling as per RESPO manual.(0.6*0.6*0.3=0.108cum per stay )
Mounting of following capacity transformers on double pole structure and fixing of channel/angle etc and making H.T & L.T connections complet work upto the stage of energisation
100 KVA T/F 11/0.4 KV
Laying spreading, stringing & sagging of 11 kv complete with binding and jumpering .
Fabrication of cross arms with cutting of MS channel making proper hole cutting of MS angle & making proper hole as per norms complete.
Earthing of SP-23 with earth Rod & GI wire.
Lopping & Chopping of trees falling on line.
Guarding of Line as per route including supply of associated materials
Painting of poles as per norms
Fixing of danger board including supply of danger board and clamp as per specifications
Installation of 11 KV VCB complete in all respect including cartage shifting of VCB and any other necessary works including testing of breaker complete wiring and auxiliaries including battery system
Installation of PRMC Complete including grouting and cartage and head load cartage of material
Saun Engineering and Construction Co P Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .