Tender Value
₹29.8 Cr
EMD Value
₹59.6 L
Closing Date
3 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer and Project Director PIU-I
Office of the Superintending Engineer and Project Director Project Implementation Unit - I,P.W. (Roads) Directorate, 3No. Commissariat Road Hastings Kolkata-700022.
Jantahat Bhulki Road from 0.0 Kmp to 13.450 Kmp Widening and Strengthening Work under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur.
2026_WBPWD_5078629_1
WBPWD/PW(R)/SEPD/PIU-I/NIT-34 OF 2026-2027
Open Tender
CIVIL WORKS
Percentage
365 days
Jantahat, Uttar Dinajpur
Please refer Tender documents.
5 documents required · 5 mandatory
₹59.6 L
Yes
Project Implementation Unit - I, P.W.(Roads) Direc
8 Oct 2026
8 Oct 2026
5 Nov 2026
9 Oct 2026
3 Nov 2026
15 Oct 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART-A : Road Works :- | |||||
| 1.01 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Reference to MoRT&H's specification clause 201)
By Mechanical Means
In area of light jungle | 3.09 | Hectare | 50,633.31 | ₹1,56,456.93 |
| 1.02 | Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits (land owned/arranged by the Agency with Royalty) with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Reference to MoRT&H's specification clause 305).
[Note: Royalty as appicable will be deducted from Agency's bill if not produce Royalty clearance certificate from the competent authority.] | 25,664.62 | Cum. | 259.94 | ₹66,71,261.32 |
| 1.03 | Construction of embankment with approved material obtained from borrow pits (land owned/arranged by the Agency with Royalty) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305). Cost of compensation for Earth material & its carriage from private land at 5km distance have been included in the rate.
(Mode of measurement: pre works and post works).
[Note: Royalty as appicable will be deducted from Agency's bill if not produce Royalty clearance certificate from the competent authority.] | 6,416.15 | Cum. | 220.72 | ₹14,16,172.63 |
| 1.04 | Cold Milling
Cold Milling of Bituminous Pavement surface upto the required depth by mechanical means using milling machine, without disturbing the under lying layers, to proper line and level, cleaning the surface properly after milling and removing the loose materials, stacking the milled materials for re-use, necessary guarding, barricading & lighting, including hire charges of machinery, cost of fuel and labour and other incidental charges all complete and as per direction of Engineer-in-Charge.
For depth upto 100mm | 41,437.5 | sqm | 42.02 | ₹17,41,203.75 |
| 1.05 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202)
By Mechanical Means
Bituminous course | 660 | Cum. | 312.86 | ₹2,06,487.6 |
| 1.06 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Reference to MoRT&H's specification clause 301). | 18,254.88 | Cum. | 85.55 | ₹15,61,704.98 |
| 1.07 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Reference to MoRT&H's specification clause 305).
With Fine Sand | 5,604.38 | Cum. | 1,208.75 | ₹67,74,294.33 |
| 1.08 | Granular Sub-Base with Graded Material
Plant Mix Method
Construction of granular sub-base byproviding graded material such as natural sand/crushed gravel/crushedstone/combination depending uponthe required grading spreading inuniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller toachieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8),complete as per clause 401
Granular Sub-base (Grading - V) with Pakur variety stone Aggregates.
(Payment will be made on the basis of finished compacted volume) | 6,102.5 | Cum. | 2,865.95 | ₹1,74,89,459.88 |
| 1.09 | Granular Sub-Base with Graded Material
Plant Mix Method
Construction of granular sub-base byproviding graded material such as natural sand/crushed gravel/crushedstone/combination depending uponthe required grading spreading inuniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller toachieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8),complete as per clause 401
Granular Sub-base (Grading - III) with Pakur variety stone Aggregates.
(Payment will be made on the basis of finished compacted volume) | 385 | Cum. | 2,830.63 | ₹10,89,792.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.38 MB
FORM_2911ii_for_25-50cr.pdf
Tender Documents • 0.18 MB
BOQ_5179254.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .