| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 CrAccepted-AOC | ₹8.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.4 Cr+₹58.3 L (6.62%)Rejected-Finance | ₹9.4 Cr+₹58.3 L (6.62%) | L2 | Rejected-Finance Due to higher bid |
Tender Value
₹9.7 Cr
EMD Value
₹19.5 L
Closing Date
22 Feb 2026, 11:00 amClosed
Executive Engineer
HPPWD Division Jaisinghpur
C/O Main Building portion, WS and SI, septic tank and Rain water harvesting tank
2026_PWD_127055_1
8719-27 dated 20.01.2026
Open Tender
Civil Works - Buildings
Percentage
548 days
Jaisinghpur
Please refer Tender documents.
19 documents required · 19 mandatory
₹10,000
EE Jaisinghpur
₹19.5 L
20 Jul 2026
2 Feb 2026
22 Feb 2026
2 Feb 2026
22 Feb 2026
2 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains of soil such as pick work, jumper work, pick jumper work, blasting work, jumper blasting work, soft and hard blasting and saturated soil, de-watering, including wedging out rocks where blasting work is prohibited, chiseling and any other mixed variety of soil, including shoring, strutting or bailing out water upto any depth or any height quantum of water including de-watering removal of slush and stacking the serviceable and un-serviceable material clear from the edge of excavation as direction of Engineer-in-Charge and returning the stacked soil in 15cm (Fifteen centimeter) layers, when required into plinths, sides of foundation etcetera; consolidating each deposited layer by ramming, watering and then disposing of all excavated earth as directed by the Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-Incharge. The rate is inclusive of octroi, royality, malkhana, toll tax, GST any other taxes imposed by the Government. | 1 | Per Cubic Metre | 420.8 | ₹420.38 |
| 2 | Excavating trenches of required width for pipes, cables, etcetra 80 mm (eighty millimetre diametre) including excavation for sockets, and dressing of sides, ramming of bottoms, upto any depth including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm (Twenty centimetres) in depth, including consolidating each deposited layer by ramming, watering, etcetre and disposing of surplus excavated soil as directed, within all lead, lifts complete in all respect including carriage of material within all leads, lifts and other. incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, malkhana, toll tax, GST any other taxes imposed by the Government. | - | Per Running Metre | 336.2 | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, malkhana, toll tax, GST any other taxes imposed by the Government. | 1 | Per cubic metre | 1,695.5 | ₹1,693.8 |
| 4 | Providing form work with steel plates 3.15 mm (three point one five millimetre) thick welded with angle iron in frames 30x30x5mm (Thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies for all heights / depths of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Foundation Footings, basis of columns etcetra and mass concrete including entire carriage of materials with in all leads, lifts and other incidential as per drawings and technical specifications and as per the direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkhana, toll tax, GST any other taxes imposed by the Government. | 1 | Per Square Metre | 277.4 | ₹277.12 |
| 5 | Providing form work with steel plates 3.15 mm (three point one five millimetre) thick welded with angle iron in frames 30x30x5mm (Thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies, for all height/depth of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Flat surfaces such as soffits of suspended floors, roofs, landings, balconies and access platform, shelves and the like floor etcetera In all thickness upto all floor level including entire carriage of materials with in all leads,lifts and other incidential as per drawings and technical specifications and as per the direction of Engineer-in-Charge.The rate is inclusive of octroi, royality, malkhana, toll tax, GST any other taxes imposed by the Government. | 1 | Per Square Metre | 393.6 | ₹393.21 |
| 6 | Providing form work with mild steel plates 3.15 mm (three point one five millimetre) thick welded with angle iron in frames 30x30x5mm (Thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies for all heights / depths of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Beams, cantilever, girders and lintels Sides and soffits of beams,beam haunchings, cantilevers, girders, bressumers and lintels upto any height/depth upto all floor level including entire carriage of materials with in all leads, lifts and other incidential as per drawings, technical specifications and as per the direction of Engineer-in-Charge.The rate is inclusive of octroi, royality, malkhana, toll tax, GST any other taxes imposed by the Government. | - | Per Square Metre | 393.6 | - |
| 7 | Providing form work with steel plates 3.15 mm (three point one five millimetre) thick welded with angle iron in frames 30x30x5mm (Thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies for all heights / depth of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Columns, Pillars, Piers, Abutment, Posts and struts upto all floor level including entire carriage of materials within all leads lifts and other incidential as per drawings, technical specifications or as per the direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkhana, toll tax, GST any other taxes imposed by the Government. | 1 | Per Square Metre | 393.6 | ₹393.21 |
| 8 | Providing form work with mild steel plates 3.15 mm (three point one five millimetre) thick welded with angle iron in frames 30x30x5mm (Thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting, propping etcetra with wooden battens and ballies, for all heights / depths of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Stair Cases with sloping or stepped soffits excluding landing upto all floor level including entire carriage of materials with in all leads, lifts and other incidentials as per drawings and technical specifications and as per the direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkhana, toll tax, GST any other taxes imposed by the Government. | - | Per Square Metre | 393.6 | - |
| 9 | Providing form work with mild steel plates 3.15 mm (three point one five millimetre) thick welded with angle iron in frames 30x30x5mm (Thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting, propping etcetra with wooden battens and ballies for all heights / depth of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Edges of slabs and breaks in floors and walls upto all width and all floor level including entire carriage of materials within all leads, lifts and upto any other incidential as per drawings and technical specifications and as per the direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkhana, toll tax, GST any other taxes imposed by the Government. | - | Per Running Metre | 166.3 | - |
| 10 | Providing and laying in position cement concrete 1:4:8 (One cement isto four sand isto eight graded broken/crushed stone aggregate 40mm (Forty millimetres) nominal size mechanically mixed and vibrated curing complete excluding the cost of centering and shuttering in foundation and plinth including carriage of material within all leads, lifts and other incidentals as per approved drawing, design, specifications and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, malkhana, toll tax, GST any other taxes imposed by the Government.. | - | Per Cubic Metre | 4,850 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_187558.xls
BOQ • 0.45 MB
SBD.pdf
Tender Documents • 5.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .