Tender Value
₹3.8 L
EMD Value
₹7,700
Closing Date
17 Jan 2026, 5:00 pmClosed
EE HP PWD Division Manali at Katrain
EE HP PWD Division Manali at Katrain
Balance work for the CO 80 mtr span passenger material BI Cable manual operated Haulage Ropway Jhulla from Dapin to Kathi Village over Fozal Nallah Khad in GP Pichhalihar Distt Kullu
2026_PWD_125311_1
9951-58 dated 6/1/2026
Open Tender
Civil Works
Percentage
30 days
Manali
Balance work for the CO 80 mtr span passenger material BI Cable manual operated Haulage Ropway Jhulla from Dapin to Kathi Village over Fozal Nallah Khad in GP Pichhalihar Distt Kullu
5 documents required · 5 mandatory
₹350
₹7,700
6 Jul 2026
8 Jan 2026
19 Jan 2026
8 Jan 2026
17 Jan 2026
8 Jan 2026
Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto any lead ,dressing of sides and bottom and backfilling in trenches with excavated suitable material within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST.
Excavation in soil in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of pick, jumper, blasting work both in soft and hard rock with chiseling/wedging out of rock( where blasting is not required ) and their intermediate classification of soil including, dewatering wherever required setting out to the required line grades, side slopes trimming bottom and level as shown on the drawings as directed by Engineer-in-charge at site according to technical specifications clause 1603.1,&1603.2 and sorting out useful/un useful materials and stacking the same in all leads and lifts and transportation of the un-useful materials for filling in road ways, embankments for grades improvements and levelling to the required grade and then disposing of surplus excvatedearth in acquired width of roads or on approved dumping sites through all modes of transportation including head load animal load or mechanical means along with its leveling fine dressing and all labour, machineries, materials, tools equipments and safety measures and incidentals necessary to complete the work by all means (if any required) Recovery for use ful stone of 2.55 Cum@ 300/-per cubic metre amounting to Rs 765.00/- only shall be done on prorata basis for the quantity of cutting in earth work effected. Any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all respect. within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government including GST.
Providing and laying concrete for plain/ reinforced concrete 1:6:12 (One cement :Six sand : Twelve graded stone aggregate 40mm (Forty millimetre nominal size ) in open foundations complete as per drawing and technical specification clause 802,803,1202 and 1203 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government including GST. .
Providing reinforced cement concrete in super structure complete as per drawings and technical specification clauses 800,1205.4 and 1205.5, RCC grade M25 (1:1.5:3) (One cement : one and half sand : three graded stone aggregate nominal mix upto any height within all leads and lift of materials and as per direction of Engineer-in- charge. within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government including GST.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_184530.xls
BOQ • 0.28 MB
bidjhullaropway.pdf
Tender Documents • 2.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .