Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-AOC VILL P O SALEMA DIST DHALAI TRIPURA | SALEMA | DHALAI | TRIPURA | ₹5.7 L | 1 | Accepted-AOC AOC |
| 2 | 2₹7.3 L+₹1.5 L (26.9%)Rejected-Finance 1753 SNV ROAD BANKAR KHOWAI | ₹7.3 L+₹1.5 L (26.9%) | 2 | Rejected-Finance None |
Tender Value
₹7.9 L
EMD Value
₹15,756
Closing Date
13 May 2026, 3:00 pmClosed
The Executive Engineer, DWS Division, Ambassa
O/o the Executive Engineer, DWS Division, Ambassa.
Construction of 01 (One) no 5000 Itr/Hr. capacity iron removal plant including installation of 15gm/hr electro chlorinator at newly constructed ST Boys Hostel attached to Satyaram CPR HS School
2026_CEDWS_72619_1
05/EE/PWD(DWS)/AMB/2026-27
Open Tender
Civil Works - Water Works
Works
60 days
District
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹15,756
Yes
23 Jul 2026
7 May 2026
13 May 2026
7 May 2026
13 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing installation & commissioning of iron Removal plant comprising of iron removal filter standard Composite pressure vessel made of corrosion resistant high quality frp filter media comprises silica dioxide 90% manganese dioxide & other non-leaching chemicals. All chemicals are infused & thereby ensure long life of media (5-8 years) fitted with an on site chlorine generator (10gm/hr) Electro-chlorinator producing hypo - chlorite solution using common salt as raw materials for oxidation & disinfection through metering pump & multiport valve provided to operate the system very easily by changing the knob into back wash, close filtration mode whenever needed including fitting fixing of necessary pipe line for raw water, interconnection all chambers delivery out - let as required with suitable engineering plastic as per direction of engineer-in-charge. | 1 | Job | 5,48,378 | ₹5,48,378 |
| 2 | Construction of semi permanent pump house with half brick walling &GCI sheet roofing fitted with tubular truss for installation IRP chemical dosing equipment, panel board, metering pump etc. Size 3.00m x4.00m (internal) for 5,000LPH capacity IRP &Electro chlorinator as per standard drawing & design | 1 | Job | 1,78,117 | ₹1,78,117 |
| 3 | Operation, upkeepment of whole plant & other allied equipment etc including supplying of chemical &consumable materials for 01 (one) years from the date of commissioning from the date of commissionin | 365 | Day | 168 | ₹61,320 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_73894.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.01 MB
DNIeT.pdf
Tender Documents • 2.64 MB
BOQ_73894.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .