Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.0 LAccepted-AOC VILL SOBLI P O DEVNAGAR TEHSIL RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹10.0 L Quoted ₹13.2 L | L-1 | Accepted-AOC the final bill passed |
| 2 | L-2₹14.9 L+₹1.6 L (12.2%)Rejected-Finance | ₹14.9 L+₹1.6 L (12.2%) | L-2 | Rejected-Finance Rejected |
| 3 | L-3₹14.9 L+₹1.7 L (12.7%)Rejected-Finance VILLAGE URU P O SHINGLA TEHSIL RAMPUR DISTT SHIMLA | ₹14.9 L+₹1.7 L (12.7%) | L-3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M/S KEDAR BHALUNI L1 | PROMILA BHANDARI GOVT CONTRECTOR L2 | M/s Prabhu Dyal L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including up rooting of rank vegetation, grass bush, wood trees and sapling of girth up to 30 cm. measured at a height of 1 metre above ground and removal of the bushes up to a distance of 20 metres outside the periphery of the area cleared. | 2,475 | Sqm. | 120 ₹2,97,000 Lowest | 160 ₹3,96,000 | 150 ₹3,71,250 |
| 2.00 | Excavation in foundation trenches etc.(for pipes & pits upto all depth) in earth work in all classification of earth work such as pick work, jumper work, saturated soil , blasting soft/hard rock or chiselling soft/ hard rock including wedging out of a rock where blasting is prohibited in all lifts including trimming and dressing of sides levelling of beds to correct grades including shoring, strutting, planking, timbering and dewatering where ever required, stacking the serviceable/unserviceable materials/soil separately and after laying and jointing of pipes, returning the usable soil in trenches in 15 CM layers including consolidation of each deposited layers by ramming and watering and then dispositng of all surplus excavated soil, useable materials as directed within all leads/lifts including restoration of metalled surfaces to its original condition and including cost of diversion for traffic night signals, fixing caution boards, crossing over trenches for access to houses fencing etc. complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge. | 119.39 | Cum. | 400 ₹47,756 Lowest | 480 ₹57,307.2 | 500 ₹59,695 |
| 3.00 | Excavation in drain and channel etc. in earth work in all classsification of soil including dressing of side and bed and disposing of all excavated earth with in all leads and lift. | 16.8 | Cum. | 350 ₹5,880 Lowest | 360 ₹6,048 | 400 ₹6,720 |
| 4.00Dressing in bed & side slope and preparation of sub grade for linning in pick work with in all laeads and lifts to the entire satisfiction of the Engineer-in Charge. | ||||||
| 4.01 | i) In Bed. | 22 | Sqm. | 100 ₹2,200 Lowest | 150 ₹3,300 | 130 ₹2,860 |
| 4.02 | ii) In side slopes. | 49.6 | Sqm. | 110 ₹5,456 Lowest | 160 ₹7,936 | 160 ₹7,936 |
| 5.00Cement concrete linning 15cm thick or less for irrigation channel in cement concrete 1:3:6(1Cement: 3Sand: 6Graded stone agg.40mm nominal size) with in all leads and lifts& to the entire satisfiction of the Engineer-in-charge. | ||||||
| 5.01 | a) Hand mixed conc. Linning in Bed | 2.2 | Cum. | 8,600 ₹18,920 Lowest | 9,000 ₹19,800 | 9,000 ₹19,800 |
| 5.02 | a) Hand mixed conc. Linning in side slope | 4.16 | Cum. | 8,700 ₹36,192 Lowest | 9,200 ₹38,272 | 9,000 ₹37,440 |
| 6.00 | Extra allowance for form work in side slope complete in all respect as per direction of the Engineer-in-Charge. | 4.16 | Cum. | 250 ₹1,040 Lowest | 260 ₹1,081.6 | 300 ₹1,248 |
Tender Value
₹11.1 L
EMD Value
₹22,337
Closing Date
18 Mar 2024, 5:00 pmClosed
EE Rampur
JSD Rampur
Rest. of rain damages to FIS Odigad to Khanewali in GP Devnagar
2024_HPIPH_88245_1
EE-JSD-RMP-TEN/23-17767-97 DT 11.3.24
Open Tender
Civil Works
Item Rate
180 days
odigad
Please refer Tender documents.
7 documents required · 7 mandatory
₹400
₹22,337
Yes
11 Aug 2026
11 Mar 2024
19 Mar 2024
11 Mar 2024
18 Mar 2024
11 Mar 2024
Amount
Clearing jungle including up rooting of rank vegetation, grass bush, wood trees and sapling of girth up to 30 cm. measured at a height of 1 metre above ground and removal of the bushes up to a distance of 20 metres outside the periphery of the area cleared.
Excavation in foundation trenches etc.(for pipes & pits upto all depth) in earth work in all classification of earth work such as pick work, jumper work, saturated soil , blasting soft/hard rock or chiselling soft/ hard rock including wedging out of a rock where blasting is prohibited in all lifts including trimming and dressing of sides levelling of beds to correct grades including shoring, strutting, planking, timbering and dewatering where ever required, stacking the serviceable/unserviceable materials/soil separately and after laying and jointing of pipes, returning the usable soil in trenches in 15 CM layers including consolidation of each deposited layers by ramming and watering and then dispositng of all surplus excavated soil, useable materials as directed within all leads/lifts including restoration of metalled surfaces to its original condition and including cost of diversion for traffic night signals, fixing caution boards, crossing over trenches for access to houses fencing etc. complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge.
Excavation in drain and channel etc. in earth work in all classsification of soil including dressing of side and bed and disposing of all excavated earth with in all leads and lift.
Dressing in bed & side slope and preparation of sub grade for linning in pick work with in all laeads and lifts to the entire satisfiction of the Engineer-in Charge.
i) In Bed.
ii) In side slopes.
Cement concrete linning 15cm thick or less for irrigation channel in cement concrete 1:3:6(1Cement: 3Sand: 6Graded stone agg.40mm nominal size) with in all leads and lifts& to the entire satisfiction of the Engineer-in-charge.
a) Hand mixed conc. Linning in Bed
a) Hand mixed conc. Linning in side slope
Extra allowance for form work in side slope complete in all respect as per direction of the Engineer-in-Charge.
Prov.and laying cement concrete 1:5:10 (1Cement: 5Sand: 10 Graded stone agg.40mm nominal size)& curing complete excluding cost of form work in foundation and plinth complete within all leads and lifts as per direction & to the entire satisfaction of the Engineer-in-Charge.
Providing and laying cement concrete 1 : 1.5 :3 (1 cement :1.5 sand :3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcemnt for reinforced concrete work complete in all respect with in all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge .
Foundation and plinth complete as per the direction and to the entire satisfaction of the Engineer-in-Charge.
Walls (any thickness but not less than 0.10m thickness) attached pillaster, buttresses, plinth & string courses etc from top of foundaation level upto floor two level as per the direction & to the entire satisfaction of the Engineer-in-Charge.
Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :-
Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like.
Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel.
Wire crate made of G.I. wire filled with boulders with square cut faces against the wire. ( wire crate to be measured and paid for separatelly) complete as per the direction and to the entre satisfaction of the Engineer-in-Charge.
Wire crate made of G.I. wire filled with boulders with square cut faces against the wire. ( Boulder filling to be measured and paid for separatelly)G.I. wire 4 mm thick corresponding to SWG-815cm x15 cm mesh complete with in all lead and lift & to the entire staisfaction of the Engineer-in-charge.
Laying,jointing & testing of G I Pipe 150 mm dia plain ended (Medium grade) having outer dia with bevelled edge i/c testing and commissioning and cost of jointing with butt welding ( Three layer)as per relevant BIS specification (leak proof) i/c cost of bend tail pieces, tees, reducers increaser etc. as per site requirement as per the direction of the engineer in charge and earth work in trenches to be measured and paid for seprately i/c all leads, lifts and carriage of materials at site.
GI pipe 150 mm dia.
PROMILA BHANDARI GOVT CONTRECTOR
M/s Prabhu Dyal
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .