| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.5 L+₹36,852.42 (4.04%)Accepted-AOC | L2 | Accepted-AOC L2 | |
| 3 | L3₹9.6 L+₹45,396.64 (4.98%)Accepted-AOC | L3 | Accepted-AOC L3 | |
| 4 | L4₹9.9 L+₹78,125.14 (8.56%)Accepted-AOC | L4 | Accepted-AOC L4 | |
| 5 | L5₹11.3 L+₹2.2 L (23.8%)Accepted-AOC | L5 | Accepted-AOC L5 |
Tender Value
₹9.9 L
EMD Value
₹24,762
Closing Date
27 Jun 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
PWD Roads Subdivision Office, North Paravur
MLA-ADS 2019-20 Construction of Kshemodayam-Sastha temple road in ward 5 of Ezhikara grama panchayath under N.Paravur LAC
2020_PWD_366715_1
PWD/2020-2021/14202/NPVR
Open Tender
Civil Works - Roads
Item Rate
180 days
Paravur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,185
Yes
online
₹24,762
Yes
7 Sept 2020
22 Jun 2020
30 Jun 2020
22 Jun 2020
27 Jun 2020
22 Jun 2020
22 Jun 2020 - 27 Jun 2020
60 days
Amount
DRAIN AND ROAD WORK
3.13.1.B : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
od18235/2019_2020 : Supplying and filling quarry muck for forming the road in weak soil and conveyance of all materials, labour charges for spreading in line and level with all leads and lifts involved etc complete as directed by the departmental officers at site
od18236/2019_2020 : Engaging man mzdoor for clearing the site and placing the cover slabs in position.
od18381/2019_2020 : supply and fixing mild steel greatings size 0.45x0.30 m in the starting point of drainage fixed in the cover slab of drain including all materials ,labor,hire charges etc complete
od7335/2020_2021 : Supplying and fitting Inauguration stone with lettering
P.S Sakthidharan
MUNEER K A
Gokul Sakthi
SALAM.T.K
ABDUL RASHEED A I
Bidder Name
P.S Sakthidharan
SALAM.T.K
SYAM.K.T
ABDUL RASHEED A I
MUNEER K A
Gokul Sakthi
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_518347.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .