Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | L1 | Accepted-AOC Single bid in retender is admitted. |
Tender Value
₹1.2 L
EMD Value
₹3,089
Closing Date
10 Oct 2022, 11:15 amClosed
Executive Engineer, KRFB-PMU, PKD/MLPM
Office of the Executive Engineer, Kerala Road Fund Board (KRFB) PMU, Palakkad/Malappuram, Building No. 17/620, Shoranur-679121
Investigation work with boundary stone laying
2022_KRFB_507452_2
PWD/KR/TR/12663/2022_3_1_1/1
Open Tender
Civil Works - Others
Item Rate
90 days
Panampalam
Please refer tender documents
7 documents required · 7 mandatory
₹555
Yes
₹3,089
Yes
19 Dec 2023
29 Sept 2022
12 Oct 2022
29 Sept 2022
10 Oct 2022
29 Sept 2022
Amount
Appendix A : Alignment / Boundary Stone Laying of Panampalam Bridge
OD81549/2022-2023:Imposing the Field Measurement Books on alignment drawing, preparing LA strip plan with the list of survey numbers, tabulation of LA particulars including buildings and extends of each plot to be acquired as per direction of the Engineer in Charge including all cost of transportation, labour, preparing drawings with sufficient copies, collecting data etc complete. (for a width of 30m)
8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting .
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
OD81628/2022-2023:Setting up GTS points (customized concrete pillar) on the project road with respect to known elevation of nearest railway station as per the direction of Engineer in Charge including all cost of labour, materials, transportation, collecting data, hire charge of equipment, painting and marking, indicating same in alignment drawing etc complete
OD81684/2022-2023:Total Station Surveying for taking detailing in Plain and open area without hindrance to line of sight for laying of alignment/ boundary stones along the bridge approach alignment including providing all necessary traffic safety measures and submitting all relevant data in hard copy and soft copy and as directed by the engineer at site.
OD81685/2022-2023:Total Station Surveying for taking detailing in heavily built up area or in roads with heavy traffic or in thick vegetation for laying alignment/ boundary stones along proposed approach including providing all necessary traffic safety measures and submission of and all relevant data in hard copy and soft copy and as directed by the engineer at site.- areas with hindrance to line of sight
OD81687/2022-2023:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations).
Bidder Name
SURVEXINFRA PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_732326.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .