Executive Engineer, N.P.Main Canal Dn.No.2, Gandhinagar-382010
Constructing Rest house cum Camp Office at Ch. 263.574Km on Narmada Main Canal.
355994
16 of 2026-27
Open
Civil - All
Works
Gandhinagar
5 documents required · 5 mandatory
₹1,770
Executive Engineer, N.P.Main Canal Dn.No.2, Gandhinagar
₹26,000
16 Oct 2026
16 Oct 2026
16 Oct 2026
30 Oct 2026
16 Oct 2026
8 Section -7 Bill of Quantities 155-170
9 Section -8 Securities and Other Forms 171-182
10 Section -9 Drawing 183-184
11 Section -10 Documents to be furnished by Bidder 185-187
INVITATION FOR BID
NATIONAL COMPETITIVE BIDDING
1. The Executive Engineer, Narmada Project Main Canal Dn.No.2, Gandhinagar invites
bids for the works detailed in the table.
The bidders may submit bids for any or all of the following works.
Sr. Name of work Approximate Bid Cost of Period of #Class of
No. value of security document completion Registration /
works (Rs.) (Rs.) (Rs.) Category of
1 Constructing Rest house cum 25,80,216=57 26,000/- Rs.1500/- + 06 months Class-A” and
Camp Office at Ch. 263.574Km Rs.270/- above
on Narmada Main Canal. (18% GST)
2. Prospective / Interested bidder may download the Bid Documents from website
https://tender.nprocure.com free of cost till the Time and Date as mentioned on
online NIT at website https://tender.nprocure.com
(A) The concerned Contractor/bidder shall submit the certificate of registration or
renewal receipt as approved contractor in "A & above" Class in SSNNL/NWRWS & K
Dept / R & B Dept of Gujarat State or equivalent class in CPWD/ Railway /other State
(B) The Contractor registered outside Gujarat shall apply for getting registered himself
in "A & above" class either with the Sardar Sarovar Narmada Nigam Limited or with
the state of Government of Gujarat before the date of submission of Tender. The
proof of the application for the registration shall have to be attached with the Tender
(C) The Contractor registered in CPWD / Railway and other State Govt. equivalent to
class of Gujarat mentioned above, will be eligible to quote for the Tender with the
condition that concerned Contractor shall get themselves registered in "A & above"
class in the Sardar Sarovar Narmada Nigam Limited or in the State of Gujarat on or
before the date of acceptance (approval) of his Tender.
Failure of such bidders to get themselves registered in “A & above" class either
with the Sardar Sarovar Narmada Nigam Limited or with the state of Government
of Gujarat before the date of submission of Tender, the bid of such concerned
contractor/bidder shall be rejected, and he shall be considered nonresponsive/
3. However, Bidder who is submitting the Bid Online will have to pay the Bid Document
Fee / Tender Fee through Demand Draft only of any Schedule Bank payable at
Gandhinagar and in favour of ‘Executive Engineer, Narmada Project Main Canal
Division No.2, Gandhinagar’. Once the Bid is received online, Bid Document / Tender
Fee will not be refundable. As Per GoG R&B Department's Circular
No.Parach/102/000/1B/221/(59)C dated.24/01/2007.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against
Bid Security / EMD shall be submitted in electronic format through online (by
scanning) while uploading the bid, this submission shall mean that bid document /
tender fee and Bid Security / EMD has been received. Accordingly, the offer of only
those shall be opened whose Bid Document / Tender Fee and Bid Security / EMD
have been received electronically. However, for the purpose of realization of
Demand Draft, and FDR / Bank Guarantee bidder shall send the same in original
through R.P.A.D./Speed Post/Courier only so as to reach to Engineer, Narmada
Project Main Canal Division No.2, Gandhinagar within 07 days from the last day of
bid submission.
Penaltative action for not submitting Demand Draft / FDR / Bank Guarantee in
original to Executive Engineer / Tender Inviting Authority by bidder shall be initiated
WRD GR No.PRC-102014-1-MICell-K.1 Dated 29/10/2014.
4. Bids received online, will be opened on the time, date and place as specified in the
online NIT at website https://tender.nprocure.com in the presence of the bidders or their
authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the
bids will be opened on the next working day at the same time and venue.
5. A pre bid meeting will be held on ….-05-2026 at 1 3 : 0 0 hrs. at 5th Floor,
Committee Room, Block No.12, SSNNL, New Sachivalaya, Gandhinagar to clarify the
issues and to answer questions on any matter that may be raised at that stage as
stated in clause 9.2 of ‘instructions to Bidders’ of the bidding documents.
6. Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should be
rounded off to the next thousand rupees.
7. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of the
tender submission date and time. After the tender submission date and time, the
bidder cannot modify / edit / withdraw their submitted offer in any case. No written
or online request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date of
submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer or
Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with tender
are liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and the
bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the
format given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked strictly
in electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall result in
disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the past,
it shall not be deemed to be a ground / reason for not giving required information for
this work / bid.
L. Information supplied for earlier projects shall not be considered while evaluation of
this bid. The Government will not ask for any other information, unless it is found
absolutely necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
For the works costing up to Rs. 7.5 crore (WRD Works), Rs. 7.0 crore
(ROAD/BRIDGE/ BUILDING WORKS), Rs. 0.5 Crore (Electrical Works) kindly refer to
GoG NWRWS & K Department's Circular No. Paracha/1097/1397(11)/
pa.fa./MICELL(k-1) dated 18/01/2018 and Dated 30/09/2022.
For the works costing under Rs. 7.5 crore for Construction work of Water Resources
Department, Rs. 7.0 crore for Roads, Bridges and Building and Rs. 050 crore for
Electrical work following documents shall be submitted in electronic format only
through online by scanning and the (i) Bid Document Fee / Tender Fee (ii) Bid
Security / EMD should be sent in original to the Tender opening authority through
RPAD, so as to reach the Executive Engineer within 7 days from last day of
submission of Bid.
(i) Bid Document Fee / Tender Fee
(ii) Bid Security / EMD or Valid EMD Exemption Certificate of Appropriate Class
of Registration of Approved Contractors.
(iii) Registration Certificate of Appropriate Class.
(iv) Registration Certificate of special category - Road/Building and Category
I/II/III, if required.
(vi) Work Experience, if necessary.
(vii) Other Documents, as required
INSTRUCTIONS TO BIDDERS
Section 1: Instructions to Bidders
Table of Clauses
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 8 19. Sealing & Marking of Bids
2. Source of Funds 8 20. Deadline for Submission of
3. Eligible Bidders 8 21. Late Bids
4. Qualification of the 8 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 12 E. Bid Opening and Evaluation
7. Site Visit 12 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding 13 26. Examination of Bids and
Documents Determination of
9. Clarification of Bidding 13 27. Correction of Errors
10. Amendment of Bidding 14 28. Deleted
29. Evaluation and Comparison
of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 15 F. Award of Contract
13. Bid Prices 15 31. Award Criteria
14. Currencies of Bid and 16 32. Employer’s Right to Accept
Payment any Bid and to Reject any
15. Bid Validity 16 33. Notification of Award and
Signing of Agreement
16. Bid Security 16 34. Performance Security
17. Alternative Proposals By 17 35. Advance Payment and
Bidders Security
18. Format and Signing of Bid 17 36. Dispute Review Expert
37. Correct or Fraudulent
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of
works (as defined in these documents and referred to as ‘the works”) detailed in
the table given in IFB. The bidders may submit bids for any or all of the works
detailed in the table given in IFB.
1.2 The successful bidder will be expected to complete the works by the intended
completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their
derivatives (bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat
/ Govt. of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information,
a statement that the Bidder is neither associated, nor has been associated, directly
or indirectly, with the consultant or any other entity that has prepared the
design, specifications, and other documents for the Project or being proposed as
Project Manager for the Contract. A firm that has been engaged by the Employer to
provide consulting services for the preparation or supervision of the works, and
any of its affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description of the proposed work method and schedule, including
drawings and charts, as necessary. The proposed methodology should include a
program of construction backed with equipment planning and deployment duly
supported with broad calculations and quality assurance procedures proposed to
be adopted justifying their capability of execution and completion of work as per
technical specifications, within stipulated period of completion.
4.5 QUALIFICATION CRITERIA:
(Applicable for the works which require Pre Qualification) As Per GoG
NWRWS & Department's Circular No.
Paracha/1097/1397(11)/pa.fa./MICELL(k-1) Date18/01/2018.
4.5.1 Qualification will be based on Applicant's meeting all the following minimum
pass/fall criteria regarding the Applicant's general and particular experience,
personnel and equipment capabilities and financial positions, as demonstrated by
the applicant's responses in the forms attached to the letter of application
(specified experience and resources shall not be taken in to account in
determining the requirement for joint ventures are given under para 4.6 below)
Subcontractors applicants compliance with the qualifying criteria.
To qualify for more than one contract, the applicant must demonstrate having
experience and resources sufficient to meet the aggregate of the qualification
criteria for each contract given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below.
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year.
Following enhancement factors will be used for the costs of works executed and
the financial figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting 20….-20….
Applicant should indicate actual figures of costs and amount for the works
executed by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign currency
the above enhanced multiplying factors will not be applied. Instead, the current
market exchange rate (State Bank of India BC Selling rate as on the last date of
submission of the bid) will be applied for the purpose of conversion of the amount
in foreign currency into India rupees.
4.5.3 General Experience.
The Applicant shall meet with the following minimum criteria:
(a) Achieved a minimum annual financial turnover of Rs.----Crore for works in
progress and completed in all classes of civil engineering construction works
in any one year, over the last five financial years.
(b) Experience in successfully completing or substantially completing at least one
contract of similar work (………………….) of at least 40 percent of the value of
proposed contract within the last five financial years.
The works may have been executed by the applicant as prime contractor or as
a member of a joint venture or as a nominated sub-contractor. As
subcontractor, he should have acquired the experience of execution of all
major items of works under the proposed contract. In case a project has been
executed by a joint venture, weight towards experience of the project would
be given to each joint venture in proportion to their financial participation in
the joint venture if work executed jointly otherwise as per the scope of work
define in Joint Venture agreement.
Substantially completed works means those works which are at least 90%
completed as on the date of submission (i.e. gross value of work done up to
the last date of submission is 90% or more of the original contract price) and
continuing satisfactorily.
For these, a certificate from the employers shall be submitted along with the
application incorporating clearly the name of the work, contract value, billing
amount, date of commencement of works, satisfactory performance of the
contractor and any other relevant information.
(the experience certificate should be signed by the officer not below the rank
(c) Contractor should have completed 60% of quantity of principal items of work
like concrete, earthwork, pipeline, pumping station etc. within last five finical
years Certificate of competent authority of work done with detail shall be
4.5.4 Personnel Capabilities
Availability for his work of personnel with adequate experience as required; as
4.5.5 Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major
equipment to attain the completion of works in accordance with the prescribed
construction schedule are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with their
bid, a detailed construction planning and methodology supported with layout and
necessary drawings and calculations to allow the employer to review their
proposals. The numbers, types and capacities of each plant/equipment shall be
shown in the proposals along with the cycle time for each operation for the given
production capacity to match the requirements.
4.5.6 Financial Position
The Applicant should give undertaking that he has access to, or has available,
liquid assets (aggregate of working capital, cash in hand and uncommitted bank
guarantees) and / or credit facilities up to 25 percent of the value of the
contract/contracts applied.
4.5.7. The audited balance sheets for the last five years should be submitted, which must
demonstrate the soundness of the applicant's financial position, showing long
profitability including an estimated financial projection for the next two years If
necessary, the employer will make inquiries with the applicant's bankers.
4.5.8 Litigation History
The Applicant should provide accurate information on any litigation or arbitration
resulting from contracts completed or under execution by him over the last five
financial years. A consistent history of awards against the Applicant or any
partner of a joint venture may result in failure of the applicant.
4.5.9 Disqualification
Even though the applicants meet the above criteria, they are subject to be
disqualified if they have:
Made misleading or false representation in the forms, statements submitted, and /
or Record of poor performance such as abandoning the work, rescinding of
contract for which the reasons are attributable to the non consistent history of
litigation awarded against the applicant or financial failure due performance of
the contractor; to bankruptcy. The rescinding of contract of a joint venture on
account of reasons other than non performance, such as Most Experienced
partner of joint venture pulling out, court directions leading to breaking up of a
joint venture before the start of work, which are not attributable to the poor
performance of the contractor will, however, not affect the qualification of the
individual partners.
4.5.10 The bidder who have applied for corporate Debt Restructuring (CDR) / facing
recovery proceedings from financial institutions/facing winding up processing/
those under BIFR in the last 5 financial year shall be considered for bid
qualification. However if the bank/financial institution has accepted the proposal
of debt restructuring on or before the last date of online submission, the same
shall be considered for further evaluation. An affidavit by bidder along with
certificate from bank must be produced in such cases. In case of Joint Venture
agreement, this provision shall be applicable for both lead partner and JV partner
4.6 JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead & 2 Others) (Applicable only
for estimated project cost of 50 Crore and above)
4.6.1 Joint ventures must comply with the following requirement:
(a) Following are the minimum qualification requirements:
(i) The lead partner shall meet not less than 50 percent of all criteria given in para
4.5.3 & 4.5.6 above. The joint venture must collectively satisfy the criteria of para
4.5.3 & 4.5.6 above. The experience of the other joint venture partners shall be
considered if it is not less than 30 percent of the qualifying criteria in para 4.5.3 &
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8
(b) Bid shall be signed so as to legally bind all partners, jointly and severally, and
shall be submitted with a copy of the joint venture agreement providing the joint
and several liabilities with respect to the contract.
4.6.2 Qualification of a joint venture does not necessarily qualify any of its partners
individually or as a partner in any other joint venture. In case dissolution of a joint
venture, each one of the constituent firms may qualify if they meet all the qualification
requirements, subject to the written approval of the Employer.
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will be qualified only if
their available bid capacity at the expected time of bidding is more than the total
estimated cost of the works. The available bid capacity will be calculated as under:
Assessed Available Bid Capacity = ( A*N*2-B), where
A= Maximum value of works executed in any one year during the last five
years (updated to the price level of the year indicated in appendix) taking
into account the completed as well as works in Progress.
B= Value at current price level of the existing commitments and ongoing
works to be completed during the next 02 months ( period of completion
of work for which bids are invited ) ; and
N= Number of years prescribed for completion of the works for which the
bids are invited.
Note :- In Case of joint venture, the available bid capacity will be applied for each
partner to the extent of his proposed participation in the execution of the
4.8 Even though the bidders meet the above qualifying criteria, they are subject
to be disqualified if they have:
- Made misleading or false representation in the forms, statements
and Attachments the submitted in proof the qualification requirements; and
- Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delay in completion, litigation history, or
financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to
5. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals with
the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his
Bid, and the Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and
examine the Site of work and its surrounding and obtain all information that may be
necessary for preparing the Bid and entering into a contract for construction of the
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda
issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids I
1 Instructions to Bidders
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the
bidder in compliance to section 2 will be prepared by him and furnished as Volume-
V in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, bill of quantities, forms, Annexes
and drawings in the Bid Document. Failure to comply with the requirements of Bid
Documents shall be at the bidder’s own risk. Pursuant to clause 26 hereof, bids
which are not substantially responsive to the requirements of the Bid Documents
shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may
notify the Employer in writing or through E-mail at the Employer’s address indicated
in the invitation to bid. The Employer will respond to any request for clarification
which he received earlier than 15 days prior to the deadline for submission of bids.
Employer’s response will be published on website including a description of the
enquiry but without identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting
which will take place at the address, venue, time and date as indicated in the
9.2.2. The purpose of the meeting will be to clarify issues and to answer questions on any
matter that may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to reach
the Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the
source of enquiry) and the responses given will be published without delay on the
tender website i.e. www.tender.nprocure.com. Any modification of the
bidding documents listed in sub-Clause 8.1 which may become necessary as a result
of the pre-bid meeting shall be made by the Employer exclusively through the issue
of an Addendum pursuant to Clause 10 and not through the minutes of the pre-bid
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer
will assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his discretion, extend as
necessary the deadline for submission of bids, in accordance with Sub-Clause
C. PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause
8.1) shall be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section-2
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e.
preliminary as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on
the priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and words)
for all items of the Works described in the Bill of Quantities along with total bid price
(Both in figures and words). Items for which no rate or price is entered by the bidder
will not be paid for by the Bill of Quantities.
13.3 All duties, taxes, and other levies except GST payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid
Price submitted by the Bidder. (GST will be paid extra)
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees.
All payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 120 days after the deadline date
forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer
may request that the bidders may extend the period of validity for a specified period.
A bidder may refuse the request without forfeiting his bid security. A bidder agreeing
to the request will not be required or permitted to modify his bid, but will be
required to extend the validity of his security for a period of the extension, and in
compliance with Clause 16 in all respects.
16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
column 4 of the table of IFB for this particular work. This Bid security shall be in
favor of Executive Engineer, Narmada Project Main Canal Dn.No.2, Gandhinagar
in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in
Volume III. (Bank Guarantee is applicable only for Bid Estimated Amount of
Crore and above) and Bank Guarantee of Schedule and Private Banks shall be
considered as per GoG Finance Department’s Circular No.FD/MSM/e-
file/4/2025/2712/D.M.O. Date 01/04/2026 or as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building
Department or (2) Narmada Water Resources, Water Supply and Kalpsar
Department of Govt of Gujarat. Exemption Certificate is applicable only when
Registration Certificate of Appropriate Class and Category of Approved
Contractors is required as eligible criteria of bidder.
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for
the bid shall be valid for 45 days beyond the validity of the bid i.e. total validity of
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as
indicated in Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as
non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end
of the bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has
signed the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) If found necessary, the bidder will be intimated for negotiation, He will be
intimated maximum three times within the validity period for negotiation, If
contractor does not respond in time, his Bid Security (EMD) will be forfeited and his
tender will be rejected. Punitive action will be taken on such contractors. (As per GoG
R&B Dept’s Gr. No. S/22/2017/639/D, Dt.08/06/2018)
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or
time for completion), basic technical design as indicated in the drawing and
specifications. Conditional offers or alternative offers will not be considered further
in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of these
Instructions to bidder as the “Preliminary Stage “and “Financial Bid” in separate parts to
D. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website
specified above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with Clause 10, in which case all right and obligation of
the Employer and the bidders previously subject to the original deadline will then be
subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids
and the expiration of the original period of bid validity specified in Clause
above or as extended pursuant to Clause 15.2 may result in the forfeiture of the Bid
security pursuant to Clause
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant
to Clause 22, in the presence of the Bidders or their representatives who choose to
attend at time, date and the place specified in Appendix in the manner specified in
Clauses 20 and 23.3, In the event of the specified date of Bid opening being declared
a holiday for the Employer, the Bids will be opened at the appointed time and
location on the next working day.
23.3 The “Technical Bid” shall be opened. The amount, form and validity of the bid security
furnished with each bid will be announced. If the bid security furnished does not
conform to the amount and validity period as specified in the invitation for bid (ref.
Column 4 and paragraph 3), and has not been furnished in the form specified in Clause
16, the financial bid will not be opened.
23.4 (i) Subject to confirmation of the bid security by the issuing Bank, the bids accompanied
with valid bid security will be taken up for evaluation with respect to the
Qualification information and other information furnished in part I of the bid
pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the
Evaluation Committee will finalize the list of responsive bidders whose
financial bids are eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found responsive
in accordance with Clause 23.3 will be announced. The bids of only these bidders will be
opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
discount and such other details as the Employer may consider appropriate, will be
announced by the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.3 will be announced. The bids of only these
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total
amount of each bid, any discount, and such other details as the Employer may
consider appropriate, will be announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of Estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of
Bids and recommendations for the award of a contract shall not be disclosed to
Bidders or any other persons not officially concerned with such process until the
award to the successful Bidder has been announced. Any effort by Bidder to
influence the Employer’s processing of Bids or award decisions may result in the
rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may,
at his discretion, ask any Bidder for clarification of his Bid, including breakdowns of
unit rates. The request for clarification and the response shall be in writing or by e-
mail, but no change in the price or substances of the Bid shall be sought, offered, or
permitted except as required to confirm the correction of arithmetic errors
discovered by the Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter
relating to his Bid opening to the contract is awarded. If the Bidder wishes to bring
additional information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation,
bid comparison or contract award decision may result in the rejection of the Bidders’
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether each
Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been properly
signed; (c) is accompanied by the required securities and; (d) is substantially responsive to
the requirements of the Bidding document. During the detailed evaluation of the “Financial
Bid”, the responsiveness of the bids will be further determined with respect to the
remaining bid conditions, i.e., priced bill of quantities, technical specifications, and
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation or
reservation. A material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works; (b) which limits in
any substantial way, inconsistent with the Bidding documents, the Employer’s rights
or the Bidder’s obligations under the Contract; or (c) whose rectification would affect
unfairly the competitive position of other Bidders presenting substantially
responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the
Employer, and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be
substantially responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation.
Variation and deviations and other factors, which are in excess of the requirements
of the Bidding documents or otherwise result in unsolicited benefits for the
Employer, shall not be taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will not
be taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the
Engineer’s estimate of the cost of work to be performed under the contract the
Employer may require the Bidder to produce detailed consistency of those prices
with the construction methods and schedule proposed. After evaluation of the price
analyses, the Employer may require that the amount of the performance security set
forth in Clause 34 be increased at the expense of the successful /bidder to a level
sufficient to protect the Employer against financial loss in the event of default of the
successful Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically
priced low and which cannot be substantiated satisfactorily by the bidder may be
rejected as non-responsive.
F. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid
has been determined.
(i) to be substantially responsive to the Bidding documents and who has offered
the lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price
which is the lowest evaluation in any of the packages opened earlier than the
one consideration.
In no case, the contract shall be awarded to any bidder whose available bid
capacity is less than the evaluated bid price, even if the said bid is the lowest
evaluated bid. The contract will in such cases be awarded to the next lowest bidder
at his evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any
Bid, and to cancel the Bidding process and reject all Bids, at any time prior to the
award of contract, without thereby incurring any liability to the affected bidder or
Bidder or any obligation to inform the affected Bidder or Bidders of the grounds for
the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the
Employer prior to expiration of the Bid validity period by cable, telex or facsimile
confirmed by registered letter. This letter (hereinafter and in the condition of
contract called the “Letter of Acceptance”) will state the sum that the Employer will
pay the Contractor in consideration of the execution, completion, and maintenance of
the Works by the Contractor as prescribed by the Contract (hereinafter and in the
Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to
the furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful Bidder,
within 28 days following the notification of award along with the Letter of
Acceptance. Within 21 days of receipt, the successful Bidder will sign the Agreement
and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the
Employer will promptly notify the other Bidders that their Bids have been
34. Performance Security
34.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder
shall furnish to the Employer an irrevocable and unconditional guarantee from a
Bank in the form set forth in Section 8 (the “Performance Security”) for an
amount equal to 5% (five percent) of its Contract Price. In case of bids
mentioned below, the successful Bidder, along with the Performance Security,
shall also furnish to the Authority an irrevocable and unconditional guarantee
from a Bank in the same form given at Section 8 towards an Additional
Performance Security (The “Additional Performance Security”) for an amount
calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but
upto 20% of the Estimated Project Cost, then the Additional Performance
Security shall be calculated @ 20% of the difference in the (i) Estimated
Project Cost (as mentioned in Bid Document) - Minus 10% of the
Estimated Project Cost and (ii) Contract Price offered by the selected
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of
the Estimated Project Cost, then the Additional Performance Security
shall be calculated @ 30% of the difference in the (i) Estimated Project
Cost (as mentioned in Bid Document) - Minus 10% of the Estimated
Project Cost and (ii) Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days from the
stipulated date of completion of the project and the and the Additional
Performance Security shall be valid beyond 28 (twenty-eight) days of Project
Completion Date.
Performance Security shall become refundable/releasable within 15 days after
certified project completion date subject to Fulfillment of contractual obligation
and settlement of all dues and claims.
34.2. If the performance security is provided by the successful Bidder in the form of a
Bank Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India and
acceptable to the Employer. As per GoG Finance Department’s Circular
No.FD/MSM/e- file/4/2025/2712/D.M.O. Date 01/04/2026 or as per their latest
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture of
the Bid Security.
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated
in the Conditions of Contract, subject to maximum amount, as stated in the
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in completing for the
contract in question and will declare the firm ineligible, either indefinitely or for a
stated period of time, to be awarded a contract with National Highways Authority of
India/ State PWD and any other agencies, if it at any time determines that the firm
has engaged in corrupt or fraudulent practices in completing for the contractor, or
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of
the Conditions of Contract.
APPENDIX TO ITB
Clause Reference With
respect to Section –I
1. The Name of the Employer is Executive Engineer, Narmada [ Cl.1.1]
Project Main Canal Dn.No.2, Gandhinagar
2. The last five financial years.
3. This Annual Financial Turnover Amount is Rs. [Cl.4.5.3 (a)]
4. Value of Work is Rs.25,80,216=57
6. The cost of electric work is Rs.1,25,324=00
7. The cost of water supply / sanitary works is Rs.80,252.96
8. Deleted [Cl.4.5.6 ]
9. Price level of the financial year 2026-2027 [Cl. 4.5.2]
10. The pre-bid meeting will take place : 5th Floor, Committee Room, [Cl. 9.2.1]
Block No.12, SSNNL, New Sachivalaya, Gandhinagar
11. The Technical bid will be opened at the office of the ……………
12. Address of the Employer: Block No.12, 8th Floor, New
Sachivalaya, Gandhinagar
14. The bid should be submitted latest by [Cl. 20.1 & 20.2]
As stated on online NIT
15. The bid will be opened at Executive Engineer, N.P.Main Canal [Cl. 23.1 ]
Dn.No.2, Gandhinagar
The Bank on online
Draft NIT of Executive Engineer, N.P.Main Canal
Dn.No.2, Gandhinagar.
18. Escalation factors (for the cost of works [Cl.4.5.2]
executed and financial figure to a common base
value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2026-2027
LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they
propose to use on the work.
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this
work as under: -
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work
to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed
is more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum Two Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs
but more than Rs.5 lakhs.
4. Minimum One Diploma Civil Engineers for the work when the cost of work to be
executed is less than Rs. 5 lakhs. The Engineer so employed for the Government work
must have sufficient experience to handle the work independently. Such an Engineer
shall have to stay at the site of work and he shall not be entrusted with other duty
except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer,
Employment of a separate Engineer will not be necessary provided that the Engineer
partner himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the
Deputy Executive Engineer-in-charge of the work the Name, Qualifications, copy of
marksheet, Color Photograph and the appointment order issued such engineers
engaged for this contract work. If 15 days after issue of work order such designated
Site Engineers do not resume or do not remain present on site of work, the recovery at
the rate of Rs.15,000-00 per month per Engineer will be made from the
bills/deposit/dues of the contractor. Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for
the purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders.
This information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 2021-2022
Works performed in the last five years (in Rs.
1.3.1 Work performed as prime contractor, work performed in the past as a nominated
sub-contractor will also be considered the sub-contract involved execution of all
main items of work described in the bid documents, provided further that all other
qualification criteria are satisfied (in the same name) on works of a similar nature
over the last five years** and in current year before the submission of the bid.
Project Name of Description Contract Value of Date Stipulated Actual date Remark
Name the of work No. contract of period of of explaining
Employer (Rs. issue completion completion* reasons for
Crore) of delay &
order Completed
*Attach certificate(s) from the Engineer(s)in-charge
** Immediately preceding the financial year in which bids are received.
1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a
nominated sub-contractor, will also be considered provided the sub-contract
involved execution of all main items of work described in the bid document,
provided, further that all other qualification criteria are called (in the same name
and style) in the last five years** and in current year before the submission of the
Year Name of Name of the Quantity of work performed (Cum / MT) Remarks *
the work Employee (Indicate
Cement Masonary Earth work Bituminous
Concrete Item 3 work contract Ref.)
(including Item 2 Item
1.4 Information on Bid Capacity (works for which bids have been submitted and works
which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Descriptio Place Contract Name & Address Value Contract Stipulated Value of Anticipated
n of works & State No. of (Rs. Cr) Period of Works* of
Employer Completio remaining completion
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref.
Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to
1.6 Qualifications and experience of key personnel required for administration and
execution of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of
the Conditions of Contract.
Position Name Qualification Experience
Project Manager
1.7 Proposed sub-contract and firms involved
Sections of the Value of Sub- Experience in
works Contractor similar work
Attach copies of certificates on possession of valid license for executing water
supply/ sanitary work/ building electrification works.
1.8 Financial reports for the last five years: balance sheets, profit and loss statements,
auditors’ reports (in case of companies/corporations), etc. List them below and
1.9 Evidence of access to financial resources to meet the qualification requirements:
cash in hand, lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who
may provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction
to Bidders. (Name of Consultant engaged for project preparations is * ........................... )
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawings and charts as necessary to comply with the requirements of the Bidding
documents. (Refer ITB Clause 4.1)
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
* Fill the name of Consultant
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR
AVAILABILITY OF CREDIT FACILITIES
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s. is a reputed company
with a good financial standing.
If the contract for the work, namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of
Rs. to meet their working capital requirements for executing the above
during the contract period.
Senior Bank Manager
Address of the Bank
1. I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
have not abandoned any work of
Government of Gujarat/Government of India/any Board or Corporation under
Government of Gujarat/Government of India nor any contract awarded to us for
such works have been rescinded, during last five years prior to the date of this
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested by
the Department to verify this statement or regarding any (our) competence and
general reputation.
4. The Undersigned understands and agrees that further qualifying information
may be requested, and agrees to furnish any such information at the request of
the Department/ Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
I, the undersigned do hereby undertake ......... that our
invest a minimum cash up to 25% of the value of the work during implementation of the
(Signed by an Authorized officer of the firm)
Title of officer
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 37 37 Bill of Quantities
2 Interpretation 38 38 Changes in the Quantities
3 Language and Law 39 39 Variations
4 Engineer’s Decisions 39 40 Payments for Variations
5 Delegations 39 41 Cash Flow Forecasts
6 Communications 39 42 Payment Certificates
7 Sub-Contractors 39 43 Payments
8 Other Contractors 39 44 Compensations Events
9 Personnel 40 45 Tax
10 Employer’s & Contractor Risk 40 46 Currencies
11 Employers Risks 40 47 Price Adjustment
12 Contractor’s Risk 40 48 Retention
13 Insurance 40 49 Liquidated damages
Site Investigations Reports 41 50 Bonus
15 Queries about the Contract 41 51 Advance Payment
16 Contractors to Construct the 41 52 Securities
17 The Works to be Completed By 41 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 41 54 Cost of Repair
20 Discoveries 42 E. Finishing the Contract
21 Possession of the Site 42 55 Completion
22 Access to the Site 42 56 Taking Over
23 Instructions 42 57 Final Account
24 Disputes 42 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 43 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 44 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 44 F. Special Conditions of
30 Delays Ordered by The 44 63 Labour
Engineer 64 Compliance with labour
31 Management Meetings 45 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions
of Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities
forming part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by
the Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to
execute, complete and maintain the Works till the completion of Defects
Liability Period. It consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which
comprise the Contract.
The Contractor is a person or corporate body whose Bid to carry out the
Work has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the
Contractor to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and
thereafter as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and
calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the
The Engineer is the person named in the Contract Data (or any other
competent person appointed and notified to the contractor to act in replacement of
the Engineer) who is responsible for supervising the Contractor, administering the
Contract, certifying payments due to the Contractor, issuing and valuing Variations
to the Contract, awarding extensions of time, and valuing the Compensations
Equipment is Contractor’s machinery and vehicles brought temporarily to
the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s
Letter of Acceptance.
The Intended Completion Date is the date on which it is intended that the
Contractor shall complete the Works. The Intended Completion Date is specified in
the Contract Data. The Intended Completion Date may be revised only by the
Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for
incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical,
electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and subsurface
conditions at the site.
Specifications means the Specifications of the works included in the Contract
and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the
Contractor shall commence execution of the works. It does not necessarily coincide
with any of the Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the
Contractor to carry out a part of the work in the Contract which includes work on the
Temporary Works are works designed, constructed, installed, and removed
by the Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works.
The Works are what the Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male
also means female or neuter and the other way around. Heading have no
significance. Words have their normal meaning under the language of the
Contract unless specifically defined. The Engineer will provide instructions
clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references to
the Completion Date and Intended Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following
order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in
the Contract Data.
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide
contractual matters between the Employer and the Contractor in the role
representing the Employer.
5.1 The Engineer may delegate any of his duties and responsibilities to other
people after notifying the Contractor and may cancel any delegation after
notifying the Contractor.
6. Communications
6.1 Communications between parties which are referred to in the conditions are
effective only when in writing. A notice shall be effective only when it is
delivered (in terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in
contract data, with the approval of the engineer but may not assign the
Contract without the approval of the Employer in writing. Subcontracting
shall not alter the Contractor’s obligations. Sub-contracting of supply or
specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for
the part of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors,
public authorities, utilities and the Employer between the dates given in the
Schedule of other Contractor. The Contractors shall as refer to in the Contract
Data, also provide facilities and services for them as described in the
Schedule. The employer may modify the schedule of other contractors and
shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Contract Data to carry out the functions stated
in the Schedule or other personnel approved by the Engineer. The Engineer
will approve any proposed replacement of key personnel only if their
qualifications, abilities, and relevant experience are substantially equal to or
better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of
the Contractor Staff or his work force stating the reasons the Contractor shall
ensure that the person leaves the Site within seven days and has no further
connection with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s
risks, and the Contractor carries the risks which these Contracts states are
Contractors risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as
they directly affect the execution of the Works, the risks of war, hostilities,
invasion, act of foreign enemies, rebellion, revolution, insurrection or military
or usurped power, civil war, riot commotion or disorder (unless restricted to
the Contractor’s employees), and contamination from any nuclear fuel or
nuclear waste or radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and
death which arise during and in consequence of the performance of the
Contract other than the excepted risks are the responsibility of the
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects
Liability Period, in the amounts and deductibles stated in the Contract data
for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to
the Engineer for the Engineer’s approval before the Start Date. All such
insurance shall provide for compensation to be payable in the types and
proportions of currencies required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates
required, the Employer may affect the insurance which the Contractor should
have provided and recover the premiums the Employer has paid from
payments otherwise due to the Contractor or, if no payment is due, the
payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the
approval of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation
reports referred to in the Contract Data, supplemented by any information
available to the Bidder.
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and
shall carry out the Works in accordance with the programme submitted by
the Contractor, as updated with the approval of the Engineer, and complete
them by the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the
proposed Temporary works to the Engineer, who is to approve them if they
comply with the Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for
design of the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary
or permanent work are subject to prior approval by the Engineer before their
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to
notify the engineer of such discoveries and carry out the Engineer’s
instructions for dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If
possession of a part is not given by the date stated in the Contract Data the
Employer is deemed to have delayed the start of the relevant activities and
this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is
not handed over to the Contractor, then contractor/ Employer may fore-close
the contract. Contractor/Employer has to foreclose the work within 30 days
after lapse of 25%-time limit and after 30 days foreclosure option will be
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the
Contract is being carried out or is intended to be carried out and to any place
where materials or plants are being manufactured/ fabricated/ assembled for
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to
works which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s
accounts and records relating to the performance of the Contractor and to
have them audited by auditors appointed by the Employer, if so required by
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that the
decision was wrongly taken, the decision shall be referred to
Superintending Engineer(O&M), SSNNL, Gandhinagar within 14 days of
the notification of the Engineer's decision. If the issue is not resolved, any
party can refer the matter for conciliation within 15 days from the
decision given by t h e Superintending Engineer(O&M), SSNNL,
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with
the decision of the Superintending Engineer(O&M), SSNNL,
Gandhinagar, both the parties have to refer to the Chief Engineer
concern for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the Superintending Engineer(O&M), SSNNL,
Gandhinagar, both the parties have to refer to the M.D., SSNNL
for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer
the dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If
the Contractor fails to refer a claim / dispute to the Higher Authority within
14 days of the notification of the Engineer's decision, the Contractor shall not
be entitled to any additional payment/claim if he doesn’t follow the above
sequence in stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to the
Engineer for approval a Programme showing the general methods,
arrangements orders, and timing for all the activities in the works along with
monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual
progress achieved on each activity and the effect of the progress achieved on
the timing of the remaining work including any changes to the sequence of
the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated
programme at intervals no longer than the period stated in the Contract data.
If the Contractor does not submit an updated programme within this period,
the Engineer may withhold the amount stated in the Contract data from the
next payment after the date on which the overdue programme has been
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to the
Engineer again at any time. A revised programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation
Event occurs or a Variation is issued which makes it impossible for
completion to be achieved by the Intended Completion Date without the
Contractor taking steps to accelerate the remaining work and which would
cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended
Completion Date within 35 days of the Contractor asking the Engineer for a
decision upon the effect of a compensation event or Variation and submitting
full supporting information. If the Contractor has failed to give early warning
of a delay or has failed to cooperate in dealing with a delay, the delay by this
failure shall not be considered in assessing the new Intended Completion
28.3 The Engineer shall within 14 days of receiving full justification from the
contractor for extension of Intended Completion Date refer to the Employer
his decision. The employer shall in not more than 21 days communicate to the
engineer the acceptance or otherwise of the Engineer’s decision. If the
employer fails to give his acceptance, the Engineer shall not grant the
extension and the contractor may refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any
activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to
review the plans for remaining work and to deal with matters raised in
accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to
provide copies of his record to those attending the meeting and to the
Employer. The responsibility of the parties for actions to be taken is to be
decided by the Engineer either at the management meeting or after the
management meeting and stated in writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific
likely future events or circumstances that may adversely affect the quality of
the work, increase the Contract price or delay the execution of works. The
Engineer may require the contractor to provide an estimate of the expected
effect of the future event or circumstance on the contract price and
completion date. The estimate is to be provided by the Contractor as soon as
reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering
proposals for how the effect of such an event or circumstance can be avoided
or reduced by anyone involved in the work and in carrying out any resulting
instruction of the Engineer.
C. QUALITY CONTROL
33. Identifying Defects/ Defect liability period
33.1 : Defect liability period: The contractor shall be responsible to make good and
remedy at his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of completion.
The Engineer in charge shall give the contractor a notice in writing about the
defects and the contractor shall make good the same within 15 days of receipt
of the notice. In the case of failure on the part of the contractor, the Engineer-
in-charge may rectify or remove or re-execute the work at the risk & cost of
the contractor. The Engineer-in-charge shall be entitled to appropriate the
whole or any part of the amount of security deposit towards the expenses, if
any, Incurred by him in rectification, removal or re- execution. The Defects
Liability period shall be as under....
A. For works of SSNNL Except building
(a) (i) For all works costing up to Rs. 50,000 (amount put to tender), the period
shall be 3 Months from the certified date of completion.
(b) (1) For SSNNL works likes Check Dam/ Canal/ Drainage/Road Structure
tender amount from Rs.50,000 to 10,00,000, the defect liability period shall be
12 months from the certified date of completion.
(2) For SSNNL work except likes Check Dam/ Canal / Drainage / Road
Structure tender amount from Rs.50,000 to 10,00,000, the defect liability
period shall be 6 months from the certified date of completion.
(c)(1)For SSNNL works likes Check Dam/ Canal/ Drainage/Road Structure tender
amount more than Rs.10,00,000, the defect liability period shall be 3 Years
from the certified date of completion.
(2) For SSNNL work except likes Check Dam/ Canal / Drainage / Road
Structure tender amount from Rs.10,00,000 to 1 Crore, the defect liability
period shall be 12 months from the certified date of completion.
(d)(1)For all SSNNL works of tender amount more than Rs.1 Crore, the defect
liability period shall be 3 Years from the certified date of completion
B. For Building works of SSNNL:-
For Building works of SSNNL, Follow the R&B Circular dated.
For original building works the defect liability period will be 4 years or elapse
of 4 monsoon period following date of possession of building taken over by
user agency following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be
treated as the last date.
WRD CircularNo. Matas/102013/MICELL(K-1) Dated 13/12/2013
33.2 For Road work :
Free maintenance guarantee period for works of Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year
from the date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the
contractor shall have to give four years free maintenance guarantee from the
certified date of completion. During this period the contractor shall visit the
site every three months along with the concerned Section Officer / Deputy
Executive Engineer and will examine the work already carried out in this
contract like road work, jungle cutting, side shoulders, side gutter, road
furniture, patta etc. and will prepare Km. wise inspection report duly signed
by all concerned and any defect observed shall be done within 15 days by the
contractor at his risk and cost as per the direction of Engineer in charge. The
contractor needs to do videography of these visits and require to submit at the
time of release of FMG. If B.T. the surface during the maintenance period of
years is worn out then agency shall have to provide renewal coating as per
tender item as directed by the Engineer-in-charge. The amount equivalent to
5% of each running bill shall be withheld and will be released after the free
maintenance guarantee period (i.e. 4 years) is over.
However, this amount shall be released against fixed deposit or bank
guarantee pledged in the name of Executive Engineer after completion
certificate of work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates under no
circumstances shall exceed the allowable limit set forth in the relevant clause
for the material in question.
(2) 2% of the amount eligible for the payment of bituminous iterns shall be
withheld till the miscellaneous items like earthwork in embankment / cutting
for side shoulders, side gutters, kilometer / indicator/guard stones, sign
boards etc. are completed in all respect by the contractor. After completion of
the miscellaneous items, the above said 2% withheld amount shall be released.
(3) Videography for the surface under Maintenance Guarantee is to be done as per
Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work costing
more than Rs. 5.00 Crore.
(4) Setting up of adequate laboratory & deployment of quality engineers. The
contractor shall have to set up the laboratory with adequate equipment. Till the
setting up of adequate laboratory is completed & reported of this to the
engineer (subject to due verification by engineer's representative) by
contractor in writing, Rs.2,00,000/- shall be withheld. The qualified quality
Engineer shall be deployed exclusively for this contract by the contractors. If
quality Engineer is not deployed by contractor within one month after the date
of work order, the amount equivalent to Rs.20,000 per month shall be
recovered till the actual deployment of quality engineer. The amount so
recovered towards the deployment of quality engineers shall not be refunded.
(5) Asphalt work will have to be cross checked as per G.R. No.: RGN/60/
2006/35/C, dtd.31/05/07 before final bill is paid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own risk
and cost, the existing lane(s) of the road so that the traffic worthiness and
safety thereof are at no time materially inferior as compared to their condition
10 (ten) days prior to the date of the Agreement, and shall undertake the
necessary repair and maintenance works for this purpose; provided that the
Contractor may, at his cost, interrupt and divert the flow of traffic if such
interruption and diversion is necessary for the efficient progress of works and
conforms to Good Industry Practice; provided further that such interruption
and diversion shall be undertaken by the Contractor only with the prior
written approval of the Executive Engineer which approval shall not be
unreasonably withheld. For the avoidance of doubt, it is agreed that the
Contractor shall at all times be responsible for ensuring safe operation of the
33.3 The Engineer shall check the Contractor’s work and notify the Contractor of
any defects that are found. Such checking shall not affect the Contractor’s
responsibilities the Engineer may instruct the Contractor to search for a
Defect and to uncover and test any work that the Engineer considers may
34.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that
it does, the Contractor shall pay for the test and any samples. If there is no
defect the test shall be a Compensation Event.
34.2 #1% of the amount of work done for works upto Rs. 10 crore of estimate cost
should be deducted from R.A. Bill of the contractor for testing the quality of
material workmanship. Whereas for estimated cost of works more than
crore, the charges for testing of quality of material workmanship shall be
deducted from R.A. bill of contractor as per actual charges. As Per GoG NWRWS
& K Department's Circular No. PARCH/132023/401/MICELL Dated
34.3 Agency has to establish testing laboratory on site for the various test to be
carried out in the work for this purpose agency shall construct a pukka
laboratory building with all facility on site at location specified by the
engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end
of the defects Liability Period, which begins at Completion and is defined in
the contract data. The Defects Liability Period shall be extended for as long as
Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified
defect within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is
paid for the quantity of the work done at the rate in the Bill of Quantities for
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the
original specifications , drawings, designs and instructions that may appear to
him to be necessary or advisable during the progress of the work and the
contractor shall be bound to carry out the work in accordance with any
instruction in this connection which may be given to him in writing signed by
the Engineer and such alteration shall not invalidate the contract and any
additional work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on
the same conditions in all respects on which he agreed to do the main work
and at the same rate as are specified in the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the
tender by more than 130%, the contractor will be paid for the quantity in
excess of 130%, at the rate entered in the SOR of the year during which the
excess in quantity is first executed.
39.1 All Variations shall be included in updated programmes produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate
is specified in this contract, then such class of work shall be carried out as
(i) At the rate derived from the item within the contract which is comparable to
the one involving additional or altered class of work; where there are more
than one comparable items, the item of the contract which is nearest in
comparison with regard to class or classes of the work involved shall be
selected and the decision of the Superintending Engineer as to the nearest
comparable item shall be final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works
shall be carried out at the rate entered in the Schedule of Rates of the division
for the year in which the tender was received, increased or decreased by the
percentage by which the tender amount is more or less as compared to the
amount arrived at the rates in the “Schedule of Rates” of the Division in the
year in which the tender was received. If the Schedule of rates of the Division
does not contain all the items, the percentage increase or decrease of the
tender shall be calculated considering such items which were included in the
“Scheduled Rates” of the division for the year and for materials consumed on
such item the rate to be charged would be the basic rate taken into account
for fixing the rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of
work shall be carried out at the rate decided by the competent authorities on
the basis of detailed rate analysis after hearing the contractor before a
Committee of two Superintending Engineers stationed at the same place or
the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule of
Rates” of the Division is ordered to be carried out before the rate is agreed
upon, then the contractor shall within seven days of the date of receipt by him
of the order to carry out the work, inform the Engineer-in-charge of the rate,
which it is his intention to charge for such class of work and if the Engineer in
charge does not agree to this rates, he shall by notice in writing be at liberty
to cancel his order to carry out such class of work and arrange to carry it out
in such manner as he may consider it advisable, provided always that if the
contractor shall commence work or incur any expenditure in regard thereof
before the rates shall have been determined as lastly herein before
mentioned, then in such cases he shall only be entitled to be paid in respect of
the work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as shall
be fixed by the Engineer-in-charge. In the event of the dispute, the decision of
the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs,
drawings and specifications recommended by the contractor and accepted by
the competent authority, the alternation above referred to shall be within the
scope of such designs, drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the
proportion that the increase in the cost occasioned by alterations bears to the
cost of the original work and the certificate of the Engineer-in-charge as to
such proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer
with an updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the
estimated value of the work completed less the cumulative amount certified
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days
and certify the amount to be paid to the Contractor after taking in to account
any credit or debit for the month in question in respect of materials for the
works in the relevant amounts and under conditions set forth in sub-clause
32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the
items in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or
reduce the proportion of any item previously certified in any certificate in the
light of later information
43.1 Payments shall be adjusted for deductions for advance payments, retention,
other recoveries in terms of the contract and taxes at source, as applicable
under the law. The Employer shall pay the Contractor the amounts certified
by the Engineer within 28 days of the date of each certificate.
43.2 Payment of GST (prevailing rates) on the amount payable under the contract
to the Contractor will be made by the Employer. Hence, it is the responsibility
of the contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be
paid by the Employer and shall be deemed covered by other rates and prices
in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the
(a) The Employer does not give access to a part of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being
completed beyond the Intended Completion Date then Authority will approve
EOT with eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on
due date of bid submission except GST. However, any subsequent changes in
the tax structure by Government after due date of bid submission will be
compensated (+/-) on availability or submission of actual documentation.
Contractor will have to intimate Engineer regarding changes occurred in the
tax structure after bid submission. If the contractor fails to provide such
information and if any financial obligation may arise due to change in tax
structure, same will be recovered from the contractor.
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price of
labour, materials, fuels and lubricants in accordance with the following
principles and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date
given in the contract data up to end of the initial intended completion date
or extensions granted by the Engineer and shall not apply to the work
carried out beyond the stipulated time for reasons attributable to the
(b) The price adjustment shall be determined during each month from the
formula given in the contract data.
(c) Following expressions and meanings during to the work done during each
R = Total value of work done during the month. It would include the
amount of secured advance granted, if any, during the month less the
amount of secured advance recovered, if any during the month. It will
exclude value for works executed under variations for which price
adjustment will be worked separately based on the terms mutually
47.2 To the extent that full compensation for any rise or fall in costs to the
contractor is not covered by the provisions of this or other clause in the
contract, the unit rates and prices included in the contract shall be deemed to
include amounts to cover the contingency of such other rise or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor the
proportion stated in the Contract Data until Completion of the whole of the
48.2 On Completion of the whole of the Works half the total amount retained is
48.2 On Completion of the whole of the Works half the total amount retained is
repaid to the Contractor and half when the Defects Liability Period has passed
and the Engineer has certified that all Defects notified by the Engineer to the
Contractor before the end of this period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money
deducted by the Employer under the provision of this clause, Employer shall
consider the said request of the Contractor provided that the refund
hereunder shall be made in tranches of not less than 1% (One Percent) of the
Contract Price and Contractor furnishes an irrevocable and unconditional
Bank guarantee for an equal amount substantially in the format of Bank
Guarantee for Performance Guarantee enclosed with SBD and valid up to
day beyond the scheduled / extended Defects Liability Period. On completion
of the whole works, the contractor has however an option to submit a fresh
irrevocable and unconditional Bank Guarantee for an amount equal to 5% of
the total value of work executed substantially in the format of Bank Guarantee
for Performance Guarantee enclosed with SBD and valid up to 60 days beyond
the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per
day stated in the Contract Data for each day that the Completion Date is later
than the Intended Completion Date (for the whole works or the milestone as
stated in the contract data). The total amount of liquidated damages shall not
stated in the contract data). The total amount of liquidated damages shall not
exceed the amount defined in the Contract Data. The Employer may deduct
liquidated damages from payment due to the Contractor. Payment of
liquidated damages does not affect the Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have
been paid, the Engineer shall correct any overpayment of liquidated damages
by the Contractor by adjusting the next payment certificate. The Contractor
shall not be entitled for any interest on the over payment calculated from the
date of payment to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated in
the tender, then the contractor shall pay to the employer the relevant sum
stated in the Contract Data as Liquidated damages for such default and not as
penalty for everyday or part of day which shall elapse between relevant time
for completion and the date stated in the taking over certificate of the whole
of the works on the relevant section, subject to the limit stated in the contract
The employer may, without prejudice to any other method of recovery
deduct the amount of such damages from any monies due or to become due to
the contractor. The payment or deduction of such damages shall not relieve
the contractor from his obligation to complete the works on from any other of
his obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable
any Section, a Taking Over Certificate has been issued for any part of the
Works or of a Section, the liquidated damages for delay in completion of the
remainder of the Works or of that Section shall, for any period of delay after
the date stated in such Taking-Over-Certificate, and in the absence of
alternative provisions in the Contract, be reduced in the proportion which the
value of the part so certified bears to the value of the whole of the Works or
Section, as applicable. The provisions of this Sub-clause shall only apply to the
rate of liquidated damages and shall not affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the
intended Completion Date prescribed in Contract Data the Employer shall
pay to the contractor a sum stated in Contract Data as bonus for every
completed month but subjected to maximum amount as stated in
Contract Data; which shall elapse between the date of completion of all
items of works as stipulated in the contract, including variations ordered by
the Engineer and the time prescribed in Clause
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with time
limit of the works is equal or more than 6 months. The bonus would be paid
% of Time Saved % of Initial Contract Price
entitled for Bonus
Less than 10% 0%
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be
Recorded in writing) to the Contractor of the amounts stated in the Contract
Date by the date stated in the Contract Date, against provision by the
Contactor of an Unconditional Bank Guarantee in a form and by a bank
acceptable to the Employer in amounts and currencies equal to be at least
110% of the advance payment. The guarantee shall remain effective until the
advance payment has been repaid, but the amount of the guarantee shall be
progressively reduced by the amounts repaid by the Contractor. The
Mobilization advance would be deemed as interest bearing advance at an
interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment,
plant and Mobilization expenses required specifically for execution of the
Works. The Contractor shall demonstrate that advance payment has been
used in this way by supplying copies of invoices or other documents to the
51.3 The advance payment shall be repaid by deduction proportionate amount
from payments otherwise due to the Contractor, following the schedule of
completed percentages of the Works on a payment basis. No account shall be
taken of the advance payment or its repayment in assessing valuations of
work done, variations, price adjustments, Compensation Events, or
Liquidated damages.
52.1 The performance Security (including additional security for unbalanced bids)
shall be provided to the Employer no later than the date specified in the Letter
of Acceptance and shall be issued in an amount and form and by a bank or
surety acceptable to the Employer, and denominated in Indian Rupees. The
performance Security shall be valid until a date 60 days from the certified date
of completion of the project and the additional security for unbalanced bids
shall be valid until a date 28 days from the date of issue of the certificate of
completion of the work.
Performance and Additional Performance Security shall become
refundable/releasable within 15 days after project certified completion date
subject to fulfillment of contractual obligation and settlement of all dues and
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages
arises from the Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion
of the works and the Engineer will do so upon deciding that the work is
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of the
Engineer issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the
total amount that the Contractor considers payable as full and final settlement
total amount that the Contractor considers payable as full and final settlement
of all claims under the Contract for items before the end of the Defects
Liability Period. The Engineer shall issue a Defect Liability Certificate and
certify any final payment that is due to the Contractor within 56 days of
receiving the Contractor's account if it is correct and complete. If it is not, the
Engineer shall issue within 56 days a schedule that states the scope of the
corrections or additions that are necessary. If the Final Account is still
unsatisfactory after it has been resubmitted, the Engineer shall decide on the
amount payable to the Contractor and issue a payment certificate, within
days of receiving the Contractor’s revised account.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses
and savings in final account is observed, the Engineer/Employer shall be at
liberty to restrict the final payment of BOQ items to the lowest amount
evaluated of the bids considering the final quantities and the rates quoted
including the rebates if any. Payment of variation items shall however be
made at the rates approved by the Employer, within 90 days from the
physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are
required, the Contractor shall supply them by the dates stated in the Contract
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates
stated in the Contract data, or they do not receive the Engineer’s approval, the
Engineer shall withhold the amount stated in the Contract Data from
payments due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the
1. The contractor stops work for 28 days when no stoppage of work is
shown on the current programme and the stoppage has not been
authorized by the Engineer
2. The Engineer instructs the Contractor to delay the progress of the Works
and the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation
other than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it
within a reasonable period of time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of
days for which the maximum amount of liquidated damages can be paid as
defined in the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in corrupt
or fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the
offering, giving, receiving or soliciting of anything of value to influence the
action of a public official in the procurement process or in contract execution.
“Fraudulent practice” means a misrepresentation of facts in order to influence
a procurement process or the execution of a contract to the detriment of the
borrower, and includes collusive practice among Bidders (prior to or after bid
submission) designed to establish bid prices at artificial non-competitive
levels and to deprive the Borrower of the benefits of free and open
59.3 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed under Sub Clause 59.2 above, the
Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by
the Contractor, the Engineer shall issue a Certificate for the value of the work
done less advance payments received up to the date of the issue of the
certificate, less other recoveries due in terms of the contract, less taxes due to
deducted at source as per applicable law and less the percentage to apply to
the work not completed as indicated in the Contract data. Additional
Liquidated Damages shall not apply. If the total amount due to the Employer
Liquidated Damages shall not apply. If the total amount due to the Employer
exceeds any payment due to the Contractor the difference shall be a debt
payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue a
certificate for the value of the work done, the cost of balance material brought
by the contractor and available at site, the reasonable cost of removal of
equipment, repatriation of the Contractor’s personnel employed solely on the
works, and the Contractor’s cost of protecting and securing the Works and
less advance payment received up to the date of the certificate, less other
recoveries due in terms of the contract and less taxes due to deducted at
source as per applicable law.
61.1 All materials on the Site, Plant Equipments, Temporary Works and Works are
deemed to be property of the Employer, if the Contract is terminated because
of a Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event
entirely outside the control of either the Employer or the Contractor the
Engineer shall certify that the Contract has been frustrated. The Contractor
shall make the Site safe and stop work as quickly as possible after receiving
this certificate and shall be paid for all work carried out before receiving it
and for any work carried out afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make
his own arrangements for the engagement of all staff and labour, local or
other, and for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the
Engineer a return in detail, in such form and at such intervals as the Engineer
may prescribe, showing the staff and the numbers of the several classes of
labour from time to time employed by the Contractor on the site and such
other information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub-contractor shall
abide at all times by all existing labour enactments and rules made thereunder,
regulations, notification and bye laws of the State or central Government or
local authority and any other labour law (including rules), regulations, bye
laws that may be passed or notifications that may be issued under any labour
law in future either by the State or the Central Government or the local
authority. Salient features of some of the major labour laws that are
applicable to the construction industry are given below. The Contractor shall
keep the Employer indemnified in case any action is taken against the
Employer by the competent authority on account of contravention of any of
the provisions of any Act or rules made thereunder, regulations or
notifications including amendments. If the Employer is caused to pay or
reimburse, such amounts as may be necessary to cause or observe, or for
observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part of the
Contractor, the Engineer/employer shall have the right to deduct any money
due to the Contractor including his amount of performance security. The
Employer/Engineer shall also have the right to recover from the Contractor any
sum required or estimated to be required for making good the loss or damage
suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be
treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923 :- The Act provides for compensation in
case of injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972 :- Gratuity is payable to an employee under the
Act on satisfaction of certain conditions on separation if an employee has
completed 5 years service or more on death, the rate of 15 days wages for every
completed year of service. The Act is applicable to all establishments employing
10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides for
monthly contributions by the employer plus workers @ 10% or 8.33% The
benefits payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other
benefits to women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970 : The Act provides for
certain welfare measures to be provided by the Contractor to contract labour and
in case the Contractor fails to provide, the same are required to be provided, by
the Principal Employer by Law. The principal Employer is required to take
Certificate of Registration and the Contractor is required to take license from the
designated Officer. The Act is applicable to the establishments or Contractor of
Principal Employer, if they employ 20 or more contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if
the employment is a scheduled employment. Construction of Building, Roads,
Runways are scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are to
be paid, when it will be paid and what deductions can be made from the wages
of the workers.
H) Equal remunerations Act 1979 :- The Act provides for payment of equal
wages for work of equal nature to Male and Female workers and for not making
discrimination against female employees in the matter of transfer, training and
promotions etc.
I) Payments of Bonus Act 1965 :- The Act is applicable to all establishments
employing 20 or more employees. The Act provides for payments of annual
bonus subject to a minimum of 8.33% of wages and maximum of 20 % of wages
to employees drawing Rs. 3500/- per month or less. The bonus to be paid to
employees getting Rs, 2500/- per month or above Rs. 3500/- per month shall be
worked out by taking wages as Rs. 2500/- per month only. The Act does not
apply to certain establishments. The newly set-up establishments are exempted
for five years in certain circumstances. Some of the State Governments have
reduced the employment size from 20 to 10 for the purpose of applicability of
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and
procedure for resolutions of Industrial disputes, in what situations a strike or
lock-out becomes illegal and what are the requirements for laying off or
retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all
establishments employing 100 or more workmen (employment size reduced by
some of the State and Central Government to 50). The Act provides for laying
down rules governing the conditions of employment by the Employer on
matters provided in the Act and get the same certified by the designated
L) Trade Unions Act 1926:- The Act lays the procedure for registration of trade
unions of workmen and employers. The Trade Unions registered under the Act
have given certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :- The Act prohibits
employment of children below 14 years of age in certain occupations and
process and provides for regulation of employment of children in all other
occupations and processes. Employment of Child labour is prohibited in Building
and Construction Industry.
N) Inter – St at e M igra nt wo rkmen’s (Regul a t ion of Emp lo yment &
Conditions of service) Act 1979:- The Act is applicable to an establishment
5 or more inter-state migrant workmen through an intermediary (who has
recruited workmen in one state for employment in the establishment situated in
another state).The inter-state migrant workmen, is an establishment to which
this Act becomes applicable, are required to be provided certain facilities such as
housing, medical aid, traveling expenses from home upto the establishment and
O) The Building and Other Construction workers (Regulation of employment
and Conditions of Service) Act 1996 and the Cess Act of 1996:- All the
establishments who carry on any building or other constructions work and
employ 10 or more workers are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of
the cost of construction as may be modified by the government. The Employer of
the establishment is required to provide safety measures at the Building or
construction work and other welfare measures, such as canteens, First Aid
facilities, Ambulance, Housing accommodations for workers near the workplace
etc. The Employer to whom the Act applies has to obtain a registration certificate
from the Registering Officers appointed by the Government.
P) Factories Act 1948 :- The Act lays down the procedure for approval of plans
before setting up a factory, health and safety provisions, welfare provisions,
working hours, annual earned leave and rendering information regarding
accidents or dangerous occurrences to designated authorities. It is applicable to
premises employing 10 persons or more with aid of power or 20 or more
persons without the aid of power engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof
from time to time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental
management plan for best energy use, waste management, the reduction
of pollution as in EMS (Environmental Management system)ISO-14001-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
65.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision
was wrongly taken, the decision shall be referred to Superintending Engineer
(O&M), SSNNL, Gandhinagar within 14 days of the notification of the
Engineer's decision. If the issue is not resolved, any party can refer the matter
for conciliation within 15 days from the decision given by the
Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the Superintending Engineer (O&M), SSNNL, Gandhinagar,
both the parties have to refer to the Chief Engineer (Main Canal),
SSNNL, Gandhinagar concerned for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the Superintending Engineer, both parties have to
refer to the Nigam for the conciliation process.
If the dispute is not resolved through the conciliation process,
contractor may refer the dispute to Gujarat Public Works Contract Dispute
Arbitration Tribunal. If the Contractor fails to refer a claim / dispute to the
Higher Authority within 14 days of the notification of the Engineer's
decision, the Contractor shall not be entitled to any additional
payment/claim if he doesn’t follow the above sequence in stipulated time.
However, during such period, he would not stop the work in any case.
Clause Reference With
respect To section
Item marked “N/A” do not apply to this Contract.
1. The Employers is [CL.1.1]
Name: Executive Engineer
Address: Block No.12, 9th Floor, New Sachivalaya, Gandhinagar
Name of authorized Representative (will be intimated later)
2. The Engineer is Executive Engineer, N.P.Main Canal Dn.No.2,
Name of Authorized Representative: Shri N.V.Bhavsar
3. The Defects Liability Period is 12 months from the date of [CL.1.1&33]
4. The Start Date shall be 1st days for the date of issue of the Notice [CL.1.1]
to proceed with the work.
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
06 Months after start of work with the following milestones:
Milestone dates: [CL.2.2& 49.1]
Physical works to be completed Period from the start date
Milestone 1 i.e. 25 %45 days.
Milestone 2 i.e. 50 % 90 days.
Milestone 3 i.e. 75 % 135 days.
Milestone 4 i.e. 100 % 180 days.
6. The Site is located at Narmada Main Canal, Vill. Karannagar , Ta. Kadi, [CL.1.1]
& Dist. Mehsana.
7. The name and identification number of the Contract is: As per tender [CL.1.1]
8. The works consist of Constructing Rest house cum Camp Office at Ch. [CL.1.1]
263.574Km on Narmada Main Canal. with items as per B.O.Q. The
works shall, inter alia, include the following, as Specified or as
(A) SSNNL Works :
Site clearance; setting - out and layout; Construction and Maintenance of all types of
dams and its component, earthen dam; spillway; installation of gate; excavation and
earth work, approach road, Inspection Bunglows, checkdams, bandhara, T.R., weir,
barrages, Flood Protection & Anti Sea Erosion work, canal lining and structures,, CD
Works, structure repairing, Jungale cutting, Desilting, etc. other SSNNL works.
(B) Road Works :
Site clearance; setting out and layout widening of existing carriageway and
strengthening including camber corrections; construction of new road/ Parallel
service road; bituminous pavements remodeling/construction of Junctions,
intersections, bus bays, lay-bays; supplying and placing of drainage Channels,
flumes, guard posts and guard other related items; construction/extension of cross
drainage works, bridge, approaches and other related stones; protective works for
roads/bridge; all aspects of quality assurance of various components of the
works; rectification of The defects in the completed works during the Defects
Liability Period; submission of “As- built’’ drawings and any other related
documents; and other item of work as may be required to be carried out for
completing the work in accordance with the drawings and the provisions of the
contract and to ensure safety.
(C) Bridge Works
provision of foundations, piers abutments and bearing; prestressed/reinforced
cement concrete superstructure; wearing coat, hand railings, expansion joints,
approach slabs, drainages spouts/ downtake pipes, arrangements for fixing light
posts, water mains, utilities etc; provision of suitably designed protective works;
providing wing/return walls; provision of road markings, road signs etc.; all aspects
of quality assurance; clearing the site and handing over the works on
completion; rectification of the defects during the Defects Liability Period and
submission of “As-built” drawings and other related documents; and other items
of work as may be required to be carried out for completing the works in accordance
with the drawings and the provisions of the contract and to Insure safety
(C) Other Items [CL.1.1]
Any Other Items as required to fulfill all contractual obligations as per the Bid
10. The following documents also form part of the Contract: [CL.2.3(9)]
As per clause 2-3
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death [CL13]
is Rs. 5 lakhs per occurrence with the number of occurrences limited
to four. After each occurrence, the contractor will pay an additional
premium necessary to make insurance valid for four occurrences
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be 2nd day from Letter of Acceptance [CL.21]
19. The period for submission of programme for approval of the engineer [CL. 27.1]
shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be 01 days. [CL.27.3]
21. The amount to be withheld for late submission of an updated [CL. 27.3]
programme shall be Rs 0.50 lakhs
22. The following events shall also be Compensation Events [CL. 44]
Substantially adverse ground conditions encountered during the
course of execution of work not provided for in the bidding document.
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring
additional mobilization by the contractor, e.g. ordinary soil
to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps,
etc. not caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archeological or religious structures, monuments
interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or military authority
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not
found applicable in a work, the weight component of that
commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as
indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm), such
that the gross % weight of the components shall remain as 100% .
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to
labour shall be paid in accordance with the following formula:
VL = Increase or decrease in the cost of work during the
month under consideration due to changes in rates for
L0 = The consumer price index for industrial workers for the
State on 28 days preceding the scheduled date of
opening of technical Bids as published by Labour
Bureau, Ministry of Labour, Government of India
Li = The consumer price index for industrial workers for the
State for the month under consideration as published by
the Labour Bureau, Ministry of Labour, Government of
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of
cement procured by the contractor
Vc = Increase or decrease in the cost of work during the
month under consideration due to changes in rates
C0 = The all India wholesale price index for Ordinary
Portland Cement on 28 days preceding the
scheduled date of opening of technical bid as
published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Ci = The all India average wholesale price index for
Ordinary Portland Cement for the month under
consideration as published by Office of the
Economic Adviser, Department for Promotion
of Industry and Internal Trade, Ministry of
Commerce & Industry.
Pc = Percentage of cement component of
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by the
contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products
Rebars) on 28 days preceding the date of opening of Bids as published by the
Office of the Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long
Products Rebars) for the month under consideration as published by
Office of the Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long
products Rebars has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in
accordance with the following formula
Vb = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest
centre on the day 28 days prior to the scheduled date of opening of
Bi = The official price of bitumen of IOC depot at the nearest center:
- For the first 15 days of the month under consideration, the price
declared on the 1st day of that month.
- For the remaining days of the month under consideration, the
rate declared on the 16th day of that month.
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and
lubricant) shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the existing
consumer pumps of IOC at the nearest centre on the day 28 prior to
the date of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps of
IOC at the nearest centre for the 15th day of the month of the under
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil has
been chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and
Machinery spare procured by the Contractor shall be paid in
accordance with the following formula
Vp= Increase or decrease in the cost of work during the month under
consideration due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pi = The all India average wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts
has been chosen to represent the Plant and Machinery Spares group
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials
other than cement, steel, bitumen and POL procured by the contractor
shall be paid in accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than
cement, steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on
days preceding the scheduled date of opening of technical Bids, as
published by the Office of the Economic Adviser, Department for
Promotion of Industry and Internal Trade, Ministry of Commerce
Mi= The All India wholesale price index (all commodities) for the
month under consideration as published by the Office of the
Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Pm = Percentage of local material components (other than cement,
steel, bitumen and POL) of the work.
The following percentage will govern the price adjustment for the
entire contract:
1. Labour - Pl . 32.19%
2. Cement – Pc 8.98%
3. Steel - Ps 13.80%
4. Bitumen - Pb 0.00%
6. Plant & Machinery Spares Pp. 0.27%
7. Other Materials - Pm. 43.54%
25. The proportion of payments retained (retention money) shall be 6% {CL. 48}
from each bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for For Whole of work {CL.49}
delay in completion of works (1/2000)th of the Initial contract
price, rounded off to the nearest
Thousand, per day. For sectional
Completion (wherever specified In
item 6 of Contract data) (1/2000)th of
initial contract price for #5 km
Section, rounded off to the nearest
thousand per day.
27. Maximum limit of liquidated damages 10 percent of the Initial {CL. 49}
For delay in completion work Contract Price rounded off to
the nearest thousand
28. Amount of Bonus for early completion Amount of bonus for early
completion of work shall be given
as per CL.50 of Section-3
29. Maximum limit of bonus for early 5 percent of the Contract {CL. 50}
Completion of work Price
30. The amount of the advance payment are: {CL. 51 & 52}
#Nature of Advances Amount (Rs.) Conditions to
i Mobilization 10% of the contract On submission of unconditional
Price Bank Guarantee. (to be drawn
before the end of 20% of the
contract period). The contractor
may furnish four bank guarantees of
2.5 % of each valid for the full
ii Equipment 90% for new and 50% of After equipment is brought to site
depreciated value for old (provided the Engineer is
equipment. Total amount satisfied That the equipment is
equipment. Total amount satisfied That the equipment is
will be subject to a required for performance of the
maximum of 5% of the contract) and on submission of
Contract Price unconditional Bank Guarantee for
amount of advance
iii Secured Deleted
Brought to site
(The advance payment will be paid to the Contractor no later than 28 days after
fulfillment of the above conditions).
31. Repayment of advance payment for mobilization and equipment {CL. 51.3}
The advance loan shall be repaid with percentage deduction from the interim
payments certified by the Engineer under the Contract. Deduction shall
commence in the next Interim Payment Certificate following that in which the
total of all such payments to the Contractor has reached not less than 20 percent
of the Contract Price or 6 (six) months from the date of payment of first
installment of advance, whichever period concludes earlier, and shall be made at
the rate of 20 percent (collectively for both Mobilization Advance and
Equipment Advance) of the amounts of all Interim Payment Certificate until
such time as the loan has been repaid, always provided that the loan shall be
completely repaid prior to the expiry of the original time for completion pursuant
to Clause 17 and
33. The securities shall be for the following minimum amounts equivalent {CL. 52}
As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs. …………….. (to be
decided after evaluation of the bid) as additional security in terms of ITB Clause
The standard form of Performance security acceptable to the Employer shall be
an unconditional Bank Guarantee of the type as presented in Section 8 of the
Bidding Documents.
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL. 58}
35. The date by which “as– built” drawings (in scale as directed) in 2 sets {CL. 58}
are required within 28 days of the issue of certificate of completion of the whole
or section of the work, as the case may be.
36. The amount to be withheld for failing to supply “as built” drawings {CL. 58} by
the Date of completion required is Rs 5.0 Lakhs.
37. The following events shall also be fundamentals breach of contract: {CL.59.2}
“The Contractor has contravened Sub- clause 7.1 and Clause 9 of GCC”
38. The percentage to apply the value of the work not completed representing {Cl 60}
the Employer’s additional cost for completing the Works shall be 20 percent.
TECHNICAL SPECIFICATION
TECHNICAL SPECIFICATIONS
Name of Work: Constructing Rest House cum Camp Office at Ch. 263.574 Km on Narmada
1. In these specifications "as directed" / "approved" shall mean "as directed" / "approved" by
the Engineer-in-charge.
2. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken
to mean a reference to the latest edition of the same (with amendments) in force on the date
3. These specifications are based on the "General Technical Specifications for Building Works"
of the Roads & Buildings Department, Government of Gujarat. Reference to specifications of
materials is made in the form of a designation with prefix "M" (e.g. M-3); the material
specifications so referred are reproduced in the Annexure at the end of this document.
4. In "Mode of measurement and payment", wherever a dispute arises in the absence of
specific mention of a particular point, the provisions of the relevant Indian Standard shall be
referred to. All measurements shall be carried out nearest to the following limits: Length, width
and depth (height) - 0.01 m; Areas - 0.01 sq.m; Cubic contents - 0.01 cu.m. In recording
dimensions the sequence of length, width and height (depth) or thickness shall be followed.
5. Where no lead is specified, it shall mean "all leads". Lift shall be measured from plinth level.
"Upto floor two level" means actual height of floor (max. 4 m) upto 3 m above plinth level.
6. Particulars covered in the description of the items of work, though not elucidated in these
specifications, shall be deemed to be included therein. The contract rate of an item shall be for
the work completed in all respects.
7. No collection of materials shall be made before it is got approved from the Engineer-in-
charge. Approval of samples shall not absolve the contractor of the responsibility of replacing
defective material brought on site or used in the work and found defective at a later date.
Rejected materials shall be removed from the site immediately.
8. Materials shall be stored at site in a systematic manner so as to prevent damage,
deterioration or intrusion of foreign matter and to ensure preservation of their quality and
fitness for the work. No material shall be stored so as to cause damage or overloading of any
component of the structure.
9. All works shall be carried out in a workmanlike manner as per the best techniques for the
particular item. All tools, templates, machinery and equipment for correct execution and for
checking lines, levels and alignment shall be kept on site in sufficient numbers and in good
working condition.
10. All installations pertaining to water supply, drainage, sanitary fittings and electrical works
shall be deemed to be completed only after satisfactory tests by the contractor in presence of
the Engineer-in-charge.
11. The contractor shall observe the rules and regulations under the Minor Minerals Act and
other laws and rules prescribed by Government from time to time. All necessary safety
measures (including those laid down in relevant Indian Standards) shall be taken to ensure
safety of men, materials and machinery and of the work itself.
12. Testing charges of all materials shall be borne by the contractor and as instructed by EIC
have to carry out necessary testing in GERI, Nigam approved lab including Mix Design. Approval
of any executed item does not relieve the contractor of his responsibility for the correctness,
soundness and strength of the work as per drawings and specifications.
13. After Excavation of Foundation at the cost of contractor test for SBC of soil in nigam
approved lab is to be done and after getting result if found equal to or more than considered in
the Design than to proceed further with the work and if less than necessary revision in design
as instructed by EIC to be carried out.
Item No. 1 Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(A) Loose or soft soil
1.1. Any soil which generally yields to the application of pickaxes and shovels, phawaras, rakes
or any such ordinary excavating implement, or organic soil, gravel, silt, sand, turf, loam, clay,
peat etc. falls under the category of loose or soft soil.
2.0. Clearing the site
2.1. The site on which the structure is to be built shall be cleared and all obstructions, loose
stone, materials and rubbish of all kinds, bush, wood and trees shall be removed as directed.
The materials so obtained shall be the property of the Government and shall be conveyed and
stacked as directed within 50 m lead. The roots of trees coming in the sides shall be cut and
coated with hot asphalt.
2.2. The cost of site clearance is deemed to be included in the rate of earthwork and nothing
extra shall be paid for the same.
3.0. Setting out
3.1. After clearing the site, the centre lines will be given by the Engineer-in-charge. The
contractor shall assume full responsibility for alignment, elevation and dimensions of each and
all parts of the work. The contractor shall supply labour, materials etc. required for setting out
the reference marks and bench marks and shall maintain them as long as required and directed.
4.0. Excavation
4.1. The excavation in foundation shall be carried out in true line and level and shall have the
width and depth as shown in the drawings or as directed. The contractor shall do the necessary
shoring and strutting or provide necessary slopes to a safe angle at his own cost.
4.2. The bottom of the excavated area shall be levelled both longitudinally and transversely as
directed by removing and watering as required. No earth filling will be allowed for bringing it to
level. If by mistake or any other reason excavation is made deeper or wider than shown on the
plan or directed, the extra depth or width shall be made up with concrete of the same
proportion as specified for the foundation concrete at the cost of the contractor.
4.3. Excavation upto 1.5 m depth shall be measured under this item.
5.0. Disposal of the excavated stuff
5.1. The excavated stuff of the selected type shall be used in filling the trenches and plinth or
levelling the ground in layers including ramming and watering etc.
5.2. Useful materials shall be sorted out and stacked as directed. The balance of the excavated
quantity shall be removed by the contractor from the site of work to a place as directed with
lead upto 50 m and all lifts.
6.0. Mode of measurement and payment
6.1. The measurement of excavation in trenches for foundation shall be made according to the
sections of trenches shown on the drawing or as per sections given by the Engineer-in-charge.
No payment shall be made for surplus excavation made in excess of the above requirements or
due to sloping and sloping back as found necessary on account of conditions of soil and
requirements of safety.
6.2. The rate shall be for a unit of one cubic metre.
Item No. 2 Providing and laying cement concrete 1:5:10 (1- Cement :
5- Coarse sand : 10- hand broken stone aggregates 40 mm nominal
size) and curing complete excluding cost of formwork in (A)
Foundation and Plinth
1.1. Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6
(coarse sand). Hand broken / graded stone aggregate of 40 mm nominal size shall conform to
2.1. The concrete mix is not required to be designed by preliminary tests. The proportion of the
concrete mix shall be 1 : 5 : 10 (1 cement : 5 coarse sand : 10 stone aggregate 40 mm nominal
size) by volume.
2.2. The water-cement ratio shall be so controlled that the concrete is just sufficiently wet to be
placed and compacted without difficulty with the means available. The maximum size of coarse
aggregate shall in no case be greater than one-fourth of the minimum thickness of the member.
2.3. Admixtures may be used only with the approval of the Engineer-in-charge based upon
evidence that neither the strength nor other requisite qualities of concrete are impaired by
3.0. Workmanship
3.1. Proportioning: Proportioning shall be done by volume, except cement which shall be
measured in terms of bags of 50 kg weight, the volume of one bag being taken as 0.0342 cu.m.
Boxes of suitable size (internal size 35 cm x 25 cm x 40 cm deep) shall be used for measuring
sand and aggregate. While measuring, the box shall be filled without shaking, ramming or
hammering. Proportioning of sand shall be on the basis of its dry volume and in case of damp
sand, allowance for bulkage shall be made.
3.2. Mixing: For all work, concrete shall be mixed in a mechanical mixer which, along with other
accessories, shall be kept in first class working condition throughout the construction.
Measured quantities of aggregate, sand and cement for each batch shall be poured into the
drum while it is continuously running. After about half a minute of dry mixing, the measured
quantity of water shall be added gradually and mixing continued till the materials are uniformly
distributed, a uniform colour of the entire mass is obtained and each particle of coarse
aggregate shows complete coating of mortar. In no case shall mixing be done for less than
minutes after all the ingredients have been put into the mixer.
3.3. When hand mixing is permitted by the Engineer-in-charge for small jobs, it shall be done on
a smooth watertight platform large enough to allow efficient turning over of the ingredients
before and after adding water. Dry materials shall be mixed thoroughly to a uniform colour, the
specified quantity of water shall be added gradually through a rose-can and the mass turned
over till a mix of required consistency is obtained. In hand mixing the quantity of cement shall
be increased by 10 percent above that specified.
3.4. Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned
before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge, the first
batch of concrete from the mixer shall contain only two-thirds of the normal quantity of coarse
3.5. Consistency: The degree of consistency shall be determined by regular slump tests in
accordance with IS 1199. A slump of 10 mm to 25 mm shall be adopted when vibrators are used
and 80 mm when vibrators are not used.
3.6. Inspection: The contractor shall give the Engineer-in-charge due notice before placing any
concrete to permit inspection and acceptance of the false work, forms and bed, but such
inspection shall not relieve the contractor of his responsibility for the safety of men, machinery,
materials and for the results obtained. Immediately before concreting all forms and surfaces
shall be thoroughly cleaned.
3.7. Transporting and laying: Concrete shall be so transported and placed that no
contamination, segregation or loss of constituent materials takes place. Concreting shall
proceed continuously over the area between construction joints. Fresh concrete shall not be
placed against concrete which has been in position for more than 30 minutes unless a proper
construction joint is formed. Concrete shall be compacted in its final position within 30 minutes
of its discharge from the mixer and shall be deposited in horizontal layers to a compacted depth
of not more than 0.45 m when internal vibrators are used and not exceeding 0.30 m in all other
cases. Concrete shall not be dropped into place from a height exceeding 2 m.
3.8. When concreting is resumed on a hardened surface, it shall be roughened, swept clean,
thoroughly wetted and covered with a 13 mm thick layer of freshly mixed mortar of cement
and sand in the same ratio as in the concrete mix. Where concrete has not fully hardened, all
laitance shall be removed by scrubbing the wet surface with wire or bristle brushes, the surface
thoroughly wetted, free water removed and coated with neat cement grout before placing
fresh concrete.
3.9. Compaction: All concrete shall be compacted to produce a dense homogeneous mass with
the assistance of vibrators unless otherwise permitted by the Engineer-in-charge. Sufficient
vibrators in serviceable condition shall be kept at site. Concrete shall be judged to be
compacted when the mortar fills the spaces between the coarse aggregate and begins to cream
up to form an even surface. Compaction shall be completed before the initial set. Needle
vibrators shall not be applied on reinforcement.
3.10. Curing: Immediately after compaction, concrete shall be protected from weather
including rain, running water, shocks, vibration, traffic, rapid temperature changes and drying
out. It shall be covered with wet sacking, hessian or other similar absorbent material soon after
the initial set and shall be kept continuously wet for a period of not less than 14 days from the
date of placement. Masonry work over foundation concrete may be started after 48 hours of its
laying but curing of concrete shall be continued for a minimum period of 14 days.
4.0. Mode of measurement and payment
4.1. The concrete shall be measured for its length, breadth and depth, limiting dimensions to
those specified on plans or as directed. Concrete laid in excess of the section shown on
drawings or as directed shall not be measured.
4.2. No deduction shall be made for (a) ends of dissimilar materials such as joists, beams, posts,
girders, rafters, purlins, trusses, corbels, steps etc. upto 500 sq.cm in section and (b) openings
4.3. The rate includes the cost of all materials, labour, tools and plant required for mixing,
placing in position, compacting, finishing as directed, curing and all other incidental expenses.
The rate excludes the cost of formwork.
4.4. The rate shall be for a unit of one cubic metre.
Item No. 3 Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth
in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(A) Modular
1.1. Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6 (fine
sand). Bricks shall be modular common burnt clay building bricks conforming to M-15 having
crushing strength not less than 35 kg/sq.cm. Cement mortar shall conform to M-11.
2.0. Workmanship
2.1. Proportion: The proportion of cement mortar shall be 1 : 5 (1 cement : 5 fine sand) by
2.2. Wetting of bricks: The bricks required for masonry shall be thoroughly wetted with clean
water for about two hours before use or as directed. The cessation of bubbles when the bricks
are wetted with water is an indication of thorough wetting of bricks.
2.3. Laying: Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall
not be used except when necessary to complete the bond; closers in such cases shall be cut to
the required size and used near the ends of walls.
2.4. A layer of mortar shall be spread on the full width for a suitable length of the lower course.
Each brick shall first be properly bedded and set home by gently tapping with the handle of the
trowel or a wooden mallet. Its side face shall be flushed with mortar before the next brick is laid
and pressed against it. On completion of a course, the vertical joints shall be fully filled from the
top with mortar.
2.5. The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all
vertical joints shall be truly vertical. Vertical joints in alternate courses shall generally be
directly one over the other. The thickness of brick courses shall be kept uniform. Bricks shall be
laid with frog upwards. A set of tools comprising wooden straight edges, mason's spirit level,
square, half metre rule, line and pins and plumb shall be kept at site for frequent checking
during the progress of work.
2.6. Both faces of walls of thickness greater than 23 cm shall be kept in proper plane. All
connected brickwork shall be kept not more than one metre over the rest of the work. Where
this is not possible, the work shall be raked back according to bond (and not left toothed) at an
angle not steeper than 45 degrees.
2.7. All fixtures, pipes, outlets of water, holdfasts of doors and windows etc. which are required
to be built in the wall shall be embedded in cement mortar.
2.8. Joints: Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joints
shall not exceed 12 mm. The face joints shall be raked out as directed by raking tools daily
during the progress of work while the mortar is still green, so as to provide key for plaster or
pointing. The face of brickwork shall be cleaned the very day on which the brickwork is laid and
all mortar droppings removed.
2.9. Curing: Green work shall be protected from rain suitably. Masonry work shall be kept moist
on all faces for a period of seven days. The top of masonry work shall be kept well wetted at the
close of the day.
2.10. Preparation of foundation bed: If masonry is to be laid on concrete footing, the top of the
concrete shall be cleaned and moistened. The contractor shall obtain the Engineer-in-charge's
approval for the foundation bed before foundation masonry is started. When pucca flooring is
to be provided flush with the top of plinth, the inside plinth offset shall be kept lower than the
outside plinth top by the thickness of the flooring.
3.0. Mode of measurement and payment
3.1. The measurements of this item shall be taken for the brick masonry fully completed in
foundation upto plinth. The limiting dimensions not exceeding those shown on the plans or as
directed shall be final. Battered, tapered and curved portions shall be measured net.
3.2. No deduction shall be made from the quantity of brickwork, nor any extra payment made
for embedding in masonry or making holes, in respect of the following: (1) ends of joists,
beams, posts, girders, rafters, purlins, trusses, corbels, steps etc. where the cross-sectional area
does not exceed 500 sq.cm; (2) openings not exceeding 1000 sq.cm; (3) wall plates, bed plates,
bearings of slabs, chhajjas and the like whose thickness does not exceed 10 cm and the bearing
does not extend to the full thickness of wall; (4) drainage holes and recesses for cement
concrete blocks to embed holdfasts for doors, windows etc.; (5) iron fixtures, pipes upto
mm dia., holdfasts of doors and windows built into masonry and pipes etc. for concealed
wiring; (6) chases of section not exceeding 350 sq.cm in masonry.
3.3. The rate shall be for a unit of one cubic metre.
Item No. 4 Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth
in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(A) Modular+Extra for
brick work in superstructure above plinth level upto floor two level
1.1. Bricks shall conform to M-15 (modular bricks). Cement mortar 1 : 5 (1 cement : 5 fine sand)
shall conform to M-11. Water shall conform to M-1.
2.0. Workmanship
2.1. The relevant specifications of Item No. 3 shall be followed except that the masonry work
shall be carried out in superstructure above plinth level upto floor two level.
2.2. The frames of doors, windows, cupboards etc. shall be housed into the brickwork at the
correct location and level as directed. Heavy steel door and window frames shall be built in
with the brickwork, but for ordinary steel / aluminium doors and windows the required
openings for frames, holdfasts etc. shall be left in the wall and the frames embedded later on in
order to avoid damage to the frames.
2.3. Necessary scaffolding shall be provided. The supports of the scaffolding shall be sound and
strong, tied together with horizontal pieces over which the scaffolding planks shall be fixed.
Where single scaffolding is permitted, the minimum number of holes shall be left in the
brickwork for supporting the horizontal scaffolding poles and these shall be made good
afterwards. The contractor shall be responsible for providing and maintaining sufficiently strong
scaffolding to withstand all loads likely to come upon it.
2.4. For the face of brickwork where plastering is to be done, joints shall be raked out to a
depth not less than the thickness of the joints. The face of brickwork shall be cleaned and
mortar droppings removed on the very same day that the brickwork is laid.
3.0. Mode of measurement and payment
3.1. The masonry work of ground floor i.e. above plinth level upto floor two level shall be
measured and paid under this item. Brickwork in parapet shall be included in the corresponding
masonry item of the storey immediately below the floor above which the parapet is built.
3.2. The provisions of para 3.2 of Item No. 3 regarding no deductions shall apply. In addition,
apertures for fire places shall not be deducted nor shall extra labour for splaying of jambs,
throating and making arches over the aperture be paid separately.
3.3. The rate includes the cost of scaffolding. The rate shall be for a unit of one cubic metre.
Item No. 5 Providing and laying controlled cement concrete M.200
and curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (D) Columns, Pillars
posts and struts upto floor two level.
1.1. Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Grit
shall conform to M-8. Coarse aggregate (machine crushed black trap or equivalent hard stone,
20 mm nominal size and down, graded) shall conform to M-13.
2.1. Controlled M-200 shall be designed from preliminary tests. The proportioning of cement
and aggregates shall be done by weight, using a weigh-batching machine or mobile batching
plant/ fio, and necessary precautions shall be taken in production to ensure that the required
works cube strength is attained and maintained. The letter "M" refers to the mix and the
number specifies the 28 days works cube compressive strength of 150 mm cubes in kg/sq.cm.
2.2. The strength requirements shall be as under. The 28 days compressive strength specified
shall be the criterion for acceptance or rejection of the concrete. Where the strength of a
concrete mix as indicated by tests lies between the strengths of any two grades, such concrete
shall be classified as belonging to the lower of the two grades.
Grade of concrete Preliminary test (min.) 28 days, Works test (min.) 28 days,
2.3. The minimum quantity of cement in reinforced concrete shall not be less than 360 kg/cu.m
(360 kg/cu.m in plain concrete), or as required by the approved mix design, whichever is more.
3.0. Workmanship
3.1. The proportions chosen shall be such that the concrete has adequate workability for the
conditions prevailing on the work and can be properly compacted with the means available.
Grading of aggregates shall be controlled by obtaining coarse aggregate in different sizes and
blending them in the right proportions. Aggregates of different sizes shall be stocked in
separate stockpiles; the grading shall be checked as frequently as directed to ensure that the
supplies maintain the grading approved for the preliminary tests.
3.2. Quantities of both cement and aggregates shall be determined by weight. Where the
weight of cement is determined by accepting the maker's weight per bag, a reasonable number
of bags shall be weighed separately to check the net weight. Water shall be measured by
volume in calibrated tanks or weighed. All measuring equipment shall be kept clean and
serviceable and its accuracy periodically checked.
3.3. The specified water-cement ratio shall be kept constant. Moisture content in fine and
coarse aggregates shall be determined (IS 2386 Part III) according to the weather conditions
and the amount of mixing water and weights of aggregates shall be adjusted accordingly.
3.4. Mixing, transporting, placing, compaction, curing, sampling and testing shall be as per
paras 3.2 to 3.11 of Item No. 2. Curing shall be done for a minimum period of 14 days.
3.5. Reinforced concrete stipulations: (a) In beam and slab construction, a sufficient number of
precast cover blocks in cement mortar 1 : 2 of about 4 cm x 4 cm section and of thickness equal
to the specified cover shall be placed between the bars and shuttering so as to secure and
maintain the requisite cover. In cantilevered or doubly reinforced members, main bars shall be
held in position by chairs or spacer bars at 1.0 to 1.2 m centres. (b) In columns and walls,
vertical bars shall be kept in position by timber templates with slots accurately cut, or tied with
annealed wire to the shuttering, to maintain their position during concreting. (c) Timber,
kapachi or metal pieces shall not be used as cover blocks.
3.6. All bars projecting from columns, beams, slabs etc. to which other bars and concrete are to
be bonded later shall be protected with a coat of thin neat cement grout if they are not likely to
be incorporated in the succeeding concrete within 10 days. This coat shall be removed before
3.7. Centering design and its erection shall be got approved from the Engineer-in-charge. One
carpenter with helper shall invariably be kept present throughout the period of concreting.
Movement of labour over reinforcement laid in position shall be prohibited; suitable mobile
platforms shall be provided.
3.8. Stripping: Forms shall be struck after the periods specified in Item No. 7. Immediately after
removal of forms, all exposed bolts etc. shall be cut inside the concrete to a depth of at least
mm and the holes filled with cement mortar. All honeycombed spots, broken edges or corners
and other defects shall be cleaned, saturated with water and pointed with mortar of the same
proportion as in the concrete. If honeycombs are, in the opinion of the Engineer-in-charge, of
such extent as to affect the strength of the structure materially, he may declare the concrete
defective and require its removal and replacement at the contractor's cost.
4.0. Mode of measurement and payment
4.1. The consolidated cubical contents of the concrete work in columns, pillars, posts and struts
upto floor two level shall be measured. Concrete laid in excess of the section shown on
drawings or as directed shall not be measured. The volume occupied by reinforcement shall not
4.2. No deduction shall be made for ends of dissimilar materials upto 500 sq.cm in section and
openings upto 0.1 sq.m.
4.3. The rate includes the cost of all materials, labour, tools and plant for weigh batching,
mixing, placing, vibrating, finishing, curing, testing and all incidental expenses for producing
concrete of specified strength. The rate excludes the cost of formwork and reinforcement.
4.4. The rate shall be for a unit of one cubic metre.
Item No. 6 Providing and laying controlled cement concrete M.200
and curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (C)
Slabs,landing,shelves,Balconies Lintels, Beams, Girders and Cantilever
upto floor two level.
1.0. Materials and Workmanship
1.1. The relevant specifications of Item No. 5 shall be followed except that the controlled
concrete M-200 shall be laid in slabs, landings, shelves, balconies, lintels, beams, girders and
cantilevers upto floor two level.
1.2. Slabs and beams shall be concreted in one continuous operation as far as possible. Where
construction joints are unavoidable, they shall be located at points of minimum shear (generally
at middle third of span for slabs and beams) and formed as directed, with the joint surface
treated as per para 3.8 of Item No. 2 before resuming concreting.
1.3. The top surface of slabs shall be finished to the required level and slope with a wooden
float. Exposed surfaces shall be kept continuously wet by ponding or wet hessian for not less
2.0. Mode of measurement and payment
2.1. The relevant specifications of Item No. 5 shall be followed. Slabs shall be measured
between beams; beams shall be measured from the bottom of slab to the bottom of beam and
between supports; lintels shall be measured including bearings.
2.2. The rate excludes the cost of formwork and reinforcement. The rate shall be for a unit of
one cubic metre.
Item No. 7 Providing formwork of ordinary timber planking so as to
give a rough finish including centering shuttering strutting and
propping etc. Height of propping and centering below supporting floor
to ceiling not exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (A) Foundations
Footings Bases of Columns etc. and Mass concrete.
Applicable to formwork for foundations, footings, bases of columns etc. and mass concrete.
1.1. The shuttering shall be of ordinary timber planks and shall conform to M-26. The
dimensions of scantlings and battens shall conform to the design and the strength of the wood
shall not be less than that assumed in the design.
2.0. Workmanship
2.1. The formwork shall conform to the shapes, lines and dimensions shown on the plans and
be so constructed as to remain sufficiently rigid during placing and compacting of concrete.
Adequate arrangements shall be made to safeguard against any settlement of the formwork
during and after concreting. The formwork, centering, scaffolding, bracing etc. shall be as per
approved design. Joints shall be tight enough to prevent leakage of cement slurry.
2.2. Cleaning and treatment of forms: All rubbish, particularly chippings, shavings and sawdust,
shall be removed from the interior of the forms before concrete is placed. The formwork in
contact with concrete shall be cleaned and thoroughly wetted and then coated with soap
solution (yellow soap dissolved in water to the consistency of paint) or raw linseed oil or form
oil of approved manufacture. Burnt or black oil shall not be used. Care shall be taken that the
coating does not get on construction joint surfaces and reinforcement bars.
2.3. Stripping time: In normal circumstances and where ordinary Portland cement is used,
forms may be struck after expiry of the following periods:
Sides of walls, columns and vertical faces of beams 24 to 48 hours
Beam soffits (props left under) 7 days
Removal of props to slabs spanning upto 4.5 m 7 days
Removal of props to slabs spanning over 4.5 m 14 days
Removal of props to beams and arches spanning upto 6 m 14 days
Removal of props to beams and arches spanning over 6 m 21 days
2.4. Procedure when removing the formwork: All formwork shall be removed without such
shock or vibration as would damage the concrete. Before soffit formwork and struts are
removed, the concrete surface shall be exposed where necessary to ascertain that the concrete
has sufficiently hardened. Centering shall be gradually and uniformly lowered.
2.5. Centering: The centering shall be got approved and shall be sufficiently strong to ensure
absolute safety of the formwork and concrete before, during and after pouring. Props shall be
provided on firm foundation of sufficient strength to carry the loads without settlement, resting
on sole plates with double wedges. Inspection and approval by the Engineer-in-charge shall not
relieve the contractor of his responsibility for strength, adequacy and safety of the formwork; in
case of failure the contractor shall be responsible for damage to the work, injury to life and
damage to property.
2.6. Scaffolding: All scaffolding, hoisting arrangements and ladders required for concreting shall
be provided and removed on completion by the contractor at his own expense. They shall be
strong enough to withstand all live, dead and impact loads and shall allow easy approach and
2.7. The rate is applicable to all conditions of working and height upto 4 m and includes: (a)
splayed edges, notching, allowance for overlaps and passing at angles, battens, centering,
shuttering, strutting, propping, bolting, nailing, wedging, easing, striking and removal; (b)
filleting to form chamfered edges or splayed external angles not exceeding 20 mm width; (c)
temporary openings in forms for pouring concrete and removing rubbish; (d) dressing with oil /
soap solution to prevent adhesion of concrete.
2.8. Re-use: Before re-use, all forms shall be inspected by the Engineer-in-charge and their
suitability ascertained. They shall be scraped, cleaned, joints gone over and repaired where
required, and the inside surfaces re-treated to prevent adhesion.
3.0. Mode of measurement and payment
3.1. Formwork shall be measured as the area in square metres of shuttering in contact with
concrete, except in the case of inclined members and portions of curved profile with upper
side, in which case only the area of underside shall be measured.
3.2. Formwork to secondary beams shall be measured up to the sides of main beams, but no
deduction shall be made from the formwork of the main beam at the intersection. No
deduction shall be made from the formwork of a column at intersection of beams.
3.3. The rate is for the completed item. The rate shall be for a unit of one square metre.
Item No. 8 Providing formwork of ordinary timber planking so as to
give a rough finish including centering shuttering strutting and
propping etc. height of propping and centering below supporting floor
to ceiling not exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (G) Columns Pillars
Posts and struts. (1) Square Rectangular Polygonal in plan.
1.0. Materials and Workmanship
1.1. The relevant specifications of Item No. 7 shall be followed except that the formwork shall
be for columns, pillars, posts and struts, square, rectangular or polygonal in plan.
1.2. Column forms shall be held by yokes / clamps at suitable intervals and shall be braced in
two directions so as to be truly plumb. A cleaning opening shall be left at the bottom of each
column form and closed before concreting. Concreting in columns shall be done in lifts with
proper compaction.
2.0. Mode of measurement and payment
2.1. The relevant specifications of Item No. 7 shall be followed. The rate shall be for a unit of
one square metre.
Item No. 9 Providing formwork of ordinary timber planking so as to
give a rough finish including centering shuttering strutting and
propping etc. Height of propping and centering below supporting floor
to ceiling not exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (B) Flat surfaces such
as soffits of suspended floors slabs Landings and the like. (1) Floors
etc. upto 200 mm in thickness.
1.0. Materials and Workmanship
1.1. The relevant specifications of Item No. 7 shall be followed except that the formwork shall
be for flat surfaces such as soffits of suspended floors, slabs, landings and the like, for floors
etc. upto 200 mm in thickness.
1.2. The shuttering for slabs shall have a camber of 4 mm per metre (1 in 250) or as directed so
as to offset subsequent deflection. For cantilevers the camber at the free end shall be 1/50 of
the projected length or as directed.
2.0. Mode of measurement and payment
2.1. The relevant specifications of Item No. 7 shall be followed. The rate shall be for a unit of
one square metre.
Item No. 10 Providing formwork of ordinary timber planking so as to
give a rough finish including centering shuttering strutting and
propping etc. height of propping and centering below supporting floor
to ceiling not exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (H) (1) Sides and
soffits of Beams Beam Haunchings cantilevers Girders Bressumers and
Lintels not exceeding 1 M. in Depth.
1.0. Materials and Workmanship
1.1. The relevant specifications of Item No. 7 shall be followed except that the formwork shall
be for sides and soffits of beams, beam haunchings, cantilevers, girders, bressumers and lintels
not exceeding 1 m in depth.
1.2. Beam soffit forms shall be given a camber as specified in Item No. 9. Side forms shall be so
fixed that they can be removed without disturbing the soffit forms and props.
2.0. Mode of measurement and payment
2.1. The relevant specifications of Item No. 7 shall be followed. The rate shall be for a unit of
one square metre.
Item No. 11 Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers not exceeding
cm. in depth consolidating each disposited layer by ramming and
1.0. Workmanship
1.1. The earth to be used for filling shall be free from salts, organic or other foreign matter. All
clods of earth shall be broken. Under no circumstances shall black cotton soil be used for filling
1.2. As soon as the work in foundation has been completed and measured, the site of
foundation shall be cleared of all debris, brick bats, mortar droppings etc. and filled with earth
in layers not exceeding 20 cm. Each layer shall be adequately watered, rammed and
consolidated before the succeeding layer is laid. The earth shall be rammed with iron rammers
where feasible and with the butt ends of crowbars where rammers cannot be used.
1.3. The plinth shall be similarly filled with earth in layers not exceeding 20 cm, adequately
watered and consolidated by ramming with iron or wooden rammers. When filling reaches the
finished level, the surface shall be flooded with water for at least 24 hours, allowed to dry and
then rammed and consolidated.
1.4. The finished level of filling shall be kept to the shape intended to be given to the floor. Only
selected excavated stuff, approved by the Engineer-in-charge, shall be used.
2.0. Mode of measurement and payment
2.1. The payment shall be made for filling in plinth and trenches. No deduction shall be made
for shrinkage or voids if consolidated as instructed above.
2.2. The rate shall be for a unit of one cubic metre.
Item No. 12 Providing TMT Bar FE 500D reinforcement for R.C.C. work
including bending, binding and placing in position complete upto floor
1.1. Reinforcement shall be thermo-mechanically treated (TMT) high strength deformed steel
bars of grade Fe 500D conforming to IS 1786 and M-19, obtained from primary producers /
approved manufacturers. Each lot shall be accompanied by the manufacturer's test certificate;
samples shall be tested as directed. Mild steel binding wire (annealed, 1.22 mm or 1.63 mm
dia.) shall conform to M-21.
1.2. All reinforcement shall be clean and free from dirt, paint, grease, mill scale or loose or thick
rust at the time of placing.
2.0. Workmanship
2.1. The work shall consist of furnishing and placing reinforcement to the shapes and
dimensions shown on the drawings or as directed. Reinforcing steel shall conform accurately to
the bar bending schedules.
2.2. Bars shall be bent cold to the specified shape and dimensions using a proper bar bender,
operated by hand or power, to attain the proper radius of bends. Bars shall not be heated to
facilitate bending, nor bent or straightened in a manner that will injure the material. Deformed
bars may be used without end hooks provided the anchorage requirements of IS 456 are
2.3. All bars shall be accurately placed in the exact position shown on the drawings and shall be
securely held in position during placing of concrete by annealed binding wire not less than
mm in size, and by using cover blocks, metal chairs, spacer bars or other approved devices at
sufficiently close intervals. Bars shall not be allowed to sag between supports nor be displaced
during concreting. Pieces of broken stone, brick or wooden blocks shall not be used for
supporting bars.
2.4. Bars crossing each other shall be secured by annealed binding wire so that they do not slip
over each other during fixing and concreting.
2.5. As far as possible bars of full length shall be used. Where this is not possible, laps shall be
provided as per drawings / IS 456 and staggered, located at points where neither shear nor
bending moment is maximum. Where welding or mechanical couplers are permitted, they shall
develop the full strength of the bar and shall be tested as directed.
2.6. Reinforcement after being placed in position shall be maintained in a clean condition until
completely embedded in concrete. Bars protruding from concrete and likely to be exposed for
more than 10 days shall be protected by a coat of neat cement grout.
3.0. Mode of measurement and payment
3.1. Reinforcement shall be measured in length, including hooks and laps as per design,
separately for different diameters as actually used in the work. Weight shall be calculated on
the basis of the following standard sectional weights:
Dia. (mm) Weight (kg/m) Dia. (mm) Weight (kg/m)
3.2. Wastage and binding wire shall not be measured; their cost is deemed to be included in the
rate. Wastage beyond 5 percent shall not be permitted where steel is issued departmentally.
3.3. The rate includes the cost of steel, binding wire, carting, cutting, bending, placing, binding
and fixing in position upto floor two level, all devices for keeping reinforcement in position
(chairs, spacer bars, cover blocks), laps and all wastage.
3.4. The rate shall be for a unit of one kilogram.
Item No. 13 Providing 20mm thick cement plaster in single coat on
single or half brick walls for interior plastering upto floor two level
and finished even and smooth in (i) Cement mortar 1:3 (1- cement:3-
The plaster shall be 20 mm thick in single coat on the rough side of single or half brick walls, for
plastering upto floor two level, finished even and smooth, in cement mortar 1 :
1.1. Water shall conform to M-1. Cement mortar 1 : 3 (1 cement : 3 sand) shall conform to M-
2.0. Workmanship
2.1. Scaffolding: Wooden ballies, bamboos, planks, trestles and other scaffolding shall be sound
and shall be properly examined before erection and use. Stage scaffolding independent of the
walls shall be provided for ceiling plaster.
2.2. Preparation of background: The surface shall be cleaned of all dust, loose mortar
droppings, traces of algae, efflorescence and other foreign matter by water or by brushing.
Smooth surfaces shall be roughened by wire brushing if not hard and by hacking if hard. In case
of concrete surfaces, trimming of projections shall be carried out to get an even surface. Joints
of masonry shall be raked where necessary. The surface shall not be soaked but only damped
evenly before applying plaster.
2.3. For internal plaster, ceiling plaster shall be completed before starting plaster to walls.
2.4. Application of plaster: Plaster about 15 cm x 15 cm shall first be applied horizontally and
vertically at not more than 2 m intervals over the entire surface to serve as gauges, truly in the
plane of the finished surface. Mortar shall then be applied in a uniform layer slightly more than
the specified thickness and brought to a true surface by working a wooden straight edge across
the gauges with small upward and sideways movements. Finally the surface shall be finished off
true with a trowel to an even and smooth finish. Excessive trowelling shall be avoided. All
corners, arrises, angles and junctions shall be truly vertical or horizontal and carefully finished;
rounding or chamfering shall be done with proper templates.
2.5. Cement plaster shall be used within half an hour after addition of water. Any mortar which
is partially set shall be rejected and removed forthwith from the site.
2.6. When suspending work at the end of the day, the plaster shall be left cut clean to line both
horizontally and vertically, not nearer than 15 cm to any corner or arris. When recommencing,
the edges of the old work shall be scraped clean and wetted with cement slurry before plaster
is applied to the adjacent area. No portion of the surface shall be left out initially to be patched
2.7. Curing: The plaster shall be kept continuously damp for a minimum period of 7 days.
Moistening shall commence as soon as the plaster has hardened sufficiently. Excessive
evaporation on the sunny or windward side in hot dry weather shall be prevented by hanging
mattings or gunny bags kept wet.
3.0. Mode of measurement and payment
3.1. All plastering shall be measured in square metres. Length, breadth or height shall be
measured correct to a centimetre. The thickness of plaster shall be exclusive of the thickness of
key and shall be the average thickness, the minimum at any point being not less than the
specified thickness minus 2 mm.
3.2. The measurement of wall plastering shall be taken between walls or partitions (dimensions
before plastering being taken) for length and from the top of floor or skirting to ceiling for
3.3. Deductions: (a) No deduction shall be made for ends of joists, beams, posts etc. and
openings not exceeding 0.5 sq.m each, and no addition shall be made for reveals, jambs, soffits,
sills etc. of these openings. (b) For openings exceeding 0.5 sq.m but not exceeding 3 sq.m each,
deduction shall be made as follows and no addition shall be made for reveals, jambs, soffits,
sills etc.: (i) when both faces of wall are plastered with the same plaster, deduction shall be
made for one face only; (ii) when the two faces are plastered with different plasters, deduction
shall be made from the face on the side of the frame on which the width of reveal is less; where
the widths of reveals are equal, deduction of 50% of the area of opening shall be made on each
face. (c) For openings exceeding 3 sq.m each, deduction shall be made for the opening but
jambs, soffits and sills shall be measured. (d) For openings having door frames equal to or
projecting beyond the thickness of wall, full deduction shall be made from each plastered face.
3.4. The rate includes the cost of all materials, labour and scaffolding involved in the operations
described above, for plastering upto floor two level.
3.5. The rate shall be for a unit of one square metre.
Item No. 14 Providing 10mm thick cement plaster in single coat on
brick/concrete walls for interior plastering upto floor two level and
finished even and smooth in (i)Cement mortar 1:3 (1-cement:3-sand)
1.0. Materials and Workmanship
1.1. The relevant specifications of Item No. 13 shall be followed except that the plaster shall be
10 mm thick in single coat on brick / concrete walls (fair side) for interior plastering upto floor
two level, finished even and smooth, in cement mortar 1 : 3 (1 cement : 3 sand).
1.2. Before plastering on concrete surfaces, the surface shall be hacked / roughened and a coat
of neat cement slurry applied to ensure proper bond.
2.0. Mode of measurement and payment
2.1. The relevant specifications of Item No. 13 shall be followed. The rate shall be for a unit of
one square metre.
Item No. 15 P & L 24" x 24" vitrified 8 mm thick tile flooring over
mm (average) base of cement mortar 1:6 ( 1 cement: 6 coarse sand)
on new surface or fixing on existing flooring by adhesive material
including dismantling of existing flooring and jointed with color
cement slurry including finished with flush pointing & cleaning the
surface etc. complete for antiskit
The tiles under this item shall be anti-skid (matt / rustic finish) vitrified tiles suitable for toilets,
wet areas and outdoor / external areas as directed.
1.1. Water shall conform to M-1. Cement shall conform to M-3 and white cement to M-4.
Cement mortar 1 : 6 (1 cement : 6 coarse sand) shall conform to M-11.
1.2. Vitrified tiles shall be full-body / double-charged / glazed vitrified tiles of size 600 mm x
mm (24" x 24"), 8 mm to 10 mm thick, of approved make, conforming to IS 15622 (pressed
ceramic tiles, Group BIa, water absorption not more than 0.5 percent). The tiles shall be of
uniform shade (same batch), true to shape, flat, free from cracks, crazing, spots, chipped edges
and corners. Shade, surface finish and pattern shall be got approved before procurement.
1.3. Where fixing over existing flooring is ordered, tile adhesive of approved make conforming
to IS 15477 (type as recommended by manufacturer for vitrified tiles) shall be used.
2.0. Workmanship
2.1. Preparation of base: The sub-grade / base concrete shall be cleaned, wetted and mopped.
Where existing flooring is to be dismantled, it shall be carefully removed, serviceable materials
stacked and unserviceable materials disposed of as directed, and the base made good.
2.2. Bedding: The bedding shall be of cement mortar 1 : 6 of average thickness 20 mm
(minimum 10 mm at any place), laid evenly over the surface, tamped and corrected to the
desired level and slope and allowed to harden enough to offer a rigid cushion to the tiles.
2.3. Laying: Over the bedding, neat grey cement slurry of honey-like consistency at 3.3 kg of
cement per sq.m shall be spread. The back of tiles shall be buttered with cement slurry /
adhesive. The tiles shall be laid with joints as fine as possible (generally 1 to 2 mm, using
spacers), well pressed and gently tapped with a rubber / wooden mallet till properly bedded
and in level with the adjoining tiles. There shall be no hollows in the bed or joints. The joints
shall be true to line both ways. Nahni traps / floor traps shall be so positioned that the grating
replaces one tile as far as possible. Where full tiles cannot be fixed, they shall be cut by
machine to the required size with the edges rubbed smooth.
2.4. Fixing over existing floor: Where directed, the tiles shall be fixed over the existing floor with
approved tile adhesive applied with a notched trowel as per the manufacturer's instructions
after cleaning and preparing the existing surface.
2.5. Jointing: After 24 hours the joints shall be cleaned of loose mortar to a depth of about
mm and filled with white / coloured cement slurry (or approved tile grout) matching the shade
of the tiles and finished flush. Surplus slurry shall be wiped off before it sets.
2.6. Curing and cleaning: The floor shall be kept wet and undisturbed for 7 days. The surface
shall then be washed and cleaned. Proper precautions shall be taken to ensure that the tiles are
not damaged till the completion of the work.
2.7. The finished floor shall be true to level and slopes. A variation of not more than 3 mm in
m length shall be permitted when checked with a straight edge.
3.0. Mode of measurement and payment
3.1. The work shall be measured in sq.m for the visible area of work done. The length and width
of flooring shall be measured between the finished faces of skirting / dado or wall plaster.
Flooring under skirting or dado shall not be measured. No deduction shall be made nor extra
paid for openings in the floor of area upto 0.1 sq.m. Nothing extra shall be paid for laying the
floor at different levels in the same room.
3.2. The rate includes the cost of dismantling existing flooring where ordered, bedding mortar /
adhesive, cement slurry, tiles, cutting and wastage, jointing, curing and cleaning complete.
3.3. The rate shall be for a unit of one square metre.
Item No. 16 P & L 24" x 24" vitrified 8 mm thick tile flooring over
mm (average) base of cement mortar 1:6 ( 1 cement: 6 coarse sand)
on new surface or fixing on existing flooring by adhesive material
including dismantling of existing flooring and jointed with color
cement slurry including finished with flush pointing & cleaning the
surface etc. complete for light shade
1.0. Materials and Workmanship
1.1. The relevant specifications of Item No. 15 shall be followed except that the vitrified tiles
shall be of light shade (glazed / polished vitrified tiles of approved colour and design) for
flooring of rooms, lobby and other dry areas.
2.0. Mode of measurement and payment
2.1. The relevant specifications of Item No. 15 shall be followed. The rate shall be for a unit of
one square metre.
Item No. 17 Providing and laying Vitrified tiles 8 to 10 mm thick , 24'' x
24'' in skirting risers of steps and dado on 10mm thick cement plaster
1:3 (1-cement : 3-coarse sand) and jointed with white cement slurry
1.1. Water shall conform to M-1. Cement mortar 1 : 3 (1 cement : 3 coarse sand) shall conform
to M-11. White cement shall conform to M-4. Vitrified tiles 600 mm x 600 mm, 8 mm to 10 mm
thick, shall conform to para 1.2 of Item No.
2.0. Workmanship
2.1. Preparation of surface: In case of brick masonry walls, the joints shall be raked out to a
depth of at least 15 mm while the masonry is being laid. In case of concrete walls, the surface
shall be hacked and roughened with wire brushes. The surface shall be cleaned and wetted
thoroughly before commencing the work.
2.2. The wall surface shall be covered with 10 mm thick plaster of cement mortar 1 : 3 and
allowed to harden. The plaster shall be roughened with wire brushes / scratched both ways.
The back of tiles shall be floated with grey cement slurry (or approved adhesive) and edges with
white cement slurry and the tiles set in the bedding. The tiles shall be gently tapped in position
one after the other keeping the joints as thin as possible. The top of skirting or dado shall be
truly horizontal and the joints truly vertical or as per the required pattern.
2.3. Risers of steps, skirting and dado shall rest on top of the treads or flooring. Where full size
tiles cannot be fixed, they shall be machine cut to the required size and the edges smoothened.
Skirting shall generally project uniformly not more than the thickness of tile and bedding
beyond the plaster face, or as directed.
2.4. The joints shall be cleaned and flush pointed with white / matching cement slurry. The
surface shall be kept wet for seven days and after curing washed clean.
3.0. Mode of measurement and payment
3.1. Risers of steps, skirting and dado shall be measured in square metres. Length and height
shall be measured along the finished face of the skirting or dado, correct to a centimetre; in
case of risers and skirting the height shall be measured correct to 3 mm.
3.2. The rate includes the cost of all materials and labour required including 10 mm thick
cement plaster 1 : 3 backing, cutting and wastage.
3.3. The rate shall be for a unit of one square metre.
Item No. 18 Providing and fixing window having extruded aluminum
Colour anodized section frame main outer size 95mm x 24mm x
1.17mm @ wt.of 0.738 Kg/mt , horizontal Three track member size
92mm x 31.75mm x 1.30mm,@ Wt.1.07 Kg/mt , vertical member of
size 92mm x 31.75mm x 1.50mm @ Wt. 1.06 Kg/mt with sliding
shutters of horizontal member size 40 mmx18mm x1.29mm @ wt.of
0.456 Kg/mt, vertical member of size 40mm x 18mm x 1.29 mm @
wt.of 0.456Kg/mt/ with 5 mm thick transparent bronze colour tinted
float glass with powder coated aluminum fittings and fixtures and
transparent silicon sealant glass fixing to frame as per details etc
1.1. Aluminium sections: Extruded aluminium alloy sections shall conform to IS 733 and IS
(alloy designation 63400 / HE9-WP, temper WP) and M-31, of the sizes and weights specified in
the item (outer frame 95 x 24 x 1.17 mm @ 0.738 kg/m; three-track horizontal member 92 x
31.75 x 1.30 mm @ 1.07 kg/m; vertical member 92 x 31.75 x 1.50 mm @ 1.06 kg/m; shutter
members 40 x 18 x 1.29 mm @ 0.456 kg/m), with a tolerance of +/- 5 percent on weight. The
sections shall be colour anodised (minimum anodic film thickness 15 microns, conforming to IS
1868) of approved shade.
1.2. Glass: 5 mm thick transparent bronze tinted float glass conforming to IS 14900, free from
bubbles, waves, scratches and other defects.
1.3. Fittings and fixtures: Powder coated aluminium handles, locks / latches, roller bearings
(nylon / ball bearing type) for sliding shutters, interlocks, end caps, EPDM / PVC glazing gaskets,
wool-pile weather strips, stainless steel screws, fasteners and approved transparent silicone
sealant (neutral cure). All fittings shall be of approved make and got approved before use.
2.0. Workmanship
2.1. Fabrication: The window shall be fabricated in a factory / workshop as per approved shop
drawings and the detailed drawings, true to sizes. All members shall be accurately cut (mitre or
butt as per system) with machine, joints shall be mechanically fixed with concealed cleats /
corner joints and sealed so that the joints are neat, flush and weather tight. The sliding shutters
shall slide smoothly on the tracks without any jerk.
2.2. Glazing: The glass panes shall be cut to size and fixed to the shutters with glazing gaskets /
beading and transparent silicone sealant so as to make the glazing leak proof and rattle free.
2.3. Fixing: The frame shall be fixed in the opening after plastering with rawl plugs / anchor
fasteners and stainless steel / cadmium plated screws at not more than 600 mm c/c (minimum
2 per side), keeping it truly in plumb, line and level. The gap between the frame and the
masonry / concrete shall be sealed all round with weather-proof silicone sealant. Drainage slots
shall be provided in the bottom track to drain out rain water.
2.4. Protection: The aluminium surfaces shall be protected with protective tape / lacquer during
installation which shall be removed after completion. Any damaged member shall be replaced
at the contractor's cost.
2.5. The windows shall be tested for smooth operation and water tightness at site as directed.
3.0. Mode of measurement and payment
3.1. The area of the window shall be measured as the outer dimensions of the frame in square
metres, correct to a centimetre, as fixed in position.
3.2. The rate includes the cost of all aluminium sections, glass, fittings and fixtures, sealant,
fasteners, fabrication, transportation, fixing and testing complete.
3.3. The rate shall be for a unit of one square metre.
Item No. 19 Providing and fixing glazed louvered glass windows and
ventilators with teak wood frame 10cm. x 7cm. size including 3 coats
of oil painting to wood work etc.complete.
1.1. Indian teak wood shall conform to M-29. Glass shall conform to M-38 and shall be 5 mm
thick glass of best quality with edges ground smooth. Paint shall conform to M-44.
2.0. Workmanship
2.1. Frame: The frame of 10 cm x 7 cm section shall be prepared and fixed as per the following:
all members shall be exactly at right angles, straight without any warp or bow and shall have
smooth surfaces well planed on the three exposed sides. Frames shall have dovetail / mortice
and tenon joints, closely fitting and pinned with hardwood dowels not less than 10 mm dia.,
with contact surfaces treated with an approved adhesive. A tolerance of +/- 1.5 mm shall be
allowed for each wrought face.
2.2. Holdfasts: For frames of height less than 1 m two holdfasts of size 300 x 25 x 6 mm (M.S.
flat with split end) shall be fixed on each side at quarter points, and three on each side for
higher frames. Holdfasts shall be fixed to the frames with screws and embedded in cement
concrete blocks. Holdfasts shall be protected with coal tar and the surface of the frame
abutting masonry shall be treated with an approved coating.
2.3. Louvers: Grooves of 1.25 cm depth shall be made in the frame and 5 mm thick glass louvers
of the required size shall be fixed in the grooves at the required spacing. The louver blades shall
slope down towards the outside at an angle of 45 degrees so as to exclude rain water. The
louvers shall be fixed securely with beading / putty so as to be rattle free.
2.4. Painting: All wood work shall be painted with three coats (including priming coat) of ready
mixed paint of approved shade.
3.0. Mode of measurement and payment
3.1. The area of opening within the frame in which the louvers are fixed shall be measured in
3.2. The rate includes the cost of teak wood frame, glass louvers, holdfasts and three coats of
painting to wood work complete.
3.3. The rate shall be for a unit of one square metre.
Item No. 20 Providing and laying marble stone slab flooring over
20mm (average)base of cement mortar 1:6 (1-cement : 6 coarse sand)
or L.M. 1:1.5(1- lime putty : 1.5 - coarse sand) laid and jointed with
gray cement slurry including rubbing and polishing complete. (A)
Marble slab 25mm thick
1.1. Water shall conform to M-1. Cement mortar 1 : 6 (1 cement : 6 coarse sand) shall conform
to M-11 and lime mortar 1 : 1.5 to M-10. Marble stone slabs 25 mm thick shall conform to M-51
and IS 1130, of approved variety, colour and shade.
2.0. Workmanship
2.1. Dressing of slabs: Every slab shall be cut to the required size and shape and fine chisel
dressed on all sides to the full depth so that a straight edge laid along the side is fully in contact
with it. The sides and top surface shall be machine rubbed or table rubbed with coarse sand
before laying. All angles and edges shall be true, square and free from chippings. Allowable
tolerance in thickness shall be +/- 2 mm.
2.2. Bedding: Bedding shall be of cement mortar 1 : 6 (or lime mortar 1 : 1.5 as specified) of
average thickness 20 mm; the minimum thickness at any place shall not be less than 10 mm.
2.3. Laying: The sub-grade shall be cleaned, wetted and mopped. Mortar of the specified mix
and thickness shall be spread on an area sufficient to receive one slab. The slab shall be washed
clean, laid on top, pressed and tapped gently to bring it in level with the other slabs. It shall
then be lifted and laid aside, the top surface of the mortar corrected by adding fresh mortar at
hollows and allowed to harden a bit. Cement slurry of honey-like consistency at 4.4 kg of
cement per sq.m shall be spread over it, the edges of slabs already paved buttered with grey
cement, and the slab gently placed in position and tapped with a wooden mallet till properly
bedded in level with and close to the adjoining slab. Joints shall be as fine as possible. Slabs
adjoining walls shall enter not less than 10 mm under the plaster, skirting or dado. The finished
surface shall be true to levels and slopes as directed.
2.4. Curing: The floor shall be cured for a minimum period of seven days.
2.5. Rubbing and polishing: Unevenness at meeting edges shall be removed by fine chiselling /
grinding. Polishing shall commence after 14 days of laying. The first rubbing shall be done with
machine using carborundum stone of coarse grit (about 60-80), followed by second rubbing
with medium grit (about 120) and final polishing with fine grit (220 to 350), using water during
each operation. The surface shall be washed clean and, where directed, finished with oxalic
acid / wax polish to give a glossy surface. Cement slurry shall not be applied on the surface
between polishings.
3.0. Mode of measurement and payment
3.1. Marble flooring shall be measured in sq.m. The length and breadth shall be measured
between the finished faces of skirting, dado or wall plaster. No deduction shall be made nor
extra paid for openings in the floor of area upto 0.05 sq.m. Nothing extra shall be paid for laying
at different levels in the same room. Treads of steps paved with marble slabs shall also be
measured under flooring.
3.2. The rate shall be for a unit of one square metre.
Item No. 21 Providing and fixing flush door shutters, solid core
construction with frame of first class hardwood with cross board and
face veneer or plywood face panels, including anodised aluminium
butt hinges with necessary screws. (B) Non-decorative type and block
board core anodised aluminium butt hinges in flush door shutters (2)
1.1. Flush door shutters shall be solid core, non-decorative type, 35 mm thick, with block board
core, conforming to M-30 and IS 2202 (Part 1). The frame (stiles and rails) shall be of first class
hardwood with cross bands and face veneers or commercial plywood face panels (M-37)
bonded by hot press process with BWR / BWP grade synthetic resin adhesive. Anodised
aluminium butt hinges shall conform to M-43.
1.2. The shutters shall be tested as per IS 2202 (Part 1) for end immersion test, knife test and
glue adhesion test; there shall be no delamination. Tolerance on nominal thickness shall be +/-
1.2 mm and on height and width +/- 3 mm. The thickness shall be uniform with a variation of
not more than 0.8 mm between any two points. All edges shall be square and the shutters free
from twist or warp.
2.0. Workmanship
2.1. Ready made shutters shall be of correct size and shall fit into the door frames without
excessive scraping of edges. Adding of battens etc. to make up the size shall not be allowed.
Lipping on the vertical edges, where specified, shall be of hardwood.
2.2. The shutters shall be fixed to the frame with anodised aluminium butt hinges of approved
size (generally 100 mm), three numbers for each shutter of height upto 2.1 m, with necessary
screws. The hinges shall be neatly let into the shutter and frame so that the shutter closes flush
and operates smoothly without binding. Both faces shall be sand papered smooth before
painting / polishing.
2.3. The rate includes providing block and cleat for keeping the shutter in open position as
3.0. Mode of measurement and payment
3.1. The dimensions of the shutter shall be measured as the clear size of the shutter in closed
position between the rebates of the frame, correct to a centimetre, and the area worked out in
3.2. The rate includes the cost of shutter, anodised aluminium butt hinges and screws, fixing
complete, but excludes other fixtures and fastenings and painting / polishing which shall be
paid separately.
3.3. The rate shall be for a unit of one square metre.
Item No. 22 Applying two coats of putty & two coats of primer of
approved brand and manufacture on new wall surface to give an even
shade including thoroughly brushing the surface free from mortar
dropping and other foreign matter and sand papered smooth.
1.1. Wall putty shall be white cement based polymer modified wall care putty of approved
brand and manufacture. Primer shall be cement primer / acrylic wall primer (water thinnable)
of approved brand and manufacture, compatible with the finishing paint. Materials shall be
brought to site in sealed containers of the manufacturer.
2.0. Workmanship
2.1. Scaffolding: Where scaffolding is required it shall be erected in such a way that, as far as
possible, no part of it rests against the surface to be treated. Where ladders are used, pieces of
old gunny bags shall be tied at top and bottom to prevent scratches to walls and floors.
2.2. Preparation of surface: The new plastered surface shall be allowed to dry thoroughly. It
shall be brushed free of dust, dirt, grease, mortar droppings and other foreign matter and sand
papered smooth. All unnecessary nails shall be removed. Surfaces affected by moulds, moss,
fungi, algae or efflorescence shall be treated in accordance with IS 2395 before application.
2.3. Application of putty: The putty shall be mixed with clean water as per manufacturer's
instructions to a smooth paste. The first coat shall be applied with a putty blade / trowel over
the entire surface, filling all pits and undulations. After drying (generally 4 to 6 hours) it shall be
lightly sand papered and the second coat applied in the perpendicular direction to obtain a
smooth even surface. After drying, the surface shall be rubbed with fine emery paper (No. 180 /
220) and dusted off.
2.4. Application of primer: Two coats of primer, thinned as per the manufacturer's instructions,
shall be applied with brush / roller on the clean, dry, sand papered surface, horizontal strokes
followed immediately by vertical strokes, so as to leave no brush marks. The second coat shall
be applied after the first coat has dried as per the manufacturer's recommendation. The
surface shall present a uniform finish ready to receive paint.
2.5. Splashes on floors, doors, windows etc. shall be cleaned without delay.
3.0. Mode of measurement and payment
3.1. All work shall be measured in sq.m. Dimensions shall be measured to the nearest 0.01 m
and areas worked out to the nearest 0.01 sq.m.
3.2. No deduction shall be made for ends of joists, beams, posts etc. and openings not
exceeding 0.5 sq.m each and no addition made for reveals, jambs, soffits, sills etc. of such
openings. For openings exceeding 0.5 sq.m but not exceeding 3 sq.m each, deduction shall be
made for one face only where both faces are treated; for openings exceeding 3 sq.m each,
deduction shall be made and jambs, soffits and sills measured. No deduction shall be made for
attachments such as casings, conduits, pipes, electric wiring and the like.
3.3. The rate includes the cost of all materials, labour, scaffolding and protective measures. The
rate shall be for a unit of one square metre.
Item No. 23 Wall painting (two coats) with plastic emulsion paint of
approved brand and manufacture on undecorated wall surface to give
an even shade including thoroughly brushing the surface free from
mortar droppings and other foreign matter and sand papered smooth.
1.1. Water shall conform to M-1. Plastic emulsion paint shall be interior acrylic emulsion paint
of approved brand, manufacture and shade conforming to IS 15489 (IS 5411). It shall be
brought to site in original sealed containers.
2.0. Workmanship
2.1. Scaffolding: As per para 2.1 of Item No.
2.2. Preparation of surface: The surface, prepared with putty and primer under Item No.
shall be thoroughly brushed free from mortar droppings and other foreign matter and sand
papered smooth. New plastered surfaces shall be allowed to dry before painting.
2.3. Preparation of mix: This shall be done as per the manufacturer's instructions. Thinning of
emulsion shall be done with water and not with turpentine, in the quantity recommended by
the manufacturer.
2.4. Application: The paint shall be stirred thoroughly in its container before pouring into
smaller containers and continuously stirred during use so that its consistency is kept uniform.
The paint shall be laid on evenly and smoothly by means of crossing and laying off, with brush
or roller. Crossing and laying off consists of covering the area with paint, brushing the surface
hard for the first time over and then brushing alternately in opposite directions two or three
times and finally brushing lightly in a direction at right angles to the same. The full process
constitutes one coat. Two coats shall be applied; the second coat shall not be started until the
preceding coat has become sufficiently hard to resist marking by the brush.
2.5. The finished surface shall present a flat, velvety smooth finish, even and uniform in shade,
without patches, brush marks, hair marks, paint drops etc.
2.6. Precautions: (a) Old brushes, if used, shall be completely freed of oil paint by washing in
warm soap water. Brushes shall be washed in water immediately after use and kept immersed
in water during breaks. (b) No oil-based putties shall be used in filling cracks and holes. (c)
Splashes on floors etc. shall be cleaned without delay. (d) Washing of painted surfaces shall not
be done within 3 to 4 weeks of application.
3.0. Mode of measurement and payment
3.1. The mode of measurement shall be as per para 3.0 of Item No.
3.2. The rate includes the cost of all materials, labour, scaffolding and protective measures. The
rate shall be for a unit of one square metre.
Item No. 24 Finishing wall with weather proof exterior emulsion paint
on wall surface (two coats) to give an required shape even shade after
thoroughly brushing the surface to remove all dirt, and remains of
loose powdered materials.etc complete
1.1. Water shall conform to M-1. The paint shall be 100 percent acrylic exterior emulsion paint
(weather proof, anti-algal / anti-fungal) of approved brand, manufacture and shade conforming
to IS 15489, along with exterior primer as recommended by the manufacturer. Materials shall
be brought to site in original sealed containers.
2.0. Workmanship
2.1. Scaffolding: Double scaffolding / suspended platform of adequate strength shall be
provided so that no part of the scaffolding rests against the surface to be painted. Painting shall
start from the top and proceed downwards.
2.2. Preparation of surface: The surface shall be thoroughly brushed with stiff brushes to
remove all dirt, dust, loose powdery materials, efflorescence and algae. Cracks and holes shall
be filled with exterior grade filler / cement mortar and sand papered. Surfaces affected by
fungus or algae shall be treated with an approved fungicidal wash and allowed to dry. The
surface shall be thoroughly dry before painting.
2.3. Application: Where the surface is undecorated, one coat of exterior primer shall first be
applied as per the manufacturer's instructions. Thereafter two coats of exterior emulsion paint,
thinned with water as recommended, shall be applied by brush / roller by crossing and laying
off as described in Item No. 23, allowing the manufacturer's recommended drying time
between coats. The finished surface shall be even and uniform in shade without patches, brush
marks, paint drops etc.
2.4. No painting shall be carried out in wet, damp or otherwise unfavourable weather, or when
the temperature is below 7 degrees C, or when rain is expected within the drying period. Doors,
windows, floors etc. shall be protected from splashes and any splashes cleaned forthwith.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Tender Document.pdf
02 Drawings.pdf
03 Bulding Specification .pdf
04 Electrical Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .