| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC KHOWA TRIPURA | KHOWA | TRIPURA | ₹6.7 L | L1 | Accepted-AOC Reponsive |
| 2 | L2₹7.0 L+₹33,381.10 (5.00%)Rejected-AOC JAMBURA KHOWAI | KHOWAI | KHOWAI | TRIPURA | ₹7.0 L+₹33,381.10 (5.00%) | L2 | Rejected-AOC Reponsive |
Tender Value
₹6.7 L
EMD Value
₹13,352
Closing Date
6 Dec 2025, 3:00 pmClosed
The Dy Chief Engineer KMC Khowai Tripura
O/o The Dy Chief Engineer KMC Khowai Tripura
Works
2025_Urban_67678_1
25/KMC/KH/DNIT/2025-26
Open Tender
Civil Works
Percentage
30 days
khowai
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹13,352
21 May 2026
28 Nov 2025
6 Dec 2025
28 Nov 2025
6 Dec 2025
29 Nov 2025
28 Nov 2025 - 29 Nov 2025
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m :
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil
Supplying and filling in plinth, under floor, foundations etc.with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: 4.1.5 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: 4.1.3 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 m
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.19.4 Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering shuttering including struttings, propping etc. and removal of form work for: 5.8.1.1 Foundations, footings, bases for columns etc. for mass concrete with timber plank
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level: 5.1.3 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
Providing structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 9.12.1 Hot finished welded type tubes
Supply & installation of pre-painted Galvalume sheets for roofing/cladding (size, shape and pitch of corrugation as approved by Engineer-in-charge) in 550mpa steel grade, made out of Cold Rolled Steel coated with Zinc-Aluminium alloy coating of 43.5% Zn, 55% Al and 1.5% Silicon confirming to ASTM A792/A792M and AS1397, Alloy coating AZ150/AZ70, colour coated with high quality Polyester coating, top coated of modified polyester of 20 micron, back side coat of 5 micron, having epoxy primer coat of 5 micron on both side. Sheet should have protective guard film of 25 microns minimum to avoid scratches while transportation and should be supplied in single length upto 12 metre or as desired by Engineer-incharge.
Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:- 6.12.3 In cement mortar 1:4 ( 1 cement : 4 fine sand ).
First class brick work in foundation and plinth including cost of all materials as required complete:-6.1.3 In cement mortar 1:4 ( 1 cement : 4 fine sand ).
12 mm cement plaster of mix 12.1.2 Cement mortar 1:4 (1 cement : 4 fine sand)
Neat cement punning.
Providing and laying cement concrete 1:2:4 (1 cement : 2 fine sand : 4 graded stone aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips etc. all complete as per direction of Engineer-in-charge. 10.8.1 25 mm thick with 12.5 mm stone aggregate
Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 grams/ litre, of approved brand and manufacture to give an even shade [Payment shall be made after submission of Test Certificate issued by the Manufacturer] : 12.35.1 New work ( two or more coats) over and including water thinnable priming coat with cement primer.
Finishing walls with textured exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issued by the Manufacturer] : 12.40.1 New work ( two or more coats applied @ 3.28 litre/10 sqm) over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm
Finishing with Epoxy paint ( two or more coats) ofapproved brand and manufacture at all locationsprepared and applied as per manufacturer's specification including appropriate priming coat, preparation ofsurface etc. complete [Payment shall be made aftersubmission of Test Certificate issued by the Manufacturer]. 12.48.1 On steel work
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
DNIT25.pdf
Tender Documents • 4.59 MB
BOQ_68863.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .