Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC DALHOUSIE HIMACHAL PRADESH | ₹11.3 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹12.3 L+₹1.0 L (9.01%)Rejected-Finance | ₹12.3 L+₹1.0 L (9.01%) | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹12.4 L+₹1.1 L (10.1%)Rejected-Finance VILLAGE BALI PO BEHLI TEHSIL NIHRI DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | ₹12.4 L+₹1.1 L (10.1%) | L3 | Rejected-Finance Other than lowest |
| 4 | L4₹12.8 L+₹1.5 L (13.1%)Rejected-Finance | ₹12.8 L+₹1.5 L (13.1%) | L4 | Rejected-Finance Other than lowest |
| 5 | L5₹12.9 L+₹1.6 L (14.0%)Rejected-Finance | ₹12.9 L+₹1.6 L (14.0%) | L5 | Rejected-Finance Other than lowest |
Tender Value
₹15.3 L
EMD Value
₹30,520
Closing Date
30 Aug 2023, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Sundernagar
Construction of Flood Protection Structure and extension of parking at Jal Bhawan Sundernagar Tehsil Sundernagar District Mandi HP
2023_HPIPH_77865_1
EE JSD SNR TA eTender 2023-7996-8036 dt 22.8.2023
Open Tender
Civil Works - Water Works
Fixed-rate
90 days
Sundernagar
Please refer Tender documents.
8 documents required · 8 mandatory
₹400
EE Sundernagar
₹30,520
Yes
26 Oct 2023
22 Aug 2023
31 Aug 2023
22 Aug 2023
30 Aug 2023
22 Aug 2023
Amount
Demolition above ground level upto 1.50 meters depth including stacking of serviceable materials & disposal of unserviceable materials within 20 metres lead on un-reinforced cement concrete more than 15cm thickness complete in all respect.
Providing and laying cement concrete 1:5:10 (1 cement: 5 sand: 10 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in retaining wall/ breast wall complete in all respect and as per direction and to the entire satisfaction of the Engineer-in-charge.
Excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting soft or hard rock or by chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming / dressing of sides and bed stacking the excavatted soil clear from the edge of excavation and returning the excavated soil after completion of work in 15cm layers when required into plinth , sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge. Pick work 80% and jumper wok 20%
Providing and laying cement concrete 1:6:12(1cement:6 sand: 12graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts.
Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs. and removal of the same for in-situ reinforced concrete and plain concrete work including all leads and lifts.(i) Column pillars, post and struts, square, rectangular or polygonal in plan
(ii) Vertical surface such as walls(any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like
(iii) Beams, cantilivers, girders and lintels sides and soffits of beams, beam haunchings, cantilivers, girders, bressumers and lintels not exceeding 1 metre in depth.
(iv) Flat surfaces such as soffits of suspended floors,roofs, landings and the like.Floors etcupto 200mm in thickness.
(v) Edges of slab and breaks in floors and walls under 20cm wide.
Providing and laying cement concrete grade 1:1.5:3(one cement :one and half sand : three graded crushed stone aggregate 20mm nominal size ) and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work including all leads and lifts in :-(i) Column pillars, post and struts upto floor two level.
(ii)Suspended floors, roofs, landing, shelves and their supports balconies, lintels, beams girders bresumers and cantilevers upto all floor two level .
Providing and laying cement concrete 1:2:4(1cement:2 sand:4graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts.
Providing tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level including all leads and lifts.
Sunil Sharma
ANKUSH VERMA
Karam Singh
RAVIKANT
Baldev Bansal
CHUNI LAL
VARUN CIVIL AND GOVERNMENT CONTRACTOR
daleep thakur
HEM RAJ
BAL CHAND WALIA
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .