| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC technically qualified and quoted lowest amount |
| 2 | L2₹2.1 Cr+₹12.8 L (6.59%)Rejected-Finance 121004 | ₹2.1 Cr+₹12.8 L (6.59%) | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 3 | L3₹2.1 Cr+₹18.2 L (9.39%)Rejected-Finance | ₹2.1 Cr+₹18.2 L (9.39%) | L3 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 4 | L4₹2.1 Cr+₹19.2 L (9.91%)Rejected-Finance 143 SHASTRI NAGAR LAKHIMPUR KHERI | ₹2.1 Cr+₹19.2 L (9.91%) | L4 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 5 | L5₹2.2 Cr+₹23.4 L (12.1%)Rejected-Finance 0 272 273 1 | ₹2.2 Cr+₹23.4 L (12.1%) | L5 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| Sl No | Description | Qty | Unit | M/S ASHISH KUMAR L6 | M/S KUMAR MANGLAM CONSTRUCTION L2 | M/S CHAUDHARY ENTERPRISES L7 | DHARAM DEV CHAUHAN L13 | M/S Vinay Construction L3 | NIRBHAY KUMAR MISHRA L8 | M/s Nav Bharat Construction L4 | SRI NATH INFRA CONSTRUCTIONS LLP L9 | M/S PRATAP NIRMAN SANSTHAN L11 | SINGH CONTRACTOR L10 | NIKHIL CONSTRUCTION L12 | m/s munnu lal shukla L1 | MS TRISHIRA CONSTRUCTION PRIVATE LIMITED L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site. | 2,000 | Hr | 150 ₹3,00,000 | 182.41 ₹3,64,820 | 95 ₹1,90,000 | 150 ₹3,00,000 | 50 ₹1,00,000 Lowest | 200.09 ₹4,00,180 | 188.1 ₹3,76,200 | 200.39 ₹4,00,780 | 150 ₹3,00,000 | 164 ₹3,28,000 | 65 ₹1,30,000 | 60 ₹1,20,000 | 80 ₹1,60,000 |
| 2.00 | E/w in cutting in foundation of masonary on channels of discharge above 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge. | 9,137.8 | Cum | 90 ₹8,22,402 | 106.48 ₹9,72,992.94 | 90 ₹8,22,402 | 70 ₹6,39,646 | 50 ₹4,56,890 | 116.8 ₹10,67,295.04 | 109.8 ₹10,03,330.44 | 115.97 ₹10,59,710.67 | 100 ₹9,13,780 | 102.5 ₹9,36,624.5 | 68 ₹6,21,370.4 | 40 ₹3,65,512 | 32 ₹2,92,409.6 Lowest |
| 3.00 | Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete. | 979.05 | Cum | 600 ₹5,87,430 | 773.89 ₹7,57,677.01 | 500 ₹4,89,525 | 700 ₹6,85,335 | 1,700 ₹16,64,385 | 848.91 ₹8,31,125.34 | 798.04 ₹7,81,321.06 | 850.18 ₹8,32,368.73 | 600 ₹5,87,430 | 902 ₹8,83,103.1 | 190 ₹1,86,019.5 Lowest | 200 ₹1,95,810 | 300 ₹2,93,715 |
| 4.00 | Earth Work in Making sub grade in linning work including watering, compaction and preparation of surface as per direction of Engineer-in-charge. | 13,054 | Sqm | 20 ₹2,61,080 | 13.82 ₹1,80,406.28 | 10 ₹1,30,540 | 15 ₹1,95,810 | 50 ₹6,52,700 | 15.16 ₹1,97,898.64 | 14.25 ₹1,86,019.5 | 15.18 ₹1,98,159.72 | 10 ₹1,30,540 | 82 ₹10,70,428 | 20 ₹2,61,080 | 2 ₹26,108 Lowest | 50 ₹6,52,700 |
| 5.00 | Laying Plain Cement Concrete (M-15) in foundation 1:2:4 with ston grit including cost of material, labour, T&p etc, complete. | 979.05 | Cum | 6,000 ₹58,74,300 | 4,979.83 ₹48,75,502.56 | 5,500 ₹53,84,775 | 6,245 ₹61,14,167.25 | 5,500 ₹53,84,775 | 5,462.54 ₹53,48,099.79 | 5,135.25 ₹50,27,666.51 | 5,474.76 ₹53,60,063.78 | 6,000 ₹58,74,300 | 5,880 ₹57,56,814 | 7,500 ₹73,42,875 | 4,900 ₹47,97,345 Lowest | 6,650 ₹65,10,682.5 |
| 6.00 | Laying Reinforced Cement Concrete 1:1:2 with stone grit including cost of material, labour, T&p etc, complete. | 1,958.1 | Cum | 7,000 ₹1,37,06,700 | 6,686.52 ₹1,30,92,874.81 | 7,500 ₹1,46,85,750 | 8,150 ₹1,59,58,515 | 6,500 ₹1,27,27,650 Lowest | 7,334.67 ₹1,43,62,017.33 | 6,895.21 ₹1,35,01,510.7 | 7,345.7 ₹1,43,83,615.17 | 8,000 ₹1,56,64,800 | 7,387 ₹1,44,64,484.7 | 7,800 ₹1,52,73,180 | 7,000 ₹1,37,06,700 | 6,850 ₹1,34,12,985 |
| 7.00 | Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. | 296.46 | SQM | 500 ₹1,48,230 | 722.65 ₹2,14,236.82 | 500 ₹1,48,230 | 600 ₹1,77,876 | 500 ₹1,48,230 | 792.69 ₹2,35,000.88 | 745.2 ₹2,20,921.99 | 793.89 ₹2,35,356.63 | 600 ₹1,77,876 | 492 ₹1,45,858.32 | 550 ₹1,63,053 | 350 ₹1,03,761 Lowest | 800 ₹2,37,168 |
| 8.00 | Earthwork in annual repairs with dressing by any means, lead & lift . | 939.4 | Cum | 90 ₹84,546 | 104.73 ₹98,383.36 | 90 ₹84,546 | 100 ₹93,940 | 50 ₹46,970 | 114.88 ₹1,07,918.27 | 108 ₹1,01,455.2 | 115.06 ₹1,08,087.36 | 100 ₹93,940 | 82 ₹77,030.8 | 69 ₹64,818.6 | 40 ₹37,576 Lowest | 100 ₹93,940 |
| 9.00 | Providing & Fixing Bitumen Joint filer Board For Expansion Joints. | 293.71 | SQM | 400 ₹1,17,486 | 294.85 ₹86,601.87 | 200 ₹58,743 | 300 ₹88,114.5 | 15 ₹4,405.73 Lowest | 323.43 ₹94,996.24 | 304.05 ₹89,304.05 | 323.91 ₹95,137.23 | 300 ₹88,114.5 | 82 ₹24,084.63 | 115 ₹33,777.23 | 50 ₹14,685.75 | 200 ₹58,743 |
Tender Value
₹2.9 Cr
EMD Value
₹5.7 L
Closing Date
11 Aug 2025, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
SE SIX CIRCLE LUCKNOW
Lucknow sakha ke km 172.040 ka km 173.110 tk lining ka karya
2025_UPIDC_1061710_7
01/SE-6/2025-26
Open Tender
Civil Works
Fixed-rate
360 days
lucknow
Please refer tender document
2 documents required · 2 mandatory
₹5,207
₹5.7 L
SE SIX CIRCLE LUCKNOW
23 Sept 2025
1 Aug 2025
11 Aug 2025
1 Aug 2025
11 Aug 2025
1 Aug 2025
4 Aug 2025
Amount
Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.
E/w in cutting in foundation of masonary on channels of discharge above 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge.
Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete.
Earth Work in Making sub grade in linning work including watering, compaction and preparation of surface as per direction of Engineer-in-charge.
Laying Plain Cement Concrete (M-15) in foundation 1:2:4 with ston grit including cost of material, labour, T&p etc, complete.
Laying Reinforced Cement Concrete 1:1:2 with stone grit including cost of material, labour, T&p etc, complete.
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.
Earthwork in annual repairs with dressing by any means, lead & lift .
Providing & Fixing Bitumen Joint filer Board For Expansion Joints.
M/S KUMAR MANGLAM CONSTRUCTION (BID ID -5402014)
M/S Vinay Construction (BID ID -5417399)
M/s Nav Bharat Construction (BID ID -5412109)
MS TRISHIRA CONSTRUCTION PRIVATE LIMITED (BID ID -5403330)
M/S ASHISH KUMAR (BID ID -5398508)
M/S CHAUDHARY ENTERPRISES (BID ID -5413906)
NIRBHAY KUMAR MISHRA (BID ID -5417550)
SRI NATH INFRA CONSTRUCTIONS LLP (BID ID -5412068)
SINGH CONTRACTOR (BID ID -5415938)
M/S PRATAP NIRMAN SANSTHAN (BID ID -5404718)
NIKHIL CONSTRUCTION (BID ID -5414419)
DHARAM DEV CHAUHAN (BID ID -5414775)
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 1.88 MB
BOQ.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .