Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹11.1 L+₹68,274.12 (6.53%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹13.9 L
EMD Value
₹27,860
Closing Date
1 Jul 2026, 6:00 pmClosed
XEN
Nowshera
Permanent restoration/Re-construction of water supply scheme Hathal-B damaged due to flash flood under SASCI.
2026_PHE_312813_2
e-NIT No. 06 of 2026-27
Open Tender
Civil Works
Percentage
45 days
Nowshera
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
XEN
₹27,860
Yes
8 Jul 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
1 Jul 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kind of soil | 78.75 | cum | 592.9 | ₹46,690.88 |
| 2 | Providing and laying in position cement conc. Of sepcified grade excluding cost of Centering & Shuttering all work up to plinth level 1:4:8 (1 Cement: 4 Coarse sand: 8 graded crused stone aggregate 40mm nominal size. | 15.75 | cum | 5,202.9 | ₹81,945.67 |
| 3 | Providing and laying in position cement conc. Of sepcified grade excluding cost of Centering & Shuttering all work up to plinth level 1:3:6 (1 Cement: 3 Coarse sand: 6 graded crused stone aggregate 20mm nominal size. | 67.18 | cum | 5,733.6 | ₹3,85,183.25 |
| 4 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.
40mm thick with 20 mm nominal size stone aggregate. | 90 | Sqm | 510.25 | ₹45,922.5 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 21.16 | cum | 9,821.85 | ₹2,07,830.35 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level (TMT) | 1,480 | Kg | 123.2 | ₹1,82,336 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for:-
a) Foundations, footings, bases of columns etc. for mass concrete. | 383.86 | Sqm | 286.35 | ₹1,09,918.31 |
| 8 | b) Suspended floors, roofs, landings, balconies and access platforms. | 87.12 | Sqm | 718.2 | ₹62,569.58 |
| 9 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel
primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 160 | Kg | 181.6 | ₹29,056 |
| 10 | Welding, including transportation of plant at site etc. complete by electric plant | 1,177.5 | Cm | 6.2 | ₹7,300.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1012465.xls
BOQ • 0.30 MB
Corrigendum01.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .