Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
7 Oct 2026, 4:05 pm
Executive Engineer , Road Project Department, VADODARA MUNICIPAL CORPORATION
Annual Rate Contract For Whitewash & Paint Of Divider, Footpath, Curbing & Circle on Main Roads of North Zone.
347721
402/26-27
Open
Civil Works - Roads
Works
Vadodara
1 document required · 1 mandatory
₹10,000
Municipal commissioner ,Vadodara municipal corporation
₹2.5 L
22 Sept 2026
22 Sept 2026
22 Sept 2026
7 Oct 2026
22 Sept 2026
of Item Description Rate UNIT
White washing with lime on wall surface two
coat) to give an even shade incl. thoroughly
brooming the surface to remove all dirt, dust,
1.00 mortar drops and other foreign matter. 12.60 Sq.Mt.
(R&B SOR 2024-25 Ch.No.18 Item no-
18001 page no.140 )
Painting two coats (excluding priming coat)
on new steel & other metal surface with
enamel paint. brushing interior to give an
1.00 even shade including cleaning the surface of 89.11 Sq.Mt.
all dirt, dust & other foreign matter.
(R&B SOR 2024-25 Ch.No.19 Item code-
19002 page no. 143)
Painting one coat (Excluding priming coat)
on previously painted steel and other metal
surface with enamel paint brushing to give
1.00 an even shade incl. cleaning the surface of 56.03 Sq.Mt.
all ditr, dust & other foreign matter.
(R&B SOR 2024-25 Ch.No.19 Item code -
19003 page no. 143)
Removing dry or oil bound distemper a
washing and scrapping and sand papering
1.00 the wall surface smooth including necessary 11.47 Sq.Mt.
repairs to scratches complete.
(R&B SOR 2024-25 Ch.No.18 Item code-
18014 page no. 141)
Item No.5Finishing wall the weather proof
weather proof exterior emulsion paints on
wall surface (two coats) to give an required
shape even shade after thoroughly
brushing the surface to remove all dirt and
1.00 reamins of loose powedered materials. etc. 116.24 Sq.Mt.
complete.(As per R&B SOR 2024-25
Ch.No.19 Item code-19031 page no. 146)
Applying priming coat over new steel
surface after and including preparing the
surface thoughly cleaning, oil, grease,dirt &
other foreign matter & scoured with brushes
1.00 fin steel wood,scrapers & sand paper with 35.52 Sq.Mt.
ready mixed priming painting.. (As per R&B
SOR 2024-25 Ch.No.19 Item code-19001
Painting lines, deashes, arrows,letter etc. on
road air fields and like in two coats with road
marking paint,on speed breker,
zebras,parking lines, brushing including
cleaning the surface of all dirt dust and other
foreign matter (ove 10 cm in width) R&B
SOR ch-19,2024-25, Item No.19025A. page
VADODARA MUNICIPAL CORPORATION
TECHNICAL SPECIFICATION & TERMS AND CONDITIONS
DETAILED SPECIFICATIONS FOR WHITE
WASHING & DISTEMPERING
18.11. White washing with lime on undedorated wall surfaces (two coats) to
give an even shade including throughly brooming surface to remove all dirt,
dust, mortar drops and other foreign matter.
1.1.The clcarcolle shall be made from glue and boiling water by Mixing I kg.
mixture shall be suitably tinted where required use under coloured distemper
if directed. Glue shall conform to I.S. 852-1969 (Specifications for animal
glue). 1.2 Lime used shall be freshly burnt class ‘C’ Lime (fat lime) and
white in colour conforming to I.S. 712-1973/ Water shall conform to M-l
Best quality of gum shall be used in the preparation of white wash.
Ultramarine blue or Indigo: This shall conform to I.S. 55-1970 for points,
and shall be used for preparation of white wash. Pigments : Mineral colours,
not affected by lime shall be used in preparing colour wash.
2.0. Workmanship :
2.1. Preparation of white wash solution :
Surface already white or colour. The fat lime shall be slaked at site and
shall be mixed and stirred with about five litres of water for 1 kg. of
unslaked lime to make a thin cream. This shall be allowed to stand for a
period of 24 hours and then shall be screened through a clean coarse cloth,
Kg. of gum dissolved in hot water shall be added to each cubic metre of
lime cream. Small quantity of ultramarine blut (Upto 3 gms. per kg. of lime)
shall also be added to the last two coats of white wash solution and the whole
solution shall be stirred throughly before use.
2.1. Preparation of surface:
2.2.1.The surface shall be throughly cleaned of all dust, dirt, mortar
croppings and other foreign matter before .white wash is to be applied.
2.2.2.The surface spoiled by smoke soot shall be scraped with steel wire
brushes or steel scrapers or shall be rubbed with over-burnt surkhi or brick
bats. The surface shall be then broomed to remove all dust, dirt and shall be
washed with clean water.
2.1.3.Oil or grease spots shall be removed by suitable chemical and smooth
surface shall be rubbed with wire brushes.
2.2.4. All unsound portion of the surface plaster shall be removed to full
depth of plaster in rectangular patches and plastered again after raking the
masonry joints properly. Such portion shall be wetted and allowed to dry.
They shall then be given one cat of white wash.
2.2.5.All unnecessary nails shall be removed, the holes cracks patches etc.
shall be made good with materials similar in imposition to the surface to be
2.3. Scaffolding : Wherever scaffolding is necessary it shall be erected in
such a way that as far as possible on part of scaffolding shall rest against
the surface to be white or colour washed. A properly secured strong and
well tied suspended platform (Zoola) may be used for white washing. Where
ladders arc used, pieces of old gunny bag shall be teid at top andand bottom
to prevent scratches to the floors and walls. For white washing of ceilings
proper stage scaffolding shall be erected where necessary.
2.4. Application of white wash:
2.4.1 On the surface prepared the white wash shall be applied with ‘Moon’
brush. The first stoke of the brush shall be from top downwards another,
from bottom upwards over the first stroke and similary one stoke from the
right another from the left, over the first stroke brush before it dries. This
will from one coat. Each coat shall be allowed to dry before next coat
applied. Number of coats as specified in item shall be applied.
It shall present smooth and uniform finish free from brush marks and it
should not come off easily when rubbed with finger.
2.4.2. Splashing and dropping if any on the doors and windows,
ventilators etc. shall be removed and the surface cleaned.
2.4.3. Priming and Alkali resistant treatments, scraping of surface
washing etc. surface spoiled by smoke soot removed of oil and great spots
treatment for infection with effloresence moulds moss, funji, algae and
letchen and patch repairs to plaster wherever done shall not be paid extra.
3.0. Mode of measurements & payment :
3.1. All the work shall be measured in the decimal system as under :
(a) Dimensions shall be measured to the nearest 0.01 M.
(b) Area in individual items shall be worked out to the nearest 0.01 Sq. M.
All the work shall be measured in sq. mt. Deductions for jambs, soffits, sills
etc. for opening not exceeding 0.5 sq. mt. each in area for ends of joints,
posts, beams, girders, steps etc. not exceeding 0.5 sq. mt. each in area and
for opening exceeding 0.3 sq. mt. and not exceeding 3.0 sq. mt. each in area
deductions and additions shall be made as under :
3.2. No deductions shall be made for ends of joints beams, posts etc. and
openings not exceeding 0.5. sq. mt. each. No addition
shall be made for reveals, jambs, soffits, sills etc. of these openings nor
for finish arounds ends of joints, beams, posts etc.
3.3. Deductions for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt.
each shall be made as follows and no addition shall be made for reveals,
jambs, soffits etc. of these openings:
(a) When both the faces or walls are provided with finish, deduction shall
be made for one face only.
(b) When each fasce of wall is provided with different finish deduction shall
be made for that side of frame for door, windows etc. on which width of
reveals is less than that of the other side, where width of reveals on
both faces of wall are equal,deduction of 50% of area of opening on
each face shall be made from total area of finish.
(c) When only one face of wall is treated and the other face is not treated,
full deduction shall be made if the width of revealon the treated side is
less than that on the untreated side, but if the width of the reveal is
equal or more than on the untreated
side neither deductions nor additions be made for reveals, jambs,
soffits, sills etc.
3.4. In case of area of opening exceeding 3 sq. mt. each, deduction shall be
made for openings but jambs, soffits, shall bemeasured.
3.5. No deduction shall be made for attachment such as casing, conducts,
pipe, electric wiring and the like.
3.6. Corrugated surfaces shall be measured flat as fixed and not girth. The
quantities so measured shall be increased by the following percentage and
the resultant shall be included with the general areas.
(a) Corrugated steel sheets 14%
(b) Corrugated A. C. Sheets20%
(c) semi corrugated A. C. Sheets 10%
(d) Nainital pattern roof (Plain
sheeting with rolls)10%
(e) Nainital pattern roof (with
corrugated sheets) 25%
3.7. Cornices and other wall features, when they are not picked out in a
different finish/colour shall be girthed and included
in the general area
3.8. The rate shall include the cost of all materials, labour, scaffolding,
protective measures etc. involved in all the operations described above.
3.9. The rate shall be for a unit of one sq. metre.
19.7. Painting two coats (excluding priming coat) on new steel and other
metal surfaces with enamel paint, brushing, interior to give an even shade
including cleaning the surface of all dirt, dust and other foreign matter.
1.0. Materials : The enamel paint shall conform to M-44 B.
2.0 Workmanship :
2.1.1. The materials required for work of painting work shall be obtained
directly from approved manufacturers or approved dealer and brought to the
site in maker’s drums, kege etc. with seal unbroken.
2 1.2. All materials not in actual use, shall be kept properly protected, lids of
containers shall be kept closed and surface of paint in open or partially open
containers covered with a thin layer of turpentine to prevent formation of
skin. The materials which have become stale or flat due to improper and long
storage shall not be used. The paint shall be stirred thoroughly in its
container before pouring into small containers. While applying also the
paint shall be continuously stirred in smaller container. No left over paint
shall be put back into stock tins. When not in use, the containers shall be kept
properly closed.
2.1.3.If for any seasons, thinning is necessary, the brand of thinner
recommended by the manufacturer shall be used.
2.1.4.The surface to be painted shall be thoroughly cleaned am.’ dusted. All
rust, dirt and grease shall be thoroughly removedbefore painting is started.
No painting on exterior or other exposed parts of the work shall be carried
out in wet, damp or otherwise unfavourable weather and all the surfaces
shall be thoroughly dry before painting work is started.
2.2. Application:
2.2.1.Brushing operations arc to be adjusted to the spreading capacity
advised by the manufacture of particular paint. Thepaint shall be applied
evenly and smoothly by means of crossing and laying off. The crossing and
laying off consists ofcovering the area over with paint, brushing the surface
hard for the first lime over and then brushing alternately in opposite
directions two or three times and then finally brushing lightly in direction at
right angles to the same. In this process, no brushmarks shall be left after the
laying off is finished. The full process of crossing and laying off will
constitute one coat.
2.2.2.Each coat shall be allowed to dry completely and lightly rubbed with
very fine grade of sand paper and loose particlesbrushed off before next coat
is applied. Each coat shall vary slightly in shade and shall be got approved
from Engineer-in-charge before next coat is started.
2.2.3.Each coat except the last cost shall be lightly rubbed down with sand
paper of fine pumice stone and cleaned of dust before the next coat is
applied. No hair marks from the brush or clogging of paint puddles in the
corners of panels angles ofmouldings etc. shall be left on the work.
2.2.4.Special care shall be taken while painting over
bolts, nuts, rivets, overlaps etc. Approved best quality
brushes shall be used.
3.0.Mode of measurements & payment:
3.1.The relevant specifications of item No. 19.12 shall be followed for
mode of measurements and payment. The rate is excluding priming coat.
3.2.The rate shall be for a unit of one sq. metre.
19.21. Painting one coat (excluding priming coat) on previously painted steel
and other metal surfaces with synthetic enamel
paint brushing to give an even shade including cleaning the surface of all
dirt, dust and other foreign matter.
1.0. Materials &Workmanship : 1.1. The relevant specifications of item
No. 19.19.shall be followed except that the
painting shall be carried out on previously painted steel and other metal
surfaces using synthetic enamel paint in one coat.
2 0. Mode of measurements & payment:
2.1 The relevant specifications of item No. 19.19 shall be followed.
2.2. The rate shall be for a unit of one sq. metre.
18.33. Removing dry or oil bound distemper by washing and scraping and sand
papering the wall surface smooth including necessary repairs to scratches
1.0. Materials &Workmanship :
1.1. All loose pieces and scales shall be removed by sand papering and
surface shall be
cleared of all greaseay, dust, dirt, etc. on decorated wall surface. Where
heavy scaling has taken place, the entire surface shall, be scrapped by means
of steel scrappers so as to remove all accumulated distemper, leaving clean
surfaces. Necessary repairs to the scratches shall be made as directed.
2.0.Mode of measurements & payment:
2.1.The relevant specifications of item No. 18.11 shall be followed.
2.2.The rate shall be for a unit of one sq. metre.
18.34. Extra over item No. 18.33 for removing dry oil bound distemper on
ceiling and sloping roofs!
1.0. Workmanship: 1.1. The relevant specifications of item No. 18.33 shall
be followed except that removing dry oil bound distemper from sipping roof,
ceiling is to be carried out.
2.0.Mode of measurements & payment:
2.1.The relevant specifications of item No. 18.33 shall be followed except that
the payment shall be made for removing dry/oil bound distemper from
ceiling/sloping roof over and above the rate-of item No. 18.33.
2.2.The rate shall be for a unit of one sq. metre.
Applying approved brand two coat of weather proof exterior emulsion paints of
required shade on wall surface to give an even shade after thoroughly brushing
the surface free from mortar droping & other foreign matter & also including
preparing the surface even & sand paper smooth.(Including 1% labour charge)
(As per R&B SOR 2015-16 Ch.No.19 Item code-19031)
19.11. Painting one coat (excluding priming coat) on previously painted
steel and other rnetal surface with enamel paint, brushing to given and even
shade including cleaning the surface of all dirt, dust and other foreign matter.
1.0. Materials &Workmanship : 1.1. The relevant specifications of item No.
19.7 shall be followed except that painting shall be carried out in one coat with
enamel paint on previously painted steel and metal surface.
2.0.Mode of measurements & payment:
2.1.The relevant specifications of item No. 19.7 shall be followed.
2.2.The rate shall be for a unit of one sq. metre.
1.1. The road marking paint shall conform to. I.S. 164-1951.
2.0. Workmanship
2.1. The relevant specifications item No. 19.119(1) shall be followed
except that the painting lines, dashes, arrows
and letters on roads, air fields and like shall be carried out with road
marking paint in two coats : over 10 cms. in width.
3.0. Mode of measurements and payment
3.1. The relevant specifications of item No. 19.119 (I) shall be
3.2. The rate shall be for a unit of One sq. meter.
જોગવ ઇઓનુ પ લન કરવ નુ રહશે. Minimum Wages Act, સેફટી એક્ટ કે વખતો
તો આઇ . એસ. સ્પેસીફીકે શન તથ P.W.D. MANNUALs મુજબ કરવ ની રહે શે.
૧૬. ઇજારદ રે ક મન સ્થળે MOVING ટર ફીક તેમજ ર હદ રીઓની સલ મતી મ ટે જરૂરી તમ મ
(Ref. Clause of general condition of contract)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender doc white wash 22.09.2026.pdf
SBD East Zone 22.09.2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .