| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-AOC S O UNNIKRISHNAN T K THEKKEKKATTIL HOUSE OTTAPALAM PALAKKAD PALAPPURAM KERALA 679103 | OTTAPALAM | PALAKKAD | KERALA | 679103 | ₹19.3 L | L1 | Accepted-AOC Work awarded to L1 bidder |
| 2 | L2₹20.4 L+₹1.1 L (5.53%)Rejected-AOC | ₹20.4 L+₹1.1 L (5.53%) | L2 | Rejected-AOC Second lowest |
Tender Value
₹21.0 L
EMD Value
₹50,000
Closing Date
18 Mar 2026, 3:00 pmClosed
Executive Engineer
PROJECT MANAGEMENT UNIT ELECTRICAL CIRCLE SHORANUR
RECONDUCTORING AND DRAWING ADDL FEEDER ON EXISTING TOWN FEEDER BY USING CC FROM OTP SS TO TOWN
2026_KSEB_838935_1
TENDER/2025-26/6156/57 dated 19.02.2026
Open Tender
Electrical Works
Percentage
OTTAPPALAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
₹50,000
8 Apr 2026
25 Feb 2026
23 Mar 2026
25 Feb 2026
18 Mar 2026
25 Feb 2026
25 Feb 2026 - 4 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. | 2.5 | km | 13,827.18 | ₹34,567.95 |
| 2 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 59 | No | 906.41 | ₹53,478.19 |
| 3 | Renewal of existing damaged/old 11kV PSC/RCC Pole with new A type pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole. | 1 | No | 6,231.95 | ₹6,231.95 |
| 4 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 15 | Trip | 3,142.26 | ₹47,133.9 |
| 5 | Additional rate for excavation of Pit for A type pole in Laterite. | 34 | No | 651.32 | ₹22,144.88 |
| 6 | Additional rate for excavation of Pit for A type pole in Hard Laterite. | 20 | No | 1,303.68 | ₹26,073.6 |
| 7 | Additional rate for excavation of Pit for A type pole in Soft Rock. | 5 | No | 1,955 | ₹9,775 |
| 8 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 30 | No | 434.91 | ₹13,047.3 |
| 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 20 | No | 868.77 | ₹17,375.4 |
| 10 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. | 5 | No | 1,303.68 | ₹6,518.4 |
stage.html
html • 0.04 MB
techsummary_1413409.pdf
finsummary_1413409.pdf
aoc.pdf
finance_1413409.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
document.pdf
Tender Documents • 0.66 MB
BOQ_1413409.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .