Loading…
Loading…
Tender Value
₹62.9 L
EMD Value
₹63,000
Closing Date
23 Jul 2026, 6:00 pm7d left
Executive Engineer, Panchayat R & B Division, Vadodara
C R / FDIR/PR/SR to Various Road (Asphalt Work) of Desar Taluka, Dist: Vadodara (2026-27)
324482
04 of 2026-2027
Open
Civil - All
Works
Vadodara
5 documents required · 5 mandatory
₹2,400
Executive Engineer, Panchayat (R and B) Division, Vadodara
₹63,000
16 Jul 2026
16 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
Name Of Work :- C R / FDIR/PR/SR to Various Road ( Asphalt Work ) of Desar Taluka Dist : Vadodara (2026-27)
Taluka :Desar District : Vadodara
Bill of Quantities ( For Asphalt works for Road works)
Item of work Quantities Rate in Amount
Unit Figures in
1 Providing, laying, spreading and compacting graded stone aggregate to wet mix 375.00 Cum 948.39
macadam specification including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by tipper to site, laying in
uniform layers with Manualy/Motor Grader in sub- base / base course on well
prepared surface and compacting with vibratory roller to achieve the desired
2 Providing and laying evenly priming coat with emulsion bitumien SS1 (IS8887) 3750.00 Sq.mt 93.17
at rate of 7.5 Kg / 10 Sq.M. etc complete as directed with all labour and materials
3 Providing and laying Tack coat with Bitumen emulsion (RS-1) at the rate of 2.50 11250.00 Sq.mt 19.79
Kg / 10 Sq.M. on the prepare bituminous surface etc complete as directed with
all labour and materials
4 Providing laying & rolling Of built up spray grout 37.50 mm th. in One layer 3750.00 Sq.mt 179.78
using Bituminous (VG30) .with spreading stone aggregate at the rate of
cu.mt./10 sq.mt. and spraying bitumen at the rate of 15 kg/10 sq.m. ( for each
layer)and spreading 0.13 cu.mt/10 Sq.M. of key Aggregate on top ,in accordance
with requirement of specification including cost of all stone
aggregates,bitumen,consolidation with roller, necessary firewood,oil, lubricants,
labour charges, mavhineries, equpment, tools etc.complete.
5 Providing & laying 50 mm thick compacted bitumen Macadam using B.T. chips 830.00 MT. 3622.87
aggregate as specified and mixing binder asphalt grade of VG-30 at the rate of
3.40 % by total weight of mix including heating and mixing in drum mix plant
and spreading the same with paver finisher and consolidation with vibratory roller
including necessary firewood, oil, lubricants, labour charges etc. using
contractor's own drum mix plant and equipment, tool etc. completed in
accordance with the requirement of specification.
6 Providing and laying 20mm thick mix seal surfaceasing using B.T. chips as per 259.00 M.T 4913.65
required gradation adn mixing asphalt grade VG30 @ 5.10% by weight of total
mix and mixing by contractor's own drum mix plant and laying by paver finisher
and consolidation with power roller including necessary firewood, oil, lubricants,
labour charges etc. using contractor's own drum mix plant and equipment, tool
etc. completed in accordance with the requirement of specification.
2.2.Sch B CR Asphalt Work (75.0 lakh) (2025-26) Ta. Desar.xls
Item of work Quantities Rate in Amount
Unit Figures in
7 Supply of readymade bituminous cold mix Pothole patching material for B.T. 16.00 M.T 22725.00
surface patch using medium curing cut-back Bitumen MC - 800 at the rate of
5.6% of total mix and it shall be conforming to IS:217 specification, including
heating the material as specified in section 4 and materials stacked at site of work
by contractor's own dumper as and where directed within 60K.M. lead, including
providing all materials equipment T & P oil, kerosene, labour charges etc.
8 Labour charges for patch work by conventional method including cleaning the 16.00 M.T 3030.00
patch, filling potholes by readymade bituminous fold mix pethole patching
material, consolidation by tempering etc. complete.
Rs. Sixty Two Lac Ninety Three Thousand Five Hundred Forty Three And Seventy N.P. Only
I / We am / are willing to carryout the work at ………..% above/Below percent (………………………. Percent above/Below) (Should be
written in figure and words) of the estimated rates mentioned above. Amount of my / our tender worked out as under.
Estimated amount put to tender Rs: ……………. Estimated amount put to tender Rs: …………...
Deduct……% below Rs: …………………………. Add……% above Rs: ………………………….…
(Please strike out which ever is not applicable.)
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Quantities rate and wordings of items are as per estimate and calculation in the Sch. - B are airthmatically checked.
Above all items of "Schedule-B" with Item Description, Unit, Rate & Amount have verified by me and found order.
Sr.Divisional Account Officer Dy.Executive Engineer
Panchayat (R & B) Division Panchyat (R & B) Sub Division
Signaturre of contractor Executive Engineer
with seal Panchayat (R & B) Division
2.2.Sch B CR Asphalt Work (75.0 lakh) (2025-26) Ta. Desar.xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.3 (2) Specification Cold mix Bitumine.pdf
2.1.SBD_Book CR Asphalt Work (75.0lacs) (2026-27) Ta. Desar.pdf
2.3.Specification Various Road Desar Ta (26-27).pdf
BOQ.pdf
GR_to_be_attached_with_DTP_SBD_with_Index-115.pdf
Index - BOQ Notes - Test Sch.pdf
Download all tender documents and submit your bid