| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | ₹27.7 L Quoted ₹29.2 L | L1 | Accepted-AOC BEING LOWEST BIDDER |
| 2 | L2₹30.3 L+₹1.1 L (3.90%)Rejected-Finance | ₹30.3 L+₹1.1 L (3.90%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹34.3 L+₹5.1 L (17.4%)Rejected-Finance 1ST FLOOR SHOP NO 206 NEAR GRAIN MARKIT NEW MANDI TOWN SHIP AMBALA SECTOR 8 AMBALA HARYANA 134003 | AMBALA | HARYANA | 134003 | ₹34.3 L+₹5.1 L (17.4%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹35.8 L+₹6.6 L (22.7%)Rejected-Finance | ₹35.8 L+₹6.6 L (22.7%) | L4 | Rejected-Finance Other than lowest bidder |
| 5 | L5₹44.8 L+₹15.6 L (53.5%)Rejected-Finance 59 NEW MARKET CLOCK TOWER DEHRADUN UK PIN 248001 | DEHRADUN | UTTARAKHAND | 248001 | ₹44.8 L+₹15.6 L (53.5%) | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | RONKI RAM AND COMPANY L1 | M/s badrinath Traders L5 | R. P. Suppliers and Construction Co. L4 | AMBALA ENGINEERING CO L3 | VIJ ENGINEERS L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Material & Labour for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings in entire SYL area (SYL phase I and II) by deploying jungle jims and tractors with operators including fuel, lubricant,required T &P etc complete all as specified and directed.
Notes:-
(i) 01 No. jungle jim, 01 No. tractor, with operator shall be measured as one unit with strict compliance supported with attendance/ log sheet duly signed by contractor and Engr in charge .
(ii) Cut grass/bushes/vegetation, etc of any size and type of grass and vegetation shall be removed inside or outside SYL area and/ or any other area of installation as directed.
(iii) If any of the above points are not followed then the penalty Rs 100/- per hour will be levied from the contractor. | 1,920 | Per Hour | 160 ₹3,07,200 Lowest | 200 ₹3,84,000 | 350 ₹6,72,000 | 343.5 ₹6,59,520 | 380 ₹7,29,600 |
| 2.00 | Material & Labour for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings in entire SYL area (SYL phase I and II) by operator with bush grass cutter, 01 No. bush grass cutter with 01 operator including fuel, lubricant, etc will be provided by contractor complete all as specified and directed.
Notes:-
(i) Cut grass/bushes/vegetation, etc. of any size and type of grass and vegetation shall be removed inside or outside SYL area and/ or another area of installation as directed by Engr in charge.
(ii) 01 No. bush grass cutter with 01 operator with, fuel and all machinery will be provided by contrator at no extra cost basis with strict compliance supported with attendance/ log sheet duly signed by contractor and Engr in charge
(iii) If any of the above points are not followed then the penalty Rs 100/- per hour will be levied from the contractor. | 1,920 | Per Hour | 123 ₹2,36,160 | 100 ₹1,92,000 Lowest | 350 ₹6,72,000 | 243.5 ₹4,67,520 | 250 ₹4,80,000 |
| 3.00 | Material and labour for draining out water completely from the Gravity sand filter bed-01 Nos, at SYL-I , removing the gravel/boulders, sand, silt, dirt etc from the filter beds and old unused gravel and sand shall be thrown out not exceeding 500 mtr, scrapping all the inner walls and bottom of the tanks by scrubbing with steel wire brush, washing with clean water and applying two coats of white lime wash on all internal and external surfaces of the bed, complete all as specified and directed. | 2 | Each Job | 4,500 ₹9,000 | 30,000 ₹60,000 | 2,500 ₹5,000 Lowest | 2,500 ₹5,000 Lowest | 15,000 ₹30,000 |
| 4.00 | Material and labour for draining out water completely from the Gravity sand filter bed-01 Nos, at SYL-II , removing the gravel/boulders , sand, silt, dirt etc from the filter beds and old unused gravel and sand shall be thrown out not exceeding 500 mtr, scrapping all the inner walls and bottom of the tanks by scrubbing with steel wire brush, washing with clean water and applying two coats of white lime wash on all internal and external surfaces of the bed, complete all as specified and directed. | 4 | Each Job | 4,500 ₹18,000 | 3,000 ₹12,000 | 2,500 ₹10,000 Lowest | 2,500 ₹10,000 Lowest | 15,000 ₹60,000 |
| 5.00 | Material and labour for round boulder/gravel layer of 300 mm thick of approved quality of size 40-50 mm or as per IS 8419 (Part 1) in filter bed unit and including taking out old unsv material complete all as specified and directed. | 79 | Cubic Metre | 700 ₹55,300 | 1,000 ₹79,000 | 400 ₹31,600 Lowest | 650 ₹51,350 | 750 ₹59,250 |
| 6.00 | Material and labour for round gravel layer of 500 mm thick of approved quality of size 3.15mm to 10mm or as per IS 8419 (Part 1) in filter bed unit and including taking out old unsv material complete all as specified and directed. | 132 | Cubic Metre | 700 ₹92,400 | 1,000 ₹1,32,000 | 400 ₹52,800 Lowest | 670 ₹88,440 | 750 ₹99,000 |
| 7.00 | Material and labour for silica sand of 750mm thick layer above the gravel, effective size of sand should be 0.45mm to 0.70mm, specific gravity of 2.55 to 2.65 and uniformity coefficient 1.3 to 1.7 in filter bed unit at SYL of approved quality and including taking out old unsv material complete all as specified and directed. | 198 | Cubic Metre | 700 ₹1,38,600 | 1,000 ₹1,98,000 | 400 ₹79,200 | 300 ₹59,400 Lowest | 750 ₹1,48,500 |
| 8.00 | Taking down the Air scour Rotary twin-lobe blower/compressor 1000cum/hr @ 4000mmWC from the foundation and shifting it to local workshop approved by accepting officer and filling the lub oil of Servo system 320 of IOC and ENCLO-320 of HPCL-03 ltrs and transporting back to SYL plant and refixing at the same place including connecting all electrical connections and testing complete all as specified and directed. Note : (a) Spare parts required shall be measured and paid separately as supply only under the respective items. | 2 | Each Job | 5,000 ₹10,000 | 5,000 ₹10,000 | 10,000 ₹20,000 | 9,400 ₹18,800 | 3,000 ₹6,000 Lowest |
| 8.01 | Material and labour for replacement of pressure relief valve and pressure gauge complete all as specified and directed. | 2 | Each | 450 ₹900 | 2,000 ₹4,000 | 400 ₹800 Lowest | 898 ₹1,796 | 500 ₹1,000 |
| 8.02 | Material and labour for replacement of suction filters complete all as specified and directed. | 2 | Each | 400 ₹800 Lowest | 2,000 ₹4,000 | 400 ₹800 Lowest | 788 ₹1,576 | 700 ₹1,400 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
28 May 2026, 6:00 pmClosed
GE UTILITY AMBALA
GE UTILITY AMBALA CANTT 133001
REPAIR MAINT AND CLEANING OF CANAL SYL PONDS RAW WATER TANKS FILTER MEDIA AND SYL AREA AND OTHER MISC WORKS AT SECTOR C UNDER GE U AMBALA CANTT
2026_MES_763707_1
CA NO GE U AMB 42 OF 2026-27
Open Tender
Civil Works
Item Rate
240 days
GE UTILITY AMBALA CANTT
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE UTILITY AMBALA CANTT
₹98,000
9 Jul 2026
7 May 2026
30 May 2026
7 May 2026
28 May 2026
21 May 2026
7 May 2026 - 14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material & Labour for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings in entire SYL area (SYL phase I and II) by deploying jungle jims and tractors with operators including fuel, lubricant,required T &P etc complete all as specified and directed.
Notes:-
(i) 01 No. jungle jim, 01 No. tractor, with operator shall be measured as one unit with strict compliance supported with attendance/ log sheet duly signed by contractor and Engr in charge .
(ii) Cut grass/bushes/vegetation, etc of any size and type of grass and vegetation shall be removed inside or outside SYL area and/ or any other area of installation as directed.
(iii) If any of the above points are not followed then the penalty Rs 100/- per hour will be levied from the contractor. | 1,920 | Per Hour | - | - |
| 2 | Material & Labour for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings in entire SYL area (SYL phase I and II) by operator with bush grass cutter, 01 No. bush grass cutter with 01 operator including fuel, lubricant, etc will be provided by contractor complete all as specified and directed.
Notes:-
(i) Cut grass/bushes/vegetation, etc. of any size and type of grass and vegetation shall be removed inside or outside SYL area and/ or another area of installation as directed by Engr in charge.
(ii) 01 No. bush grass cutter with 01 operator with, fuel and all machinery will be provided by contrator at no extra cost basis with strict compliance supported with attendance/ log sheet duly signed by contractor and Engr in charge
(iii) If any of the above points are not followed then the penalty Rs 100/- per hour will be levied from the contractor. | 1,920 | Per Hour | - | - |
| 3 | Material and labour for draining out water completely from the Gravity sand filter bed-01 Nos, at SYL-I , removing the gravel/boulders, sand, silt, dirt etc from the filter beds and old unused gravel and sand shall be thrown out not exceeding 500 mtr, scrapping all the inner walls and bottom of the tanks by scrubbing with steel wire brush, washing with clean water and applying two coats of white lime wash on all internal and external surfaces of the bed, complete all as specified and directed. | 2 | Each Job | - | - |
| 4 | Material and labour for draining out water completely from the Gravity sand filter bed-01 Nos, at SYL-II , removing the gravel/boulders , sand, silt, dirt etc from the filter beds and old unused gravel and sand shall be thrown out not exceeding 500 mtr, scrapping all the inner walls and bottom of the tanks by scrubbing with steel wire brush, washing with clean water and applying two coats of white lime wash on all internal and external surfaces of the bed, complete all as specified and directed. | 4 | Each Job | - | - |
| 5 | Material and labour for round boulder/gravel layer of 300 mm thick of approved quality of size 40-50 mm or as per IS 8419 (Part 1) in filter bed unit and including taking out old unsv material complete all as specified and directed. | 79 | Cubic Metre | - | - |
| 6 | Material and labour for round gravel layer of 500 mm thick of approved quality of size 3.15mm to 10mm or as per IS 8419 (Part 1) in filter bed unit and including taking out old unsv material complete all as specified and directed. | 132 | Cubic Metre | - | - |
| 7 | Material and labour for silica sand of 750mm thick layer above the gravel, effective size of sand should be 0.45mm to 0.70mm, specific gravity of 2.55 to 2.65 and uniformity coefficient 1.3 to 1.7 in filter bed unit at SYL of approved quality and including taking out old unsv material complete all as specified and directed. | 198 | Cubic Metre | - | - |
| 8 | Taking down the Air scour Rotary twin-lobe blower/compressor 1000cum/hr @ 4000mmWC from the foundation and shifting it to local workshop approved by accepting officer and filling the lub oil of Servo system 320 of IOC and ENCLO-320 of HPCL-03 ltrs and transporting back to SYL plant and refixing at the same place including connecting all electrical connections and testing complete all as specified and directed. Note : (a) Spare parts required shall be measured and paid separately as supply only under the respective items. | 2 | Each Job | - | - |
| 8.01 | Material and labour for replacement of pressure relief valve and pressure gauge complete all as specified and directed. | 2 | Each | - | - |
| 8.02 | Material and labour for replacement of suction filters complete all as specified and directed. | 2 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_855611.xls
BOQ • 0.29 MB
Tender.pdf
Tender Documents • 0.73 MB
AMENDMENT.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .