Loading…
Loading…
Tender Value
₹5.0 L
EMD Value
₹4,972
Closing Date
17 Sept 2026, 6:00 pmClosed
Executive Engineer, P. H. Works Division, GWSSB, Mehsana
Shifting of pipeline and Valves at Ransipur Vijapur RWSS TAL :- Vijapur DIST :-Mehsana Under M and R Programme Year 2026-27
341254
02/2026-27
Open
Water Supply/ Sanitation Works
Works
Mehsana
8 documents required · 6 mandatory · 2 optional
₹600
Executive Engineer, P. H. Works Division, GWSSB Mehsana
₹4,972
3 Sept 2026
3 Sept 2026
3 Sept 2026
17 Sept 2026
3 Sept 2026
Estimated Cost: Rs. 4,97,171=48
Deputy Executive Engineer
Gujarat Water Supply & Sewerage Board
P.H. Sanitary sub Division, VIjapur
Volume-III, PRICE BID VKV RWSS
Name of Work:- “Shifting of pipeline & Valves at Ransipur Vijapur RWSS TAL :-
Vijapur DIST :-Mehsana Under M&R Programme Year 2026-27”
The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
(1) The rates and prices shall be submitted in the electronic formats given by
n-procure which is called Schedule-B. Rates and prices received in any
other formats will be rejected and the Bids will be disqualified.
(2) It will be entirely at the discretion of the Employer to accept or reject
the bidder’s proposal, without giving any reasons whatsoever and the
bidder shall not be permitted to withdraw his bid on this account.
to be free supplied from the by client.
(4) In Schedule-B the Bidder shall quote prices for the items on lump sum /
unit rate as called for against the BOQ item.
quoted in Schedule-B only will be considered for price evaluation & shall
form a part of the Contract Agreement.
comparison and evaluation.
(7) The Bidder shall quote his prices for Operation & Maintenance in
Schedule-C. Bidder shall give year wise break up of cost for 5 years O&M
in Schedule-C/1 to Schedule-C/5 separately for Schedule-C. The total
shall be inline to the price quoted in Schedule-C. The total shall be
carried forward to Schedule-B for comparison and evaluation.
(8) Wherever for a particular item the quantities have been specified
payment shall be on unit rate basis and unit variation in quantity will be
paid with pro rata basis.
(9) Each item is to be individually priced online and the amounts shall be
the Schedules of prices shall be left blank except where the item
description requires the item to be priced on "as applicable” basis. The
item shall not be priced if it is “not applicable” to the bidder’s design, in
which case the bidder shall add the words “NOT APPLICABLE”. The
wording in the item description is for subject matter guidance only;
clause references are indicative only and all other relevant clauses shall
also be referred to. The prices shall allow for all the works covered under
the bid and all liabilities and contractual obligations whether separately
specified or not. Items against which no prices are quoted shall not be
separately paid for and the bidder shall be deemed to have covered the
Volume-III, PRICE BID VKV RWSS
cost of execution of such items (according to the requirements of the bid
document) in the prices quoted for other items.
executed for satisfactory working/safety of the system as specified, will
not be separately paid for by the Employer when executed and shall be
deemed to be already covered by other items and rates listed in the price
sheets No extra payment shall be given for any item which is required to
complete and perform the project.
fixed, during the pendency of the Contract. In case of any discrepancy
of the successful bidder shall be corrected accordingly. Only Price
Schedule–B after carried over and arithmetic corrections if any will be
considered for financial evaluation of the bid.
(12) Schedule ‘D gives the basis of interim payment for construction of civil
(13) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever
nature required for construction including temporary bunds, diverting
water, pumping, de-watering etc. for the proper execution of works. The
rates shall also be deemed to include any works and setting out that may
be required to be carried out for laying out of all the works involved.
(14) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents
and these documents are to be taken as mutually explanatory of one
(16) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(17) The prices quoted shall also include the cost of materials utilized for
(18) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable
access to work sites at his own cost. These accesses will be used by the
other contractors working for GWSSB.
only and the prices shall include all the equipments / materials /
accessories and services required as per the specifications. The bidder
(20) The amount to be quoted for O & M / year shall be as per Volume-II,
General Conditions of Contract, Clause No. 1, and Security Deposit.
(21) 1% of the value of work will be deducted from the Running bill against
labour cess which is non refundable.
(22) Third Party Inspection / CSC agency will be deployed by GWSSB and
charges of the same will be borne by GWSSB.
Volume-III, PRICE BID VKV RWSS
(23) Any expenditure incurred by inspection/ CSC agency for the work
misinformed by the contractor and charges of inspection/ CSC agency
without any work due to misinformation shall be recovered from the
(24) The rates quoted shall be exclusive of GST, but inclusive of all other
taxes, duties which shall not be paid extra. While GST will be paid for
admissible part of actual work done at the approved tender rates and
tender conditions of price variations. GST shall be paid as per prevailing
rates at the time of payment. The TDS shall be deducted at source as per
provision of IT rules and GWSSB Policy.
(25) The rates should be quoted exclusive of GST but inclusive of all other
taxes as per Volume-1 (B), General Conditions of Contract, Clause No.
(26) The process requires that the bidder shall quote his price for the work
prices shall remain firm and fix during the entire period of performance of
the contract except price variation allowed for supply of MS/DI/PVC/GI
pipe as per Volume-II Clause No. 59, General Conditions of Contract.
(27) Payment shall be made for the components for which lump sump prices
are quoted, as per the schedule of payment. Total cost will be worked out
on the basis of work done of individual items and rates quoted against
those particular items only.
(28) Royalties: The contractor shall be liable to pay the royalty of the
quarried materials/ minerals used in the construction of works at the
rates specified in the Narmada Water Resources, Water Supply & Kalpsar
Dept. Resolution No. GEN-2010-595- (6)- M.I.Cell ( K-1) Dt. 29-4-2011 (
Gujarati Version Copy enclosed) and shall be recovered from the running
bills of the work from time to time and remaining amount if any shall be
recovered from the final bill before releasing the security deposit of the
work. The contractor shall furnish the statement showing the quantity of
quarried materials / minerals from whom purchased ( with full address of
the seller) and copies of the bills for purchase to the Executive Engineer
of the in charge of the work. The contractor shall also furnish such
additional information as regards royalty payment to the competent
(29) Agency shall have to take Insurance policy and intimate to GWSSB along
with the evidence within time limit. In case of non compliance entire
responsibility shall be rest with the agency and required amount shall be
recovered from any due amount of the agency.
(30) GWSSB can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped
from the responsibility.
(31) The contractor shall apply fair means of stock maintenance and shall
adopt accounting standard as may be prescribed under GST Act as
applicable in the state of Gujarat. For arriving at the difference in
procurement prices due to introduction of GST it will be open for the
Board to ask for original invoices, lorry receipt, weigh bridge slips,
Volume-III, PRICE BID VKV RWSS
payment details and such other documents as may be required for the
(32) The claim of contractor regarding GST shall have to be backed by
documentary evidence substantiating the actual payment of tax duly
certified by the competent tax authority. The final decision regarding the
quantum of claim amount to be recovered or reimbursed shall be of the
competent authority of the GWSSB and shall be binding on the contractor.
Signature of contractor Deputy Executive Engineer
Public Health Sanitary Sub Division
Executive Engineer
Public Health Works Division
Volume-III, PRICE BID VKV RWSS
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: “Shifting of pipeline & Valves at Ransipur Vijapur RWSS TAL :- Vijapur
DIST :-Mehsana Under M&R Programme Year 2026-27”
The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
execution of the above Contract, we the undersigned offer to design, Engineer,
procure, construct, complete, commission, operate and maintain the whole of
the said works for 2 years from the date of commissioning including defects
liability period as given in Conditions of Contract and in conformity with the
Annexure, Bidding Documents, including Addenda Nos.__________ (insert
numbers) for Lump sum fixed price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained
in accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out
the inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved
by the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take
any action including termination of Contract and impose at his absolute
discretion any penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within 15 months, inclusive of monsoons, from the
date or receipt of Letter of Acceptance issued to us by you.
Volume-III, PRICE BID VKV RWSS
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms
and of value specified in the Clause 1 of Volume-II, “General Conditions of
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages
likely to be suffered by you in the event of the work not being completed by us
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID VKV RWSS
NAME OF SCHEME – Piyaj Dharoi Pipeline Based Vijapur RWSS Ta:-Vijapur Dist:-Mehsana
Name of Work:- “Shifting of pipeline & Valves at Ransipur Vijapur RWSS TAL :-
Vijapur DIST :-Mehsana Under M&R Programme Year 2026-27”
The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
Schedule showing the approximately the materials to be supplied to the contractor
from government stores for the work to be executed and the rate at which they are
Rate at which the material
Place of Delivery
Sr. will be charged to the
Particular Qty. (Transportation
given separately)
210 Store, Vijapur and
1 Mtr. Free of Cost any other GWSSB
1. The person or the firm submitting the tender should see that the rates of above
schedule are filled up by the Executive Engineer or in charge of the work before
issuing the tender.
2. The contractor should have to make his own arrangement for loading,
unloading and carting the materials from store to site of work at his own
unloading and carting the materials from store to site of work at his own cost.
3. The materials shall be issued free of cost by the Department. However, recovery
with be effected at the double rate of issue rate, in case of non return of balance
materials by the contract.
4. Approved vendor List for purchase of materials/Equipment required for the
work if Required.
5. All the surplus materials supplied by the deptt. As mentioned in schedule-A
should be handed over to the Department by the contractor at the Govt. stores as
6. The materials mentioned in schedule-A shall have to be checked for their
correctness and soundness by the contractor before taking the delivery of the
materials from the Government.
7. Necessary cement will be purchased by the agency at their own cost from open
market as per specification.
Volume-III, PRICE BID VKV RWSS
8. The persons of firm submitting the Tender should see that rates in the above
schedule are filled up by the Executive Engineer, on the issue of form prior to the
submission of the Tender.
9. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor Deputy Executive Engineer
Public Health Sanitary Sub Division
Volume-III, PRICE BID VKV RWSS
SUMMARY (SCHEDULE-B)
Name of Work:- “Shifting of pipeline & Valves at Ransipur Vijapur RWSS TAL :- Vijapur DIST
:-Mehsana Under M&R Programme Year 2026-27”
Sr. No. Name of Work Amount Rs.
I / We am / are willing to carry out the work at______________________________% above / Below
percent (should be written in figure and words) of the estimated rates mentioned above amount of my /
our tender works out as under.
Estimated amount put to tender : Estimated amount put to Tender
Deduct________% Below Add________% above
Signature of contractor Deputy Executive Engineer
Public Health Sanitary Sub Division
Volume-III, PRICE BID VKV RWSS
ITEM DESCRIPTION Qty. Unit Rate Amount
1 Providing and supplying ISI mark CI D/F Sluice Valves as per
IS:14846 (latest Edition) of following class and diameter
including all taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc. complete.
PN-1 with hand wheel/cap operated (PD type short body)
1.1 300 mm dia Sluice valve 2.00 No. 20384.00
1.2 200 mm dia Sluice valve 5.00 No. 9813.00
1.3 150 mm dia Sluice valve 5.00 No. 5848.00
1.4 100 mm dia Sluice valve 3.00 No. 3563.00
1.5 80 mm dia Sluice valve 5.00 No. 2652.00
2 Providing and supplying C.I Temper proof Air valves with
SS304 float gun metal nozzle of approved make & quality of
following class and diamete including all Taxes insuarance,
transportation, freight charges, octroi, inspection charges,
loading, unloading, conveyance to departmental stores,
staking etc. complete.Temper proof Air valves without
Isolating Sluice Valve
2.1 50mm dia Temper proof Air valve without Isolating PN 1.0 5.00 No 5499.00
2.2 80mm dia Temper proof Air valve without Isolating PN 1.0 5.00 No 7387.00
3 Excavation for pipe line trenches for water supply, sewarage
line, manhole etc. all with shoring and struting if required as
per required gradient and line including safety provisions
using site rails and stacking excavated stuff including up to
all required lead cleaning the site etc. complete for all lifts
and strata as required.
(a) In all sorts of soil and soft murrum
3.1 (A)Up to 1.50 mt depth. 297.00 Cmt 89.00
4 Removing of Existing Pipeline
Removing of existing pipeline incl. removal of specials,
valves jointing material including carting and stacking of
removed material from site of work to the department store
as directed excl. excavation and refilling
160mm dia PVC pipe 30.00 Mt 6.00
5 Manufacture, Supply & Delivery of ductile Iron flange socket
spigot bends, tees, reducers or any other specials as per
BS-EN-545/1995 class-A series K12 suitable for use with DI
pipes manufactured as per IS:8329/1994 delivery of specials
is to be made to GWSSB store or site of works any where in
Gujrat including all taxes, loading, unloading, carting,
stacking, insuarance, inspection charges, octroi etc.
complete. Up to 300 mm. dia.
5.1 Soket Spigot Type
Specials Weight 40.00 Kg 148.00
Volume-III, PRICE BID VKV RWSS
5.2 flanged Ended
Specials Weight 235.00 Kg 155.00
6 Lowering, laying, fixing and jointing PVC/uPVC/cPVC pipes
and specials of following class and diameter including cost
of conveyance from stores to site of works at all level
including cost of labour, material, giving satisfactory
hydraulic testing etc. comp.
160mm dia PVC pipe 210.00 Mt 28.00
7 Manufacture, supply and delivery of cast iron detachable
joints (short & long) complete with joint flanges duly drilled
synthetic rubber sealing rings manufactured from styrene
butadine rubber (SBR) and other required accessories such
as nut bolts etc. conforming to IS specification 8794-1988 or
its latest revision if any suitable for use with A C pressure
pipes. Delivery of joints including its accessories including
loading, unloading, carting, stacking, insurance all taxes
octroi etc. complete
Long collar over sizeWithout ISI Mark Class-15
8 Labour charges for repairing of leakage in PVC pipeline of
following dia meter at different places including necessary
excavation manually or by mechanise excavation,
dewatering removing of mud, cleaning of pipe and leakage
portion, cutting the pipeline & removing piece of pipe from
trench with inclusive of mechanical devices JCB, Hydra/Crain
if necessary & labours required with providing material such
couplers, solution etc. comp. (incl. all material but Exclu.
160mm dia PVC pipeline 2.00 No. 1629.00
9 Labour charges for repairing of leakage in CI/DI pipeline for
following diameter at different places including necessary
excavation manually or by machinery, removing mud,
dewatering, cleaning of pipe and leakage partion and
repairing by Inserting lead wool including tools required for
inserting lead wool, hiring charges of excavators,
Hydra/Crane, dewatering set, fuel, operator, cost of lead
wool etc complete (including all material but excluding cost
200 mm dia DI pipeline 2.00 No. 1660.00
10 Lowering, laying and jointing in position following C. |. / D/F
Reflux valves, Butterfly valves, Sluice valves and Air valves
including cost of all labour, jointing material, including nut
bolts and giving satisfactory hydraulic testing, etc. complete.
10.1 300 mm dia Sluice valve 2.00 No. 1141.00
10.2 200 mm dia Sluice valve 5.00 No. 742.00
10.3 150 mm dia Sluice valve 5.00 No. 585.00
10.4 100 mm dia Sluice valve 3.00 No. 439.00
10.5 80 mm dia Sluice valve 5.00 No. 400.00
Volume-III, PRICE BID VKV RWSS
10.6 50mm dia Temper proof Air valve without Isolating PN 1.0 5.00 No. 379.00
10.7 80mm dia Temper proof Air valve without Isolating PN 1.0 5.00 No. 411.00
11 Erection of Air valve with Air valve riser by installing new MS
pipe of 6mm thick or Heavy Duty GI pipe and 3.2mt length
with necessary fitting such as flange of appropriate size, nut
bolts and embedded the pipe in RCC M-15 with offset of
10cm around pipe with necessary steel etc complete.
11.1 50mm dia Temper proof Air valve without Isolating PN 1.0 5.00 No 3112.00
11.2 80mm dia Temper proof Air valve without Isolating PN 1.0 5.00 No 4350.00
12 PVC fittings: Providing and supplying at store or site of work
incl. freight, loading, unloading, stacking, insaurance & all
taxes etc. complete
P. V. C. Tail Piece with P. V. C. Flange (ISI) Heavy duty
13 |C.C M:100 for Pipe Encasing Providing C.C.M.:100 for
encasing pipes using trap metal size 12 mm to 50 mm incl.
form work curing consolidation etc. complete for various
location on pipe line using trap metal 20 mm nominal size
14 RCC Precast ChamberManufacture, supply and delivery of
chemical fabricatad RCC precast chambers with top cover as
per specification and drawing attached with the tender
documents for sizes as mentioned below. The delivery of
chambers with clamps nuts, bolts and looking arrangement
(without lock) is to be made to GWSSB store or sites any
where in Gujarat. The rates includes all taxes, loading,
carting, unloading, stacking including all taxes.
A) 60 X 60 X90 cm deep (Suitable to 80 to 300mm dia pipes) 10.00 No. 3053.00
15 Refiling the pipe line trenches incl. ramming watering,
consolidating, disposal of surplus stuff as directed with in a 482.99 M3 22.00
radious of 3.00kms
Rupees Four Lac Ninety Seven Thousand One Hundred Seventy One & Paise Forty
I / We am / are willing to carry out the work at______________________________% above
/ Below percent (should be written in figure and words) of the estimated rates mentioned
above amount of my / our tender works out as under.
Estimated amount put to tender: Estimated amount put to Tender
Deduct________% Below Add________% above
SIGNATURE OF CONTRACTOR Deputy Executive Engineer
Public Health Sanitary Sub Division
Volume-III, PRICE BID VKV RWSS
ITEM NO. 1 Providing and supplying ISI mark CI D/F Sluice Valves as per IS:14846
(latest Edition) of following class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection charges, loading,
unloading, conveyance to departmental stores, stacking etc. complete.
PN-1 with hand wheel/cap operated (PD type short body)
1.1 300 mm dia Sluice valve
1.2 200 mm dia Sluice valve
1.3 150 mm dia Sluice valve
1.4 100 mm dia Sluice valve
1.5 80 mm dia Sluice valve
Design Features
Sluice valve shall conform to IS 14846 (ISI Marked). Except pump house, these valves
are to be installed in valve chamber. All valves of pump house and rising mains shall
be non-rising stem type.
The valves shall be free from sharp projections, which are likely to catch and hold
stringy materials. Valves shall close with clockwise rotation of the hand wheel. The
direction of closing and opening shall be marked on the hand wheel.
Necessary joining materials viz. bolts, nuts, washers, packing etc. shall be provided
by the contractor at his cost. The valves shall be fixed so as to have axis perfectly
horizontal. If required the contractor shall also carry out drilling of holes of
appropriate diameter in flanges in required numbers. A hand wheel shall be provided
for emergency operation. The hand wheel drive shall be mechanically independent.
The valve design shall take care of the pressure drop across the valve disc in case of
partial opening of the valve and shall take care of the erosion and cavitation effect
on the body and disc during such operation. Valve(s) subjected to back pressure shall
have the valve seat, disc and the operator suitably designed to ensure trouble-free
operation. The shaft diameter shall take into consideration, the maximum torque
required for the valve operation, the maximum differential pressure across the valve
disc when the valve is closed and the shock load due to accidental closure of the
valve disc. The disc shall be designed for maximum differential pressure across the
valve as well as the shock load due to accidental closure of the valve. Disc design
shall offer minimum head loss. Disc shall also offer minimum resistance to flow Disc
shape shall be contoured.
Valve seats shall be of a design that permits removal and replacement at site and
shall be securely clamped on the body or disc of the valve. Seat material shall be
suitable for the operating conditions and handling fluid and may be suitably
reinforced, if required. The seat design shall permit easy removal for replacement
purposes without the need for removing the valve from the line. No deposited or
Volume-III, PRICE BID VKV RWSS
welded seat rings permitted. The valve bearings shall be of 'self-lubricated' type and
shall not have any harmful effect due to handling fluid. Adjustable thrust bearing(s)
shall be provided to hold the valve disc securely in the center of the valve seat. Each
Sluice Valve shall be provided with a hand wheel for manual operation. For the
Valves located at inaccessible position, it shall be provided with extension spindle
and floor stand or hand lever / round chain to facilitate manual operation.
Hydrostatic Test
Each valve body shall be subjected to hydrostatic test (Body and Seat) as per IS
14846. For valves subjected to back pressure condition, leakage test shall be carried
out on both sides of the disc.
Performance Test
Each valve complete with operator shall be shop operated at least three (3) times
from fully closed to fully open conditions and reverse, hold at intermediate positions
under no flow condition, to prove the workability of the assembly.
Positive material Identification (PMI Test)
PMI test shall be checked at random for Stainless steel parts.
Test Certificates
When specified by Owner, the manufacturer shall issue a test certificate confirming
that the valves have been tested in accordance with this standard and stating the
actual pressures and medium used in the test.
Marking shall be cast integral on the body or on a plate securely attached to the body
for ‘DN’ size, ‘PN’ rating, Heat Number and Serial number.
Each valve shall be drained, cleaned, prepared and suitable protected with 2 coats of
red oxide and then black bituminous paint for minimum of 150 micron DFT on
surfaces before dispatch.
Electric Actuator
Each actuator shall be adequately sized to suit the application and be continuously
rated to suit the modulating control required. The gearbox shall be oil or grease
filled, and capable of installation in any position. All operating spindles, gears and
head stocks shall be provided with adequate points for lubrication. The valve
actuator shall be capable of producing not less than 1½ times the required valve
torque and shall be suitable for at least 15 minutes continuous operation.
Volume-III, PRICE BID VKV RWSS
The actuator starters shall be integrally housed with the actuator in robustly
constructed and totally enclosed weatherproof housing. The motor starter shall be
capable of starting the motor under the most severe conditions. The starter housing
shall be fitted with contacts and terminals for power supply, remote control and
remote positional indication, and shall also be fitted with internal heaters so as to
provide protection against damage due to condensation.
Each starter shall be equipped as follows: i. A.C. electric motor. ii. Reduction gear
unit. iii. Torque switch mechanism complete with set of torque switches. iv. Limit
switch mechanism complete with set of limit switches. v. Hand wheel for manual
operation. vi. Hand-auto changeover lever with suitable locking arrangement. vii.
Local control switch / push buttons viii. 415 V / 240 V AC control transformer.
The actuator shall be suitable for operation in the climate conditions and power
supply conditions given in the specification. The actuator shall be capable of
producing not less than 1½ time the maximum required torque and shall be suitable
for at least 15 minutes continuous operation. All local controls shall be protected by
a lockable cover.
SLUICE VALVE/GATE VALVE
No Component PN- 1.0/1.6 PN-2.0 PN-2.5 PN-4.0
CI IS 210 Gr. ASTM A216 Gr. WCB/
1 Body ASTM A216 Gr. WCB ASTM A216 Gr. WCB
FG260 ASTM A351 Gr. CF8
CI IS 210 Gr. ASTM A216 Gr. WCB/
2 Bonnet ASTM A216 Gr. WCB ASTM A216 Gr. WCB
FG260 ASTM A351 Gr. CF8
3 Wedge ASTM A217 Gr. CA15 ASTM A217 Gr. CA15 ASTM A217 Gr. CA15
CI IS 210 Gr. ASTM A216 Gr. WCB/
4 Gland ASTM A216 Gr. WCB ASTM A216 Gr. WCB
FG260 ASTM A351 Gr. CF8
5 Stem SS 410 SS 410 SS304 SS
6 Ring/Wedg IS 318 Gr LTB-2 ASTM A217 Gr. CA15 ASTM A217 Gr. CA15 ASTM A217 Gr. CA15
Gland Graphoil Filler with SS Graphoil Filler with SS
7 Jute and Hemp Graphoil Filler
Packing 304 wire winding 304 wire winding
ASTM A320 Gr L7 and ASTM A320 Gr L7 and ASTM A320 Gr L7 and
8 Nut Bolts Carbon steel
ASTM A194 Gr 4 ASTM A194 Gr 4 ASTM A194 Gr
Volume-III, PRICE BID VKV RWSS
9 and Stem IS 318 Gr LTB-2 SS 304 SS 304 SS
10 Cast Iron Cast Steel Cast Steel Cast Steel/SS
ASME/ANSI B16.5 Class ASME/ANSI B16.5 Class ASME/ANSI B16.5 Class
11 Flange End IS
MODE OF MEASUREMENT AND PAYMENT
Measurement shall be paid on number basis as per relevant dia of the item in
Payment schedule of the tender.
ITEM NO. 2 Providing and supplying C.I Temper proof Air valves with SS304 float gun
metal nozzle of approved make & quality of following class and diamete
including all Taxes insuarance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to departmental stores,
staking etc. complete.Temper proof Air valves without Isolating Sluice Valve
1.1 50mm dia Temper proof Air valve
1.2 80mm dia Temper proof Air valve
2 ISI mark C.I. Air valve shall be supplied by contractor.
3 Necessary bolts, nuts, rubber packing tools and plant shall be supplied by the contractor without any
4 The valve shall be fixed to the entire satisfaction as directed by Engineer in charge properly.
5 Necessary excavation and refilling shall be done by agency at own cost.
6 Medium duty G.I. pipe of 3.00 mtr. Length with required coupling or flange at both ends of the pipe
shall be brought by agency at own cost.
7 Necessary fitting of Air valve pipe shall be done by agency at own cost. Proper fixing must be done.
If leakage found, the same will be rectify by agency.
8 After laying GI pipe The raised G.I. pipe protected with RCC in CC 1:2:4 column of 0.30 mtr dia. size
& 2.40 mtr height with base footing of 0.60 X 0.60 X 0.60 mtr at bottom with required additional
excavation incl. bolts, rubber packing, form work etc. complete.
9 Payment shall be made on Number basis.
ITEM NO. 3 Excavation for pipe line trenches for water supply, sewarage line, manhole
etc. all with shoring and struting if required as per required gradient and line
including safety provisions using site rails and stacking excavated stuff
including up to all required lead cleaning the site etc. complete for all lifts
and strata as required.
(a) In all sorts of soil and soft murrum
(A) up to 1.50 mt depth
(A) 1.50 to 3.00 mt depth.
Volume-III, PRICE BID VKV RWSS
1.1The excavation for trenches will generally, refer to open excavation for
trenches in wet / dry conditions for pipe laying work.
CLEARING OF SITES:
The site on which the pipelines are to be laid and shown on plan and the area
required for setting out and other operations shall be cleared and all obstruction
loose stones and materials, rubbish of all kinds, stumps, brushwood as trees shall
be removed as directed the roots shall be entirely grubbed up.
The products of the clearing to restocked in such a place and in such a manner,
as directed by the engineer in charge.
In jungle clearings, all trees not specially marked for preservation, bamboo’s
jungle wood and brushwood shall be cut down their roots grubbed up. All wood and
materials from the clearing shall be the property of the Board shall be arranged as
directed by the Board Engineer or his authorized agent, the material pronounced
as useful by the Engineer will be conveyed and properly stacked as directed within
the specified limit. Unless materials will be burnt or otherwise disposed off as
All holes or hollows whether originally existing or produced by digging up roots,
shall be carefully filled up with earth, well earth, well rammed leveled off, as may
3.0SETTING OUT:
The center lines of all pipe trenches etc. shall be given by the Engineer-in-charge
and it will be the responsibility of the contractor to install substantial reference
marks, bench marks, etc. and maintain then as long as required true to line, level
curve and slopes. The contractor shall assure full responsibility for alignment, and
dimension of trench.
The labor materials etc. required for setting out and establishing benchmarks and
other reference marks shall be arranged by the contractor at his own cost.
The excavation incl. Bailing out of water for the pipe trenches shall also incl.
Removal of all materials of whatever nature and whether wet or dry condition
necessary for laying of pipelines exactly in accordance with alignment, levels
grades and curves shown on the plans or as directed by the Engineer-in-charge.
Trenches shall be excavated to the exact width and depth according to the size of
pipe and the sides shall be left vertical as far as possible or according to the angle
of repose of various soils. Unless there is a specific extra provision in the contract
for shoring and strutting or for cutting side slopes the contractor shall at his own
cost do the necessary shoring and strutting or cutting of slopes to a safe of repose
or both approved by the Engineer-in-charge. As per Site condition if Extra width or
depth require then prior permission of concern chief engineer is require. The
contractor shall notify the Engineer before starting excavation to enable him to
take cross sectional levels for purpose of measurements before the ground is
disturbed. The bottom of the trenches shall be leveled both longitudinally and
Volume-III, PRICE BID VKV RWSS
transversely or slopped as directed by the Engineer. The contractor shall at his
own cost to remove such portions of boulders or rocks, as are rectified to make the
bottom of the trench level. No filling shall be allowed to bring the trench to level.
If by contractor’s mistake excavation is made deeper than shown on the plans and
if ordered by the Engineer the extra depth shall have to be made with selected
excavated stuff only with watering, remedying etc. as directed, by the Engineer
and at the cost of the contractor. Other hard excavation shall be cleared of all
sorts and loose materials and cut to firm surface, either level, stepped as directed
by the Engineer. The Engineer may order such charges in the dimensions and
alignment of pipe trench as may be deemed necessary to secure satisfactory cover
over pipeline. The contractor shall, at his own expense, make provision for bailing
out of draining water and the trenches shall be kept free of water, during laying
After each excavation is completed, the contractor shall notify the Engineer to
that effect and no laying of pipeline will be allowed to laid until Engineer has
approved the depth and dimensions of trenches level and measurements.
The minimum width of trench should be 25 CM on each side of the pipe the rate
includes cost of dewatering, blasting if required and as per detailed specification
5.0 SHORING AND STRUTTING:
Shoring & strutting and dewatering if required shall have to be carried out by the
contractor, for which any extra charge will not be paid During excavation if water
connections, sewage connections, telephone lines khalkuva (soak pits) etc. are
damaged by the contractor, the same shall have to be restored by the contractor
without any extra payment.
The trenches shall be strongly fenced and red light signal shall be kept at night
and arrangement of watchman to prevent accidents should be done, sufficient
care protective measure shall be taken to see that the excavation shall not affect
or damage the adjoining structure. The contractor shall be entirely responsible for
any injury to life and damage to the properties etc. Necessary protection work
such as guide ropes, crossing places, barricades, caution boards etc. shall be
provided by the contractor.
7.0 The excavation in all sorts of soil, hard murram, soft rock or hard rock or any
type of soil shall have to be carried out up to the required depth by the agency, no
extra payment shall be given for soft/ hard rock.
8 DISPOSAL OF EXCAVATED STUFF
No excavated stuff from trench are to be placed even temporarily nearer than
1.5 meter or greater distance up to 90 meter or as prescribed by the Engineer from
the outer edge of trench. All excavated material will be the property of the board.
Volume-III, PRICE BID VKV RWSS
The rate of excavated includes sorting out of useful materials and stacking then
separately as directed within specified lead. The excavated stuff suitable and
useful for refilling or for other use shall be stacked at convenient places. The
materials not useful in any wet shall be disposal off as directed by the Engineer
from the outer edge of trench.
8.2The site should be cleared off on completion of work.
9.0ADDITIONAL REQUIREMENTS
At the joints of pipes, the trench shall be excavated to an additional depth of
15 cm. and width of 30 cm. And length of 15 cm. beyond the edge of collar on both
the sides or as directed. The rate include for such extra excavation made at the
joints. The trenches shall be excavated perfectly in straight line. The bottom of
the trench shall be kept as per invert level or as directed. To maintain the proper
slop the usual method of site rails and boning rods shall be adopted. The
contractor shall have to provide and fix and maintain sight rails and boning rod
without any extra cost.
If the contractor fails or makes delay to give hydraulic test of the pipe line laid
in any of the section, without any genuine reason, he shall be responsible to get
any part of the length trenches refill in such case i.e. before tasting for safety of
pedestrian and/or vehicular traffic as found necessary by the engineer-in-charge
without any extra cost. If found necessary any directed by the Engineer-in-charge.
The contractor shall have to excavate the refilled trenches, during hydraulic test
without any extra cost.
At all road crossings, trenches shall be excavated only for half width of the road
and pipe shall be laid. The other half shall be excavated only after back filling over
the laid pipeline is done so as to make it suitable for the traffic. The contractor
shall provide direction when the pipeline is to be laid along the road as required
and shall maintain the diversion or any part of it, without any extra cost. At all
road crossings, the pipe shall be laid below the crest of read.
9.2The contractor shall break the road surface by excavation chiseling to the exact
width and length as shown on the drawing or as directed by the Engineer-in-
The excavated stuff shall be deposited in uniform layers to avoid mixing with
other kind of materials at non-objectionable place or as directed by the Engineer-
MEASURMENT AND PAYMENT
As per Price bid or Payment Schedule.
This item of excavation shall include unless and otherwise mentioned.
(a) Clearing of site
(b) Setting out work including all materials and labour.
(c) Providing and subsequently removing, shoring and strutting outing slopes etc.
Volume-III, PRICE BID VKV RWSS
(d) Excavation and removal and staking of all excavated stuff as directed.
(e) Necessary protection including labour materials equipment etc. to ensure safety
and protection against risk or accident.
(f) Providing facilities for inspection and damage to property if caused during
progress of work.
(g) Compensation for injury to life and damage to property if caused during progress
(h) Restoring of water supply connections, sewer connections, telephone
lines, khalkuva soapiest etc. if damaged by contractor without extra
(i) Dewatering of excavated pit trench during the progress of work.
(j) Clearing the site on completion of works directed by the Engineer.
The payment shall be made on Cum. basis.
ITEM NO. 4 Removing of Existing Pipeline
Removing of existing pipeline incl. removal of specials, valves jointing
material including carting and stacking of removed material from site of work
to the department store as directed excl. excavation and refilling
4.1 160mm dia PVC pipe
The excavation for the pipe trenches shall include removal of all material of whatever
nature and whether in wet or dry condition necessary for laying of pipe lines exactly in
accordance with alignment levels, grades and curves shown on the plans or as
directed by the Engineer-in-charge. The width and depth of the trenches shall be kept
as per instruction of Engineer-in-charge. Generally the trenches shall be kept. 60cm
wider than the outer diameter of pipeline (including coating) to be laid and depth of
excavation to conform the gradient shown in approved plans. Trenches shall be
excavated to the exact width and depth according to the size of pipe and the sides
shall be left vertical as far as possible. The pipe trenches shall be taken sufficiently
deep to give a minimum cushion of one meter above the top of pipe. At joints, the
trenches shall be made deeper and wider suitably for some length for facilitating
welding of joints. The contractor shall have to provide necessary shoring and strutting
at his own cost in the trenches where soft of loose soil is met with. The cost of
excavation for welding pits is including in the quoted rate. Payment will be made on
cum basis as per Schedule-‘B’
The Contractor shall notify the Engineer-in charge before starting excavation to enable him to
take levels for longitudinal and cross section for purpose of record of measurements before the
Volume-III, PRICE BID VKV RWSS
ground is disturbed. The bottom of the trench shall be levelled both longitudinally and
transversely or sloped as directed by the Engineer-in-charge. The contractor at his own cost
shall remove boulders if met with to make the bottom of the trench level. No. filling shall be
allowed to bring the trench level. If excavation for trench is made deeper than that shown on
the plans. Or ordered by the Engineer-in-charge, the extra depth shall have to be made up with
sand filling with watering and ramming at his own cost by the contractor. The Engineer may
order such changes in the dimensions and alignment of pipe trench as may be deemed
necessary to secure satisfactory cover over pipeline.
The Contractor shall, at his own expense, make provision for all pumping, dredging, bailing out
or draining water and the trenches shall be kept dry during execution of all.
ITEM OF THE WORK :-
At places where’d the pipeline crosses existing pipeline, road canals etc. excavation shall be
made deeper and wider to adjust the laying of pipe and casing pipes at levels specified by the
authority in charge of existing pipe line or roads SOR canals. After excavation is completed the
contractor shall notify the same to Engineer-in-charge. Laying of pipe line shall not be
commenced until the Engineer-in-charge has approved the depth and dimensions of trenches
Ropes. Crossing Places, Barricades. Caution boards etc. shall be provided by the Contractor.
The contractor shall also provide facility for crossing trench wherever reburied as per
instruction of Engineer-in-charge.
CLASSIFICATION OF STRATA :-
The decision regarding classification of strata shall rest with the Engineer-in charge/ consultant
and his decision shall be binding to the contractor. In case of dispute the decision of
Superintending Engineer shall be final and binding to the contractor.
The contractor shall have to arrange at his cost bailing or pumping out all water, which may
accumulate in the trench during the progress of the work, either by percolation. Seepage,
spring, rain or any other cause. Similarly he shall also have to arrange diverting surface flow if
any, by providing earthen bunds or by other means at his cost. The bunds shall be removed
after the work is completed in all respect at his own cost.
DISPOSAL OF EXCAVATED STUFF :-
No excavated stuff from trench is to be placed even temporarily within a distance up to 3 meter
from outer edge of trench. All excavated materials shall be property of owner. The contractor
shall have to sort out useful materials and stack them separately at convenient places as
directed within 90m. lead. The materials not useful in any way shall be disposed off within
radius of 3000 m as directed by the Engineer-in-charge. The site should be cleared all debris
on completion of work.
Removing pipe line Material incl carting stacking of removed material from site of work
to the departmental store
o The work shall be carried out as per the description of Item & as per the instruction of in
Charge of work.
FILLING AND MATERIAL:
o Filling materials shall be excavated stuff.
o Excavated stuff to be used shall be cleared of all rubbish large size stones, brick
bats etc. Big clods shall be broken down to a size of 50 mm or less.
Volume-III, PRICE BID VKV RWSS
o Refilling shall be done in a systematic manner by the contractor Before,
refilling the trenches the contractor shall get checked the trenches, ready for
o All space between pipe line and the sides of excavation shall be refilled to the
original surface with earth or selected materials in layers of 15 to 20 cms well
o Trenches for pipe line shall be back filled after the pipe line is laid tested to a
o Depth of 30 cms above the pipe except the joint portion.
o Refilling on top of pipe shall be carried out carefully with selected soft stuff out
of the excavated stuff. The filling shall be raised about 5 cms to take care of
subsequent settlement.
o The contractor shall be responsible for any settlement during passage of time of
during monsoon and the same shall be refilling with stuff brought from the
outside lif necessary.
o The process of refilling trenches, ramming shall be carried out in such a way as
not to endanger the pipe line already laid.
MODE OF MEASUREMENT AND PAYMENT :
The work shall be carried out as per the description of Item. & as per the instruction of in
Charge of work.
The Rate incl. removing of special, valve, etc.
During execution removing of existing pipe line very carry fully as per the instruction of in
Charge of work.
The payment shall be made on RMT Basis.
ITEM NO. 5 Manufacture, Supply & Delivery of ductile Iron flange socket spigot bends,
tees, reducers or any other specials as per BS-EN-545/1995 class-A series
K12 suitable for use with DI pipes manufactured as per IS:8329/1994 delivery
of specials is to be made to GWSSB store or site of works any where in
Gujrat including all taxes, loading, unloading, carting, stacking, insuarance,
inspection charges, octroi etc. complete Up to 300 mm. dia.
5.1 Socket &Spigot Type
5.2 Flanged Ended
A) Manufacture, supply and delivery of Ductile Iron Flange Socket spigot bends,
tees, reducers or any other specials as per BS-EN-545 / 1995 class-A series K-12
suitable for use with DI pipes manufactured as per IS 8329/1994 delivery of
specials is to be made to site of works including all taxes, loading, unloading,
carting, stacking, insurance, inspection charges, Octroi etc. complete with
internal cement mortar lining with EPDM rubber gaskets.
B) Manufacture, supply and delivery of flanges, Tee, bends, tail piece, reducers,
air valve raiser pipes or any other specials suitable for use with DI pipes and
delivery of specials is to be made to site of works anywhere in Gujarat including
all taxes, loading, unloading, carting, stacking, insurance, inspection charges,
Octroi etc. complete.
Volume-III, PRICE BID VKV RWSS
C) Manufacture, supply and delivery of CID joints with Rubber Rings of Standard
quality or any other specials suitable for use with D.I. pipes and delivery of
specials is to be made to site of works anywhere in Gujarat including all taxes,
loading, unloading, carting, stacking, insurance, inspection charges, Octroi
D) DI Specials with all types of diameters suitable of K9 grade pipes with inner
cement mortal lining. The necessary DI Specials required during the lowering &
lying of Ductile Iron Pipe shall be supplied by the agency and shall be as per
standard specification.
E) It shall be of best quality as per requirement Rate shall be including loading,
unloading, carting, insurance and labour charge etc. complete.
F) The payment shall be made on kg. basis as per Payment schedule.
ITEM NO. 6 Lowering, laying, fixing and jointing PVC/uPVC/cPVC pipes and specials of
following class and diameter including cost of conveyance from stores to
site of works at all level including cost of labour, material, giving satisfactory
hydraulic testing etc. comp.
6.1 160mm dia PVC pipe
1) The excavation for trenches shall be done before laying of the pipes as per
required depth and width so that adequate space can be made available for joint.
2) The pipes & joints shall be procured, supplied by the Contractor at work site
at his own cost. Every care shall be taken in carting them to site. During
transportation any damage shall be occurring to pipes for fittings the replacement of
pipes given by the contractor at his own cost.
3) Before laying the pipes it shall be brushed throughout length so that the dust
and soil can be removed.
4) Reducer bends tees, and adopter etc. to be supplied by the contractor as per
5) All the specials such as bends, tees, reducer, etc. shall be fixed as per
instruction of engineer-in-charge in the pipeline.
6) The pipe shall be hydraulically tested during the testing no leakage shall be
observed. If, leakage observed, it shall be set rightly by the contractor at his own
cost as per the instruction of engineer-in-charge. The payment shall be as per
payment schedule.
b) PVC Specials (N.A)
1 Specials as per site requirement shall be supplied by the contractor. The
specials should be as per standard and shall be got approved by the Engineer in
Volume-III, PRICE BID VKV RWSS
charge before being used. The specials should be perfectly in working condition and
having necessary threads holes etc. as per standard.
2 PVC specials should be as per IS standard specification and should be price
make. All the specials should be suitable for PVC pipes for which it is being used.
The Scope For The Item Cover
Cost of additional excavation required for jointing clearing the site of all scrubs,
bushes, and trees and dewatering where necessary.
Labour for laying pipes in trenches to correct alignment at required depth with tools,
including cutting of pipes and specials if required for laying of pipes including
connecting pipes to specials and appurtenances. Cost of the scaffolding, tools and
plants, ropes etc.
Protection of existing works from damage and cost of repair to the damages carried
out to the existing structure, sewer line telephone/electricity cables, electric cables,
electric lines, gas pipe line, irrigation pipe line etc
Providing, supplying and fixing all PVC specials required for laying.
The pipe laying across the state highways, national highways etc. will have to be done
either through open cut method or through push through method depending upon the
requirement to be prescribed by the sanctioning authority. However, mostly it would
be push through method.
GWSSB will not be able to provide water for testing of the pipelines & water
containers of the project. This shall have to be managed by the contractor at his cost
Labour for making joints including jointing material for joints, tools as well as tests.
Testing of pipes for leakage under water pressure and flushing the pipes after testing
and construction work shall have to be arranged by the contractor at his own cost.
After each section of the pipeline has been completed it shall be tested for water
tightness before being covered. The contractor shall at his own cost fill up water in
pipe line and given necessary hydraulic test section by section and the pipe line shall
stand the pressure which shall stand the pressure which shall exceed the working
pressure by (a) 50% of the highest pressure in the section. (b) 30m whichever is less
without showing any leakage or sweating anywhere in the pipes joints specials valves
etc. it any defect are found the contractor shall be made good the same at his own
Any leaking joints shall be made good and above test pressure in to be lowered
gradually after satisfactory test is & over.
Volume-III, PRICE BID VKV RWSS
GWSSB will not be able to provide water for testing of the pipelines & water
containers of the project. This shall have to be managed by the contractor at his
costs and risk.
The hydraulic test shall be given again if considered necessary by the Executive
Engineer or his representative to show that no further leakages or sweating is there.
The contractor shall have to make necessary arrangements for water testing as well
as plugging the opening of pipes etc. as directed without claiming any extra cost. The
pipelines shall be kept filled with water for a work lines shall be kept filled with
water for a week or till it is situated for testing is done.
If the pipe lines are laid in detached sanctioned & not in continuous length due to any
reasons such as non-availability of specials or due to obstacle etc. The contractor
shall see that no end of pipes length is kept open-ends are immediately covered up
either by suitable blank flange or cap slug or by means of double layer gunny bags
clothes tied properly by mild steel wire without any claim for extra-cost.
Method Of Measurement Of Pipes:
The measurement shall be recorded in running meter of pipe length laid along center
line or axis of pipe line including tees, enlarges, reducers and bends correct up to
0.01M. length. No payment shall be made for overlaps etc.
The payment shall be paid after completion of whole item as mentioned in price bid
on Number basis.
ITEM NO. 7 Manufacture, supply and delivery of cast iron detachable joints (short &
long) complete with joint flanges duly drilled synthetic rubber sealing rings
manufactured from styrene butadine rubber (SBR) and other required
accessories such as nut bolts etc. conforming to IS specification 8794-1988
or its latest revision if any suitable for use with A C pressure pipes. Delivery
of joints including its accessories including loading, unloading, carting,
stacking, insurance all taxes octroi etc. complete
Long collar over sizeWithout ISI Mark Class-15
The item itself specifies the requirement of supply and erecting recessed mount luminaries and
shall be supplied to store or directed by Engineer in charge.
The necessary vouchers bill for purchase shall be produced if demanded by Engineer in
The payment shall be made on No. basis
Volume-III, PRICE BID VKV RWSS
ITEM NO. 8 Labour charges for repairing of leakage in PVC pipeline of following dia
meter at different places including necessary excavation manually or by
mechanise excavation, dewatering removing of mud, cleaning of pipe and
leakage portion, cutting the pipeline & removing piece of pipe from trench
with inclusive of mechanical devices JCB, Hydra/Crain if necessary &
labours required with providing material such couplers, solution etc. comp.
(incl. all material but Exclu. cost of pipe)
8.1 160mm dia PVC pipe
The work shall be carried out as per Item Description & instruction of Engineer in charge.
No extra Payment paid for Dewatering, Excavation, Mud Removing, JCB, Hydra & Crane
No damage shall be occurred to existing line/structure.
If any damage occurred, it should be rectified by the contractor at his own cost.
The connection work shall be put into commission into its original condition after
completion of the main work.
The payment shall be made on number basis The payment shall be made on number basis
as per price bid.
ITEM NO. 9 Labour charges for repairing of leakage in CI/DI pipeline for following
diameter at different places including necessary excavation manually or by
machinery, removing mud, dewatering, cleaning of pipe and leakage partion
and repairing by Inserting lead wool including tools required for inserting
lead wool, hiring charges of excavators, Hydra/Crane, dewatering set, fuel,
operator, cost of lead wool etc complete (including all material but excluding
9.1 200mm dia DI pipe
The work shall be carried out as per Item Description & instruction of Engineer in charge.
No extra Payment paid for Dewatering, Excavation, Mud Removing, JCB, Hydra & Crane
No damage shall be occurred to existing line/structure.
If any damage occurred, it should be rectified by the contractor at his own cost.
The connection work shall be put into commission into its original condition after
completion of the main work.
The payment shall be made on number basis The payment shall be made on number basis
as per price bid.
ITEM NO. 10 Lowering, laying and jointing in position following C. |. / D/F Reflux valves,
Butterfly valves, Sluice valves and Air valves including cost of all labour,
Volume-III, PRICE BID VKV RWSS
jointing material, including nut bolts and giving satisfactory hydraulic
testing, etc. complete.
10.1 300 mm dia Sluice valve
10.2 200 mm dia Sluice valve
10.3 150 mm dia Sluice valve
10.4 100 mm dia Sluice valve
10.4 80 mm dia Sluice valve
10.6 50mm dia Temper proof Air valve
10.7 80mm dia Temper proof Air valve
Design Features
Sluice valve shall conform to IS 14846 (ISI Marked). Except pump house, these valves
are to be installed in valve chamber. All valves of pump house and rising mains shall
be non-rising stem type.
The valves shall be free from sharp projections, which are likely to catch and hold
stringy materials. Valves shall close with clockwise rotation of the hand wheel. The
direction of closing and opening shall be marked on the hand wheel.
Necessary joining materials viz. bolts, nuts, washers, packing etc. shall be provided
by the contractor at his cost. The valves shall be fixed so as to have axis perfectly
horizontal. If required the contractor shall also carry out drilling of holes of
appropriate diameter in flanges in required numbers. A hand wheel shall be provided
for emergency operation. The hand wheel drive shall be mechanically independent.
The valve design shall take care of the pressure drop across the valve disc in case of
partial opening of the valve and shall take care of the erosion and cavitation effect
on the body and disc during such operation. Valve(s) subjected to back pressure shall
have the valve seat, disc and the operator suitably designed to ensure trouble-free
operation. The shaft diameter shall take into consideration, the maximum torque
required for the valve operation, the maximum differential pressure across the valve
disc when the valve is closed and the shock load due to accidental closure of the
valve disc. The disc shall be designed for maximum differential pressure across the
valve as well as the shock load due to accidental closure of the valve. Disc design
shall offer minimum head loss. Disc shall also offer minimum resistance to flow Disc
shape shall be contoured.
Valve seats shall be of a design that permits removal and replacement at site and
shall be securely clamped on the body or disc of the valve. Seat material shall be
suitable for the operating conditions and handling fluid and may be suitably
reinforced, if required. The seat design shall permit easy removal for replacement
purposes without the need for removing the valve from the line. No deposited or
welded seat rings permitted. The valve bearings shall be of 'self-lubricated' type and
shall not have any harmful effect due to handling fluid. Adjustable thrust bearing(s)
shall be provided to hold the valve disc securely in the center of the valve seat. Each
Sluice Valve shall be provided with a hand wheel for manual operation. For the
Volume-III, PRICE BID VKV RWSS
Valves located at inaccessible position, it shall be provided with extension spindle
and floor stand or hand lever / round chain to facilitate manual operation.
Hydrostatic Test
Each valve body shall be subjected to hydrostatic test (Body and Seat) as per IS
14846. For valves subjected to back pressure condition, leakage test shall be carried
out on both sides of the disc.
Performance Test
Each valve complete with operator shall be shop operated at least three (3) times
from fully closed to fully open conditions and reverse, hold at intermediate positions
under no flow condition, to prove the workability of the assembly.
Positive material Identification (PMI Test)
PMI test shall be checked at random for Stainless steel parts.
Test Certificates
When specified by Owner, the manufacturer shall issue a test certificate confirming
that the valves have been tested in accordance with this standard and stating the
actual pressures and medium used in the test.
Marking shall be cast integral on the body or on a plate securely attached to the body
for ‘DN’ size, ‘PN’ rating, Heat Number and Serial number.
Each valve shall be drained, cleaned, prepared and suitable protected with 2 coats of
red oxide and then black bituminous paint for minimum of 150 micron DFT on
surfaces before dispatch.
Electric Actuator
Each actuator shall be adequately sized to suit the application and be continuously
rated to suit the modulating control required. The gearbox shall be oil or grease
filled, and capable of installation in any position. All operating spindles, gears and
head stocks shall be provided with adequate points for lubrication. The valve
actuator shall be capable of producing not less than 1½ times the required valve
torque and shall be suitable for at least 15 minutes continuous operation.
The actuator starters shall be integrally housed with the actuator in robustly
constructed and totally enclosed weatherproof housing. The motor starter shall be
capable of starting the motor under the most severe conditions. The starter housing
shall be fitted with contacts and terminals for power supply, remote control and
Volume-III, PRICE BID VKV RWSS
remote positional indication, and shall also be fitted with internal heaters so as to
provide protection against damage due to condensation.
Each starter shall be equipped as follows: i. A.C. electric motor. ii. Reduction gear
unit. iii. Torque switch mechanism complete with set of torque switches. iv. Limit
switch mechanism complete with set of limit switches. v. Hand wheel for manual
operation. vi. Hand-auto changeover lever with suitable locking arrangement. vii.
Local control switch / push buttons viii. 415 V / 240 V AC control transformer.
The actuator shall be suitable for operation in the climate conditions and power
supply conditions given in the specification. The actuator shall be capable of
producing not less than 1½ time the maximum required torque and shall be suitable
for at least 15 minutes continuous operation. All local controls shall be protected by
a lockable cover.
SLUICE VALVE/GATE VALVE
No Component PN- 1.0/1.6 PN-2.0 PN-2.5 PN-4.0
CI IS 210 Gr. ASTM A216 Gr. WCB/
1 Body ASTM A216 Gr. WCB ASTM A216 Gr. WCB
FG260 ASTM A351 Gr. CF8
CI IS 210 Gr. ASTM A216 Gr. WCB/
2 Bonnet ASTM A216 Gr. WCB ASTM A216 Gr. WCB
FG260 ASTM A351 Gr. CF8
3 Wedge ASTM A217 Gr. CA15 ASTM A217 Gr. CA15 ASTM A217 Gr. CA15
CI IS 210 Gr. ASTM A216 Gr. WCB/
4 Gland ASTM A216 Gr. WCB ASTM A216 Gr. WCB
FG260 ASTM A351 Gr. CF8
5 Stem SS 410 SS 410 SS304 SS
6 Ring/Wedg IS 318 Gr LTB-2 ASTM A217 Gr. CA15 ASTM A217 Gr. CA15 ASTM A217 Gr. CA15
Gland Graphoil Filler with SS Graphoil Filler with SS
7 Jute and Hemp Graphoil Filler
Packing 304 wire winding 304 wire winding
ASTM A320 Gr L7 and ASTM A320 Gr L7 and ASTM A320 Gr L7 and
8 Nut Bolts Carbon steel
ASTM A194 Gr 4 ASTM A194 Gr 4 ASTM A194 Gr
9 and Stem IS 318 Gr LTB-2 SS 304 SS 304 SS
10 Cast Iron Cast Steel Cast Steel Cast Steel/SS
Volume-III, PRICE BID VKV RWSS
ASME/ANSI B16.5 Class ASME/ANSI B16.5 Class ASME/ANSI B16.5 Class
11 Flange End IS
MODE OF MEASUREMENT AND PAYMENT
Measurement shall be paid on number basis as per relevant dia of the item in
Payment schedule of the tender.
ITEM NO. 11 Erection of Air valve with Air valve riser by installing new MS pipe of 6mm
thick or Heavy Duty GI pipe and 3.2mt length with necessary fitting such as
flange of appropriate size, nut bolts and embedded the pipe in RCC M-15 with
offset of 10cm around pipe with necessary steel etc complete.
11.1 50mm dia Temper proof Air valve
11.2 80mm dia Temper proof Air valve
1.0 SUPPLY OF MATERIAL
1.1 50 mm Dia Mild Steel pipe shall be supplied and carted by the contractor. The
rate shall include loading, unloading and stacking at site.
1.2 The mild steel pipe shall be examined before erecting for cracks and other flows.
They shall be undamaged in all respect.
1.3 The mild steel pipe shall be properly checked before erecting.
1.4 All grits and foreign materials shall be removed from the inside of MS pipe before
1.5 All the faces of pipe shall be thoroughly cleaned.
2.0 JOINTING MATERIAL
2.1 The contractor shall provide all necessary jointing materials such as nuts bolts,
rubber packing white zinc jute lead wool etc.
2.2 All tools and plant required for installation of sluice valve shall be provided by
the contractor.
2.3 All jointing materials shall be not approved from the engineer-in-charge before
2.4 The nut and bolts shall conform to Item No MSP-19 of specification of materials.
2.5 The rubber packing shall confirm all specifications as narrated in Item No MSP-20
of specifications of materials.
Specifications for Air Riser for Pipeline are as under:
The work of air valve riser shall be carried as per drawing attached. Column/
Footings for Air riser pipe shall be carried out in cement concrete M-150 using trap
Volume-III, PRICE BID VKV RWSS
metal as per instructions and workmanship of the engineering in charge. Materials
and workmanship shall be given in concrete section.” The reinforcement as per IS
Standard and specifications. The item Air Valve raising includes the cost of providing
and laying cement concrete M-150 base MS clamps, MS pipe 4.50 mt., M.S. flange,
nut, bolts, rubber packing and cement concrete column in M-150 etc. complete.
MODE OF MEASUREMENT AND PAYMENT
Measurement shall be paid on number basis as per payment schedule.
ITEM NO. 12 PVC fittings: Providing and supplying at store or site of work incl. freight,
loading, unloading, stacking, insaurance & all taxes etc. complete
12.1 P. V. C. Tail Piece with P. V. C. Flange (ISI) Heavy duty (Moulded)
b) PVC Specials
1. Specials as per site requirement shall be supplied by the contractor. The
specials should be as per standard and shall be got approved by the Engineer in
charge before being used. The specials should be perfectly in working condition and
having necessary threads holes etc. as per standard.
2. PVC specials should be as per IS standard specification and should be price
make. All the specials should be suitable for PVC pipes for which it is being used.
3. The payment shall be made on No. basis as per Payment schedule.
ITEM NO. 13 C.C M:100 for Pipe Encasing Providing C.C.M.:100 for encasing pipes
using trap metal size 12 mm to 50 mm incl. form work curing consolidation
etc. complete for various location on pipe line using trap metal 20 mm
The concrete shall be consist of one part of ordinary Portland cement
confirming to IS 269-1976 Three parts of well graded angular best quality
river sand free of dust and organic matter and size 1 mm. To 3 mm and Six
parts of approved quality black trap kapachi of size 12 mm to 25 mm. All C.C.
work shall be carried out as per I.S.S. regulations and as per standing
practice and ordered prevailing in PWD. All the items are to be carried out
as per details supplied and as required and directed by the engineer in charge
or his authorized agencies. The work will have to be strictly as per approved
design and as directed by the engineer in charge.
The course aggregate and the fine aggregate for the concrete shall be
hard,clean,tough & durable and shall e free from all deleterious matter such
as dust,lump of clay,soft & flaxy pieces, shale alkali, organic matter.
The materials shall be got approved by the Engineer-In-Charge or his agent.
The proportion of course and fine aggregate shall be that one part of cement,
three parts of fine aggregates & Six parts of course aggregates by volume. The
Volume-III, PRICE BID VKV RWSS
proportion of cement & water of the water cement ratio shall be as specified,
having regard to the nature of work & strength to be developed.
Whether the concrete is mixed by hand or in a mechanical mixture. It shall be
thoroughly mixed and the concrete placed in its final position with the
minimum of delay. Every pieces of aggregate shall be uniformly coated by
Laying & Consolidation
The concrete must be laid gently (Not dumped) from height so as not to pent
segregation of aggregates .after placing it shall be well compacted by tampl
and/or mortar to cream up. In no case ramming shall be prolonged after the
cement has begun to take its initial set. In no case, more water is added in
order to reduce the work of completion.
As soon as the concrete has set sufficiently the surface shall be protected
from rapid during by being covered with wet sand, wet gunny bags or where
possible by foaming shallow pools water on the top. The setting shall be
continued for at least 10 days & usually two to three weeks.
Water stops shall be cleaned before placing them in position. Oil or grease
shall be removed thoroughly using water and suitable detergents. Water stops
shall be procured in long lengths as manufactured to avoid joints as far as
possible. Standard L or T type of intersection pieces shall be procured for use
depending on their requirement. Any non-standard junctions shall be made by
cutting the pieces to profile for jointing. Lapping of water stops shall not be
permitted. All jointing shall be of fusion welded type as per manufacturer's
instructions. Water stops shall be placed at the correct location/level and
suitably supported at intervals with the reinforcement to ensure that it does
not deviate from its intended position during concreting and vibrating. Care
shall also be taken to ensure that no honey-combing occurs because of the
serrations/end grips, by placing concrete with smaller size aggregates in this
region. Projecting portions of the water stops embedded in concrete shall be
thoroughly cleaned of all mortar/ concrete coating before resuming further
concreting operations. The projecting water stop shall also be suitably
supported at intervals with the reinforcement to maintain its intended
position during concreting so as to ensure that it does not bend leading to
formation of pockets. In addition, smaller size aggregates shall be used for
concreting in this region also.
Volume-III, PRICE BID VKV RWSS
Mode of payment
80% payment if necessary shall be made after laying of concrete & 20%
payment shall be release after completion of curing period of exposed
The rate shall be paid per cum. of completed work as per payment schedule.
ITEM NO. 14 RCC Precast Chamber
Manufacture, supply and delivery of chemical fabricatad RCC precast
chambers with top cover as per specification and drawing attached with the
tender documents for sizes as mentioned below. The delivery of chambers
with clamps nuts, bolts and looking arrangement (without lock) is to be made
to GWSSB store or sites any where in Gujarat. The rates includes all taxes,
loading, carting, unloading, stacking including all taxes.
14.1 60 X 60 X90 cm deep (Suitable to 80 to 300mm dia pipes)
14.2 90 X 90 X 145 cm deep
be used for this work shall be confirming to specification laid down in material
Chamber shall be constructed at places approved by the Employer’s Representative.
Where valves are provided for maintenance of the pipeline.
Excavation / P.C.C.
Excavation, shoring, dewatering/ P.C.C. etc. for the pits of chambers, laying of
pipes and fittings/specials shall be done in accordance with Employer’s
Requirements described elsewhere in the document.
The bed concrete 150 mm thick for chamber shall be done in C.C. 1:4:8 as directed
by the Engineer-in-charge using trap metal of 25 mm to 40 mm.
Bricks used for construction of manholes shall conform to the relevant Indian
Standards. They shall be sound, hard, and homogeneous in texture, well burnt in
kiln without being vitrified, table molded, deep red, cherry or copper coloured, of
regular shape and size and shall have sharp and square and parallel faces. The
bricks shall be free from pores, chips, flaws or humps of any kind. Bricks containing
ungrounded particles, which absorb water more than 1/6th of their weight when
soaked in water for twenty-four hours, shall be rejected. Over burnt or under burnt
bricks shall be liable to rejection. The bricks shall give a clear ringing sound when
Volume-III, PRICE BID VKV RWSS
struck and shall have a minimum crushing strength of 50 kg/sq.cm. The class and
quality requirements of bricks shall be as laid down in IS:
The size of the brick shall be 23.0 x 11.5 x 7.5 cm. unless otherwise specified; but
tolerance up to 3 mm in each direction shall be permitted. Only full size brick shall
be used for masonry work. Brick bats shall be used only with the permission of
Employer’s Representative to make up required wall length or for bonding. Sample
bricks shall be submitted to the Employer’s Representative for approval and bricks
supplied shall conform to approved samples. If required by the Employer’s
Representative, brick sample shall be tested as per IS: 3495 by Contractor. Bricks
rejected by the Employer’s Representative shall be removed from the Site within
Mortar for masonry shall be as per IS: 2250. Chambers shall be constructed in brick
masonry with cement mortar (1:6) unless otherwise specified. Gauge boxes for sand
shall be of such dimensions that one bag containing 50 kg. of cement forms one
unit. The sand shall be free from clay, shale, loam, alkali and organic matter and
shall be of sound, hard, clean and durable particles. Sand shall be as approved by
the Employer’s Representative. If required by the Employer’s Representative sand
shall be thoroughly washed till it is free of any contamination.
For preparing cement mortar, the ingredients shall first be mixed thoroughly in dry
conditions. Water shall then be added and mixing continued to give a uniform mix
of required consistency. Cement mortar shall be used within 25 minutes of mixing.
Mortar left unused in the specified period shall be rejected.
The Contractor shall arrange for tests on mortar samples if so required by
Employer’s Representative. Re-tempering of mortar shall not be permitted.
All bricks shall be thoroughly soaked in clean water for at least one hour
immediately before being laid. The cement mortar for brick masonry work of
Chambers shall be in the proportion specified in drawing. Brick work 230 mm thick
and over shall be laid in English Bond unless otherwise specified. 115 mm thick brick
work shall be laid with stretchers. For laying bricks, a layer of mortar shall be
spread over the full width of suitable length of the lower course. Each brick shall be
Volume-III, PRICE BID VKV RWSS
pressed into the mortar and shoved into final position so as to embed the brick fully
in mortar. Bricks shall be laid with frogs uppermost.
All brickwork shall be in plumb and square/ circular unless otherwise shown on
drawing and true to dimensions shown. Vertical joints in alternate courses shall
come directly one over the other and be in line. Horizontal courses shall be leveled.
The thickness of brick courses shall be kept uniform. For walls of thickness greater
than 230 mm both faces shall be kept in vertical planes unless otherwise specified.
All interconnected brickwork shall be carried out at nearly one level so that there is
uniform distribution of pressure on the supporting structure and no portion of the
work shall be left more than one course lower than the adjacent work. Where this is
not possible, the work shall be raked back according to bond (and not saw toothed)
at an angle not exceeding 45 degrees. But in no case the level difference between
adjoining walls shall exceed 1.25 M. Workmanship shall conform to IS:
Brick shall be so laid that all joints are well filled with mortar. The thickness of
joints shall not be less than 6 mm and not more than 10 mm. The face joints shall
be raked to a minimum depth of 12 mm by raking tools daily during the progress of
work when the mortar is still green, so as to provide a proper key for the plastering
to be done. When plastering is not required to be done, the joints shall be uniform
in thickness and be struck flush and finished at the time of lying. The face of
brickwork shall be cleaned daily and all mortar droppings removed. The surface of
each course shall be thoroughly cleaned of all dirt before another course is laid on
top. If mortar in the lower courses has begun to set, the joints shall be raked out to
a depth of 12 mm before another course is laid.
All joints in masonry shall be raked to a depth of 12 mm with hooked tool made for
the purpose when the mortar is still green and in any case within 48 hours of its
laying. The surface to be rendered shall be washed with fresh clean water free from
all dirt, loose material, grease etc. and thoroughly wetted for 6 hours before
plastering work is commenced. Concrete surfaces to be rendered will however be
kept dry. The wall should not be too wet but only damp at the time of plastering.
The damping shall be uniform to get uniform bond between the plaster and the
The proportion of the cement mortar shall be as approved on relevant drawings.
Cement shall be mixed thoroughly in dry condition and then just enough water
added to obtain a workable consistency. The quality of water, sand and cement
shall be as per relevant I.S. The mortar thus mixed shall be used immediately and in
no case shall the mortar be allowed to remain for more than 25 minutes after
mixing with water.
Volume-III, PRICE BID VKV RWSS
Curing of plaster shall be started as soon as the applied plaster has hardened
enough so as not to be damaged. Curing shall be done by continuously applying
water in a fine spray and shall be carried out for at least 7 days.
Plastering shall be done on inner face of brick masonry in cement mortar (1:3) and
15 mm thick unless otherwise specified.
Cement pointing in C: M (1:3) shall be done on outside the chamber including
racking out joints, curing etc. complete as directed by the engineer-in-charge.
Cement Concrete Block
The C.C. blocks for the chamber shall be constructed in cement concrete of M15
grade to take care of weight of valves.
Pipe Entering or Leaving Chamber
Whenever a pipe enters or leaves a chamber, bricks on edge must be cut to a
proper form and laid around the upper end of the pipe so as to form an arch. All
around the pipes, there shall be a joint of cement mortar (1:2) 13 mm thick
between it and the bricks.
Precast Reinforced Cement Concrete Slab with key holes
Precast Reinforced cement concrete top slab shall be casted in pieces for covering
the chamber. Necessary keyholes shall be provided at appropriate place for
operation of spindle of valve. The minimum thickness of slab shall be 100mm and
same shall be casted in C.C. of M20 grade. The required reinforcement shall be
provided. The top & bottom surface of precast slab shall be finished with cement
Measurement and Payment
Measurement shall be paid on number basis as per payment schedule.
Extra depth of valve chamber. beyond 1.00 mt. depth.
The work shall be measured and paid for additional meter depth of chamber beyond
1.0 m depth. The work in general shall be carried out as per instructions & approval
of engineer in charge.
Volume-III, PRICE BID VKV RWSS
ITEM NO. 15 Refiling the pipe line trenches incl. ramming watering, consolidating,
disposal of surplus stuff as directed with in a radious of 3.00kms
On completion of the pipe laying operations in any section, for a length of about
100m and while further work is still in progress, refilling of trenches shall be
started by the Contractor with a view of restricting the length of open trenches.
Pipe laying shall closely follow the progress of Trench Excavation and the
Contractor shall not permit unreasonably excessive lengths of trench excavation
to remain open while awaiting testing of the pipeline. If the Engineer considers
that the Contractor is not complying with any of the foregoing requirements, he
may prohibit further trench excavation until he is satisfied with the progress of
laying and testing of pipes and refilling of trenches. The excavated material
nearest to the trench shall be used filling. Care shall be taken during backfilling,
not to injure or disturb the pipes, joints or coating. Filling shall be carried out
simultaneously on both sides of the pipes so that unequal pressure does not
occur. Walking or working on the completed pipeline unless the trench has been
filled to height of at least 30cm over the top of the pipe except as may be
necessary for tamping etc., during backfilling work.
The remaining portion of the trench may be filled in with a mixture of hard and
soft material free from boulders and clods of earth larger than 150mm in size if
sufficient quantity of good earth and murrum are not available. The trench shall
be refilled so as to build up to the original ground level, keeping due allowance
for subsequent settlement likely to take place. The top 300mm layer or fertile
agricultural soil shall be kept aside during excavation and shall be laid in layers
near ground level during refilling.
To prevent buckling of pipe shell of diameters 1200mm and above, pipes shall be
strutted from inside while the work of refilling is in progress, for which no
separate payment shall be made.
Strutting shall be done by means of strong spiders having at least 6 arms which
shall be sufficiently stiff to resist all deformation. Spiders shall be provided at a
maximum interval of 2m & shall be welded in such a way that internal coating
does not get burnt.
The Engineer shall, at all times, have powers to decide which portion of the
excavated materials shall be for filling and in which portion of the site and in
what manner it shall be so used.
If any material remains as surplus it shall be disposed of as directed by the
Engineer, which includes loading, unloading, transporting and spreading as
directed within all lead. If the Contractor fails to remove the earth from site
within 7 days after the period specified in a written notice, the Engineer may
arrange to carry out such work at the Contractor's risk and cost or may impose
Volume-III, PRICE BID VKV RWSS
such fine for such omission as he may deem fit. Particular care shall be taken to
keep the trench dry during the entire refilling operation.
If suitable material for refilling is not available for excavation the Contractor
shall bring earth, murrum of approved quality as directed by the Engineer.
No mechanical plant other than approved compacting equipment shall run over or
operate within the trench until backfilling has reached its final level or the
approval of the Engineer has been obtained.
Subsidence in filling in : Should any subsidence take place either in the filling of
the trenches or near about it during the maintenance period of 24 months from
the completion of the Contract Works, the Contractor shall make good the same
at his own cost or the Engineer may without notice to the Contractor, make good
the same in any way and with any material that he may think proper, at the
expense of the Contractor. The Engineer may also, if he anticipates occurrence
of any subsidence, employ persons to give him timely notice of the necessity of
making good the same, and the expenses on this account shall be charged to the
Payment shall be as per payment schedule
The payment shall be made on Cum. basis.
Deputy Executive Engineer
Signature of contractor Public Health Sanitary Sub division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Circular 1_3-A Certificat Paripatra.pdf.pdf
pdf • 1.11 MB
Circular 1_Badhakam Shramyogi.PDF
pdf • 0.74 MB
Circular 1_DMO_2631_21-Apr-2023_872.pdf
pdf • 0.24 MB
Circular 1_Insaurance1.jpg
jpg • 1.82 MB
Circular 1_Insaurance2.jpg
jpg • 1.98 MB
Circular 1_Labour Fee Circular.pdf
pdf • 0.09 MB
Circular 1_Mat.Test.GR.pdf
pdf • 0.13 MB
Circular 1_SIGN BOARD.pdf
pdf • 0.30 MB
Circular 1_SPECIAL CLAUSE.pdf
pdf • 0.67 MB
Circular 2_DTP circular p-1.pdf
pdf • 2.15 MB
Circular 2_DTP circular p-2.pdf 2.pdf
pdf • 1.41 MB
Circular 2_DTP circularp-3.pdf
pdf • 1.39 MB
Circular 2_DTP circularp-4.pdf
pdf • 2.43 MB
Circular 3_DTP circular p-5.pdf
pdf • 2.82 MB
Circular 3_DTP circular p-6.pdf
pdf • 2.23 MB
Circular 3_DTP circular p-7.pdf
pdf • 2.55 MB
gst latest.pdf
vijapur vol 1 tech bid.pdf
Vol-II GCC.pdf
Vol-III Pricebid.pdf
DMO_2941_01-Apr-2026_744.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .