| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 LAccepted-AOC PUTHIYAVILA PUTHEN VEEDU MATHURAPPA THADICADU PO | L1 | Accepted-AOC L1 | |
| 2 | L2₹37.8 L+₹1.4 L (3.82%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MANI J, CONTRACTOR L1 | PREM SINGH L2 |
|---|---|---|---|---|---|
| 1.00Appendix-A: Building Proper | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 24 | cum | 240.7 ₹5,776.8 Lowest | 249.9 ₹5,997.6 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 98.21 | cum | 336.09 ₹33,006.05 Lowest | 348.93 ₹34,267.02 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 22.48 | cum | 122.41 ₹2,751.78 Lowest | 127.09 ₹2,856.98 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 11.35 | cum | 7,411.7 ₹84,085.74 Lowest | 7,694.9 ₹87,298.64 |
| 1.00 | OD129404/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Cement content 340kg/m3. Excess/less cost of cement as per mix design is not payable or not recoverable. All works up to Plinth level | 34.98 | cum | 10,257.06 ₹3,58,750.93 Lowest | 10,648.99 ₹3,72,459.07 |
| 1.01 | OD129406/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Cement content 340kg/m3. Excess/less cost of cement as per mix design is not payable or not recoverable. All works above Plinth level upto floor V level | 30.81 | cum | 12,157.9 ₹3,74,621.37 Lowest | 12,622.45 ₹3,88,935.55 |
| 1.01 | 4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 1.89 | cum | 10,361.19 ₹19,582.65 Lowest | 10,757.1 ₹20,330.92 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3,523.53 | kilogram | 105.04 ₹3,70,111.59 Lowest | 109.06 ₹3,84,276.18 |
| 1.01 | OD283571/2025-2026:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and
packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per
direction of Departmental officers at site ( as per CTE approved OD) | 7.88 | cum | 3,731.09 ₹29,393.53 Lowest | 3,873.66 ₹30,516.69 |
Tender Value
₹39.0 L
EMD Value
₹50,000
Closing Date
26 Feb 2026, 3:00 pmClosed
Executive Engineer
O/o Office of the Executive Engineer Buildings Division Kollam
GENERAL BW 25 26 Construction of a New Building Sub centre for PHC at Perumannoor New Building Sub centre for PHC at Perumannoor General Civil Work
2026_PWD_831031_2
PWD/BLDG/TR/15809/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
540 days
Perumannoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
26 May 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix-A: Building Proper | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.4 | cum | - | - |
| 1.003 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | - | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | OD129404/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Cement content 340kg/m3. Excess/less cost of cement as per mix design is not payable or not recoverable. All works up to Plinth level | 1 | cum | - | - |
| 1.006 | OD129406/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Cement content 340kg/m3. Excess/less cost of cement as per mix design is not payable or not recoverable. All works above Plinth level upto floor V level | 1 | cum | - | - |
| 1.007 | 4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.009 | OD283571/2025-2026:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and
packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per
direction of Departmental officers at site ( as per CTE approved OD) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1411845.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBDPERUMANOOR.pdf
Tender Documents • 1.64 MB
NITPERUMANOOR.pdf
Other Document • 0.03 MB
BOQ_1411845.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .