Loading…
Loading…
Tender Value
₹73.7 L
EMD Value
₹73,700
Closing Date
24 Aug 2026, 6:00 pmClosed
dy.commissioner
Supply, Erection, Testing and Commissioning of Street light system on Internal roads of Glorina Valley Society in Moje-Kanakpur Kansad at South Zone-B (Kanakpur),Surat Municipal Corporation.
333851
DMC/SZ-B/05/2026-2027, Work No : 01
Open
Street Lighting
Works
Surat
3 documents required · 3 mandatory
₹2,832
Commissioner, Surat Municipal Corporation
₹73,700
11 Aug 2026
11 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
NAME OF WORK : Supply, Erection, Testing and Commissioning of Street light
system on Internal roads of Glorina Valley Society in Moje-
Kanakpur Kansad @ South Zone-B (Kanakpur),Surat Municipal
TENDER DOCUMENTS
Publishing Authority: Surat Municipal Corporation
Inviting Authority: Deputy Municipal Commissioner (South Zone-B)
Head of the Department: Executive Engineer (South Zone-B)
South Zone-B (Kanakpur), Beside, Swaminarayan Tample, Gujarat
Concerned Office:
Housing board, C.O.P No.5, Kanakpuar, Surat.
E-mail: [email protected]
Bid Type: E-tender
Website: https://smctender.nprocure.com
Surat Municipal Corporation |South Zone-B| Page 1 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Abbreviation used in this document:
DMC : Deputy Municipal Commissioner
SZ-B : South Zone-B
Ele : Electrical
Mech : Mechanical
SMC : Surat Municipal Corporation
EMD : Earnest Money Deposit
SD : Security Deposit
RMD : Retention Money deposit
LED : Light Emitting Diode
BRTS : Bus Rapid Transport System
O&M : Operation and Maintenance
pdf : Portable Document Format
I/C. : In-Charge
DD : Demand Draft
RPAD : Registered Post with Acknowledge Due
P.F. : Provident Fund
GST : Goods And Service Tax
TP : Town Planning
MR : Market Rate
CMS : Complaint Management System
CCMS : Centralised Control and Monitoring System
G.I. : Galvanised Iron
MCB : Miniature Circuit Breaker
RCCB : Residual Current Circuit Breaker
SP : Single pole
DP : Double Pole
TP : Triple Pole
TPN : Three Pole with Neutral
DIN : Deutsche Institut für Normung, which translates into English as 'German Institute of
GIS : Geographical Information System
Surat Municipal Corporation |South Zone-B| Page 2 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
MIS : Management Information System
EESL : Energy Efficiency Services Limited
ERDA : Electrical Research and Development Association
DWC : Double Wall Corrugated
N.B. : Nominal Bore
SFU : Switch Fuse Unit
XLPE : Cross linked polyethylene
PVC : Polyvinyl Chloride
ID : Internal Diameter
OD : Outer Diameter
sq mm : Square Millimetre
F.L. : Flood Light
RGB : Red Green Blue
Surat Municipal Corporation |South Zone-B| Page 3 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
SR. NO. DESCRIPTION
(1) DETAILED TENDER NOTICE PUBLISHED ON NEWS PAPER/ SMC’S WEBSITE 05-08
VOLUME – I (09-39)
(2) QUALIFICATION CRITERIA 10-13
(3) BRIEF DETAILS REGARDING THE WORK 14-15
(4) CONTRACTOR’S / BIDDER’S AFFIDAVIT CUM UNDERTAKING / CERTIFICATE 16-18
(5) MANUFACTURER’S / BIDDER’S AFFIDAVIT CUM UNDERTAKING 19-20
(6) CHARTERED ACCOUNTANT'S CERTIFICATE
(7) SPECIAL TERMS AND CONDITIONS
(8) ANNEXURE –I TO VI 23-30
(9) TECHNICAL / SERVICE PROFILE PERTAINING TO TENDERER 31-33
(10) THE MODE OF DOCUMENT SUBMISSION CUM CHECK LIST 34-35
(11) IMPORTANT DATE
THE VITAL COMMON INFORMATION REGARDING THE TENDER
VOLUME – II (40-92)
(13) BRIEF DETAILS ABOUT THE CONTRACT / WORK : 41-43
(14) ABOUT THE TENDERING PROCESS 44-50
(15) GENERAL TERMS & CONDITIONS OF THE CONTRACT 51-74
(16) CONDITIONS ABOUT THE EXECUTION OF WORK 75-82
(17) CONDITIONS ABOUT TESTING & INSPECTION 83-86
CONDITIONS REGARDING GUARANTEE/ WARRANTY, SECURITY DEPOSIT/
PERFORMANCE GUARANTEE
(19) PAYMENT & PENALTY TERMS & CONDITIONS 88-92
VOLUME – III (93-122)
(20) DETAILED TECHNICAL SPECIFICATIONS 94-120
(21) GENERAL SPECIFICATION FOR ELECTRICAL INSTALLATION
(22) VENDOR LIST
Total Nos. of Pages:
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 4 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
TENDER NOTICE (PUBLISHED IN THE NEWSPAPER)
Surat Municipal Corporation |South Zone-B| Page 5 of
Tender Notice # DMC/SZ-B/05/2026-2027,
2027, Work No :
SURAT MUNICIPAL CORPORATION
SOUTH ZONE-B (KANAKPUR)
e- Tender (Online) invitation Notice No. DMC/SZ
DMC/SZ-B/05/2026-27
Tender for the work mentioned are invited online on
onhttps://smctender.nprocure.comfrom
from Government approved
contractor with Following Schedule.
Name of Work 1.Estimated Amount
Sr. 2.Earnest Money Deposit
No 3.Document fee + 18% G.S.T.
4.Registration Class
1. SETC of Street Light system on internal roads of Glorina Valley Society in 1.Rs.
Kanakpur Kansad in South Zone -B(Kanakpur) Surat. 2.Rs.
4. " Experienced "
2. Supply,Installation,Testing and Commissioning of 8/10 Passanger Lift(Ground 1.Rs.
Plus 2 Upper Floor) for Health Center at mojeGabheni 2.Rs.
R.S.No.218/paikee(Amenities space) in South Zone -B(Kanakpur) Surat. 3.Rs.
4. " Experienced "
3. Providing and Making Furniture for Health Center Building at mojeGabheni 1.Rs.
R.S.No.218 in South Zone -B(Kanakpur)
B(Kanakpur) Surat. 2.Rs.
4. Providing and laying 250m Dia R.C.C NP
NP-3 class pipe line with simple chamber 1.Rs.
on internal road of Haridarshan Nagar Society(Moje
Society(Moje-Gabheni)R.S.No. 224/1, 2.Rs.
Block No.228 and 230 in South Zone-B
Zone (Kanakpur) Surat. 3.Rs.
5. Repairing and Maintainance work of Footpath of newly added area in 1.Rs.
D.T.P.S.34 (Pali-Sachin-Kansad),
Kansad), D.T.P.S.33 (Tanlangpor
(Tanlangpor-Umber), Kanakpur, 2.Rs.
kansad of South zone-BB (Kanakpur) Surat. (2nd Attempt) 3.Rs.
6. Repairing and Maintainance work of Footpath in D.T.P.S -59(Unn), D.T.P.S- 1.Rs.
67(Jiav-Sonari-Gabheni)
Gabheni) MojeGabheni, Dipli, Sonari, Jiav of South Zone - 2.Rs.
B(Kanakpur) Surat. (2nd Attempt) 3.Rs.
Surat Municipal Corporation |South
Zone-B| Page 6 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
1. No. of Tenders
2. Total Estimated cost of Tender Rs. 251.28Lacs
3. Up Loading of / Tender Document Dt- 10/08/2026
4. Downloading of Tender Documents From Dt.- 10/08/2026 to 24/08/2026 17.00 hours
5. Pre-Bid Meeting to bidder. Bidders shall have to post their queries on E-Mail address
(for the Tender work No. 1 and 5) exen.szb @ suratmunicipal.org on or before Dt.17/08/2026
6. Online submission (Last Date)
Tender Fee / EMD and other UptoDt. 24/08/2026, 18.00 hours
Documents in Soft Copy.
7. Opening of Online Technical Bid etc. On Dt. 25/08/2026 11.00 hrs. (Probable date)
8. Submission of Tender Fee, EMD, UptoDt. 31/08/2026 to Chief Accountant,Surat Municipal
( Only Banker Cheque / D. D. ) andAffidavitin Corporation, TapiBhavan,Tapipura, Surat by R. P. A. D. / Speed
Hard Copy. Post up to 18.00 hours.
9. Opening of Tender Fee, EMD & Other On Dt. 02/09/2026 (Probable date)
Documents etc. in Hard Copy.
10. Opening of Price Bid After Scrutiny of Technical Bid.
Demand Draft for E. M. D. &Tender Fee Shall be submitted in electronic format only through online (by
Scanning) while uploading the bid. This submission shall meanthatE.M.D. & Tender Fee are received for purpose
of Opening the Bid. Accordingly offer of hose shall be opened whose E.M.D. & Tender Fee is received
Electronically. However for the purpose of realization of D.D.Bidder shall send the D.D. in original through
R.P.A.D./Speed Post so as per Clause as reach to Account Department (Main Office) within 7 days from the
last date of Online Submission of the Bid as per Tender Notice.
Penaltative action will be taken for not submitting D.D.in Original in the Account Department of suratmunicpal
corporation within 7 days from the last date of the online submission of the bidfor the first time as
mention below .
Sr. No. Tender Amount Penalty Amount in Rs.
1. Up to 1 Crore Rs.10,000/-
2. More thenRs. 1 Crore and UptoRs. 10 Crore Rs.20,000/-
3. More thenRs. 10 Crore and UptoRs. 50 Crore Rs.30,000/-
4. More thenRs. 50 Crore and UptoRs. 100 Crore Rs.70,000/-
5. More thenRs. 100 Crore Rs.1,00,000/-
If bidder will not submit the penalty amount within 10 days to surat municipal corporation and/or bidder will
not submit the demand draft in orignal for the second time and after,Penaltativeaction shall be taken for
abeyance of registration and cancellation of E-tendering code for 6(six) months.
All documents must be coloured scanned to be seen as original. Scanning in black and white or gray shall not be
All the Documents must be notarized with clearly displaying stamp, number and name of the notary.
G.S.T. Registration No.
Surat Municipal Corporation |South Zone-B| Page 7 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
GST CLAUSE FOR CONSTRUCTION/ERECTION/COMMISSONING/ INSTALLATIN/ REPAIRS/ MAINTENANCE / RENOVATION
/ FABRICATION OF STRUCTURE INCLUDING BUILDING (MEANS ALL WORKS CONTRACT / TURN KEY PROJECTS/ SUPPLY
OF MATERIAL / GOODS )
GST (Goods & Service Tax) has come in Existence from 1st July, 2017. Contractor/Successful Bidder is bound to pay any
amount of GST prescribed by the Govt.of India as per the Terms of Contract agreed upon during the course of execution of
this contract. During the course of execution of Contract, if there is any change in rate of GST (Goods & Service Tax) by the
Government, the same shall be reimbursed/recovered separately by SMC. subject to the submission of original
receipt/proof for the amounts actually remitted by the Successful Tenderer / Contractor to the Competent Authority
along with a certificate from chartered Accountant of Contractor/Successful Bidder certifying that the amount of GST
paid to the Government and the same shall be intimated/submitted/claimed within 30 (Thirty) Days form the date of
payment.Remittance of GST within stipulated period shall be the sole responsibility of the Successful Bidder/Contractor,
failing which, SMC may recover the amount due, from any other payable dues with SMC and decision of Municipal
Commissioner shall be final and binding on the Contractor/Successful Bidder in this regard. Further, the non-payment of
GST to the- Government may lead to the termination of contract and forfeiture of Security Deposit/ Performance
Guarantee Amount If imposition of any other new taxes/Duties/Levies/Cess or any other incidentals etc. or any increase in
the existing taxes/Duties/Levies/Cess or any other incidentals etc. (Excluding GST) are imposed during the course of the
contract, the same shall be borne by the contractor/successful Bidder only, in no case SMC shall be liable for the same.
Following Documents shall only be submitted in HARD COPY to The Chief Accountant, Surat Municipal
Corporation, Muglisara, Surat by all bidders."
Earnest Money Deposit as mentioned in the tender.(i.e.D.D./Bankers Cheque, Bank Guarantee)
Tender Fees as mentioned in the tender
Affidavit on Non Judicial Stamp Paper of Rs.300/-[ IF APPLICABLE]
Tender documents are available on https//smc.nprocure.com
Bidders have to submit price bid in Electronic format only on https://smctender.nprocure.com
website till the last date & time for submission.
Price Bid in Physical form shall not be accepted in any case.
Submission of EMD, Tender Fee, Addenda Corrigendum (If any) duly signed by contractor as mentioned in
technical bid etc. in hard copy to above mentioned addressed by R.P.A.D. /Speed Post only S.M.C. shall not be
responsible for any postal delay.
The Bidder must have been mention Party Name, SMC Party Code (If you have), Mobile Number, GST Number
beside of Demand Draft/ Banker Cheque/ Pay Order & Correspondence address on Tender Cover (HARD COPY).
The Surat Municipal Corporation reserves the right to accept or reject any or all the tender to
be received without assigning any reasons thereof.
• In case bidder needs any clarification or if training required for participating in online tender, they can
contact the following office :-
“(n) Code Solution-A division GNFC LTD.”
403, GNFC Info tower, Bodakdev, Ahmedabad-
380054, Gujarat ((India)
E_Mail: [email protected] Web-site:www.nprocure.com
Tender for the work mentioned are invited online on https://smctender.nprocure.com from Government
approved contractor with Following Schedule.
Deputy Municipal Commissioner
South Zone-B (Kanakpur)
Surat Municipal Corporation
Surat Municipal Corporation |South Zone-B| Page 8 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
QUALIFICATION BID
Surat Municipal Corporation |South Zone-B| Page 9 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Attention Please
BIDDERS ARE REQUESTED TO PROVIDE ALL INFORMATION/DETAILS/EMD ETC AS ASKED IN THE TENDER.
ANY DEVIATION WHETHER IN TECHNICAL OR COMMERCIAL SHALL NOT BE ENTERTAINED, AND NO CHANCE
SHALL BE GIVEN FOR ANY TECHNICAL OR COMMERCIAL CLARIFICATIONS. TENDERS SHALL BE OUT
RIGHTLY REJECTED IN SUCH CASES.
THEREFORE, BIDDERS ARE REQUESTED TO BE VIGIL WHILE PARTICIPATING ELECTRONICALLY/ UPLOADING
TENDER. NO DISPUTE SHALL BE ENTERTAINED ON LATER DATE.
I / WE AFFIRM THAT ALL REQUIRED DOCUMENTS, CERTIFICATES, DATA / INFORMATION, EMD ETC. AS
ASKED IN THE TENDER HAVE BEEN FURNISHED AND / OR ELECTRONICALLY UPLOADED / ATTACHED. I / WE
UNDERSTAND THAT MY / OUR TENDER SHALL BE OUT RIGHTLY REJECTED, IF THOSE CONDITIONS AREN’T
ALL THE TECHNICAL SPECIFICATIONS, TERMS, CONDITIONS INCLUDING ADDENDA CORRIGENDUM IS
THOROUGHLY GONE THROUGH BY ME / US. I / WE CONFIRM THAT BID(S) SUBMITTED ARE EXACTLY IN LINE
WITH THE SPECIFICATIONS, TERMS & CONDITIONS STIPULATED IN THE TECHNICAL BID ALONG WITH THE
ADDENDA CORRIGENDUM.
I / WE UNDERSTAND THAT ANY DEVIATION, IF MENTIONED BY ME / US IN SPITE OF ABOVE WILL CAUSE
REJECTION OF MY / OUR TENDER ALTOGETHER AND, AS SUCH PRICE BID WILL NOT BE OPENED.
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 10 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
QUALIFICATION CRITERIA
The qualification process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule. The following criteria along with other conditions/ criteria shall
be applicable to Bidder.
[01] Bidder must possess valid electrical contractor's license issued by concerned department
of state government of Gujarat.
[02] Average annual financial turnover of bidder during the last 3 years, ending 31st March of
the previous financial year should be at least 30% of total estimated cost. C.A.'s
certificate must be furnished for the same.
[03] Experience of having successfully completed “similar works” (defined below) during
last 7 years ending last day of month before the one in which tenders are invited
should be either of the followings:
Work Completion Certificate(s) [Containing the details like (i) name of Min. Nos. of
work, sanctioning/ work order/ agreement details, sanctioning WCC
amount, work done amount, work completion date, certificate issue [Work(s)
details (reference no. of issuing department/ authority, date etc.) will Completed
80% of Total Estimated Cost
50% of Total Estimated Cost
40% of Total Estimated Cost
The word “similar work” signifies SITC of outdoor Streetlight system, comprising of
major components as per bill of materials (e.g. pole, luminaire, cable, CCMS / feeder
pillar etc.) The work completion within last 07 years, ending last day of month
previous to the one in which tenders are invited shall only be considered.
In case if work is combined with other work(s), documents should prove that amount
of items / work completed for streetlight equipment / components only and amount
must be as per the min. requirement(s) mentioned in the technical-bid. All necessary
documents, including work completion certificate, work order, relevant price-bid,
technical-bid documents etc. from the authority who has placed the work order. In
absence of all required documents, such works aren’t considered for technical-bid
Experience of the work completed for government / semi-government organisations /
urban local authorities, PSUs / govt. companies only. Work completed for any private
company or property shall not be considered.
Surat Municipal Corporation |South Zone-B| Page 11 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Appropriate evidence(s) like work completion certificate(s) (Form-3A) must be
[04] Following enhancement factors will be used for the cost of works executed and financial figures to
common base for the value of the works completed in India: -
Year Multiplying Factor
One 2025-26 1.10 The year ONE will be considered as the year ending 31st
March of the previous financial year for which tender is
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 12 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Work Completion Certificates / Documents:
Bidder has to fill up following tables consciously and, duly sealed and signed, submit in hard copy within
stipulated time mentioned elsewhere in bid.
I / We are providing following information in order to my/our eligibility for the tender under
consideration (Tender ID No._____________.
BIDDERS ARE ADVISED TO SUBMIT ONLY RELEVANT INFORMATION AND ITS SUPPORTIVE DOCUMENT(S)-
COPY OF 3-A FORMS (WORK COMPLETION CERTIFICATES).
For ONE work according to 80.00% of estimated cost;
Sr. Name of work Actual date of Total Amount of Effective/Consider
Sr. Name of work Actual date of Total Amount of Effective/Consider
No. work Completion Work Done, Rs.( able Amount, Rs.
For TWO work(s) according to 50.00% of estimated cost;
Sr. Name of work Actual date of Total Amount of Effective/Consider
Sr. Name of work Actual date of Total Amount of Effective/Consider
No. work Completion Work Done, Rs.( able Amount, Rs.
For THREE work(s) according to 40.00% of estimated cost;
Sr. Name of work Actual date of Total Amount of Effective/Consider
Sr. Name of work Actual date of Total Amount of Effective/Consider
No. work Completion Work Done, Rs.( able Amount, Rs.
Note: PLEASE CLEARLY NOTE THAT filling of above details is must (along with submission of
required certificates / documents) otherwise, offer of such bidder shall be rejected and
price-bid will not be opened.
SEAL & SIGNATURE OF THE TENDERER:
Surat Municipal Corporation |South Zone-B| Page 13 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
BRIEF DETAILS REGARDING THE WORK: -
Work is to be carried out for Supply, Erection, Testing and Commissioning of Street light system
on Internal roads of Glorina Valley Society in Moje-Kanakpur Kansad @ South Zone-B
(Kanakpur), Surat Municipal Corporation within city limits. It includes installation of GI
Pipe/Octagonal poles & streetlight LED luminaires, 6 kW capacity CCMS and other allied
components / accessories of the streetlight system.
[B] BRIEF- IMPORTANT TECHNICAL DETAILS OF THE WORK:-
Sr. Item Description(s)
(1) Street Light StreetLight Pole Height : 6.0 m
Pole and Material : As per specification.
Bracket Pole Type : GI Pipe/ Octagonal with base plate.
Base plate/J-bolt : To be got approved prior to supply.
Bidder has to confirm at his own prior the order
placement to manufacturer.
Bracket fitment : Brackets to be fixed with bolts
Testing of pole and bracket : At Manufacturer's works only.
(2) LED Luminaires IES file is mandatory. : Must be provided for all luminaires within
days from the date of work order.
Rated I/P (max.) : 15 W (Outdoor Streetlight)
Luminaires Type : LED, Outdoor application.
Ingress Protection for : As per IEC
entire LED Luminaries IP 66 (for cap. > 65 W) | IP 65 (for cap. <=65 W)
LED Driver : Luminaires’ driver shall be appropriately
sealed/ potted.
Min. life of LED driver must be
Luminaires Testing : REVERSE TESTING AT MANUFACTURER'S WORKS.
After placement of order, bidder will supply all
luminaires as per tender. From the received
lot(s), sample(s) will be collected and send back
to the manufacturer’s works and testing will be
done at manufacturer's works. If, result(s) aren’t
as per requirements, entire lot may be rejected
or penalty will be imposed as mentioned
elsewhere in tender or, the action(s) as per the
decision of the competent authority.
BIS approval for LED : LED luminaires/ family of LED luminaire models
Luminaire(s) must be approved by Bureau of Indian Standard
Surat Municipal Corporation |South Zone-B| Page 14 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
BIS approval for LED : BIS approval is must along with R-number
Driver(s) allotted by BIS.
(3) Cables / Wires Size : [1] 4 X 6/10 mm2 aluminium conductor XLPE
armoured cable for pole to pole & also CCMS to
[2] 3 X 1.5 mm unarmoured flexible copper wire
/ cable for Luminaires supply.
(4) Terminations Glands : All cable glands shall be single compression made
from appropriate steel material suitable for such
application(s).
Lugs : Crimping type bimetallic lugs / sockets.
(5) Junction box Integral part of streetlight : There shall be provision for fitment of 3 Nos. of
for GI pole. Cable Glands, MCB, terminal / connector strip(s)
Octagonal and, earthing wire / strip for luminaire(s). Having
poles Allen key type locking arrangement WITH NON
DETACHABLE / REMOVABLE BOLT.
(6) DWC Pipe Size : ID- 38 & 50 mm.
(7) G.I. Pipe Size : N.B.: 40 & 50 mm.
(8) CCMS ---- : 6 kW (Current carrying capacity of power
cabling/ wiring/ switch gear must be 40 A (min.)
per phase), 3-Phase, 415 V AC, 50 Hz system.
(9) Pole As per respective Zone : Good quality Radium Sticker/Paint. Number /
Numbering & Colour Code System. series will be finalized in consultation of
colour code Engineer-in-charge.
SPECIFIC DATA SHEET OF LED LUMINAIRES: -
Sr. No. Parameter Outdoor Streetlight/Floodlight Luminaires
(1) Max. I/P power of LED luminaires 15 W
(2) Min. Initial Lumen 1,500 lm
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 15 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
AFFIDAVIT CUM UNDERTAKING CUM DECLARATION BY THE BIDDER REGARDING THE WORK OF
(To be furnished on Non-judicial stamp paper (Rs. 300.00) duly signed by authorized notary)
Name of Work: - (to be mentioned by the bidder as per detailed tender notice).
[01] I / We, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
[02] The undersigned also hereby certifies that neither our firm
__________________________________________ nor any of its constituent partners have
abandoned any work in India nor any contract awarded to us for such works have been
rescinded, during last five years prior to the date of this application.
[03] The undersigned hereby authorize(s) and request(s) any bank, person, firm or corporation to
furnish pertinent information deemed necessary and requested by the Department to verify this
statement or regarding my (our) competence and general reputation.
[04] The undersigned understands and agrees that further qualifying information may be requested,
and agrees to furnish any such information at the request of the department.
[05] I / We, ______________________________________ solemnly affirm and state on oath that
____________________________________ (Name of Tenderer) has not been black listed by any
Government / Semi Government / Public Sector Undertaking / Public limited and not have been
banned / suspended business dealings with the said firm. The information given above is true to
the best of my knowledge.
I / We agree that if this information found to be false / wrongful at any stage then, my / our bid /
tender / Contract shall be liable to be rejected / terminated.
[06] Further, at present I / We am / are the partners of this firm, hereby give an undertaking that, we
are jointly and severally responsible to meet all the liabilities over and above the business of this
firm and make good the above financial loss sustained by the Surat Municipal Corporation as a
result of our abandoning the works entrusted to us i.e. this firm:
Surat Municipal Corporation |South Zone-B| Page 16 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
[07] For this tender, I / We will supply _______________ make LED luminaire (Offer for min. One
make Only, otherwise, offer shall be rejected and price-bid will not be opened.), and, for that,
I / We have submitted authorization letter and service back up after installation.
[08] For this tender, I / We will supply ________________ make CCMS (Offer for min. One make
Only, otherwise, offer shall be rejected and price-bid will not be opened.), and, for that I / We
have submitted authorization letter and service back up after installation.
[09] I/ We confirm that, in case of discontinuation of product of LED/ CCMS during any stage of
contract period, we accept that my/ our firm will accept the decision of competent authority of
[010] In order of token of bid submission, I / We am / are submitting tender fees of Rs.________ (in
words, Rs._________________________________________, drawn on (bank name)
No._____________, issued on ___________ and, tender guarantee (E.M.D.) of Rs.________(in
Branch ________________vide pay order / DD No._____________, issued on __________.
I / we hereby declare that I / We have gone through the technical bid document, have examined
closely all the specifications / terms & conditions described in the bid document & addenda
corrigendum(s) [if any].
I / We hereby agree to be bound by and, comply with all such specifications / terms, conditions
I / We also confirm that my / our offer is strictly in line with the tender specifications,
stipulations, terms and conditions etc. and understand that in the event of any deviations,
technical or commercial, my / our price bid will not be opened.
I / We have clearly understood the tender specification(s) / term(s) / condition(s) / all content of
tender and particularly, intent behind the content and bind my / ourselves for larger intent of
the tender & content as well.
Surat Municipal Corporation |South Zone-B| Page 17 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
If any items / conditions / specifications / scope of work is mentioned differently at more than
one place(s) by chance, most appropriate as decided by the department (Surat municipal
Corporation) will apply & binding to me/us.
I / We clearly understand that all documents/ details/ certificates as asked/ requested along
with the bid must be submitted in soft copy/ hard copy as mentioned in the tender & submission
of such documents etc. after expiry of technical-bid submission date shall not be accepted and,
offer of all such bidders shall be rejected out-rightly.
I / We also clearly understand that dispute(s) created at later date wouldn’t be entertained &
Surat Municipal Corporation can treat them as fraudulent practice(s) and action(s) as deemed fit
can be initiated against me / us and I / We have quoted my / our offer and submitted documents
/ certificates accordingly.
I / We have gone through the fact(s) as above and, have clear understanding regarding the Detail
Technical Specification as described.
I / We also confirm that I / We have quoted my / our offer (tender) after close examination of all
certificate(s) / document(s) to be submitted either in hard copy or online and submitted
accordingly. I / We are clearly aware that in event of fraudulent practice(s) found in any of such
certificate / document, action(s) to be taken against me as per tender terms & conditions for
such fraudulent practice(s) will be binding & acceptable to me / us.
Signed by an Authorized Officer of the Firm
Title of Officer
Surat Municipal Corporation |South Zone-B| Page 18 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
AFFIDAVIT CUM UNDERTAKING CUM DECLARATION BY LED MANUFACTURER REGARDING
THE WORK OF TENDER ID NUMBER: ____________.
(To be furnished on Non-judicial stamp paper (Rs. 300.00) duly signed by authorized notary)
Name of Work: - (to be mentioned by the bidder as per detailed tender notice).
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and
I/ We understand that I/ We have offered the LED luminaries for longer time of use. Our products will
remain available for use during the contract period. Further in case of LED luminaries we confirm that our
product will not face the colour shift issue for seven years after the commissioning.
I/ We confirm/abide that in case of colour shift appears in LED luminaries we will repair/replace the
luminaries during seven year from the commissioning.
I/ We confirm that in case of discontinuation of product of LED for the period of seven years, we accept
that my/ our firm can be debarred for one year from the date of order (Debarred).
Seal and Signed by the authorised signatory of the firm
Title of the office
Name of the firm
Surat Municipal Corporation |South Zone-B| Page 19 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
AFFIDAVIT CUM UNDERTAKING CUM DECLARATION BY CCMS MANUFACTURER
REGARDING THE WORK OF TENDER ID NUMBER: ____________.
(To be furnished on Non-judicial stamp paper (Rs. 300.00) duly signed by authorized notary)
Name of Work: - (to be mentioned by the bidder as per detailed tender notice).
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and
I/ We understand that I/ We have offered the CCMS for longer time of use. Our products will remain
available for use during the contract period.
I/ We confirm that in case of discontinuation of product of CCMS for the period of seven years, we accept
that my/ our firm can be debarred for one year from the date of order (Debarred).
Seal and Signed by the authorised signatory of the firm
Title of the office
Name of the firm
Surat Municipal Corporation |South Zone-B| Page 20 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
(To be furnished on letter pad of Chartered Accountant of the bidder.)
It is to certify that,
1. …………………………………………………………….....................…….……(Name of the firm) is a partnership/
proprietary firm/ limited company (strike out, which isn’t applicable) having registered office
number...…………………………………, GST registration number …..................…………………….....
2. The legal name of the firm mentioned in GST registration certificate is
…………………………................................ and trade name of the firm mentioned in GST registration
certificate is....................................……………… and the name of the firm mentioned in PAN
(i) The legal name of the firm mentioned on GST registration certificate has been/ has not
been (strike out, which isn't applicable) prefixed with ..................... (e.g. M/s.. shri, jay etc).
(ii) The trade name of the firm mentioned on GST registration certificate has been/ has not
been (strike out, which isn't applicable) prefixed with ..................... (e.g. M/s.. shri, jay etc).
(iii) The legal name and trade name as mentioned in GST registration certificate is of the same
(iv) The PAN no. & GST registration no. as mentioned above is of the same entity.
(v) This Certificate is valid for One year or till any change in above details.
Above certificate is issued based on specific request by .............................................................for
submission to Surat Municipal Corporation.
Signature of the C.A.
Title of the office
Name of the firm
Surat Municipal Corporation |South Zone-B| Page 21 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
SPECIAL TERMS AND CONDITIONS: -
THE FOLLOWINGS MUST BE CONSIDERED: -
1. Each tender must accompany with latest passport size photograph along with specimen signature
of the contractor(s).
2. In the event of the tender being submitted by a partnership firm, signature of all partners must be
done along with their latest photographs duly signed thereof. The partnership deed must also be
attached with the tender. Power of attorney of to sign the all other documents/ certificates must
be furnished failing which offer of such bidder shall not be considered.
3. For contractor(s) paying royalties to the Government, the receipt of the same must be produced.
4. The successful contractor(s) shall be required to submit photographs, address and specimen
signatures in duplicate at the time of executing the agreement. The agreement shall be executed by
partner/ person who have signed the tender/ quotation.
5. Affix passport size photograph in table below: -
Give specimen signature/photo of all partners/ Any partner(s) who is given power by agency/firm,
in case of partnership agency/ firm: -
1. Submission of registered
agreement is compulsory
2. in case of partnership
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
NOTE: -PLEASE CLEARLY NOTE THAT “SPECIAL TERMS AND CONDITIONS” MUST BE RETURNED DULY
SEALED & SIGNED ALONG WITH THE TECHNICAL-BID.
Surat Municipal Corporation |South Zone-B| Page 22 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
BIDDERS ARE ADVISED TO FURNISH EVERY DETAIL(S) IN RESPECTIVE COLUMN OF ALL ANNEXURE
(S).I.E., NO FIELD SHALL BE KEPT BLANK IN ANY ANNEXTURE.
(1) No. of years of experience:
a) as a Prime Contractor (contractor shouldering
major responsibility)
i) in own country
ii) other countries (specify country)
(2) For how many years has your organization been in
business of similar works under its present name?
What were your fields when your organization was
established? Whether any new fields were added in
your organization? And if so, when?
(3) Give details of your similar type of experience in
implementing turnkey projects of electrical work
(4) Give details of similar type of ongoing works
(5) Amount of Solvency Certificates issued by Bankers
(Attach attested copy of latest Solvency
(2) Date of issue
SEAL & SIGNATURE OF THE TENDERER:
Surat Municipal Corporation |South Zone-B| Page 23 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Information Regarding Current Litigation, Debarring/ Expelling of Bidder or Abandonment of Work by
1 a) Has the Applicant / tenderer or its constituent partner consistent history of Yes / No
litigation / police case / FIR awarded against him. OR, does any government /
semi government or Local authority has entered any litigation / FIR / Police
case for forgery against him? (If Yes, give details).
b) If yes, give details. (Attach separate sheet if required).
2 a) Has the applicant or any of its constituent partners been debarred / expelled Yes / No
by any Agency in India, during the last 5 years as on the date of application,
except on account of reasons other than non-performance, such as
rescinding of joint venture due to most experienced partner of joint venture
pulling out, court directions leading to breaking up of a joint venture before
b) If yes, give details. (Attach separate sheet if required).
3 a) Has the Applicant or any of its constituent partners abandoned any contract Yes / No
work in India during the last 5 years.
b) If yes, give details. (Attach separate sheet if required).
4 a) Has the Applicant or any of its constituent partners been declared bankrupt Yes / No
during the last 5 years.
b) If yes, give details, including present status. (Attach separate sheet if
5 Has the applicant or any of its constituent partners been debarred by any Yes / No
State R & B Dept. for as on the date of last date of hard copy submission.
Note: If any information in this schedule is found to be incorrect or concealed, pre-qualification
application will be summarily rejected.
SEAL & SIGNATURE OF THE TENDERER
Surat Municipal Corporation |South Zone-B| Page 24 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
"Bill of Quantity with estimated cost for Supply, Erection, Testing and Commissioning of Street
light system on Internal roads of Glorina Valley Society in Moje-Kanakpur Kansad @ South
Zone-B (Kanakpur),Surat Municipal Corporation."
As per enclosed pdf file: Bill of Quantity (Work No- 01).pdf (Total Page(s): 02)
Particulars Up to 9 Mtr.
(Side Arrangement)
Estimated Cost (Rs.) 73,66,683.00 (Without GST)
1. All works is to be carried out in the Surat city. Actual payment will be made based on the actual
work completed at site.
FORM ONLY. RATE MENTIONED IN ANY HARD COPY (i.e Physical hard copy as well in form of scan
copy attachment) WILL NOT BE CONSIDERED AND TENDER OF SUCH BIDDER WILL BE OUT
RIGHTLY REJECTED.
4. Estimated cost to be quoted separately as % age above / below of the cost estimated as above.
5. The zero Quantity item(s) may also be executed as an when required as a part of entire job only.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 25 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
General Data / Details of Luminaire/ Guaranteed Technical Particulars:
TO BE SUBMITTED SEPARATELY FOR EACH LUMINAIRE OFFERED:
Sr. Parameters Data/ Details/ Guaranteed Value
(1) LED Rated Operating Current (mA)
(2) No(s) of LEDs (Chips) to be Used in Luminaire
(3) Luminaire manufacturer
(4) Luminaire model identification no/ name
(5) Rated Input of LED Streetlight luminaire
(6) Initial lumen output (Rated)
Lumen output (as per LM79 report, mentioning
Lumen depreciation at the end of Rated Life
(8) (mentioning junction temperature 85 °C and
rated current in mA)
(9) Rated Correlated colour temperature (CCT)
(10) Rated Colour rendering index (CRI)
Material of Construction: -
(12) Dimensions
(14) LED Luminaire's IS Registration Number & Date
LED Driver’s make, model no. and IS Registration
Number (R-Number) (Separate Registration
Number (R-Number) must required otherwise
fitting shell not be accepted.)
Additional MOV protection must be provided for Confirmed
(16) protection of LED driver, LED chips having voltage
rating of 270± 1%.
Protection of MOV must cover phase-neutral, Confirmed
neutral-earth & phase-earth terminals.
LED Driver’s rated life (hours) {min.
Operating hours)
LED chip’s rated operating current (mA) {not
more than 1,050 mA}
Surat Municipal Corporation |South Zone-B| Page 26 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Sr. Parameters Data/ Details/ Guaranteed Value
Rated Supply Voltage of LED Luminaire (230/
(20) V only) {Power input data for reference will be
considered at 240 V Only)
(21) Operating voltage range
(22) Operating Frequency Range
(23) Rated Power factor
(24) Total harmonic distortion
(25) Working humidity range
(26) Working temperature range
IP rating of luminaires (IP 65 / 66, whichever
(28) Electrical connector(s)
Surge Voltage Level(s) in kV | Internal {min. 4 kV} &
External {min. 10 kV}
(30) Name of the LED chip manufacturer
(31) LED chip model name and number
LM 80 report from the LED chip manufacturer on
the lumen depreciation characteristics of the
specific LED chip employed in the proposed
luminaire product
(33) Junction temperature (°C) of LED {max. 85° C }
Rated Life of LED Chip at L70 (min.
LED driver Cut off Voltage/ optional
arrangement (if provided)
Note: - Aforesaid data sheet(s) for all LED luminaires must be furnished post approval within 30 days
from the date of work order.
SEAL & SIGNATURE OF THE TENDERER: - SEAL & SIGNATURE OF THE OEM AUTHORITY: -
Surat Municipal Corporation |South Zone-B| Page 27 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Technical confirmation sheet for LED Luminaire
Bidders must study specifications carefully & confirm that his offered LED fitting is complying all
the technical specifications, specified in the detailed specification. Bidders has to confirm
followings: (strikethrough, whichever is not confirmed by the bidder): -
(1) Codes & Standards Yes/ No
(2) Environmental Conditions Yes/ No
(3) Constructional Features Yes/ No
(4) Data Sheet: Fixed & Performance Parameters Yes/ No
(5) General Data Sheet Yes/ No
(6) Power (Price) Loading Yes/ No
(7) Illumination Level& related parameters Yes/ No
(8) Penalty (ies) Yes/ No
(9) Details to Be Submitted by The Bidder Yes/ No
If, my / our confirmation found fake / wrong during verification at any stage or at any stage of
contract, or after contract execution or even after defect liability period; I / We are agreed to
whatever action(s) taken by the competent authority of corporation in the aforesaid
circumstances including forfeiture of security deposit, recovery of penalty amount from any
pending due(s) with SMC, debarring from participation in future tenders for the period / years as
decided by the corporation and informing the same to all other state/ central level Government /
semi-government organizations.
SEAL & SIGNATURE OF THE TENDERER: - SEAL & SIGNATURE OF THE OEM AUTHORITY: -
Surat Municipal Corporation |South Zone-B| Page 28 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Sr. Description Remarks Mode of Submission
(1) LM 80 Report of LED : --- All certificates/documents/
Chip(s) to be used submission(s) should be sealed
and signed by relevant
authority/authorized person/
authorized signatory only
(2) LM 79 report of LED : --- -as above-
Luminaire(s) to be
(3) Impact resistance (IK) : --- -as above-
test report(s) for all
LED luminaries to be
(4) LED driver test report : --- -as above-
including efficiency
(5) LED Driver approval : Documentary evidences -as above-
certificate issued by are must.
BIS with R-Number
(6) LED Luminaire : Documentary evidences -as above-
approval certificate are must.
(7) IES file(s) : The bidder must submit ies Must be provided for all
file generated from LM 79 luminaires within 30 days from
from UL or NABL approved the date of work order.
laboratory test report(s).
All bidders must note specifically & submit their offer accordingly: -
All certificates/ documents/ submission(s) should be sealed and signed by relevant authority/
authorized person/ authorized signatory only.
Bidder must check all certificate(s)/ document(s) to be furnished as mention in tender. If it is
found (during any stage) that any content of any certificate/ document is being modified in
comparison with the original then it will be considered as fraudulent practice and the bidder who
Surat Municipal Corporation |South Zone-B| Page 29 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
has submit the offer/ tender will be held responsible for such practice(s).
Further, various certificate(s) / document(s), which are issued by the other authority / agency /
organisation / govt. body shall be verified with the original certificate(s) / document(s) issued to
the bidder, if required. Moreover, in case it is found that the content of document(s) /
certificate(s) is / are modified then action(s) including debarring the bidder for min. 2 years for
participation in any of SMC's tender/ work and/or other action(s) as deemed fit as decided by the
competent authority shall be taken.
If, it is found that, OEM has provided wrong / false / manipulated information / data to the
bidder then, all the lighting products of concerned OEM will be banned for min. 2 years or other
action(s) as deemed fit as decided by the competent authority shall be taken.
All tests defined as “Acceptance Tests” other than IES LM 79 and IES LM 80, are allowed to be
carried out at Manufacturer’s works. LM 79 must be prepared by NABL approved laboratory only.
LM 80 report is prepared by LED Chip Manufacturer.
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 30 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
TECHNICAL / SERVICE PROFILE PERTAINING TO BIDDERS: -
Sr. Description :- To be filled by Contractor
1 Name of Bidders / Contractor :-
2 The Applicant is :-
a) an individual
b) a proprietary firm
c)a firm in partnership
d)a Limited Company or Corporation
3 Name of contact person :-
E-mail address, if any. :-
Address of Head Office. :-
Address Main office in Gujarat. :-
Office in Surat or nearest to Surat. :-
Surat Municipal Corporation |South Zone-B| Page 31 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
4 Give details about your service network :-
5 Minimum period for attending the call/ :-
breakdown from the time of intimation.
6 Do you agree to all terms and conditions :- Yes
specified in the tender if no, please specify
where and how you differ (attach separate
sheet if necessary)
7 How maintenance / services will be offered. :-
Specify clearly (i.e. from Surat office or any
8 If order is split or scope of work is reduced, will :- No
it affect your any of terms / conditions,
guarantee period, servicing, maintenance?
Mention clearly.
9 Testing will be carried out at manufacturer’s :- Yes
works prior to dispatch of equipment as
specified earlier.
10 Rates are inclusive of all taxes (excluding GST), :- Yes
duties, levies, overheads, insurance,
transportation, freight, construction cess etc.
whatsoever is applicable.
11 Portion or percentage of the work the bidder :-
proposes to sub-contract (if any) in case
contract is awarded.
12 For how many years has the organization been :-
in business under its present name & style?
Surat Municipal Corporation |South Zone-B| Page 32 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
In which field of electrical Engineering do you
claim specialization?
14 Details of your latest project completed.
(i) Attach separate sheet / sheets if where ever required.
(ii) The Corporation will not issue any declaration form.
Signature of Authorized person :-
Surat Municipal Corporation |South Zone-B| Page 33 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
THE MODE OF DOCUMENT SUBMISSION CUM CHECK LIST:
The bidder has to submit following documents as indicated and, duly filled, sealed and signed in order to
consider his bid.
In hard Submission Checked and
Sr. Document(s) In soft copy
copy stage furnished
[01] Tender fee Colour Original
scanned Submission
[02] EMD Colour Original during tendering
[03] Bidder's Forwarding letter Colour Original
[04] OEM selected for LED Colour Original
Luminaires scanned
[05] OEM selected for CCMS Colour Original
[06] CA's certificate [As per --- Original
technical bid, page No. 21]
[07] Notarised Affidavit [As per --- Original
technical bid, page No.16-18]
hard copy during
[08] Notarised Affidavit [As per --- Original tendering as a
technical bid, page No.19-20] part of technical-
[09] Works to be considered for --- Original bid/ offer
qualification [As per submission
technical bid, page No. 13]
[010] Page of Special Terms and --- Original
Condition [As per technical
bid, page No. 22]
[011] The mode of document --- Original
submission cum check list
[As per technical bid, page
[012] Addenda Corrigendum (if --- Original
[013] Technical/Service Profile Readable -----
Pertaining to Bidders Scanned
[014] Valid Electrical Contractor’s Readable -----
License Scanned Online
Power of attorney if Readable submission
Partnership firm Scanned during tendering
Readable as a part of
[016] PAN CARD -----
Scanned technical-bid /
GST registration certificate Readable offer submission
(must be self attested). Scanned
Annual Turnover Certificate Readable
issued by C.A. Scanned
Surat Municipal Corporation |South Zone-B| Page 34 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
In hard Checked and
Sr. Document(s) In soft copy
[019] P.F. Registration (Optional) Scanned -----
Professional tax registration Readable Online
certificate. Scanned submission
Bank Solvency Certificate. during tendering
[021] (Certificate should be 20% of ----- as a part of
the estimated amount). technical-bid /
Readable offer submission
[022] ANNEXURE: I, II, III -----
[023] ANNEXURE: IV, V, VI ----- Original
Lighting Design for
from the date of
illumination levels and all
[024] relevant installation/ design ----- Original
parameters.[As per technical
bid, page No. 94-95]
Sealed and signed copy of
[025] ----- Original sanctioning of
BIDDER HAS TO PROVIDE DETAILS AS PER POINT NO.22 AND 23 OF ABOVE TABLE WITHIN
STIPULATED TIME.
IT'S SOLELY BIDDER'S RESPONSIBILITY TO SUBMIT MOST APPROPRIATE DOCUMENT(S) DURING THE
TENDER SUBMISSION. IF, BIDDER FAILS TO DO SO, THE BIDDER SHALL BE REJECTED AND PRICE-BID
OF SUCH BIDDER WILL NOT BE OPENED
ALL THE DOCUMENTS REQUIRED AS PER THE ABOVE TABLE MUST BE SEALED & SIGNED / SELF
ATTESTED / NOTARISED BY THE AUTHORISED SIGNATORY OF THE BIDDER. SOFT COPY (FILE) SHALL
BE IN PDF/ JPG FORMAT ONLY,
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
I / We have gone through the bid document(s) and fact(s). I / We Have clear understanding
regarding the scope as described and, I am / We are consciously submitting my / our bid.
SEAL & SIGNATURE OF THE TENDERER
Surat Municipal Corporation |South Zone-B| Page 35 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
IMPORTANT DATES:
Sr. Description
[01] Downloading of tender : From 10/08/2026 to 24/08/2026 up to 17:00 Hrs.
[02] Pre-bid query, if any : Up to 17/08/2026, 17:00 Hrs, Only through email
[03] On line Tender submission : 24/08/2026 up to 18:00 Hrs.
[04] Submission of Tender fees, : 31/08/2026 up to 18:00 Hrs.
EMD & other documents etc.
[05] Validity of the bid. : 120 calendar days from submission of Hard Copy of
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 36 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
THE VITAL COMMON INFORMATION REGARDING THE TENDER MEMORANDUM:
Sr. Description
[01] Tender Notice No. : DMC/SZ-B/05/2026-2027, WORK NO.01
[02] Name of Work : Supply, Erection, Testing and Commissioning of
Street light system on Internal roads of Glorina
Valley Society in Moje-Kanakpur Kansad @ South
Zone-B (Kanakpur),Surat Municipal Corporation.
[03] Tender Fees : Rs.2,832.00
[04] Earnest Money Deposit : Rs.73,700.00
[05] All banking instrument(s) : Must be in the name of “Municipal Commissioner,
Surat Municipal corporation”, and of all Nationalized
Bank, AXIS Bank, AU Small Finance Bank, Bandhan
Bank, City Union Bank, CSB Bank, DBS Bank India
Limited, DCB Bank, Dhanlaxmi Bank, Equitas Small
Finance Bank, FEDERAL Bank, HDFC Bank, HSFC Bank,
ICICI Bank, IDBI Bank, IDFC First Bank, IndusInd Bank,
Jammu and Kashmir Bank, Jana Small Finance Bank,
Karnataka Bank, Karur Vysya Bank, Kotak Mahindra
Bank, RBI Bank, South Indian Bank, Standard
Chartered Bank, Tamilnadu Mercantile Bank, Utkarsh
Small Finance Bank, YES Bank, Ahmedabad Mercantile
Co.op. Bank, Nutan Nagarik Sahakari Bank Ltd., Rajkot
Nagarik Sahakari Bank Ltd., Saraswat Co-Operative
Bank Ltd.,SBPP Co-Operative Bank Ltd., SVC Co-
Operative Bank LTD., The Cosmos Co-Op Bank Ltd.,
The Gujarat State Co-operative Bank, The Surat
District Co-Operative Bank, The Surat People’s Co-
Op.Bank Ltd., The Baroda Central Co-operative Bank,
The Panchmahal District Co-operative Bank, The
kalupur Commercial Co-op.Bank, The Karnatak
Commercial Co-operative Bank, The Banaskantha
Mercanttile Co-op Bank, Gujarat Gramin Bank payable
at Surat and, the banks permitted by the Govt. of
[06] Bid Type : E-tender
web site: https://smctender.nprocure.com
[07] Tender (Hard Copy) to be : The Chief Accountant,
submitted to. Accounts Department,
Surat Municipal Corporation,
2nd Floor, Main Office Building,
Muglisara, Surat-395003.
[08] Security deposit & retention : As mentioned elsewhere in the tender.
Surat Municipal Corporation |South Zone-B| Page 37 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
[09] Water charge on civil works. : 3%
[010] Defect Liability Period. : 12 month from the date of commissioning.
[011] Time limit for completion of the : Quantity Completion Period (In
61 to 100 poles
[012] Penalties. (1) For late submission of Security Deposit
0.065% on amount of Security Deposit per day.
(2) For work delay 0.2% (Zero-point Two Percent) of
the tender value of unexecuted work per day of
delay subject to maximum 10% of unexecuted
[013] Scanned copies. : All scanned copies of the document(s) certificate(s)
should be readable and look like an original. Non
readable/improper scanned shall not be considered.
[014] Mandatory for bidder. : [01] On completion of the entire work, the
contractor must have to submit "AS BUILT
DRAWING" of the project with marking of
various item(s) / cable route / CCMS prior the
[02] GIS Mapping should be done covering all
switching points and the details of each switch
point, shall be viewable in the web application
software through a Google-map interface or
web based digital map.
Contractor should take GIS Coordinates of
poles, feeder pillar etc. and submit to
department. The department will proceed for
[015] Stamp Paper(s). : FOR ALL LEGAL DOCUMENT(S), NON JUDICIAL STAMP
PAPER(S) TO BE USED, MUST BE PURCHASED FROM
SURAT/GUJARAT ONLY.
[016] Signature and page Numbering. : IN THE EVERY DOCUMENT(S) SUBMITTED BY THE
BIDDER, HE HAS TO SIGNED EVERY PAPER ON RIGHT
BOTTOM CORNER AND, MUST MENTIONED PAGE
NUMBER ON RIGHT TOP CORNER ONLY.
Surat Municipal Corporation |South Zone-B| Page 38 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Security deposit & retention money:
[A] For Works up to and below Rs. 2.0 Cr.
1. Initial security deposit, 2.0% of order To be released after payment of final bill
value. and, completion of defect liability period, if
2. Retention money deposit, 2.0% from Looking to the pros and cons of the work,
each running bill. to be released during payment of final bill.
3. Retention money deposit, 5.0% from Looking to the pros and cons of the work,
each running bill. to be released during payment of final bill.
2.0% initial security deposit to be submitted in form of cash/ DD/ Pay Order.
[B] For Works above Rs.2.0 Cr.
If, 2.0% initial security deposit is submitted in If, 2.0% initial security deposit is submitted
form of Bank Guarantee. in form of cash/D.D./F.D.R./ Pay Order.
1. Initial security deposit, 2.0% of order Initial security deposit, 2.0% of order value.
value. To be released after payment of final bill
Looking to the pros and cons of the and, completion of defect liability period, if
work, to be released during payment any.
2. Retention money deposit, 2.0% from Retention money deposit, 2.0% from each
each running bill. running bill.
To be released after payment of final Looking to the pros and cons of the work,
bill and, completion of defect liability to be released during payment of final bill.
3. Retention money deposit, 5.0% from Retention money deposit, 5.0% from each
each running bill. running bill.
Looking to the pros and cons of the Looking to the pros and cons of the work,
work, to be released during payment to be released during payment of final bill.
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 39 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Surat Municipal Corporation |South Zone-B| Page 40 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Brief details about the contract / work :
RIGHT OF INTERPRETATION OF TENDER SPECIFICATIONS, TERMS & CONDITIONS: -
The right of interpretation of each statement mentioned in this tender document, which also includes
all the terms, conditions, specifications etc. rest with the corporation.
The Surat Municipal Corporation, hereinafter, referred to as the “Corporation” hereby invites
tenders for the work as mentioned elsewhere in this tender document, as per the specification(s).
The Contract documents may be secured in accordance with the notice Inviting Tender for the said
The site is located in Surat city, is very important commercial, textile and diamond city of Gujarat
State located in south Gujarat region. The city is well connected to rest of India by both Rail and
Road. The City locate on bank of river Tapti and enjoy moderate climate having minimum average
temperature as 25°C and extreme ranging from 45°C in summer and 10°C in winter. The actual
average rainfall is approximately 80 cm distributing over three months from mid-June to mid of
The intending bidders shall be deemed to have visited site(s) and familiarized themselves
thoroughly with the site conditions before submitting the tender. Non-familiarity with the site
conditions will not be considered a reason either for extra claims or for not carrying out the work in
strict conformity with the specifications, terms & conditions.
For site visit, the intending bidders may contact Concern Department/Authority, as mentioned, of
Surat Municipal Corporation.
Service roads are laid up to the site of the work. These will be available to the contractor subject to
any limitations imposed by SMC. However, the bidders shall visit the site and acquaint him of the
approaches to the sites before tendering.
Non availability of access roads or railway siding or permits for entry of vehicles and equipment
at any specific area shall in no case be the cause to condone any delay in the execution of the works
or be the cause for any claims or extra compensations.
SCOPE OF WORK:
The scope of the work includes all supply, installation, testing, commissioning, including supply of
materials, labour and workmanship, complete, on turnkey basis as detailed in, specifications, terms
& conditions, etc. The Contractor shall make his own arrangement(s) for everything(s), required for
completion of the work.
Surat Municipal Corporation |South Zone-B| Page 41 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Scope of work not mentioned specifically in tender document, but required for the completion of
the job shall be considered as part of the tender and shall be executed free of cost. Any site-specific
work, incidental or accidental, shall be considered & included in the scope of work. Any charges /
cost to be incurred towards such work(s) shall be considered and included in the rates quoted.
The entire work covered by this document viz. said work. Bidders shall quote for this accordingly.
The quoted price shall include all taxes (excluding GST), duties, levies, overheads, insurance,
transportation, freight, construction cess etc. whatsoever is applicable and the price shall remain
firm till the completion of the project in all respect.
INCLUSION OF WORK:
Any item of equipment equipment’s/machineries or materials not shown in the specifications,
drawings of as specified elsewhere, but is clearly essential to make the system operational, shall be
supplied and installed by the Contractor even if it has not been shown or specified therein.
However, to the above requirement, item/ work that is not included in the Contract Documents
shall not b e performed except when approved in writing by the Engineer-in-charge/ S.M.C.
EXCLUSION OF WORK:
Exclusion of work and addition/ variation in the tender terms & conditions etc. must be considered
while quoting the tender as mentioned in the variable section of the technical bid (if any).
BIDDERS TO CONSIDER:
1. The bidder shall produce latest solvency certificate (valid, not more than one year old from the
last date of the submission of hard copy of technical bid) of minimum 20% amount of the total
estimated tender value. (If Solvency expires during validity period, it shall be renewed/fresh
solvency shall be submitted to department immediately.)
2. The Supervisor/wireman permit (issued by Govt. of Gujarat) holder persons must be employed
for the job. The corporation will not be responsible for any accident or injury to the workman/ staff
of the contractor. No compensation of any kind shall be paid by the corporation. The contractor
shall observe latest Government rules regarding labours etc.
3. The firm/bidder should possess adequately qualified electrical personnel required for the proposed
work. Presently, if party is not in possession, the clear confirmation to arrange such staff/ facilities
in the event of award of contract must be furnished.
4. The bidder should have full flagged office with technical personals at Surat. He should clearly state
the arrangement of staff available with them in separate sheet. Relevant sheet must be clearly filled
Surat Municipal Corporation |South Zone-B| Page 42 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
5. All-important certificate(s) / document(s) / evidence(s) as specified in the technical-bid should be
duly notarised. All work details should be provided with self-attested copies of evidences.
Execution of Work after Award of Work Order: -
Followings must be ensured on award of work:
(1) Technical data sheet of all item(s) to be tested including LED luminaires (along with driver(s), LED
chip(s) to be used) should be submitted for approval. Proof must be provided by the manufacturer
of luminaires for make of LED chip used in luminaires. For the authenticity of the same, it must be
certified by manufacturer only, duly sealed and signed.
(2) Quality assurance plan [QAP] for testing at manufacturer’s works along with drawing of item(s) to
be tested including LED luminaires (with all relevant/ important technical details) should be
submitted for approval.
After receiving all aforesaid details / documents, approval will be given for go ahead to
manufacture/supply. Supply of material(s) will not be allowed before aforesaid approval(s).
(3) In case of LED luminaires, relevant test certificate(s) including IES LM 79, LED Driver test certificate
must be furnished for all models to LED luminaires / lot(s). LM 79 certificate from own NABL
approved laboratory will also be acceptable. LM 79 certificate from own or from third party NABL
approved laboratory signed by designated signatory along with stamp of manufacturer and, such
certificate must be valid at the time of bidding the tender. However, Third Party's NABL certificate
of offered model must be provided before placement of work order.
(4) If at any time, corporation express intention to test the LED luminaires or any item mentioned in
BOQ / tender at any government recognised laboratory like ERDA / UL / ERTL third party NABL
approved laboratory; the same shall be arranged by the bidder. In such case, only testing charges
shall be paid by corporation, if the testing results are found satisfactory otherwise the same shall be
borne by the supplier. Cost towards all arrangement(s) of such testing shall be borne by the
contractor including lodging / boarding of the representative appointed by SMC.
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 43 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
ABOUT THE TENDERING PROCESS:
[01] NO DEVIATION IN TECHNICAL SPECIFICATION OR COMMERCIAL TERMS LIKE TERMS OF PAYMENT,
COMPLETION PERIOD ETC. SHALL BE ALLOWED. SUCH DEVIATION (S), IF OFFERED WILL CAUSE
THE REJECTION OF TENDER(S) OUTRIGHTLY.
[02] EMD & tender fee shall also be submitted in electronic format through online (scanned colour
copies) while uploading the technical bid. This submission shall mean that EMD & tender fee is
received for the purpose of opening the bid. Accordingly, offer of those shall be opened whose
EMD & tender fee is received electronically. However, for the purpose of realization of DD / Pay
order, bidder must submit the DD / PO in original through RPAD / Speed Post so as to reach to
the office of the Chief Accountant within the time limits specified in the tender.Punitive action
for not submitting D.D. in Original to Account Department (Main Office) by bidder shall be
initiated and action shall be taken for abeyance of registration and cancellation of E-tendering
code for as follows.
The punitive action (penalty) for a bidder failing to submit the original Demand Draft (D.D.) to the
Accounts Department (Main Office) within the specified time limit for the first instance is as
Sr No. Tender Amount Penalty
2 Above 1.00 Cr up to 10.00 Cr Rs. 20,000/-
3 Above 10.00 Cr up to 50.00 Cr Rs. 30,000/-
4 Above 50.00 Cr up to 100.00 Cr Rs. 70,000/-
If bidder fails to submit penalty within 10 days and/ or in case of second instance of this similar of
mistake i.e. non submission of original Demand Draft (D.D.) to the Accounts Department (Main
Office) within the specified time limit, punitive action of abeyance of registration and
cancellation of E-tendering code for 6 months shall be taken.
[03] BIDDERS TO READ AND NOTE CAREFULLY:
[A] At his own expenses and prior to submitting his tender, each bidders shall (a) examine the
Contract Documents (b) visit the sites and determine local conditions which may affect the
work including the prevailing wages and other pertinent cost factors (c) familiarize himself
with all central, State and local laws, ordinance, rules, regulations and codes affecting the
material supply including the cost of permits and licenses required for the work and (d)
correlate his observations, investigations, and determinations with the requirement of the
tender documents.
[B] The documents / appendices / annexure / statements should be completed legibly in ink,
checked in responsible manner, signed, stamped and returned together with the tender
security Bond by the bidders.
[C] All the pages in which entries are required to be made by the bidders are contained in the
tender documents and the bidders shall not take out or add to or amend the text of any of
the documents or else the tender shall be rejected forfeiting the EMD.
Surat Municipal Corporation |South Zone-B| Page 44 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
[04] EARNEST MONEY DEPOSIT:
[A] Each tender must be accompanied by a receipt of deposit as tender guarantee (Earnest
money deposit) of the amount mentioned in memorandum, in the form of crossed Demand
Draft / Pay Order of Scheduled Bank/Nationalized Bank (As per bank list mentioned in
Memorendum of this tender only), payable at Surat and, the banks permitted by the Govt.
of Gujarat acceptable to Corporation drawn in favour of the "Municipal Commissioner,
Surat Municipal Corporation" payable at Surat. The tender bond shall be valid for a period
of not less than 180 days from the date of the tenders are opened and shall comply with
the requirements for Bond as stipulated in the general conditions of contract. The
Corporation as a guarantee will hold the tender guarantee bond that the bidders if awarded
the contract, will enter in to the contract agreement in good faith and furnish the required
bonds. Any tender not accompanied by a tender Guarantee in the form of earnest money
deposit in the form of Bank Draft for the sum stipulated in the tender document will be
summarily rejected.
[B] The earnest money deposit will be refunded to the unsuccessful bidders(s) after the award
of work has been finalized.
The earnest money deposit (tender guarantee) will be forfeited in the event, the successful
bidders fails to accept the contract and fails to submit the performance guarantee bond to
the corporation as stipulated in the tender documents within ten days after receipt of
notice of award of contract. In such case corporation, may disqualify the bidders from
tendering for further works, under the jurisdiction of the corporation (SMC).
[C] The earnest money deposit of the successful bidders shall be returned after the
performance guarantee bond, as required, is furnished by the bidder.
[D] No interest shall be paid by the corporation on any tender guarantee / performance
[E] Bank guarantee or cheque or FDR shall not be accepted for EMD / tender guarantee.
[05] GST REGISTRATION CERTIFICATES:
Latest GST registration certificates (along with all annexure) should accompany the tender without
which, the tender is liable to be summarily rejected. The GST registration number must be clearly
[06] DOWNLOADING OF TENDER DOCUMENT:
The tender document for this work is available only in Electronic format, which can be downloaded
free of cost by the bidder. Tender documents consist of two parts (i) technical bid with qualifying
requirements (ii) Price bid.
[07] INFORMATION FOR ON LINE PARTICIPATION:
[A] Internet site address for e-tender activities will be https:// smc.nprocure.com.
[B] Interested bidders can view detailed tender notice and download tender document from
the above-mentioned website.
Surat Municipal Corporation |South Zone-B| Page 45 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
[C] Bidders who wish to participate in online tender have to register with the website through
the “New User Registration” link provided on the home page. Bidder will create login id &
password on their own in registration process.
[D] Tenders by partnership firm must be signed by all partners. The full name and addresses of
all the partners shall be furnished. The tenders by Corporation / Companies must be signed
with the legal name of the Corporation / Company by the president / or by the secretary or
other person or persons legally authorised to bind the Corporation / Company in the
PRICE BID IS NOT TO BE SUBMITTED IN PHYSICAL FORM. PLEASE NOTE THAT NON-
SUBMISSION OF PRICE BID DOES NOT ABSOLVE THE BIDDERS FROM ANY LIABILITY
CREATED FROM THE BID CONDITIONS AND BIDDING PROCESS. ENTIRE TECHNICAL-BID
NEED NOT BE SUBMITTED; HOWEVER, UNDERTAKING AS PER CHECK LIST MUST BE
SUBMITTED DULY SEALED & SIGNED AS A TOKEN/ ACKNLOWLEDGEMENT OF STUDYING &
UNDERSTANDING THE ENTIRE TECHNICAL BID CAREFULLY & INTENDED PURPOSE OF THE
[08] PREPARATION OF TENDER DOCUMENTS:
Bidders(s) are requested to note the following while preparing the tender documents:
[A] The document, which is issued by the respective government office in whichever language,
shall be acceptable. In Case language other than Gujarati & Hindi, proper & authentic
interpretation/translation should be furnished, if required. All tender items and
statements shall be properly filled in. Numbers shall be stated both in words and in figures
were so indicated.
[B] Each tender shall be accompanied by the prescribed tender security bond and other
required documents and drawings. All witnesses and sureties shall be persons of status and
proximity and their full names, occupations and addresses shall be stated below their
signatures. All signatures in the tender documents shall be dated.
[C] Delivery of tenders shall comply with notice inviting tenders as to place, date and time.
[09] SUBMISSION OF TENDER DOCUMENT:
Bidders wishing to participate in this e-tender shall be required to procure Digital Certificate as per
Information Technology Act-2000. By using this certificate, the bidder can digitally sign his
electronic bid. Bidders can procure the Digital Certificate from any of the CCA approved certifying
agency or can contact M/ s (n) Code Solution at the below mentioned address who will assist in
procuring the same. Bidders who already have a valid Digital Certificate need not procure it again.
In case bidders need any clarification regarding online participation they can contact:
M/ s (n) Code Solution, 301, GNFC Info Tower, Near Grant Bhagwati Hotel, Ahmedabad–380
URL: https:// smc.nprocure.com
Bidders who are willing to participate in e-tender need to fill data in pre-defined forms of Tender
fee, EMD (Bid Security), Qualifying Criteria & Technical Bid and Price Bid only.
Surat Municipal Corporation |South Zone-B| Page 46 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Bidders should upload scan copies of reference documents in support of their eligibility of the bid.
Technical-bid (except specific documents/ pages) needs not be submitted in hard-copy instead pdf
file of the tech-bid/ documents must be uploaded on respective web-page in pdf format only. After
filling the data in pre-defined forms, bidders need to click on final submission link to submit their
BIDS SHALL BE SUBMITTED AS BELOW:
[1] EMD & Tender Fee along with proof of Qualifying Criteria in pre-defined forms, tender
papers & certificates (except specific pages, which must be furnished in hard-copy) in
electronic mode.
[2] Price Bid must be submitted online only.
[I] Price bid in physical form (in hard copy) will not be accepted.
[II] The direct or indirect mention regarding cost in technical-bid shall not be allowed.
THE DOCUMENTS SHALL BE SUBMITTED IN ONE SET IN THE FOLLOWING MANNER:
(a) Set of documents shall be put in a separate sealed cover. Name of the Work, Tender Notice
No. and full name and address of the bidder shall be written clearly on the sealed cover.
(b) The Bank Draft for EMD shall be put in a separate envelope subscribed as “EMD” on top of
the cover. Tender fee amount (DD) shall be put in the same cover.
(c) The documents along with the envelope containing EMD shall be put inside one large
envelope, sealed and clearly super scribed on top of the packet name of the work & tender
notice no. Name and full address of the bidder shall be written on the bottom left corner of
each envelope. Due date of Receiving the tender shall also be mentioned on the envelope.
This cover must be super scribed as “Technical Bid Cover”.
(d) The hard copy as above should be sent to the Chief Accountant, Surat Municipal
Corporation, Muglisara, Surat 395 003 by RPAD & Speed Post only as per the dates
mentioned in the tender notice. SMC shall not be responsible for any postal delay.
(e) Tender documents are not transferable.
(f) Corporation will not defray expenses incurred by bidders in tendering.
[010] TENDER VALIDITY PERIOD:
The validity period of the tender submitted for this work shall be as mentioned elsewhere in this
document and, that the bidders shall not be allowed to withdraw or modify the tender offer on
his own during the validity period. The bidders will not be allowed to withdraw the tender or
make any modifications or additions in the terms and conditions of his tender. If this is done
then the corporation shall, without prejudice to any right or remedy, be at liberty to reject the
tender and forfeit the earnest money deposit in full.
[011] GENERAL PERFORMANCE DATA:
Bidders(s) shall submit all the information, which is sought for in the tender documents in the
form of various schedules. Tenders may not be considered if left blank or the schedules are not
properly filled in before submissions of the tender.
[012] SIGNING OF TENDER DOCUMENTS:
Surat Municipal Corporation |South Zone-B| Page 47 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
[A] Documents clarifying type of business (as applicable), e.g. Self-declaration in case of
proprietary firm, Partnership deed in case of Partnership firm, Power of attorney and deed
of “karta” in case of HUF, Certificate of incorporation issued by registrar of companies in
case of private/public limited companies etc.
[B] All witnesses and sureties shall be persons of status and proximity and their full names,
occupations and addresses shall be stated below their signatures.
[013] TAXES AND DUTIES:
Prices quoted must be inclusive of all taxes (excluding GST), levies, work contract tax, packing/
forwarding, transportation, freight, watch & ward, insurance Construction cess etc.
The Municipal Corporation will not issue “C” or “D” form.
GST (GOODS & SERVICE TAX) has come in to existence from 1st July 2017. Contractor/ Successful
Bidder are bound to pay the amount of GST prescribed by the Govt. of India as per the Terms of
Contract agreed upon during the course of execution of this Contract.
[014] WITHDRAWAL OF TENDERS:
If, during the tender validity period, the bidder withdraws his tender, the tender security (earnest
money) shall be forfeited and the bidders may be disqualified from tendering for further works
under the jurisdictions of the SURAT MUNICIPAL CORPORATION.
[015] OPENING OF TENDER DOCUMENTS
1. The Technical Bid will be opened in the office of the competent authority, Surat Municipal
Corporation, Surat, if possible, on next working day of last date of receipt at 16:00 Hours.
Bidders or their representative who wish to participate in tender opening should remain
present at Concern department / authority-Surat Municipal Corporation. Only one
representative of each firm will be allowed to remain present.
2. Technical bid cover containing Technical Bid papers/ documents & EMD will be opened first
and relevant details will be read out.
3. The bidders, who fulfil the requirements of the qualifying criteria & technical-bid, price-bid
of such bidders will be opened.
4. The price bid, which is quoted online on web site https://www.nprocure.com or
https://smc.nprocure.com will remain unopened till the technical bid of all bidders are as
per technically at par.
[016] EVALUATION OF TENDER
Conditional tenders shall not be accepted.
After opening of the technical bid, department will examine the technical bid thoroughly. The
bidder must fulfil all eligibility criteria.
However, tender will be opened for the bidder who qualifies for all terms / conditions. If bidder
is disqualified on any ground, tender for the same will not be opened. For eligibility of opening
of price-bid, all criteria should be fulfilled.
The bidder is required to furnish all details, literature, certificates etc. as per specifications,
terms & conditions, which is must.
The competent authority of Surat Municipal Corporation reserves the right to reduce the scope
of work without assigning any reason even after award of contract.
Surat Municipal Corporation |South Zone-B| Page 48 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Price variation clause of any form shall not be accepted. Price shall remain firm till execution of
work in all respects till the release of security deposit.
[017] CORRUPT AND FRAUDULENT PRACTICES: -
(a) The Employer (SMC) requires that bidders/ contractors under this contract observe the
highest standard of ethics during the procurement and execution of this contract. In
pursuance of this policy, the Authority; Defines, for the purpose of these provisions, the
terms set forth below as follows:
[I] Corrupt practice: means the offering, giving, receiving or soliciting of anything of value to
influence the action of a public official in the procurement process or in contract
[II] Fraudulent practice means a misrepresentation of facts in order to influence a
procurement process or the execution of a contract to the detriment of the Employer, and
includes collusive practice among Bidders (prior to or after bid submission) designed to
establish bid prices at artificial non-competitive levels and to deprive the Employer of the
benefits of free and open competition.
[III] Will reject a proposal for award of work if Employer determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in competing for
the contract in question.
[IV] Will declare a Bidder ineligible, either indefinitely or for a stated period of time, to be
awarded a SMC contract/contracts if he at any time determines that the Bidder has
engaged in corrupt or fraudulent practices in competing for, or in executing, the contract.
(b) The Employer will reject a proposal for award if he determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in competing for
the contract in question. The Employer will declare the firm ineligible, either indefinitely or
for a stated period of time, to be awarded a contract by Surat Municipal Corporation if it at
any time determines that the firm has engaged in corrupt or fraudulent practices in
competing for the contract, or during execution.
(c) In case of any misunderstanding due to interpretation of any terms, conditions or
specifications the decision of Municipal Commissioner, Surat Municipal Corporation, Surat
shall be final and binding on the part of contractor. In unnecessary queries raised verbally/
and/ or in writing shall be treated as “Fraudulent Practice(s)” and action(s) deemed shall be
taken against such bidder(s) will be taken after taking due permission of Municipal
[018] OPENING OF PRICE-BID:
The bidders whose technical-bid is found as per terms and conditions and achieving the
performance parameters as per tender terms & conditions may be allowed to remain
present during the opening of the price-bid. The Successful bidders of technical bid,
who choose to remain present may attend price bid opening and price break-up will be
readout at that time. The competent authority of SMC reserves the right to open/ seal/
accept/ reject any tender without assigning any reasons thereof.
Price Bid(s) of Bidders, who do not meet the technical requirements of the tender, will not
Surat Municipal Corporation |South Zone-B| Page 49 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Acceptance of tender will rest with the competent authority of the corporation. It does
not bind SMC to accept the lowest bidders and reserves the right to reject any or all
tenders and no reasons will be given for acceptance or rejection thereof. The bidders
whose tender is accepted should enter into a regular contract agreement and to abide by
all rules and regulations embodied in the tender.
[019] AWARD OF CONTRACT/WORK:
The works of SITC of new street light system mentioned in tender shall be allocated to overall
lowest bidder as per capability or as per decision of competent authority of the corporation
and the competency (financial & experience) of bidders.
On receipt and, scrutiny of bidder's document(s); soft copies as well as hard copy, if bidder fulfil
the tender term(s), the price bid of such bidders will be opened and, proposal for work sanction
and allotment to overall lowest bidder will be sent to the competent authority.
Within 30 days from the date of work order, contractor has to furnish the post sanctioned
documents. Original/ original copy of the all test certificates (LM79 Report, Type test report,
driver test report, Valid Laboratory approval certificate issued by NABL, Impact resistance
test report (IK), Ingress Protection Test Report and relevant if required as per tender) for
verification must be furnished within 30 days. Hence, all bidders are specifically requested to
offer the fittings after careful examination of all documents/ certificates associated with the
offered LED fittings. If, lowest contractor fails to do so in stipulated period, then, , it will be
accepted only after paying the administrative charges of Rs. 5000.00/- from contractor to
Surat Municipal Corporation till further 15 days and after that bidder will have to supply LED
Luminaires from the approved make & model of the LED streetlight luminaires mentioned
The TENDER GUARANTEE / EMD paid against this tender shall be retained till submission of
performance guarantee by lowest bidder on award of contract. The earnest money deposit will
be forfeited in the event; the successful contractor denies to accept the contract and fails to
submit the performance guarantee bond to the corporation as stipulated in the tender
documents within ten days after receipt of notice of award of contract.
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 50 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
GENERAL TERMS & CONDITIONS OF THE CONTRACT: -
(1) The contract shall be constituted according to and, subject to law(s) in India and State of Gujarat
and under the jurisdiction of courts of Gujarat at Surat only.
(2) The correctness of each detail given in the tender documents is not guaranteed. The contractor
shall independently obtain all necessary information for quoting/ offering the tender. The
contractor shall be deemed to have examined the contract documents, to have generally obtained
his own information in all matters that might affect the tendered rates.
(3) Any Error in description does not relieve the contractor from executing the work according to the
specifications, terms & conditions. Tender documents must be viewed in totality. If there is
contradiction in any form in this bid document, appropriate as decided by the department/
municipal commissioner will be final & binding to contractor/ bidder(s).
(4) No officer, Employee of Municipal Corporation is admitted to any share or part of this contract to
any benefit that may rise there from.
(5) STORES SUPPLIED BY SMC
If the specification or estimate of the work provides for the use of any special description of
materials to be supplied from the Municipal Store or if it is required that the contractor shall use
certain stores to be provided by the Engineer-in-charge. Such materials and stores and the prices to
be charged thereof as hereinafter mentioned being so far as practicable for the convenience of the
contractor but not so as in any way to control meaning or effect of the contract specified in the
schedule or memorandum hereto annexed) the contractor shall be supplied with such materials
and stores as may be required from time to time to be used by him for the purpose of the contract
only and the value of the full quantity of materials and stores so supplied shall be set off deducted
from any sums then due, or thereafter to become due to the contractor under the contract, or
otherwise or from the security deposit, or the proceeds of sale thereof shall be deposit is held in
Government securities the same or a sufficient portion thereof shall in that case be sold for the
purpose. All material supplied to the contractor shall remain the absolute property of Municipal
Corporation and shall on no account be removed from the site of the work, and shall at all times be
opened to inspection by the Engineer-in-charge. Any such materials unused and in perfectly good
condition at the time of completion or determination of the contract shall be returned to the
Municipal Corporation store, if the Engineer-in-charge so requires by a notice in writing given under
his hand, but the contractor shall not be entitled to return any such materials except with such
consent and he shall have no claim for compensation on account of any such materials supplied to
him as aforesaid but remaining unused by him or for any wastage in or damage thereto.
(6) ALTERATION IN SPECIFICATIONS
The Engineer-in-charge shall have right of alternation power to take any alteration in, or addition to
specifications the original specifications, drawings, designs and design not instruction that may
appear to him to be necessary to invalidate or advisable during the progress of the work, and
contractors. the contractor shall be bound to carry out the work in accordance with any instructions
in this connection which may be given to him in writing signed by the Engineer- in-charge and such
alteration shall not invalidate the contract and any additional work which the contractor may be
directed to do in the manner above specified as part of the work shall be carried out by the
contractor on the same conditions in all respect on which he agreed to do the main work and at the
same rates as are specified in the tender for the main work. And if the additional and altered work
Surat Municipal Corporation |South Zone-B| Page 51 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
includes any class of work for which no rates are specified in this contract than such class of work
shall be carried out at the rates entered in the schedule of rates of Municipal Corporation or at the
rates mutually agreed upon between the Engineer-in-charge and the contractor whichever are
lower if the additional or altered work for which no rate is entered in the schedule Rates for works
of Rates of Municipal Corporation is ordered to be not entered in carried out before the rates are
agreed upon then estimate or the contractor shall, within seven days of the schedule of date of
receipt by him of the order to carry out rates of the work, inform the Engineer-in-charge of the
Municipal rate which it is his intention to charge for such Corporation. class of work and if the
Engineer-in-charge does not agree to this rate he shall by notice in writing be at liberty to cancel his
order to carry out such class of work, and arrange to carry it out in such manner as he may consider
advisable provided always that if the contractor shall commence the work or incur any expenditure
in regards thereto before the rates shall have been determined as lastly herein before mentioned,
then in such case he shall only be entitled to be paid in such case he shall only be entitled to be paid
in respect of the work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as shall be fixed by the
Engineer-in-charge. In the event of a dispute, the decision of the Commissioner will be final.
Where, however, the work shall have to be executed according to the designs; drawings and
specifications recommended by the contractor and accepted by the competent authority the
alteration above referred to shall within the scope of such designs drawings and specification
appended to the tender.
The time limit for the completion of work shall be extended in the proportion that the increase in
its cost occasioned by alterations or addition consequence of the cost of the original contract work,
and the certificate of the Engineer-in-charge as to such proportion shall be conclusive.
(7) NO COMPENSATION FOR ALTERATION OR RESTRICTION OF WORKS TO BE CARRIED OUT
If at any time after the execution of the contract documents the Engineer-in-charge shall for any
reason whatsoever, require the whole or any part of the work as specified in the tender to be
stopped for any period or shall not require the whole or part of the work to be carried out at all or
to be carried out by the contractor, he shall give notice in writing of the fact to the contractor who
shall thereupon suspend or stop, the work totally or partially, as the case may be. In any such case,
except as provided hereunder, the contractor shall have no claim to any payment or compensation
whatsoever on account of any profit or advantage which he might have derived from the execution
of the work in full but which he did not so derive in consequence of the full amount of the work nor
having been carried out, or on account of any loss that he may be put to on account of materials
purchased or agreed to be purchased, or for unemployment of labour recruited by him. He shall not
also have any claim for compensation by reason of any alteration having been made in the original
specifications, drawings, designs and instructions may involve any curtailment of the work as
originals contemplated. Where which however, materials have already been purchased or agreed
to be purchased by the contractor, before receipt by him of the said notice, the contractor shall be
paid for such materials at the rate determined by the Engineer-in-charge, provided they are not in
excess of requirements and are of approved quality and/ or shall be compensated for the loss, if
any that he may be put to in respect of materials agreed to be purchased by him, the amount of
such compensation to be determined by the Engineer-in-charge, whose decision shall be final. If the
Surat Municipal Corporation |South Zone-B| Page 52 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
contractor suffers any loss on account of his having to pay labour charges during the period during
which to stoppage of work has been ordered under this clause the contractor shall on application
be entitled to such compensation on account of labour charges as the Engineer-in-charge, whose
decision shall be final, may consider reasonable, provided that the contractor shall not be entitled
to any compensation on account of labour charges if, in the opinion of the Engineer-in-charge, the
labour could have been employed by the contractor elsewhere for the whole or part of the period
during which the stoppage of the work has been ordered as aforesaid.
The Contractor is required to cover up and protect the works from the weather, and is required to
suspend all `wet' operations during weather which, in the Executive Engineer's opinion, will be
detrimental to the work.
(8) WORK TO BE OPEN TO INSPECTION
All works under in course of execution or executed in pursuance of the contract shall at all-time be
open to the inspection and supervision of the Engineer-in-charge and his subordinates, and the
contractor shall at all times during the usual working hours, and at all other times at which
reasonable notice of the intention of the Engineer-in-charge or his subordinate to visit the work
shall have been given to the contractor, either himself be present to receive orders and
instructions, or have a responsible agent duly accredited in writing present for that purpose. Orders
given to the contractor's duly authorised agent shall be considered to have the same force and
effect as if they had been given to the contractor himself.
(9) NOTICE TO BE GIVEN BEFORE WORK IS COVERED UP
The contractor shall give not less than five days’ notice in writing to the Engineer-in- charge or his
subordinate in charge of the work before covering up or otherwise placing beyond the reach of
measurement any work in order that the same may be measured; and correct dimensions thereof
taken before the same is so covered up or placed beyond the reach of measurement any work
without the consent in writing of the Engineer- in- charge or his subordinate in charge of the work,
and if any work shall be covered up or placed beyond the reach of measurement without such
notice having been given or consent obtained, the same shall be uncovered at the contractor's
expense, and in default thereof no payment or allowance shall be made for such work or for the
materials with which the same was executed.
(10) CONTRACTOR LIABLE FOR DAMAGE DONE
If the contractor or his workmen; or servants shall break, deface injure or destroy any part of a
building in which they may be working, or any building, road, fence enclosure or grass land or
cultivated ground continuous to the premises on which the work of any part thereof is being
executed; or if any damage shall be done to the work for any cause whatever while it is in progress
or if any imperfection become apparent in it within the Defect liability period mentioned above by
Engineer-in-charge the contractor shall make good the same at his own expense, or in default the
Engineer in charge may cause the same to be made good by other workmen and deduct the
expenses (of which certificate of Engineer-in- charge shall be final) from any sum that may be due
Surat Municipal Corporation |South Zone-B| Page 53 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
or thereafter became due to the contractor or from his security deposit or the proceed of sale
thereof or of a sufficient portion thereof.
(11) MATERIAL/TOOL/EQUIPMENTS/DRINKING WATER ETC. REQUIRED FOR COMPLETION OF JOB
The contractor shall supply at his own cost all materials (except such special materials, if any, as
may be supplied from the SMC Stores in accordance with the contract).plant tools, appliances
implements, ladders, cordage, scaffolding and any temporary works which may be required for the
proper execution of the work, in the original; altered or substituted from, and whether included in
these specification or, other documents forming part of the contract or referred to in these
conditions or not and which may be necessary for the purpose of satisfying or complying with the
requirements of the Engineer-in-charge as to any matter on which under these conditions he is
entitle to be satisfied, or which he is entitled to require together with carriage thereof To and from
the work. The contractor shall also supply without charge the requisite number of persons with the
means and materials necessary for the purpose of setting out works and counting, weighing and
assisting in the measurement or examination at any time and from time to time of the work or
materials, Failing this the same may be provided by the Engineer-in-charge at the expense of the
contractor and the expense may be deducted from any money due to the contractor under the
contract, or from his security deposit or the proceeds of sale thereof or of a sufficient portion
The contractor shall provide all necessary fencing and lights required to protect the public from
accident; and shall also be bound to bear the expenses of every suit. Action or other legal
proceedings, at law, that may be brought by any person for Injury sustained owing to negligence of
the above precautions, and to pay damages and costs which may be awarded in any such suit
action or proceedings, to any such person, or which may with the consent of the contractor be paid
in compromising any claim by any such person. The contractor shall make his own arrangement for
drinking water for the labour employed by him.
(12) LIABILITY OF CONTRACTOR FOR ANY DAMAGE DONE IN OR OUTSIDE WORK AREA
Compensation for all damage done intentionally or unintentionally or by contractor's labourers
whether in or beyond the limits of municipal property shall be estimated by the Engineer-in-charge
or such other office as he may appoint & estimates of Engineer-in-charge subject to the decision of
the Commissioner on appeal be final & the contractor shall be bound to pay the amount of the
assessed compensation of demand failing which the same will be recovered from the contractor as
damage from the security deposit or deducted by the Engineer-in-charge from any sum that may be
due or become due from Municipal Corporation to the contractor under this contract or otherwise.
The contractor shall bear the expenses of defending any action or other legal proceedings that may
be brought by any person from injury sustained by him owing to negligence of precautions to
prevent the spread of fire & he shall also pay any damages and cost that may be awarded by the
court in consequence.
All sums payable by a contractor by way of compensation under any of these conditions shall be
considered as a reasonable compensation to be applied to the use of Municipal Corporation
Surat Municipal Corporation |South Zone-B| Page 54 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
without reference to the actual loss or damage sustained and whether any damage has or has not
been sustained actual loss.
(13) CHANGES IN THE CONSTITUTION OF FIRM TO BE NOTIFIED
In the case of a tender by partners any change in the constitution of a firm shall be forthwith
notified by the contractor to the Engineer-in-charge for his information.
(14) DECISION OF COMMISSIONER TO BE FINAL- REGARDING INTERPRETATION OF TENDER
Except where otherwise specified in the contract decision of the Commissioner shall be final
conclusive and binding on all parties to the contract upon all questions relating to the meaning of
the specification designs, drawings and instructions here in before mentioned and as to the quality
of workmanship, or materials used on the work, or as to any other question, claim, right, matter, or
thing whatsoever in any way arising or relating to the contract, designs, drawings, specifications,
estimates, instructions, orders or these conditions, or otherwise concerning the works or the
execution or failure to execute the same, whether arising, during the progress of the work or after
the completion or abandonment thereof.
(15) COMPENSATION UNDER WORKMAN'S COMPENSATION ACT
The contractor shall be responsible for and shall pay any compensation to his workmen payable
under the workmen's Compensation Act 1923 (VIII of 1923) or any statutory modification thereof
for injuries caused to workmen.
(16) CLAIM FOR COMPENSATION FOR DELAY IN STARTING THE WORK
No compensation shall be allowed for any delay caused in the starting of the work on account of
any acquisition of land and in the case of clearance work, for any delay in accordance to estimate.
(17) CLAIM FOR COMPENSATION FOR DELAY IN EXECUTION OF WORK
No compensation shall be allowed for any delay in execution of the work on account of water
standing in borrow-pits or compartments. The rates are inclusive for hard or cracked soil,
excavation in mud, soil water or water standing in borrow-pits, and no claim for an extra rate shall
be entertained, unless otherwise expressly specified.
(18) TERMINATION FOR UNSATISFACTORY PERFORMANCE
In any case, under any Clause/s of this tender, the contractor has rendered itself liable to pay
compensation if a breach of any of the terms, conditions, specifications, etc. The SMC shall have
To terminate the contract of which a notice in writing to the Contractor by the SMC shall be
conclusive and binding in which case the security deposit of the contractor shall stand forfeited, at
the absolute disposal of the SMC.
To take such part of the work as shall be unexecuted and to give it to another/other contractor to
complete, in which case the expenses incurred, if any, in excess of the sum which would have been
paid to the original contractor, if the whole work had been executed by him (the certificate of SMC
for the excess amount shall be final and conclusive) shall be borne and paid by the original
contractor and may be deducted from any money due to him by the SMC under the contract or
otherwise or from the Security deposit or the proceeds of sale thereof, or a sufficient part thereof.
Surat Municipal Corporation |South Zone-B| Page 55 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
In any case in which under any clause of or clauses of this contract, the contractor shall have
tendered himself liable to pay compensation amounting to the whole of this security deposit
(Whether paid in one sum or deducted by instalments) or in the case of abandonment of the work
owing to serious illness or death of the contractor or any other cause, the Commissioner on behalf
of the Corporation shall have power to adopt any of the following courses, as he may deem best
suited to the interest of the Municipal Corporation.
To rescind the contract (of which rescission notice in writing to the Contractor under the hand of
the Commissioner shall be conclusive evidence) and in that case that security deposit of the
Contractor shall stand forfeited and be absolutely at the disposal of the Municipal Corporation.
a. To employ labour paid by the Department and to supply material to carry out the works, or any
part of the work debiting the Contractor with correctness of which cost and price, the
certificate of the Executive Engineer shall be final and conclusive against the Contractor and
crediting him with the value of the work done, in all respects in the same manner and at the
same rates as if it had been carried out by the contractor under the terms of his contract, and in
that case the certificate of Executive Engineer as to the value of the work done shall be final
and conclusive against the Contractor.
b. To order that the work of the contractor be in measured up and to take such part thereof as
shall be executed out of his hands and to give it to another contractor to complete, in which
case any expenses which may be incurred in excess of the sum which would have been paid to
the original contractor, If the whole work had been executed by him (as to the amount of which
excess expenses the certificate in writing of the Executive Engineer shall be final and conclusive)
be borne and paid by the original contractor and shall be deducted from any money due to him
by the Municipal Corporations under the Contract of otherwise from security deposit or the
proceeds of sale thereof, or a sufficient part thereof.
In the event of any of the above courses be adopted by the Commissioner the Contractor shall
have no claim to compensation for any loss sustained by him by reason of his having purchases
or procured any materials or entered into any engagements, or made any advances on account
of or with a view to the execution of the work or the performance of the contract and in case
the contract shall be rescinded under provision aforesaid, the contractor shall not be entitled to
recover, or be paid any sum for any work thereto actually performed by him under this contract
unless and until the Executive Engineer certifies in writing the performance of such work and
the amount payable to him in respect thereof, and he shall only be entitled to be paid the
amount so certified.
In any case in which any of the powers conferred upon the Commissioner shall have become
exercisable and the same shall not have been exercised the non-exercise thereof shall not
constitute a waiver of any of the conditions hereof such powers shall not withstanding be
exercisable in any future case default by the Contractor for which by any clauses hereof he is
declared liable to pay compensation amounting to the whole of his security deposit and the
liability of the contractor for past and future compensation shall remain unaffected.
In the event of the Commissioner taking, action under any of the clause mentioned as above,
he may, be he so desires to take possession of all or any tools; plant materials and stores in or
Surat Municipal Corporation |South Zone-B| Page 56 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
upon the works, or the site thereof or belonging to the Contractor, or procured by him and
intended to be used for the execution of the work of any part thereof, paying or allowing for
the same in account at the contract rates, or in the case of contract rates not being applicable
at current market rates, to be certified by the Executive Engineer whose certificate thereof shall
be final. In the alternative the Commissioner may, by notice in writing to the Contractor or his
clerk of the works, foremen or other authorized agent require him to remove such tools, plant,
materials or stores from the premises within a time to be specified in such notice and in the
event of the Contractor failing to comply with, any such requisition, the commissioner may
remove them at the Contractor's expense or sell them by auction or private sale at the risk and
account of the Contractor in all respects and certificate of the Executive Engineer as to the
expense of any such removal and the amount of the proceeds and expense of any sale shall be
final and conclusive against the contractor.
The Contract shall not be assigned or subject without the written approval of the Engineer-in-
Charge, and if the Contractor shall assign or subject his contract or attempt to do so, or become
insolvent or commence any proceedings to be adjudicated any insolvent or make any
composition with his creditors, or attempts or attempt to do the Engineer-in-Charge may, by
notice in writing rescind the contract. Also if any bribe, gratuity gift, load, perquisite, reward or
advantage, pecuniary or otherwise, shall either directly or indirectly be given, promised, or
offered by the contractor, or any of his servants or agents to any public officer or person in the
employ of the Municipal Corporation in any way relating to his office or employment, or if any
such officer or person shall become in any way directly or indirectly interested in the contract
the Commissioner may by notice in writing rescind the contract. In the event of contract being
rescinded, the security deposit of the contractor shall thereupon stand forfeited and be
absolutely at the deposit of the Municipal Corporation and the same consequences shall ensure
as if the contract had been rescinded as per above clauses here of and in addition the
contractor shall not be entitled to recover or be paid or be paid for any work thereto for,
actually performed under the contact.
(19) RIGHTS, REMEDIES AND POWERS
TERMINATION OF CONTRACT DUE TO CONTRACTOR’S DEFAULT
If the Contractor
Abandons the work;
At any time, defaults in proceeding with the works with due diligence and continue to do
so after a notice in writing of 7 days from the SMC; or
Commits default in complying with any of the terms and conditions of the Contract and
does not remedy it or take effective steps to remedy it within 7 days after a notice in
writing is given to him to that effect by the SMC; or
Persistently disregards the instructions of the SMC and / or Engineer-in-Charge or
contravenes any provision of the Contract; or
Fails to remove material from the Site or to pull down and replace Work after receiving
from the Engineer-in-Charge notice to the effect that the said materials or works have
Surat Municipal Corporation |South Zone-B| Page 57 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
been rejected or
Fails to complete the works or items of work on or before the stipulated date(s) of
completion and do not complete them within the period specified in a notice given in
writing to that effect by the SMC; or
Offers or gives or agrees to give to any person in the SMC’s service or to any other
person on this behalf, any gift or consideration of any kind as an inducement or reward
for doing or forbearing to do or for having done or forborne to do any act in relation to
the obtaining or execution of this or
Shall enter into a contract with the SMC in connection with which commission has been
paid or agreed to be paid by him or to his knowledge, unless the particulars of any such
commission and the terms of payment thereof have previously been disclosed in writing
Shall obtain a Contract with the SMC as a result of non- tendering or other non-bonafide
methods of competitive tendering; or
Assigns, transfers, sub-lets (engagement of labour on a piece-work basis or of labour with
materials not to be incorporated in the work, shall not be deemed to be sub-letting) or
attempts to assign, transfer or sub-let the entire works or any portion thereof without
the prior written approval of the SMC:
The SMC may, without prejudice to any other right or remedy which shall have accrued
or shall accrue thereafter to the SMC by written notice determine the contract either as
a whole or in part.
or otherwise specified elsewhere in contract.
(20) LIABILITY FOR COMPENSATION EVEN IF CONTRACT IS NOT TERMINATED
In case any of the powers conferred upon the SMC by the above Clause become exercisable and
have not been exercised by the SMC, the non-exercise thereof shall not constitute a waiver of any
of the conditions hereof and such powers shall not withstanding anything contained above, be
exercisable in the event of any default by the Contractor for any clause or clauses hereof and be
liable to pay compensation as per the terms of these presents. In the event of SMC putting in force
either of the powers vested in it under the mentioned above, it may, if it so desires, take possession
of all or any of the tools, plant, materials and stores, in or upon the works or the site thereof or
belonging to or procured by the Contractor for the execution of the work or any part thereof,
paying or allowing the same for the adjustment in account at the contract rates, or in case of these
not being applicable, at current market rates as the case may be and certified by the SMC, whose
certificate to that effect shall be final. Otherwise the SMC may, by notice in writing, ask the
contractor, to remove such tools, plant, materials, or stores from the premises within a 10 days and
in the event the contractor fails for such compliance, the SMC may issue suitable instructions to
remove or sell them by auction or private sale on account of and at the cost and risk of the
contractor and the certificate of the SMC, as to that effect, shall be final and conclusive for the
Surat Municipal Corporation |South Zone-B| Page 58 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
(21) TIME EXTENSION
Provided nevertheless if in the opinion of SMC, the contractor is entitled to any extension of time
on account of the works being altered, varied or added or delay by the reason of any inclement
weather or due to the reasons not under the control of the Contractor, the SMC is empowered to
order in writing for the extension of the aforesaid period for final completion, by such period(s) as it
deems reasonable and the Contractor shall complete the works within such extended period(s).
However, the Contractor shall not be entitled to any extension of the period unless requested in
writing for such extension for event, which the Contractor considers to entitle for requesting for
any extension, to Engineer-in-Charge, SMC. The SMC may in its absolute discretion, dispense with
such notice and allow an extension of time. Nevertheless, in case of any extension of time, the
aforesaid provisions for damages and compensation shall apply in case of non-completion of the
works within the extended time. Such time extension shall not become any base for compensation
for contractor under any circumstances what so ever.
(22) MONTHLY ASSESSMENT OF WORKS
All work shall be measured net by standard measure and according to the rules and custom of the
Department of SURAT MUNICIPAL CORPORATION without reference to any local custom. No
proposals to adopt alternative methods for measurement of work will be accepted.
The Commissioner’s decision as to what is the “Usual method in use in the Department will be
Under no circumstance shall any contractor be entitled to claim enhanced rates for any items in this
A bill may be submitted by the Contractor once in each month on or before the date fixed by the
Engineer-in-Charge for all works executed in the previous months and the Engineer-in-Charge shall
take or cause to be taken the requisite measurement for the purpose of having the same verified,
and the claim, so far as it is admissible shall be adjusted if possible within 30 (thirty) days from the
presentation of the bill. If the contractor does not submit the bill within the time fixed as aforesaid,
the Engineer-in-Charge may depute a subordinate to measure up the said work in the presence of
the Contractor or his duly authorized agent whose counter signature to the measurement list shall
be sufficient warrant, and the Engineer-in-Charge may prepare a bill from such list which shall be
binding on the Contractor in all respects. The payment shall be made as per the decision of
engineer in charge. No payment shall be made for any work, estimated to cost less than Rupees one
The Contractor shall submit all bills on the printed forms to be hand on application at the office of
the Engineer-in-Charge. The Charges to be made in the bills shall always be entered at the rates
specified in the tender or in the case of any extra work ordered in pursuance of these conditions,
and not mentioned or provided for in the tender at the rates hereinafter provided for in the tender
at the rates hereinafter provided for such work.
The rates for several items of the work agreed to within shall be valid only when the item
concerned is accepted as having been completed fully in accordance with the sanctioned
specifications. In cases where the items of works are not accepted and not completed, the
Surat Municipal Corporation |South Zone-B| Page 59 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Engineer-in-Charge may make payment on account of such items at such reduced rates as he may
consider reasonable in the preparation of final or on account bills.
Payment against bills for the work done, subject to the required deductions, shall be made to the
contractor based on detailed measurements and certifications of bills by the Engineer-in-Charge
and on the recommendations of SMC as per the terms of payment mentioned elsewhere in tender
All such intermediate payments shall be regarded as payments by way or advance against the final
payments only and not as payments for work actually done and completed and shall not preclude
the Engineer-in-Charge from requiring bad, unsound imperfect of unskilful work to be removed and
taken away and reconstructed, or re-erected, nor shall any such payments be considered as an
admission of the due performance of the contract or any part thereof in such respect of the
accruing of and claim nor shall it conclude, determine or affect in any the powers of the Engineer-
in-Charge as to the final settlement and adjustment of the accounts or otherwise, or in any other
way vary or affect the contract. The final bill shall be submitted by the contractor within one month
of the date fixed from the completion of the work, otherwise the Engineer-in-Charge's certificate to
the measurement and of the total amount payable for the work shall be final and binding to
the measurement and of the total amount payable for the work shall be final and binding to
The final bill for the work will be assessed on the modified Tender, wherever applicable, to give
effect to the omissions, additions or variations from the prescribed drawings, specifications, and
instruments and the detailed assessment of such omissions or variations.
Provided always that no final or other certificate is to cover or relieve the Contractor from its
liability under the provisions of the following clause
Whether or not the same may be notified by SMC at the time or subsequent to the granting of the
All material supplied and work done by the Contractor shall remain the absolute property of the
Municipal Corporation, and shall on no account be removed from the site of the work, and shall at
all times be opened to inspection by the Engineer-in-Charge.
When the estimate on which a tender is made includes lump-sums in respect of parts of the work
the contractor shall be entitled to payment in respect of the items of work involved or the part of
the work in question at the same rates as are payable under contact or such items or if the part of
the work in question is not the opinion of the Engineer-in-Charge capable of measurement the
Engineer-in-Charge may at his discretion pay the lump sum amount entered in the estimate, and
the certificate in writing of the Engineer-in-Charge shall be final and conclusive under the provisions
Under any circumstance any interest on any account what so ever due to incident of the contract
shall not be payable to contractor.
All such intermediate payments shall be regarded as payments by way or advance against the final
payments only and not as payments for work actually done and completed and shall not preclude
the Engineer-in-charge from requiring bad, unsound imperfect of unskilful work to be removed and
taken away and reconstructed, or re- erected, nor shall any such payments be considered as an
Surat Municipal Corporation |South Zone-B| Page 60 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
admission of the due performance of the contractor any part thereof in such respect of the accruing
of and claim; nor shall it conclude, determine or affect in any way the Powers of the Engineer-in-
charge as to the final settlement and adjustment of the accounts or otherwise, or in any other way
vary or affect the contract. The final bill shall be submitted by the Contractor within one month of
the date fixed for the completion of the work, otherwise the Engineer-in-charge's certificate to the
measurement and of the total amount payable for the work shall be final and binding on all parties.
measurement and of the total amount payable for the work shall be final and binding on all parties.
If at any time before the security deposit is refunded to the Contractor, it shall appear to the
Engineer-in-charge of the work that any work has been executed with unsound imperfect ,or
unskilful workmanship or with materials of inferior quality; or that any materials or articles
provided by him for the execution of the work are unsound, or of a quality inferior to that
contracted for, or otherwise not in accordance with the contract, it shall be lawful for the Engineer-
in-charge to intimate this fact in writing to the Contractor and then notwithstanding the fact that
the work, materials or articles complained of may have been in advertently passed, certified and
paid for ,the Contractor shall be bound forth with to rectify, or remove and reconstruct the works
so specified in whole or in part as the case may require, or if so required, shall remove the materials
or articles so specified and provide other proper and suitable materials or articles at his own charge
and cost; and in the event of his failing to do so within a period to be specified by the Engineer-in-
charge in the written intimation a foresaid, the Contractor shall be liable to pay compensation at
the rate of one percent on the amount of the estimate for every day not exceeding ten days, during
which the failure so continues and in the event of any such failure as a foresaid the Engineer-in-
charge may rectify or remove and re-execute the work or remove and replace the materials or
articles complained or as the case maybe at the risk and expense in all respects of the contractor,
should the Engineer-in-charge consider that any such inferior work or Materials as described above
may be accepted or made use of it; shall be within his discretion to accept the same at such
reduced rates along with the appropriate penalty as the Commissioner may deem fit. The period to
be counted from that date of final completion and handing over of the work to the Municipal
Corporation during which the Contractor is so liable for any defects in the work shall be the Defects
Liability Period shown in the attached Memorandum.
(23) COMPLETION CERTIFICATE
The Work shall be deemed to have been completed in all respects on the day SMC certifies that the
Works have been completed in accordance with the Contract and issues a Certificate to that effect.
The stage of work completion shall mean, the work completed by contractor with all respect and
according to terms, conditions and specifications. This stage will be considered after completion of
(24) WORK TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS, DRAWINGS AND ORDERS OF
The Contractor shall execute the entire work in the most productive, professional and prudent
manner both as regards usage of materials and time in every respect in strict accordance with the
approved design, specifications, drawings, etc.
The Contractor shall comply with the provisions of the contract and with due care and diligence
execute and maintain the works and provide all labour and materials, tools and plants including for
Surat Municipal Corporation |South Zone-B| Page 61 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
assessment and supervision of all works, structural plans and other things of temporary or
permanent nature, required for such execution and maintenance in so far as the necessity for such
provision is specified or reasonably inferred from the contract. The contractor shall take full
responsibility for adequacy, suitability and safety of all the works and methods of erection /
All works under the contract shall be executed under the directions and subject to the approval in
all respects of the SMC which shall for time to time direct at what point(s) and in what manner the
works to commence, and carried on.
The contractor shall execute the whole and every part of the work in the most substantial and
workman like manner, and both as regards materials and in every other respect in strict accordance
with the specifications. The contractor shall also conform exactly, fully and faithfully to designs,
drawings and instructions in writing relating to the work signed by the Engineer-in-charge and
lodged in his office and to which the contractor shall be entitled to have access for the purpose of
inspection at such office, or on the site of the work during office hours, and the contractor shall, if
he so requires, be entitled at his own expense to make or cause to be made copies of the
specifications and of all such designs, drawings and instruction on aforesaid.
(25) ACTION IN CASE WORK NOT DONE AS PER SPECIFICATIONS
All works in the course of execution or executed in pursuance of the contract shall, at all times, be
open and accessible to the inspection and supervision of the SMC or its authorized representative
and the contractor shall, at all times, during the usual working hours and at all other times at which
reasonable notice of the visit of such representatives has been given to the contractor, either
himself be present to receive orders and instructions or has a responsible agent duly accredited in
writing, present for that purpose. Orders given to such agent shall be considered to have the same
force as if they had been given to the Contractor himself.
If at any time, it appears to the SMC or its authorized representative that any work has been
executed with unsound, imperfect, or unskilful manner, or with inferior or grade of materials or
articles or otherwise not in accordance with the contract for the execution of the work, the
contractor shall, on demand in writing, which shall be made within the Project Completion Period
from the SMC specifying such work, materials or articles, notwithstanding that the same may have
been passed, certified and paid for forthwith rectify, or remove and reconstruct the work so
specified in whole or in part, as the case maybe, and remove the materials or articles so specified
and provide materials or articles as per the terms and in accordance with the spirit of the contract,
at its own expense and cost. In the event of the Contractor failing to do so within a period specified
by the SMC in its demand as aforesaid, the Contractor shall be liable to pay compensation at the
same rate as for non-completion of the work in time for the default on its past.
In such case the SMC may at its sole discretion, accept the item of work at reduced rates as
applicable under the contract during the preparation of on account bills or final bill. Further, if the
item is so acceptable, without detriment to the safety and utility of the item and the structure the
Surat Municipal Corporation |South Zone-B| Page 62 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Reject the work outright without any payment and/or get it other connected and incidental items
rectified, or removed and re-executed at the risk and cost of the contractor. The decision of SMC to
be conveyed in writing in respect of the same will be final and binding on the Contractor.
(26) INTERPRETATION OF CONTRACT DOCUMENTS / DISCREPANCIES BETWEEN INSTRUCTIONS
Should any discrepancy occur between the various instructions furnished to the contractor his
agents or staff, or any doubt arises as to the meaning of any such instruction or, should there be an
misunderstanding between the contractor's staff and the Engineer-in-charge's staff ,the Contractor
shall immediately report the matter in writing to the Engineer-in-charge whose decision there on
shall be final and conclusive and no claim for losses alleged to have been caused by such
discrepancies between instructions, doubts or misunderstanding shall in any event be admissible.
(27) STATUTORY AND OTHER OBLIGATIONS REGARDING WORKMEN
The Contractor shall comply with all Central, State and Local Regulations, enactment and laws
pertaining to workmen labour compensation or otherwise and the Engineer-in-Charge shall have
the right to inquire into and decide all complaints in such matters.
The contractor shall work only during the daylight hours as approved by the SMC / Engineer-in-
Charge unless he obtains the prior written approval to do otherwise. Even if such approval is given,
no liability in respect of any excess cost arising there from shall be borne by the Contractor.
The Contractor shall be solely liable for all the pecuniary and other consequences arising on
account of violation or default on its parts of any of the provisions of the laws, Acts, Rules and
Regulations or any other statutory obligations which may be in force, from time to time, regarding
the conditions of employment of workmen. In addition, any such failure or violation or default on
part of the Contractor will constitute a breach of the conditions of the contract and liable for
suitable actions in terms of the relevant clauses thereof.
The contractor shall be liable to pay the wages directly to the workmen/workers employed by him
on the works without the intervention of any intermediaries and shall ensure that no amount by
way of commission or otherwise is deducted or recovered by such intermediaries from the wages of
workmen/ workers.
(28) FORCE CLOSURE OF CONTRACT OR ABANDONMENT DUE TO REDUCTION IN THE SCOPE OF WORK
If, at any time after the commencement of work, the SMC, for any reason whatsoever, does not
require the whole work as specified in the tender to be carried out, the SMC or its authorized
representative shall give a notice in writing, to that effect to the Contractor and the Contractor shall
have no claim to any payment or compensation what so ever on account of any profit or advantage
which he might have derived from the execution of the works in full but could not derive in
consequence of such decision of the SMC. He shall have no claim for the compensation by reason of
any alteration having been made in the original specifications, drawings and instructions which may
involve any curtailment, variation or increase of the work as originally contemplated.
(29) TEMPORARY SUSPENSION OF WORKS
If the work should be suspended by the reason of rain, strike, lock outs, or other causes, the
Contractor shall take all necessary precautions for the protection of the Works and shall at his own
Surat Municipal Corporation |South Zone-B| Page 63 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
cost and expense make good any damage arising from any of these causes. No claim in this regard
shall be entertained.
(30) AMBIGUITIES OR DISCREPANCIES IN DRAWINGS AND SPECIFICATIONS
The Contractor shall from time to time check all Drawings and Specifications and shall promptly
notify the Engineer-in-Charge of any omission or discrepancies therein. In case of ambiguities or
discrepancies in Drawings, Specifications or Schedule of Quantities and Rates/Prices or any of them,
the same shall be referred to the SMC in writing, and the decision of SMC shall be final and binding
on the Contractor.
(31) GUARANTEE OF WORKS AND LIABILITY FOR DAMAGES, DEFECTS ETC
The defect liability period in respect of the works shall be fulfilled and adhered to after completion
of the work. The Contractor shall guarantee that the Material/equipment or parts thereof provided
under the contract are new and free from defects in design, material and workmanship. The
contractor shall also give guarantee for the satisfactory performance of the material/equipment or
parts thereof provided under the contract and for the workmanship of the works executed as per
the contract. This guarantee shall be valid for the duration of the defect liability period. Any
defects, that may appear in the work within the defect liability period, which in the opinion of SMC
or the Engineer-in-Charge is due to defective or improper material/equipment or bad workmanship
or the work not being in accordance with the drawings, specifications or instructions under the
contract shall be made good and/or repairs by the Contractor at his own cost and expense.
If it is found that the performance of the Material/equipment or parts thereof are not satisfactory
and that any defect in design, material and/or workmanship is found within the defect liability
period, the Engineer-in-Charge shall intimate to the Contractor to that defect in writing. The
Contractor shall immediately but not later than 7 days of the receipt of such intimation investigate
the causes of such defects. The Contractor shall arrange to provide within a reasonable period all
the necessary Engineering designs, materials for the rectification/replacement of the defective
Material/equipment or parts thereof at site at his own cost and expense. If the Contractor fails to
take proper corrective action to repair the defects or otherwise to replace the Material/equipment
or parts thereof to the satisfaction of the Engineer-in-Charge within a reasonable period, the SMC
may at its option after giving 15 days’ notice in writing, take suitable action for such rectification or
replacement, as it deems necessary, at the risk and cost of the Contractor.
In the event of an emergency in the opinion of the Engineer-in-Charge, where the delay would
cause serious loss or damage or in the cases of minor defects found in the designs, materials and/or
workmanship, within the defect liability period, the SMC shall however, have a sole right to take up
immediately, notwithstanding Clause 2.20.2. Above, suitable corrective action for repair or
rectification or replacement as deemed necessary, through a third party chosen by the SMC
without any advance intimation to the Contractor. In such cases, the Contractor shall be intimated
and shall assist and cooperate in making the repairs/rectification.
In case the defects are of such nature that the Material/equipment or parts thereof requires to be
taken to the workshop of the Contractor for rectification, the same shall be taken by the Contractor
at his cost and expense. In case the Contractor so desires the same shall be so dispatched at the risk
and cost of the Contractor. However in both cases, the Contractor shall furnish necessary
Surat Municipal Corporation |South Zone-B| Page 64 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Hypothecation Deed to the Engineer-in-Charge in respect of such Material/equipment or part
thereof, and shall provide additional bank guarantee (Nationalized bank only) of amount equal to
the cost of Material/equipment, as required by the Engineer-in-Charge before the
Material/equipment, or parts thereof are removed from the site. After the necessary rectification
or replacement, the Contractor shall deliver and duly install the Material/equipment or parts
thereof at site at his own expense to the satisfaction of the Engineer-in-Charge. All risks in transit to
and from the site shall be borne by the Contractor.
If the repairs, replacement or modifications as referred above are of such nature as may affect the
efficiency of the Material/equipment or parts thereof, the SMC shall have the right to give to the
Contractor a notice in writing within one month of such repair, replacement, renewal to carry out
the tests, as may be required, for the acceptance of the equipment by the Engineer–in Charge.
When the defective Material/equipment or parts thereof are not repairable at site and sent to the
workshop of the Contractor for necessary repairs or replacement but are essential for the operation
of the facility, the Contractor shall take all the necessary steps to the satisfaction of the Engineer-in-
Charge to minimize interruptions in the operation of the facility till such time the repaired
equipment or parts thereof are returned back satisfactorily.
Material/Equipment or parts there of so repaired or replaced shall have further defect liability
period of 36 months from the date of acceptance, of such repair or replacement, by the Engineer-
in-Charge and the contractor shall immediately arrange to extend the validity of the respective
Bank Guarantee to adequately cover the extended period. Failing to supply the repaired
Material/equipment with the mutually agreed time period, the bank guarantee shall be forfeited to
SMC and the Material/equipment will be replaced by SMC at risk and cost of contractor.
(32) EQUIPMENT NEEDED FOR THE WORKS
The Contractor shall, at his own cost and expense, provide all the Material/equipment,
machineries, tools, etc. required for the works.
All Material/equipment to be provided by the Contractor shall be in conformity with the
specifications laid down or referred to in the Contract and the Contractor shall on the request of
the Engineer-in-Charge, furnish proof, to the satisfaction of the Engineer-in-Charge, that the
Material/equipment so comply.
The Engineer-in-Charge shall be entitled to have tests carried out as specified or referred to in the
contract for any Material/equipment provided by the Contractor at the cost and expense of the
Contractor and the Contractor shall provide at its cost and expense all facilities which the Engineer-
in-Charge may require for such purpose. In case of the tests not being specified in the Contract, but
are considered necessary by the Engineer-in-Charge, the Contractor shall provide all facilities and
assistance required for the purpose and the charges for such tests shall be borne by the Contractor.
All Material/equipment and parts thereof shall be of such design as properly and satisfactorily
function under all operating conditions. All the components or Material/equipments shall have
proper factor of safety, maximum efficiency minimum wear and tear and ability to withstand in the
respective environmental conditions encountered at the specific location, whether specifically
mentioned in the specifications or not. Equipment shall be new, free from defects and of best
Surat Municipal Corporation |South Zone-B| Page 65 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
quality. All the equipment shall conform to the latest revised relevant Indian / International
Standards. Equipment which do not conform to either Indian Standards or the International
Standards accepted in India, shall require approval of the SMC or Engineer-in-Charge by the
Contractor furnishing a sample with the test certificate and performance certificates from a duly
recognized test house in India.
(33) REMOVAL OF SITE STAFF ON THE DIRECTION OF THE ENGINEER-IN-CHARGE
The Engineer-in-Charge may require the Contractor to dismiss or remove from the site of the work
any person or persons in the contractors' employment who may be found to be incompetent or
misconduct(s) and the Contractor shall forthwith comply with such requirements
The Contractor shall provide and employ on the site only such efficient and competent engineers,
supervisors and skilled, semi-skilled and unskilled workers as are necessary for the proper
supervision and timely execution of the Works. Orders / instructions given to the Contractor’s
Engineers/ Supervisors shall be considered to have the same force as if it had been given to the
Contractor himself. The contractor is bound to remove any of its employees from the works/ site if
the said employee is not acceptable to the Engineer-in-Charge.
(34) CHANGES IN FIRM'S CONSTITUTION
Where the Contractor is a partnership firm/ private/public organization, a prior approval in writing
from the SMC shall be obtained for any change in the constitution of the firm. Where the
Contractor is an individual or a Hindu undivided family, such approval as aforesaid, shall likewise be
obtained before the contractor enters into any partnership agreement where under the
partnership firm would acquire the right to carry out the business of the Contractor. If such prior
approval is not obtained, the contract shall be deemed to have been assigned in contravention of
clause mentioned elsewhere in the tender, for the work hereof and the same action may be taken,
and the same consequences shall ensure as provided in the said Clause.
(35) DECISIONS BY THE SMC AND ENGINEER-IN-CHARGE
It shall be accepted, like as an inseparable part of the Contract, that in matters quality of materials,
workmanship, removal of improper work, interpretation of Contract, drawings and specifications,
mode or procedure of carrying out the work, the decision of the SMC shall be final and binding on
the Contractor and for any technical question which may arise touching the Contract, the SMC or
Engineer-in-Charge decision shall be final and conclusive.
(36) PATENTS, RIGHTS AND ROYALTIES
The Contractor shall fully indemnify the SMC and their all agents, servants and employees of the
SMC against any action, claim or proceedings relating to infringement or use of any patent or
design or any alleged patent or design rights and shall pay the royalties or other charges which may
be payable in respect of any article or part thereof included in the Contract. In the event of any
claim being made or action being brought against the SMC or any agent, servant or employee in
respect of any of the matters aforesaid, the Contractor shall be notified thereof for taking necessary
action at its cost and expense.
Surat Municipal Corporation |South Zone-B| Page 66 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
(37) RIGHT OF SURAT MUNICIPAL CORPORATION TO CAUSE AUDIT OF THE ACCOUNT OF
CONTRACTOR AND TECHNICAL EXAMINATION OF THE WORK
The SMC shall have the right to cause an audit and technical examination of the works and the final
bills of the contractor including all supporting vouchers, abstract, etc., to be made after payment of
the final bill and if as a result of such audit and technical examination any sum is found to have
been overpaid in respect of any work done by the Contractor under the Contract or found not to
have been executed, the Contractor shall be liable to refund the amount of over-payment and it
shall be lawful for the SMC to recover the same from the Contractor in the manner prescribed or in
any other manner legally permissible; and if it is found that the Contractor was paid less than what
was due to it under the Contract in respect of any work duly executed by the Contractor, the
amount of such under payment shall be duly paid by the SMC to the Contractor, without any
interest thereon whatsoever.
(38) SUPERINTENDENCE OF WORK BY THE CONTRACTOR, SUPERVISION, TECHNICAL STAFF,
The Contractor shall provide all the necessary superintendence during the execution of the work
and subsequently as long as may be necessary for proper fulfilling of the obligations of the
Contractor under the contract.
The Contractor shall, immediately after receiving letter of acceptance of the tender and before
commencement of the work, intimate in writing to the SMC, the name, qualification, experience,
age, address and other particulars along with certificates, of the principal technical representative/
Project Engineer to be in charge of the work. Such qualifications and experience shall be in the
relevant field. The SMC shall, within 15 days of the receipt of such communication, intimate in
writing its approval or otherwise of such representative of the Contractor. Any such approval may,
at any time, be withdrawn and in case of such withdrawal under this clause, the decision of the
SMC shall be final and binding on the Contractor. Such a principal technical representative/Project
Engineer shall be appointed by the Contractor soon after the receipt of the approval from the SMC
and shall be available at site within fifteen days of the start of the work.
In case where the Contractor is a sole proprietorship or partnership firm and the sole proprietor or
partner himself / herself has such qualification, it shall not be necessary for the said Contractor to
appoint such a principal technical representative but in such case the Contractor shall designate
and appoint a responsible agent to represent him / her who will be present at the works whenever
the Contractor is not in a position to be so present. All the provisions applicable to the principal
technical representative under the Contract shall be applicable, in such a case, to the Contractor or
its designated representative, in charge of the work in writing or in person or otherwise, present
himself / herself to the Engineer-in-Charge and/or at the site of work, as required, to take
instructions. All instructions given to the principal technical representative or the responsible agent
shall be deemed to have the same force as if they have been given to the Contractor. The principal
technical representative and/or the Contractor or its responsible authorized agent shall be actually
available at site at least three working days in every week, as determined by the Engineer-in-Charge
in consultation with the Contractor, by a written notice, and shall also note down instructions
conveyed by the Engineer-in-Charge in the site order book and shall affix its/his/her signatures in
Surat Municipal Corporation |South Zone-B| Page 67 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
token of noting down the instructions and acceptance of the same. There shall be no objection if
these details are disclosed to the Engineer-in-Charge and he shall be satisfied that the provisions
and the purpose of this clause are fulfilled satisfactorily.
If the Engineer-in-Charge, whose decision in this respect is final and binding on the Contractor, is
convinced that no such technical representative or agent is effectively appointed or is effectively
attending or fulfilling the provision of this clause, a recovery shall be effected from the Contractor
as per the relevant Clause(s) and the decision of the Engineer-in-Charge, as recorded in the site
order book and assessment recorded in assessment Book, shall be final and binding on the
Contractor. Further if the Contractor fails to appoint a suitable technical representative or
responsible agent and if such appointed person is not effectively present or does not discharge
his/her responsibilities satisfactorily, the Engineer-in-Charge shall have full powers to suspend the
execution of the work until such date a suitable person is so appointed and the Contractor shall be
held solely responsible for the delay so caused in the matter.
The Contractor shall provide and employ skilled, semiskilled and unskilled labour as is necessary for
the proper and timely execution of the work.
The Engineer-in-Charge shall be at a liberty to object and require the Contractor to remove from
the works any person who in his opinion misconducts himself or is incompetent or negligent in the
performance of his/her duties or whose employment is otherwise considered by the Engineer-in-
Charge to be undesirable. Such person shall not be employed again at works without the written
permission of the Engineer-in-Charge and the Contractor shall suitably replace the person so
removed, as soon as possible.
All works under in cause of execution or executed in pursuance of the contract shall at all-time be
open to the inspection and supervision of the Engineer-in-Charge and his subordinates, and the
contractor shall at all times during the usual working hours, and at all other times at which
reasonable notice of the intention of the Engineer-in-Charge or his subordinate to visit the work
shall have been given to the contractor, either himself be present to receive orders and
instructions, or have a responsible agent duly accredited in writing present for that purpose, orders
given to the contractor's duly authorized agent shall be considered to have the same force and
effect as if they had been given to the contractor himself.
The contractor shall give not less than five days’ notice in writing to the Engineer-in-Charge or his
subordinate in charge of the work before covering up or otherwise placing beyond the reach or
measurement any work in order that the same may be measured; and correct dimensions thereof
taken before the same is so covered up or placed beyond the reach of measurement any work
without the consent in writing of the Engineer-in-Charge or his subordinate in charge of the work,
and if any work shall be covered up or placed beyond the reach of measurement such notice having
been given or consent obtained, the same shall be uncovered at the contractor's expense, and in
default thereof no payment or allowance shall be made for such work or for the materials with
which the same was executed.
(39) TAXES, AND DUTIES TO BE PAID BY THE CONTRACTOR, OBTAINING OF PERMIT ETC.
RESPONSIBILITY OF THE CONTRACTOR
Surat Municipal Corporation |South Zone-B| Page 68 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Any other taxes, customs, works contract tax, Construction cess, stamp or any other statutory
duties or dues of Central or state government(s) or Authorities on the equipments and/or
components in respect of the contract, including applicable works contract tax, income tax and
construction cess shall be payable by the contractor and shall be deemed to have been included in
the amount quoted by the contractor for executing the works under the contract. The SMC shall
not entertain and shall not be liable for any claim whatsoever in this respect and shall not issue any
kind of certificate to the Contractor for obtaining exemption / concession from the respective
concerned authorities.
If pursuant to or under any law, notification or order, any fee, cess or the like becomes payable by
the Contractor to the Central or State Government(s) or any local authority in respect of any
material used by the contractor in the works, the SMC shall have a right to recover the amount paid
in the circumstances by SMC, towards the said levies, from the dues of the Contractor.
(40) EXCEPTED RISKS (FORCE MAJEURE)
If, at any time, the execution of the Contract is affected by War, (declared or not), hostilities,
invasion, acts of foreign enemies, civil war, rebellion, revolution insurrection, riots and civil
commotion (other than solely restricted to the employees/workers of Contractor), Acts of State,
Acts of God such as earthquake, massive floods and other notified epidemic which an experienced
Contractor could not have reasonably foreseen or reasonably made provision for these or insured
against, then the Contractor shall, within seven days of such occurrence, apply to the SMC together
with the adequate evidence for obtaining such extension of time as may be warranted by the
circumstances. After a careful examination of the circumstances, the SMC may grant such extension
of time as deemed necessary, without insisting on changing liquidated damages from the
Contractor for such period.
Any extension of time granted by the SMC shall neither entitle the Contractor to claim for any
increase in prices nor shall it release him from any of the obligations under the Contract. If the
execution of the Contract as a whole is delayed by the reason of force majeure conditions persisting
for a continuous period exceeding six months, the SMC and the Contractor shall discuss the matter
and decide either to terminate the Contract without obligations on each side or to continue its
execution on such terms as may be agreed upon.
(41) APPRENTICES ACT PROVISIONS TO BE COMPLIED WITH
The Contractor shall remain liable for the payments of all wages or other money to its employees or
workers under the Minimum Wages Acts, Payment of Wages Act, Employees Liability Act,
Workmen’s Compensation Act, ESI Act or any other laws, enactments and rules in force or made
applicable from time to time by the Central or State Government(s). The Contractor shall also
comply with the provisions of the Apprentice Act, Contract Labour (Regulations and Abolition) Act
and the Rules and Orders issued there under from time to time. In case the SMC pays or becomes
liable to pay any wages or dues to the labour or to any Government Agency under any of the
provisions of the said acts or rules or other regulations, due to the omission or default on the part
of the Contractor, the SMC may, at its sole option, make such payments and recover the same from
the bills of the Contractor.
(42) INSPECTION OF SITE
Surat Municipal Corporation |South Zone-B| Page 69 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
The Contractor shall be deemed to have quoted after fully understand the nature of work to be
done under this contract and the Contractor shall also be deemed to have inspected the Site of the
Works and surroundings, the means of access thereto and to have generally obtained its own
information on all matters and things which can in any way influence its tender. The Contractor
shall also make itself familiar with the working conditions, accessibility to site of works, availability
of Labour and equipment and such other relevant conditions which may affect the execution and
completion of the work. No claim for any extra work or otherwise will be allowed in consequence of
any misunderstanding, error or incorrect information on the above mentioned points or of any
other inaccuracies in the reference thereto which may appear on the drawings or in the
specifications or other records nor shall the contract be nullified in consequence of any such
misunderstandings, incorrect information or inaccuracies.
(43) CONTRACTOR’S SITE OFFICE & AMENITIES
The responsibility for providing any accommodation, feeding and sanitary necessities for the
workers employed by the Contractor shall be exclusively of the Contractor; SMC shall not provide
any site for that.
(44) IDENTIFICATION BADGES/PASSES
The Contractor shall provide to each of its employees, including labour, with the identification
badge at its cost and expense. The employees / labourers shall display the badges on their person
so that the badges are clearly visible for checking at all times by the security as they enter and work
in the premises of the SMC. The badges shall be printed, serially numbered with an identification
number and duly signed by the Contractor.
The Contractor shall immediately notify the SMC if any of the badges is lost and a new one issued in
its place, or when the badges are taken away by the discharged labour. No employee / worker of
the Contractor without such badge will be permitted to enter and work in the premises of SMC,
except in such cases where special permission in writing, of the Engineer-in-Charge is obtained.
(45) WATCHING AND LIGHTING
The Contractor shall at its own cost and expense provide watchmen at all the places of the work
wherever deemed necessary or required by the Engineer-in-Charge. The Contractor shall also keep
all open trenches, excavations or other dangerous places properly and sufficiently lighted between
sunset and sunrise and shall provide and fix proper fencing, hoardings or temporary bridges to
protect and assist the normal traffic. The Contractor shall also, at its own cost and expense, erect
temporary fences on the sites where required by the Engineer-in-Charge.
(46) COMPLIANCE WITH LOCAL LAWS, ETC.
The Contractor shall comply with all Acts, Rules, Bye-laws, Regulations and all other statutory
requirements of local or other Authorities having jurisdiction over the Site and shall be responsible
for the payment of all fees and other charges and giving and receiving of all necessary notices, and
keep the Engineer-in-Charge informed of the said compliance with such Acts, Rules, Bye-laws,
Regulations, statutory requirements, payments made, notices issued and received.
Surat Municipal Corporation |South Zone-B| Page 70 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
The Contractor shall be responsible for and shall pay any compensation to his workmen payable
under the workmen's compensation Act 1923 (VIII of 1923) of any statutory modification thereof
for injuries caused to workmen.
The contractor shall also arrange to obtain the license from the competent Authority under the
contractor labour (regulation and abolition) Act
No contractor shall employ any person who is under the age of 18 years. If any contractor found
employing person or persons under the age of 18 years, during execution of work at any stage, legal
actions shall be taken against him as stipulated in child labour (Prohibition & Regulation) Act
and also, a penalty of Rs. 20,000/- (Rupees Twenty thousand) shall be imposed which shall be
deposited with District Collector in child labour Rehabilitation cum welfare fund.
The contractor shall pay fair and reasonable wages to the workmen employed by him in the
contract undertaken by him in the event of any dispute arising between the contractor and his
workmen on the ground that the wages paid are not fair reasonable, the dispute shall be referred
without delay to the Executive Engineer who shall decide the same.
The decision of the Executive Engineer shall be conclusive and binding on the contractor but such
decisions shall not in any way affect the condition in the contract regarding the payment to be
made by the Municipal Corporation at the sanctioned tender rates.
(47) MATERIALS OBTAINED FROM EXCAVATION/DISMANTLING
All the useful materials, obtained from dismantling or demolition, and all fossils, coins, articles of
value, etc. which may be found, discovered during the execution of the works shall be handed over
to the SMC as directed at no extra cost to the SMC.
(48) INDEMNITY AND INSURANCE
The Contractor shall indemnify and keep indemnified both the SMC and against all losses and claims
for the injuries or damage to any person, or property whatsoever which may incur out of or in
consequence of the construction and maintenance of the Works and against all claims, demands,
proceedings, damages, costs, charges and expenses whatsoever in respect of or in relation thereto.
The Contractor shall obtain, at its cost and expense, an Insurance Policy in the joint names of the
SMC and the Contractor, covering the following risks and lodge the Policy with the SMC
Works including temporary / permanent structures, equipment, tools etc. at site against the
damage by fire, burglary, strikes, riots and civil commotion and natural calamities like floods,
earthquake, explosion, etc.
The workmen / workers employed by the Contractor against the Workmen Compensation Act and
other statutory Laws where the compensation is payable by the Contractor;
Damages to the property of third parties including the neighbouring buildings, equipment etc.
Damages to third parties including the staff, visitors, neighbours and other passer-by of the SMC
against any claim that may arise due to accidents, on account of the incidental risks, which may
occur during the execution of Works.
Surat Municipal Corporation |South Zone-B| Page 71 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
All claims/ amounts against the policy shall be payable to the SMC and not to the Contractor. The
Contractor shall keep the policy renewed from time to time until the Certificate for Completion of
works is issued by the SMC. If at any time the policy so obtained and kept with the SMC expires, it
shall be lawful for the SMC to stop further payments until the duly renewed policy is lodged with
In case of, damage to the property such as equipments, machineries, instruments, buildings, and
other assets etc., the claims once remitted to the SMC by any insurance company, the same will be
disbursed in favour of contractor after rectifying such damage to the satisfaction of engineer in
charge. In case of damage to labours, or any other persons, contractor shall compensate to the
concern labours or any other persons till then SMC will retain the amount equal to compensation to
be made, from the RA bills. After producing the authentic proof of compensation and clearance
from the labour office where ever applicable, the retained amount of contractor shall compensate
to the concern labours or any other persons till then SMC will retain the amount equal to
compensation to be made from the RA bills. After producing the authentic proof of compensation
and clearance from the labour office where ever applicable, the retained amount shall be released
to the contractor.
The contractor shall take “Workman compensation policy” for all workers and labours of contractor
and clients working at site and “Third party insurance policy” to fully cover all third-party type risk.
The insurance policy so taken by the contractor for such purpose shall be in the joint name of the
contractor and the client and the policy shall be deposited with the SMC.
TRANSIT INSURANCE
The Contractor shall arrange at his cost for transit insurance for the dispatch of Material/
equipment or parts thereof.
(49) ACCESS TO THE SITE
During the progress of the Work, the Contractor shall keep the site reasonably free from all
unnecessary obstructions. The existing roads or water courses or pipes, electrical line and conduits
shall not be blocked, cut through, altered, diverted or obstructed in any way by the Contractor,
except with the permission of the Engineer-in-Charge in writing.
All operations necessary for the execution of work and for construction of any temporary work
shall, so far as compliance with the requirements of the Contract permits, be carried on so as not to
interfere unnecessarily or improperly with the convenience of the public or access to the use and
occupation of public or private road, including approach roads from the main road and footpaths,
and of properties whether in the possession of the SMC or any other person / organization.
All compensation claimed for any unauthorized closure, cutting through, alteration, diversion or
obstruction to such roads or internal plant piping, etc. against the contractor or his agent or his
staff shall be recoverable from the Contractor by deduction from any sums which may become due
in terms of the Contract or otherwise according to Law.
(50) SETTING-OUT OF WORKS
Surat Municipal Corporation |South Zone-B| Page 72 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
The Contractor shall be responsible for the perfect setting out of the Works and for correctness of
the positions, levels, dimensions and alignment of all parts of the works. All measurements shall
comply with the dimension noted on the drawings and or as directed. If at any time during the
progress of work, any error appear or arise in the positions, levels, dimensions or alignments of any
part of the Work, the Contractor, on being required to do so by the Engineer-in-Charge, shall at his
own cost and expense rectify such errors to the satisfaction of the Engineer-in-Charge
notwithstanding that he may have been assisted by the Engineer-in-Charge in setting out the same
(51) CARE OF WORKS
In the event of any accident or failure occurring or being likely to occur in or on the works which, in
the opinion of the Engineer-in-Charge, required immediate attention either during the work period
or the defect liability period, the Engineer-in-Charge may direct the Contractor by written notice to
take necessary remedial action and if the Contractor fails to take action as directed by the Engineer-
in-Charge within 7 days of such notice, the SMC and / or the Engineer-in-Charge may, by its own
workmen or employing any other agency, make the necessary repairs or precautionary works and
recover the costs from the Contractor.
(52) VARIATIONS IN THE SCOPE OF WORK
The SMC shall have the power to make any alterations/variations/ deletions/additions or
substitutions from drawings, specifications, designs and instructions that may appear in its opinion,
be necessary or advisable during the progress of the Works and the Contractor shall be bound to
carry out the work in accordance with the instructions which may be given to him by the SMC in
writing. Such alterations / deletions / additions or substitutions shall form part of and be read as
incorporated in the Agreement itself.
(53) DISPUTES AND JURISDICTION
Except where otherwise specified in the contact the decision of the commissioner shall be final,
conclusive and binding on all parties to the contact upon all questions relating to the meaning of
the terms, conditions, specifications, drawings, designs and instructions hereinbefore mentioned
and as to the quality of workmanship, or materials used on the work, or as to any other question,
claim, right, matter, or thing whatsoever in any way arising aloof, or relating to the contract,
designs, drawings, specifications, estimates, instructions, orders or these conditions, or otherwise
concerning the works or the execution or failure to execute the same, whether arising, during the
progress of the work or after the completion or abandonment thereof.
(54) LEGAL COSTS
Legal Costs incurred by the SMC in the event of litigation or other legal proceedings arising from
this Contract agreement shall be borne by the Contractor.
This tender document contains technical bid and price bid, forwarding letter and other documents
like Tender Fees, EMD, Addenda / Corrigendum, Registration copy, Authorization, Company Profile,
Experience Certificates/List of clients along with Technical data, catalogues, performance curves,
Annexures & Data sheet of Technical Bid, other Technical and General Specifications should be
furnished duly filled in and signed. No pages can be removed from the conditions of contract,
Surat Municipal Corporation |South Zone-B| Page 73 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
specification of drawings, otherwise it will be considered as an intentional fault and bidders will be
liable for rejection and the amount of earnest money deposit forfeited.
(55) RESPONSIBILITY OF CONTRACTOR UNDER CONSTRUCTION AND DEMOLITION WASTE (C & D
WASTE) RULES 2016:
1. Contractor shall remove all construction and demolition waste (C & D Waste) and clean the area
every day, or depending upon (1) The type & schedule of work. (2) The quality and type of waste
generated, appropriate storage and collection facility shall be developed at site. Reasonable
timeframe shall be worked out in consultation with engineer in charge of the project, for storage &
usage of C & D Waste.
2. If it’s found that contractor is irregular and showing negligence to management of C & D Waste,
then if deem fit, Engineer in charge would arrange to dispose the said C & D Waste through an
Authorized C & D Waste Contractor/agency of Surat Municipal Corporation and All expenditure
made towards disposal of this C & D Waste shall be recovered from the contractor as per the
prevailing charges.
3. Contractor shall have to bear the expenses towards management of C & D Waste as per the
prevailing norms; no extra payment shall be entertained for the same.
4. Contractor shall keep record of the generation and disposal of Construction and Demolition
waste(C & D Waste) and proof of its disposal as per the provision of C & D Waste rules and he has
to submit along with running bills.
5. If contractor fails to upkeep and maintain records of C & D Waste generation Disposal records etc.
than it shall be calculated as per the provision of the Standing Committee Resolution no 1621/2016,
Dt.01/10/2016 and charges shall be recovered from due of contractor with Surat Municipal
6. Contractor shall also ensure use of recycled product made from SMC authorized C & D Waste
agency as far as possible to promote the C & D Waste management project.
(56) ALL CLAUSES ARE OF GENERAL IN NATURE; BIDDER/ CONTRACTOR MUST FOLLOW; WHICHEVER
IS / ARE APPLICABLE FOR WORK UNDER CONSIDERATION.
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 74 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
CONDITIONS ABOUT THE EXECUTION OF WORK: -
(1) Bidders must make his own arrangement for watch and ward of material supplied till it is
commissioned satisfactorily at site and handed over to the corporation. Corporation will not be
responsible for theft of materials till it is commissioned satisfactorily and handed over to the
corporation even if part payment is released.
(2) All equipment/ materials/ accessories are to be supplied by contractor and to be erected by
contractor. No tools-tackles/ machinery/ manpower will be provided by the Corporation. No
change in units shall be allowed.
(3) Entire lighting system installation with methodology shall have to be got approved before
commencement of actual work on site. Map/ installation drawing needs to be provided with actual
work done/ quantities of materials/ equipment supplied/ installed with table after commissioning.
(4) The supply shall be done during working days between 8.00 A.M. to 6.00 P.M. only. If the
contractor intends to work on holidays or outside working hours specified, he shall take prior
written permission from Engineer in charge/ Zonal officers.
(5) After completion of job, contractor shall submit the test reports, wiring diagram, complete
installation in as built drawings etc. All these shall be printed and bound in book form. Payment
shall be released only on receipt of this volume.
(6) Any damage to any service or accident in carrying out the works pertaining to this contract shall be
to contractor’s account.
(7) Samples of each class of material and workmanship shall be submitted by the Contractor for the
approval of Engineer-in-charge and after such approval these samples shall be deposited at any
place the Engineer-in-charge may appoint and the Contractor shall be required to perform all the
works of this contract in accordance with the samples.
(8) On completion, all work must be cleaned down; rubbish removed and the works and land cleaned
of rubbish; surplus materials and other accumulations, and everything left in a clean and ordinary
(9) The contractor shall provide, erect and maintain proper sheds and temporary buildings for the
storage and protection of materials and goods and for the execution of work which may be
fabricated or brought on the site.
(10) The contractor shall permit the execution of the work not provided for in the tender by artists;
tradesman, or others engaged by the Municipal Corporation. The contractor shall allow all
reasonable facilities and the use of his scaffolding and water for the execution of such work, but is
not required to provide any special scaffolding for the execution of such work except by special
arrangement with Municipal Corporation.
Surat Municipal Corporation |South Zone-B| Page 75 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
(11) All works to be executed under the control shall be executed under the directions and subject to
the approval in the respects of the Executive Engineer who shall be entitled to direct at what point
or points and in what manner they are to be commenced, and from time to time carried on.
(12) SAFETY REGULATIONS
[I] During the execution of the work, unless otherwise specified, the contractor shall at its own
cost and expense provide the materials for all shoring, timbering and shuttering work
necessary for the stability, safety and construction of all structures, excavations and works
and shall ensure that no damage, injury or loss is caused or is likely to be caused to any
person or property.
[II] The Contractor shall be responsible to take all precautions to ensure the safety of the person
or property whether on public or works site during the period of contract and shall post such
look out personnel as may, in the opinion of the Engineer-in-Charge, be required.
[III] The Contractor shall assure the safety of the work and personnel and contractor shall be
entirely responsible for any damage or injuries to any property or person resulting from any
accident due to any reasons.
[IV] The Contractor must take sufficient care while moving, handling and installing
material/equipment, so as not to cause any injury or damage to the persons or property of
the SMC or the public or other working in or around the works. In case of causing of any
injury or damage, to any person or property as aforesaid, the costs and expense of such
occurrences, including eventual loss of working hours as estimated by the SMC, shall be
borne by the Contractor. The Contractor shall also replace or repair all the damages caused to
buildings or Material/equipments left at the time of the completion of the work to bring the
building or Material/equipment back to the original condition.
[V] The Contractor shall, at its cost and expense, provide all the necessary facilities such as
ladders, tools & tackles, railing, platform, inspection lamps, safety ropes, etc., for providing
the safe working conditions to its or sub-contractor’s workmen/workers and also for the
inspection of the works by the authorized officials under the contract.
[VI] In any case of dismantling or demolition or otherwise the Contractor shall take necessary care
not to damage the existing structure, equipment or materials while executing the works, and
any damage, if caused on account of the same, shall be rectified or repaired by the contractor
at its own cost and expense in restoring the structure or materials to its original condition.
(13) EXECUTION OF THE WORKS
The whole erection and installation work shall be done in supervision of electrical supervisor/
engineer-in-charge. No work including erection/ installation shall be between 8.00 to 17.00 hours
with 1.00 hour of recess in between or on Sunday or Government holidays, except with the special
sanction of the Engineer in writing previously obtained, and the withholding of such sanction shall
be no ground of complaint on the part of contractors of cause for compensation to them. The
Surat Municipal Corporation |South Zone-B| Page 76 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
period within which the work has to be carried on and completed has been fixed in terms of this
cause with the provision that the total number of hours of work permissible shall not exceed
hour in a week and in no case more than 8 hours on any working day the actual times within which
the said hour shall be worked being subject to mutual arrangement with the contractors at the
commencement of the work or from time to time as may be required and provided that for the one
hour about mid-day exclusively of the permissible hours aforesaid for work, all works shall be
stopped for raft and modes though sanction may be accorded to the contractor to work on days
and at times otherwise, normally non-permissible under this contract, the contractors shall be
required to bear the cost of such supervision as in the opening of the engineer-may be necessary at
these times It should be distinctly understood that the granting of permission to work extra hours
or to work on Sundays and Holidays will be entirely at the discretion of the Engineer and cannot be
claimed by the contractors as a matter of right and the refusal to grant such permission will not be
set up as a ground or for not completing the work within the contract period.
If on the other hand the Engineer requires that the work shall be proceeded with on days and at
times otherwise normally non-permissible under this contract the contractors shall proceed with
the work but they will not be required in such cases to bear the cost of the Municipal establishment
employed at the time. A six hours work at night will be considered as equal to day’s work. Such
number of days and hours as may be worked under these exceptions will be takes into account in
determining the contract period fixed for completion of the works.
The contractors at all times during the continuance this contract shall in all their dealings with local
labour for the time being employee on the works contemplated by this contract have due regards
to all local festivals and religious or other customs and all disputes, matters and questions arising
between the contractors and any of their Agents on the hand and any local labour on the other
hand with respect of any matter or thing in any way connected with this contract shall be decided
by the Commissioner whose decision shall be final and binding on all parties.
The contractor shall not enter upon or commence any portion of work except with the authority
and instructions of the Engineer-in-Charge or of his subordinate in charge of the work failing such
authority the contractor shall have no claim to ask for measurements of or payment for work.
THE CORPORATION MAY DO PART OF THE WORK
Upon failure of the Contractor to comply with any instructions given in accordance with the
provisions of this contract, the Corporation has the alternative right, instead of assuming charge of
entire work to place additional labour force, tools, equipments and materials on such parts of the
works, as the Corporation may designate or also engage another Contractor to carry out the work.
In such cases, the Corporation shall deduct from the amount which otherwise becomes due to the
Contractor, the cost of such work and materials with 10% added to overall departmental charges
and should the total amount thereof exceed the amount due to the Contractor, the Contractor shall
and should the total amount thereof exceed the amount due to the Contractor, the Contractor shall
pay the difference to the Corporation.
Surat Municipal Corporation |South Zone-B| Page 77 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Contractor to note that SMC shall appoint Project Management Agency/ Third Party Agency for the
supervision/ inspection of the work and they have to work under them.
(14) WORKMANSHIP
The work to be done under the contract or any part thereof shall be executed in the best and most
skilled workmanship like manner, with best and approved quality of equipment and both the work
and the material/equipment should conform to the particulars contained in or implied by the
specifications and as referred to in the drawings or in such other additional directions, instructions
and documents as may be found necessary and given time to time to the contractor during the
execution of the works and to the entire satisfaction of the SMC and the Engineer-in-Charge.
The entire work shall conform to the latest and acceptable engineering practices and shall be such
as to cause minimum transfer of noise and vibration to the building structures.
(15) REMOVAL OF IMPROPER WORK AND MATERIAL/ EQUIPMENT
The SMC shall have power to check and reject at any stage such work / equipment which it
considers to be defective in quality or workmanship and nothing shall prevent from rejecting the
materials brought to the site (i.e. materials made ready for use on works) which has been
previously passed by the SMC or the Engineer-in-charge in an un-worked condition. The Contractor
shall immediately arrange to replace the defective equipment by proper and suitable equipment
with the approval of the Engineer-in-Charge and carry out rework of the rejected work at his own
cost and expense and to the satisfaction of the SMC. In the event of failure on the part of the
Contractor to carry out his obligations under this clause, the SMC shall have the right to get the
work done through other agencies at the risk of the Contractor and recover the cost in full from the
All rejected Material/equipments will at once be removed from the site by the Contractor to such
distances as may be desired, failing which the Engineer-in-Charge after giving three days’ notice in
writing may do so and recommend to the SMC for recovering the cost of removal from the
(16) URGENT WORKS
If any urgent work (in respect whereof the decision of the SMC shall be final and binding) becomes
necessary for safety of the work or personnel and the Contractor is unable or unwilling to carry it
out, the Engineer-in-Charge shall have right to employ outside labour. All expenses incurred on it
shall be recoverable from any sum payable to the Contractor.
(17) CLEARANCE OF SITE ON COMPLETION
As part of the work included in this Contract, the Contractor shall completely remove and
satisfactorily dispose “off” all temporary works to the extent directed. He shall demolish and
dispose of all temporary structure, shall remove or grade to the extent directed all embankments
made for erection purposes, shall satisfactorily dispose “off” all rubbish resulting from the
Surat Municipal Corporation |South Zone-B| Page 78 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
operations under this Contract and shall do all the work necessary to restore the territory
embraced within the site of his operations to at least as good order and conditions as at the
beginning of the work under this Contract.
No final payment in settlement of the accounts for the Works will become due and shall be made to
the Contractor till, in addition to any other conditions necessary for such final payment, Site
clearance has been affected by him. In the event of his failure to comply this provision within
fourteen (14) days after receiving notice to that effect, such clearance may be made by the
Engineer-in-Charge at the cost and expense of the Contractor. In the event, it become necessary for
the Engineer-in-Charge to have the Site cleared at the cost and expense of the Contractor, the SMC
shall not be held liable for any loss or damage to the Contractor’s property as may be made on the
site and due to such removal there from.
(18) EXTRA WORK
Work that is not included in the tender documents shall not be performed, except when
approved/sanctioned in writing by S.M.C.
Rates for additions or extras
Any additional item of work over and above those schedules in the tender are to be carried out at
the same basic rates as quoted in the tender for the same type of work.
Rate for extra items, as far as possible will be derived from the quoted tender items where it is not
possible to do so, the same shall be arrived at by adding 15 % towards overhead and profits on the
actual cost of labour, material and plant and machinery input as approved by Engineer-in-Charge.
No claim for any extra or compensation for damage will be entertained on account of such
variation, except where the quantity is increased by more than 30%.
No claim for any extra or compensation for damage will be entertained on account of such variation
where the quantity is decreased to any percentage or where the item is totally deleted.
Before payment of final bill on completion of the work, total amount of that work done at
Before payment of final bill on completion of the work, total amount of that work done at
sanctioned rate shall be considered with the total amount of work done, had it been executed at
sanctioned rate shall be considered with the total amount of work done, had it been executed at
the rate of second tenderer. While comparing total amount, quantity to be taken into consideration
the rate of second tenderer. While comparing total amount, quantity to be taken into consideration
will be the quantity executed and not the quantity put to tender and will also include variation of
quantity within the limits of quantity executed as per clause i.e. 30% of the estimated quantity.
(19) EXTENT OF DEVIATION OR VARIATION
The Contractor is not to vary / deviate from the approved scheme, its drawings and specifications
or instructions or execute any extra work of any kind whatsoever unless upon an order in writing is
given by the SMC in this regard. If compliance with the SMC’s aforesaid order or approval involves
extra work, and/or expense beyond that involved in the execution of the works as per contract,
then unless the same were issued in consequence of some breach of this contract on the part of the
Surat Municipal Corporation |South Zone-B| Page 79 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Contractor, the latter shall be paid the price of the said work (to be valued as hereinafter provided)
and/or the expense aforesaid.
(20) MODIFICATIONS TO THE CONTRACT
There are no other understandings between the parties other than this Contract Document.
In the event of any of the provisions of the Contract require modifications after the Contract
Documents have been signed, except those directions and orders given by the SMC under the
Contract for the due execution of the works, the modifications shall be made in writing and signed
by both the parties before giving effect to such modifications.
(21) COMMENCEMENT OF WORKS
The Contractor, having signed the Contract with the SMC, shall commence the work within the
period stipulated in the document.
The Engineer-in-Charge may direct the Contractor to use so much of the site as may, in the
Engineer-in-Charge’s opinion, be required in order to enable the Contractor to commence and
continue the work and shall from time to time, as the work proceeds, give the Contractor the use of
such further portions of the site as the Engineer-in-Charge may from time to time consider proper
and adequate in that regard. Phased delivery in the manner aforesaid of the use of site or any other
facilities to be afforded to the Contractor shall not entitle the Contractor to any claims whatsoever.
If the Contractor commits default in commencing the execution of the work as aforesaid, the SMC
shall, without prejudice to any other right or remedy, be at liberty to forfeit the Earnest Money
Deposit absolutely.
WARRANTY FOR MATERIAL/EQUIPMENT
With respect to the Material/equipments provided by the contractor under this contract, the
contractor shall be deemed to have furnished to the SMC.
“The Contractor warrants that the Material/equipments are not subject to any security interest,
lien or other encumbrance”
Against Patent Infringements
“The Contractor shall at his own expenses defend and save the SMC harmless from the expenses
and consequences of any suit or procedure brought against the user so far as the said suit or
procedure is based on a claim that the equipment provided constitute an infringement of any
patent in existence on the date of the contract”.
“In addition, the Contractor shall secure at his own expense a fully paid up license or license that
will permit the user to continue operation of the equipments provided, free of further claim for
Surat Municipal Corporation |South Zone-B| Page 80 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
“The Contractor warrants that the equipment provided are suitable for the purpose or the
purposes, for which such goods are used, conform to promise or affirmations made by the
contractor and conform to specifications stipulated in the Contract”.
“The Contractor warrants that the equipments provided are suitable for the particular purpose
stipulated in the contract. The SMC affirm that it has relied on the contract’s skills and judgments to
select or provide equipment for a particular purpose”.
“The Contractor warrants that the equipments are new and of best quality and that the equipment
will be free of defects in design, workmanship or materials”.
BREACH OF WARRANTY
In the event of a breach of warranty, the contractor shall be required to take all necessary action at
his cost and expense to correct the breach in the most expeditious manner dictated by the existing
Upon oral or written notification of defects or malfunctioning of equipment during normal
operation, which requires corrective action, the Contractor shall send the necessary personnel with
the required materials, tools, test equipment and such other items to site to supervise and assume
responsibility for repair. If the Contractor does not expeditiously take steps to correct the defects,
the Engineer-in-Charge may at its option do so. However, such action on the Engineer-in-Charge’s
part, will not release the Contractor of his responsibility and the Contractor inter-alia shall
reimburse all the expenses incurred by the Engineer-in-Charge to repair or replace malfunctioning
or non-conforming equipment.
(23) MAINTENANCE AND DEFECTS
AFTER SALES SERVICE
The Contractor shall ensure that adequate and prompt after sales service in the form of
maintenance personnel and spares as and when required with a view to minimize the breakdown
period. Particular attention shall be given to ensure that all spares are easily available during the
normal life of the equipment.
(24) CONTRACTOR TO MAKE FACILITIES AT SITE
The Contractor shall make temporary arrangements at his own cost and expense for any
approaches/accesses required for the movement of men and materials to his working places and
material yard. If directed by the Engineer-in-Charge, the Contractor shall remove and make good
temporary arrangements after completion of the works.
Surat Municipal Corporation |South Zone-B| Page 81 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
(25) The contractor shall not enter upon or commence any portion of work except with the written
authority and instructions of the Engineer-in-charge or of his subordinate in charge of the work
failing such authority the contractor shall have no claim to ask for measurements for payment of
(26) Disputes if any shall be discussed and mutually settled and in case of disagreement the same shall
be referred to Commissioner/ Standing Committee. After referring to Commissioner/ Standing
Committee if the said dispute is not solved, the same shall be referred to the court subject to Surat
Jurisdiction only.
(27) ALL CLAUSES ARE OF GENERAL IN NATURE; BIDDER/ CONTRACTOR MUST FOLLOW; WHICHEVER IS/
ARE APPLICABLE FOR WORK UNDER CONSIDERATION.
(28) TERMINATION FOR UNSATISFACTORY PERFORMANCE
If the corporation considers that the performance of the contractor is unsatisfactory or not up to
the expected standard, the corporation shall notify the contractor in writing and specify in detail
the cause of dissatisfaction. The corporation shall have the option to handover this work to other
agency (ies) at risk &cost of the contractor and terminate this contract if the contractor fails to
comply with the requisition contained in the said written notice issued by the corporation to the
contractor within fifteen days of the receipt thereof. Decision of the competent authority shall be
final regarding deduction of performance guarantee or release the performance guarantee.
Any other details, if required can be obtained from the office of the Concern department/authority,
on request and prior to submitting the tender. No dispute at a later date shall be entertained.
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER
Surat Municipal Corporation |South Zone-B| Page 82 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
CONDITIONS ABOUT TESTING & INSPECTION: -
Bidder may offer the approved make & model of the LED streetlight luminaires sanctioned under Unit
Rate Tender by the competent authority’s resolution no.2013/2024, Dtd:- 26/12/2024. If bidders wish
to offer other make/ model of the LED luminaries than following procedure must be followed: -
(1) APPROVAL OF LED LUMINAIRE FOR PRIMARY QUALIFICATION OF USAGE:
a. All details/ documents/ certificates pertaining to LED luminaires must be furnished within
days from the date of work order/ intimation letter.
b. One sample of each LED luminaires needs to be deposit for physical verification within 30 days
from the date of work order.
c. Design for all road-pole configuration(s) has to be submitted within time limit as specified in the
d. All designed parameters must be matched with the specifications of the tender.
e. One sample of each LED luminaire to be tested Total luminous flux measurement, Luminous
intensity distribution, luminous efficiency and colour characteristics test as per LM-79 at any
government recognised laboratory like ERDA/UL/ERTL/third party NABL approved laboratory
within 30 days from the date of the allotment of the intimation letter after award of contract.
Original copy/ attested copy of test will be submitted by the contractor and original test
report(s) needs to be furnished for verification. All kinds of testing charges will be borne by the
contractor and charges for all arrangements related to testing also will be borne by the
f. All process of approval of the LED luminaires must be completed within 30 days from the date
g. After successful completion all processes for approval, LED luminaires’ models will be
considered as primarily qualified for usage at site. Testing during actual use will be carried out
independently as per terms & conditions.
h. Aforesaid process of approval of particular capacity LED streetlight will be applicable for the
LED streetlight fittings, other than above mentioned LED streetlight luminaires model.
It is to be noted that Bidder will have to submit affidavit cum undertaking cum
declaration by LED and CCMS manufacturer in every case.
(2) All fabricated, manufactured items, equipments, etc. shall be subjected to inspection and tests as
per the relevant standards at the manufacturer's works prior dispatch.
(3) Surat Municipal Corporation may depute Third Party representative for Inspection at manufacturer
site. Bidder has to make all necessary arrangement at manufacturer works, regarding
inspection.Further, SMC will issue separate work order for inspection to TPI and payment will be
(4) Bidders shall give notice of two weeks to the Engineer-in-charge who may depute his
representatives at his option to witness such tests.
(5) All inspection call must be placed on manufacturer’s letter by authorised signatory (Quality
control) duly stamped, clearly indicating qty. offered for inspection and evidence of readiness of
materials. Sales / marketing / irrelevant department’s letter will not be considered.
Surat Municipal Corporation |South Zone-B| Page 83 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
(6) It shall however, be the bidder's responsibility to supply all materials as per specifications,
standards mentioned herein and inspection by the clients does not relieve the contractor form his
all obligations.
(7) If, first testing, on any ground fails and, retesting is required, in such case, entire expenditure for
retesting shall be in bidder’s account.
a. The Contractor shall provide at all times during the progress of the work and also during the
defect liability period proper means of access and required attendants to move and arrange
things as directed for the purpose of inspection or assessment of the work by the SMC or its
authorized representative.
b. All Works embracing more than one activity shall be subject to examination and approval at
each stage and the contractor shall give due notice in writing to the Engineer-in-Charge when
each stage is ready. In default of such notice, the Engineer-in-Charge shall be entitled to
appraise the quality and extent thereof.
c. No work shall be put out of view by the Contractor without the approval of the Engineer-in-
Charge and the Contractor shall afford full opportunity for the examination and assessment of
any work which is so considered. Similarly, no work involving pre- assessment shall be taken up
without a specific authorization by the Engineer-in-Charge. The contractor shall give a notice of
not less than 2 days but not more than 4 days, in any case, in writing to the Engineer-in-Charge
whenever any work or equipment is intended to be covered up in the earth or in walls or
otherwise to be placed beyond the reach of assessment so that the work may be inspected and
verified by the Engineer-in-Charge or that the correct dimensions may be taken before being so
covered up. The Engineer-in-Charge shall, without unreasonable delay, unless he considers it to
be unnecessary and advises the Contractor accordingly, attend for the purpose of examining
and assessing such work or materials intended to be covered up. In the event of the failure on
the part of the contractor to give such notice, such work/equipment shall be uncovered, if
required, by the Engineer-in-Charge at the expense and cost of the Contractor.
d. The Contractor shall uncover any part of the Works and/or make openings in or through the
same as the Engineer-in-Charge may from time to time direct for his verification and shall
reinstate and make good such part to the satisfaction of the Engineer-in-Charge. However If any
such part has been covered up or put out of the view after being approved by the Engineer-in-
Charge and is subsequently found on uncovering, to be executed in accordance with the
Contract, the cost and expense of uncovering and/or making openings in or through reinstating,
making good the same shall be borne by the SMC. In any other case all such costs and expenses
shall be borne by the Contractor.
(8) Testing of LED luminaires: -
All Tests defined for acceptance other than LM 79 and LM 80 is allowed to be carried out at
Manufacturer works.
Normally testing of LED luminaires to be supplied/ installed are to be done as mentioned in
the table below. The testing methodology mentioned wherein is for normal cases. Competent
authority or concern department head of SMC can waive some or all tests, in special cases or
quantity of the LED luminaires are less.
Test Scheme of LED luminaires: -
Surat Municipal Corporation |South Zone-B| Page 84 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Sr. Prototype Acceptance Routine
Description of test Type Test
No. Test Test Test
Visual and Dimensional
Checking of documents
of purchase of LED
(3) Resistance to humidity Y Y --- ---
(4) Insulation resistance Y Y Y Y
(6) Over voltage protection Y Y Y Y
(7) Surge protection Y Y Y ---
(8) Reverse polarity Y Y Y ---
(9) Temperature rise Y Y --- ---
(10) Ra (CRI) measurement Y Y --- ---
(11) Lux measurement Y Y Y ---
(12) Fire retardant Y Y --- ---
(13) Test for photometric Y Y Y ---
(14) Environmental Y --- --- ---
(15) Reliability Y --- --- ---
(17) Endurance Y --- --- ---
(18) IP protection Y Y Y ---
** Quality Assurance Plan/ Details
Approved Approved
(19) Testing at Mfr. works Mfr. works
Govt. Lab Govt. Lab
(20) Testing by --- --- SMC/ TPI SMC/ TPI
Up to 35 W: =>100 Nos,
Lot size for testing not
Above 80 W : =>50 Nos.
(22) Test Sample Size --- --- Min. 10%. ---
(23) Documentation to be Whenever issuance of
testing at testing at
submitted asked Work order/
Mfr. works Mfr. works
(24) LM 79 and LM 80 test --- -as above- --- ---
report & result
(25) Certificate for Impact --- --- testing at
Resistance Test
Please note that the testing of LED luminaires shall be done as mentioned in the "BRIEF DETAILS
REGARDING THE WORK".
Surat Municipal Corporation |South Zone-B| Page 85 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
(9) TESTING OF OCTAGONAL POLES & Brackets:
If no. of Poles are equal or more than 50 nos., poles and brackets must be got tested/
inspected for all tests at manufacturer's works in presence of corporation's/ TPI’s
representative before supply. The supplier must make all the arrangement for
testing/inspection at manufacturer's works without any extra cost to the corporation. 7 days’
clear prior notice should be given for testing/inspection. All the material/equipment/
accessories must confirm to the relevant IS with its latest amendments. If quantity is less than
50 nos., supplier should submit internal test reports of pole & brackets and contractor has to
make necessary arrangements for onsite checking of Galvanizing coating thickness of poles &
brackets with valid calibrated meter prior to installation.
Hi-Mast must be got tested/ inspected for all tests at manufacturer's works in presence of
corporation's/ TPI’s representative before supply.
(10) TESTING OF CABLES:
Manufacturer’s test certificate must be furnished for cable of concerned work. If the length of
cable is equal or more than 1.5 km for each size/category, the cable must be got tested at
manufacturer's works for all routine tests as well as acceptance tests presence of
representative of TPI/ SMC before supply. If the quantity of cable required for the work is less
than the drum packing with length of 1.5 km, contractor is permitted to use the cable tested
by manufacturer. However, test certificate(s) must be furnished along with the invoice(s).
(11) PACKING, MARKING, PROTECTION AND DISPATCH OF EQUIPMENT
The Contractor shall be held liable for all damages or breakages to the material/equipment due
to the defective or insufficient packing as well as for corrosion due to insufficient protections.
The Contractor shall arrange for dispatch of the Material/equipment by rail/road/ship after
proper packing protection. The consignments shall be dispatched after inspection or otherwise,
if agreed to, on freight paid basis, irrespective of the basis of price.
(12) PERFORMANCE TESTING OF CCMS AT SITE:
Performance testing of CCMS shall be done at site after drawing approval. Functioning and
report generation shall be checked.
In case of unsatisfactory performance necessary remedial actions must be taken by the
contractor including complete replacement of components/ spares without any extra cost to
All the material/equipment/accessories should be supplied with manufacturer's test certificates.
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 86 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
CONDITIONS REGARDING GUARANTEE/ WARRANTY, SECURITY DEPOSIT/ PERFORMANCE GUARANTEE: -
(1) The successful contractor shall be required to deposit an amount equal to 2.0% of the total order
value as Security Deposit as mentioned elsewhere in the tender document. If security deposit in
form of FDR, the Bidder shall have to become the contract agreement on non–judicial Gujarat
stamp paper of amount of 4.92% or Prevailing amendment of Government or norms of government
for security deposit amount.
(2) The material / equipment offered by the bidders must carry an un-conditional guarantee of
minimum one year from date of commissioning. The amount of performance guarantee shall be
retained till expiry of satisfactory guarantee period. During the defect liability period, all necessary
spare(s)/ material(s) required will be supplied / arranged by contractor.
(3) During defect liability period, if any spare(s) / material(s) found defective than same should be
repaired or new spare(s) / material(s) is to be replaced. In no case second hand / used material /
equipment wouldn’t be allowed.
(4) Defect liability period will be 12 months from the date of satisfactory commissioning. After
successful commissioning, entire system shall be handed over to O & M Contractor of the
respective Zone / Sub Zone. However, spares / components of streetlight system under the defect
liability period shall be provided by the contractor, who has installed the system. Therefore, the
rates must be quoted accordingly and no dispute will be entertained at later date.
(5) If, contractor fails to supply required spares of any component within five days of intimation then,
following penalty shall be charged and recovered from his pending bills / security deposit or from
any other pending amount / any other works in SMC.
(a) If contractor supply spares for any component of system within five days, NO penalty.
(b) If contractor supply on sixth day, penalty for first five days will be Rs. 100.00 per day.
(c) For sixth to ten days, penalty will be Rs. 200.00 per day.
(d) After tenth days, SMC shall order O & M contractor to supply spares on chargeable basis &
this charge(s) plus penalty for ten days (Rs. 1,500.00) shall be recovered from the SITC
(e) Above penalty shall be recovered on per complaint basis.
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER
Surat Municipal Corporation |South Zone-B| Page 87 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
PAYMENT & PENALTY TERMS & CONDITIONS: -
(1) No payment shall be made in advance. The Corporation shall not under any circumstances relax
the terms of payment and will not consider any alternative terms of payment. Bidders should
therefore in their own interest note this provision to avoid rejection of their tender.
(2) All payments shall be made as per prevailing rules/regulations of SMC.
(3) During the course of execution of Contract, if there is any change in rate of GST (GOODS & SERVICE
TAX) by the Government the same shall be reimbursed/ recovered separately by SMC, subject to
the submission of original Receipt/ Proof for the amount actually remitted by the successful bidder/
Contractor to the competent Authority along with a certificate from chartered Accountant of
Contractor/ Successful Bidder certifying that the amount of GST paid to the Government and the
same shall be intimated/ submitted/ claimed within 30 (Thirty) Days from the sole responsibility of
the Successful bidder/ Contractor, failing which, SMC may recover the amount due, from any other
payable dues with SMC. Further the non-payment of the GST to the Government may lead to the
termination of contract and forfeiture of Security Deposit/ Performance Guarantee Amount.
(4) TDS of GST shall be deducted as per the act/rules from the bills of the contractor.
(5) The corporation shall not accept advance payment term. All payments are subject to income tax,
construction cess, GST etc. at source as per prevailing rules. All payments shall be made by A/C
Payee cheque of any schedule bank Surat branch only or as per prevailing rules/ regulations of SMC.
(6) The work must be completed in all respect within stipulated time period as mentioned in Important
instruction to bidder, failing which penalty @ 0.2% of order value of unexecuted portion per day of
delay subject to maximum 10% of order value shall be charged and shall be deducted from the bill
or any outstanding payment. Also, if contractor fails to execute the work than action against
contractor will be taken as per decision of competent authority of SMC and that should bind to
(7) The Contractor shall be liable to the payment of all the Central/ State/ Local Body's Levies, taxes or
duties etc. The SMC shall neither bear it nor reimburse at any time but will ensure deduction of
Central/ State/ Local levies and taxes at Source at the rate provided under the relevant statutes
from time to time in force. Further the work contract tax or sale tax shall be borne by the
Contractor as per Rules and Regulations of Government.
(8) Any increase or decrease in taxes/ duties or imposition of any new taxes/ duties shall be on account
to the Corporation and such increase/ decrease shall be paid/ recovered to/ from the Contractor on
producing documentary evidences only. The contractor shall be the sole responsible for payment of
such incidentals to the concerned Government department which he has collected from the
Corporation. This provision is limited for Schedule-B of the tender.
Surat Municipal Corporation |South Zone-B| Page 88 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
(9) As per government G.R. Building and other construction work welfare cess act-1966 labour and
employment development G.R. No. CWA/ 2004/ 841/ M-3, Dt-30/01/2006 contractor shall have to
pay 1% cess on every bill amount.
(10) Quantities shown in the tender are approximate and no claim shall be entertained for quantities of
work executed being either more or less than those mentioned in the tender.
(11) Seven percent (7%) shall be retained from every running bill as retention money and shall be
released in Final Bill, after of satisfactorily completion of SITC work.
(12) Security deposit shall be released after final takeover of the installation after expiry of defect
liability period as well as satisfactory clearance from Audit department.
(13) In case site access is not available within the date of completion of work than 5% of sanctioned
value shall be released against submission of a Bank Guarantee for equivalent amount.
(14) Further, if in another three-month, site access is still not available further 5% of quoted value shall
be released against submission of a Bank Guarantee of equivalent amount.
(15) The contractor shall have to submit bill in duplicate along with documents as mentioned elsewhere
in this tender document for the activities completed. The payment should be made as per the
actual work done and actual measurement of each item done on site.
(16) TERMS OF PAYMENTS:
[ A ] 70% of equipment(s) quoted value after satisfactory delivery/ acceptance of material and
after, submission of invoice.
[ B ] 25% of equipment(s) quoted value after satisfactory commissioning of all the equipments and
after, submission of invoice.
[ C ] Remaining 5% of equipment(s) quoted value after satisfactory completion of whole work in
all respects as a final bill.
Recoveries shall be made from the above payments as per provisions made in various conditions,
clauses, terms etc., in the tender documents and other dues from the Contractor.
Receipt for payments made on account of any work when executed by a firm, should also be signed
by all the partners, except where the contractors are described in their tender as a firm in which
case the receipts shall be signed in the name of the firm by one of the partners, or by some other
person having authority to give effectual receipt for the firm.
(17) SCHEDULE OF QUANTITIES AND RATES/ PRICE
The Contractor shall neither be entitled for any revision of price owing to variations in actual
quantities of work nor be entitled to any loss of consequential profits or for any other damages
arising thereof. The Contractor shall be paid only for the actual quantities of work executed and
according to the price or unit rates agreed to.
Surat Municipal Corporation |South Zone-B| Page 89 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
The price or unit rates agreed to under this contract shall be for the finished works (except to the
extent specifically excluded) and shall be inclusive of all equipment, accessories, hard wares,
fabrication works, support structures, tools and plant, transport, labour, hoisting, setting and fixing
and including all royalties, taxes and duties, etc. and shall remain firm and free from any variations
arising from the cost of materials, labour, equipment, etc.
The price or unit rates agreed to under this contract shall be deemed to compensate for all minor
details, which are not specifically mentioned, but are fairly and obviously intended and are essential
for the full and final completion of the works. Further, the Contractor is not entitled to make any
extra claims for such works, if any.
If the Contractor or his workmen; or servants shall break, deface injure or destroy any part of a
building in which they may be working, or any building, road, fence enclosure or grass land or
cultivated ground continuous to the premises on which the work of any part thereof is being
executed, or if any damage shall be done to the work for any cause whatever while it is in progress
of if any imperfection becomes apparent in it within the Defect liability period mentioned above by
the Engineer-in-Charge the contractor shall make good the same at his own expense, or in default
the Engineer-in-Charge may cause the same to be made good by other workmen and deduct the
expenses (of which certificate of the Engineer-in-Charge shall be final) from any sum that may be
due or thereafter becomes due to the contractor, or from his security deposit or the proceeds of
sale thereof or of a sufficient portion thereof.
Compensation for all damage done intentionally or unintentionally or by the Contractor's labourers
whether in or beyond the limits of the Municipal Property shall be estimated by the Engineer-in-
Charge or such other office as he may appoint and estimates of the Engineer-in-Charge subject to
the decision of the Commissioner on appeal be final and the contractor shall be bound to pay the
amount of the assessed compensation on demand failing which the same will be recovered from
the Contractor as damage from the security deposit or deducted by the Engineer-in-Charge from
any sum that may be due or become due from the Municipal Corporation to the contractor under
this contract of otherwise.
The contractor shall bear the expenses of defending any action or other legal proceedings that may
be brought by any person from injury sustained by him owing to negligence of precautions to
prevent the spread of fire and he shall also pay any damages and cost that may be awarded by the
court in consequence.
(18) PAYMENT AT REDUCED RATE
The rates for several items of the work agreed shall be valid only when the item concerned is
accepted as having been completed fully in accordance with the sanctioned specifications. In cases,
where the items of works are not accepted, the Engineer-in- charge may make payment on account
of such items at such reduced rates as he may consider reasonable in the preparation of final or on
(19) GUARANTEED INPUT POWER PENALTY
Surat Municipal Corporation |South Zone-B| Page 90 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
If guaranteed rated power input is not achieved during the test (After Work Order) as per IS
16104 & 16106 (with latest amendments) then all luminaires/ such lot will be rejected and fresh
lot of luminaires needs to be supplied free of cost after successful testing of the same.
(20) FINAL PAYMENT
The final bill shall invariably be preceded by a thorough assessment of the entire work performed
by the Contractor. The Contractor shall submit the final bill for the works within one (1) month of
such final assessment. The bill shall be based only on the works as assessed and at the accepted
tender rates, including rates for any additional or extra work which might have been sanctioned by
the SMC. All the deductions due under the Contract shall be adjusted accordingly in the final
(21) NO ESCALATION PAYABLE FOR WAGES AND MATERIALS
No payments to the Contractor on account of escalation of rates of equipment, materials, wages,
fluctuation in foreign exchange rate, etc., are admissible. The Contractor is supposed to foresee all
statutory /other escalations which may be taken into account while quoting the rates in the tender.
However, the Contractor as notified by the Government shall pay the minimum wages payable to
the labour as per Minimum Wages Act from time to time during the execution of the project. Any
payment made over and above the specified minimum wages shall be on Contractor‘s account and
the SMC shall not be liable to account for the same. In case of imported equipment any possible
increase in custom duties, CVD, etc., shall also be foreseen and absorbed by the Contractor.
Income Tax on gross amount billed by the Contractor, as per prevailing statutory rules will be
deducted as per Section 194(c) of Income Tax Act.
CONSTRUCTION CESS
Construction Cess on gross amount billed by the Contractor, as per prevailing statutory rules will be
deducted as per Labour & employment development GR No.CWA/2004/841/M-3, Date: -
30/01/2006 of Gujarat Government.
Applicable GST TDS will be deducted as per prevailing act(s)/ rule(s)/ notification(s).
(23) RELEASE OF SECURITY DEPOSIT ACCORDING TO WORK DONE
In case the total amount of work done is less than 5% of the contract value, prorate S.D. to that
In case the total amount of work done is less than 5% of the contract value, prorate S.D. to that
extent may be refunded to the contractor while releasing the payment of final bill. In soft, the S.D.
to be retained by the Corporation after payment of final bill shall be equal to 2% of the amount of
final bill as per the prevailing norms or as per the norms decided from time to time.
Surat Municipal Corporation |South Zone-B| Page 91 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
If there is increase in amount of work more than 5% of the contact value. The Additional S.D. shall
be recovered from the running bill. When the total of any of work done by the contractor up to
running bills under consideration is more than 5% of the contact value. However, such S.D. shall be
recovered in the round figure of Rs. 1,000.00 i.e. the amount of work done when it exceeds 5% of
the contract value it shall be refunded of to the nearest multiple of Rs. 25,000.00 such additional
S.D. shall be recovered for the works amount to Rs. 5/- Lakh or more at the rate of 4% of the
additional amount.
Executive Engineer,
South Zone-B (Kanakpur),
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Surat Municipal Corporation |South Zone-B| Page 92 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Surat Municipal Corporation |South Zone-B| Page 93 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
DETAILED TECHNICAL SPECIFICATIONS
Illumination Design & Relevant Data Sheet : -
Sr. No. Parameters <= 9 Mtr. Road Width.
(1) Average Illumination 4 lx
(2) Uniformity Ratio (min.)
(3) Transverse Uniformity (min.)
(4) Arrangement Side
(5) Average Span 23 m
(6) Height of Pole 6m
(7) Bracket Arm(s) Single
(8) Bracket Arm Length 0.50 m
(9) Type of Luminaire LED
Initial Lumen Output luminaire
(11) Input of LED luminaire (max.) 15 W
(12) Tilt angle 0°-15°
(13) Mounting Height of Luminaire* 5.2 m
(14) Design Area (Span x Width) 23 m x 6 m
Note: - * = Variation of ± 0.3 m will be allowed in mounting height to achieve lighting/ illumination
Surat Municipal Corporation |South Zone-B| Page 94 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Illumination Level:
The luminaires shall be so designed that the illumination level shall be evenly distributed and shall
be free from glare. The lux distribution curve/ graph/ spatial distribution shall be submitted.
Sr. Parameters Value/ Details
1. Road Width <= 9.0 mtr
2. Arrangement Side
3. Pole Height (mtr) 6.0 mtr
4. Height Range of Luminaire 5.2 mtr
5. Pole Avg Span(mtr) 23 mtr
6. Required Average Illumination Level On Main Carriage way
Initial Min. Average Illumination Level
(based on the maintenance factor of 0.7)
on road with 1 mtr median/ central verge
(if applicable)
Required Min. Uniformity Ratio
Required Min. Transverse Uniformity Ratio
10. Tilt Angle (wrt to road surface) 0° to 15°
11. Illumination Regulation <5% ( wrt Ta& Line Voltage)
12. Design Area (Span x Width) 23 m x 6 m
Note: - * = Variation of ± 0.3 m will be allowed in mounting height to achieve lighting/ illumination
Surat Municipal Corporation |South Zone-B| Page 95 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
GI Streetlight poles: -
The scope of work broadly covers supply, installation, testing and commissioning of various
types of GI poles. This specification gives the general requirements. It shall be the
responsibility of the contractor to take the joint measurement and obtain SMC’s approval
before the placement of orders to the main supplier/manufacturer.
The GI pole should meet the requirements of the following standards and rules:
a) Indian Electricity Acts and Rules
c) BS 5649: part 6
Please note that among the various standards mentioned, most appropriate will be applied.
All codes and standards mean the latest. Where not specified, the installation shall generally
follow the Indian Standard Code of Practice and/or best engineering practices.
3. DETAILED SPECIFICATIONS:
The poles should be with MS base plate and as per given information in tender (Below Table)
and confirming to relevant standards with latest amendment(s): -
Height of Pole 6m
Dimensions 'B' class GI pipe Post, 80 mm N.B. dia
Planting depth of Pole 1.2 m
Approx. weight of each pole with base plate 47 kgs (min.)
Base Plate Size (L X B X thickness) 300 x 300 x 4 mm
The tolerances for outside diameter, thickness and length shall be as per the relevant IS. The
tolerance shall not be applicable to the weight of poles. I.e. the weight of pole mentioned
above shall be without any tolerance.
Painting: The poles shall be coated with black bituminous paint up to the planting depth
externally and remaining exterior portion shall be coated with one coat of red oxide and
(Two) coats of aluminium paint after erection prior to commissioning.
Earthing: The pole shall be provided with 12 mm Ø tapped hole with bolt-nut welded for
Earthing at 2.5 m height from base plate.
Weight: The pole weight should be verified in presence of representative of SMC at SMC
Surat Municipal Corporation |South Zone-B| Page 96 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
GI Octagonal/ Conical pole: -
DESIGN CONSIDERATIONS: -
Poles shall be designed to withstand the maximum wind speed 159 km/hr & Maximum stress
at design wind speed shall not exceed 80% of the strength of steel. The detail of top loading
i.e. the weight and area of top luminaires should be worked out based on this consideration.
Maximum deflection of the pole shall meet the requirement of BS 5649: part 6
CONSTRUCTIONAL FEATURES: -
The pole shall be hot dip galvanized as per IS 2629/IS 2633/IS 4759 standards with
minimum coating thickness 65 microns considering operating conditions of the city.
The pole shaft shall have shape conical/octagonal, as specified, and it should be with
single longitudinal welding. There shall not be any circumferential welding. The welding
of pole shaft shall be done by Submerged Arc Welding process using state of the art
All Pole shafts shall be single piece and shall be provided with the rigid flange plate of
suitable thickness with provision for fixing four bolts. This base plate shall be fillet
welded to pole shaft at two locations i.e. from inside and outside and supports to be
Terminal Box/Plate:
Integral Junction box consist of terminal plate of min. 6 mm Hylam sheet, standard
profile 35 X 7.5 mm DIN-Rail as per EN 50022 for MCB mounting and stud type terminal.
If a particular light fitting has to be manually operated the same can be done by MCB
provided on terminal plate. Terminal plate shall be suitable for loop-in-loop-out of max.
Core x 25 sq mm armoured cable.
The cable shall be terminated at connector in the pole using ISI Marked PVC 1.1 KV grade
insulating tape roll with appropriate colour code.
There shall also be welded a clit of size 40 x 40 x 4 mm for the purpose of earthing.
Termination (lugs, gland, and labour) cost should not be considered in the cost of pole.
1. For Side arrangement of poles: - Door height (Top portion of the door) should be
1,500 mm above from the base plate.
2. For Central arrangement of poles in divider and Bridge: - Door height (Top portion of
the door) should be 1,000 mm above from the base plate.
3. In case of poles to be mounted on parapet wall: 500 to 750 mm to be got approved
prior to supply.
4. Door opening should be hinged type with necessary special locking bolt. Door should
be minimum 500 mm. Suitable plate of min. 3 mm size shall be provided for cable
Surat Municipal Corporation |South Zone-B| Page 97 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
The pole shall be adequately strengthened at the location of the door to complete for
the loss in section.
The door opening shall be carefully designed and reinforced welded steel rod, to avoid
undue buckling of the cut section under heavy wind conditions.
The base plate in case of poles to be mounted on parapet wall (of bridge and similar
structure) shall be manufactured as per site requirements. The adopter base plate if
required shall be supplied and installed free of cost. The dimensions like centre to centre
distance of bolts and PCD etc. shall be accurately measured (for each pole base plate).
It shall be responsibility of contractor to clean foundation bolts and make foundation
ready for installation.
Nut bolts/fasteners/terminal/J bolts etc:
All Nut Bolts/fasteners/ terminals shall be galvanised for anti-corrosive treatment.
PU Painting (normally applicable for conical poles AND, AS PER MANUFACTURER'S
STANDARD PROCESS):
PU painting, if mentioned specifically in the tender, shall be provided. Gray charcoal
colour is preferred; however, colour shall be got approved prior to supply.
The detailed dimensions of Octagonal / Conical Poles are follows: -
O.D. O.D. THICK- Preferable Min. Size of
Height Bolt Length Foundation
TOP BOTTOM NESS BASE PLATE
of Pole Details of J Bolt*
(Min.) (Min.) (Min.) (Min.) (L x B x H in mm)
Octagonal/ Conical Poles: - As per BSEN 10025 grade S355 J0. Yield strength Min.
N/mm2 or equivalent national/international standard.
Foundation Bolts: - EN 8 grade
Base Plate: -Steel as per IS 226/ IS
Please note that among the various standards mentioned, most appropriate will be
applied and will be binding to contractor.
Surat Municipal Corporation |South Zone-B| Page 98 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
DRAWING APPROVAL:
Product manual & spare parts list along with drawing of Pole & Bracket must be
submitted along with offer for each product quoted.
G.A. drawing of pole, Data Sheet and Quality Assurance Plan (For testing by client at
manufacturer’s works) shall be got approved before starting manufacturing.
1. For GI Steel Tubular Pole: -
Single/Double/Triple arm 1 m (Horizontal) with cap/ sleeve of 0.5 m
The single/ double/ triple arm bracket, consisting of "B" Class GI pipe of 25 mm ID (min.)/suitable
dia., complete with approx. 0.5 m GI sleeve tubing of appropriate dia; suitable for pole top
having nuts and bolts for fixing the bracket and having spread (Horizontal) of 1 m, with suitable
welded stiffener-reducer and nipple with check nut shall be erected on the top of 6 m pole at an
angle of as per design of the luminaire. The bracket should be painted with one coat of red oxide
and two coats of aluminium paint.
Arm angle shall not more than 105° with vertical plane/Tilt (Arm) angle must be maintained
suitably to achieve lux level as per requirements mentioned in the illumination design data sheet.
2. For GI Octagonal/ Conical pole: -
Single/Double/Triple arm(s) with cap
Brackets to be fixed with bolts: -
Streetlight bracket, single / double / triple arm, shall be manufactured and supplied from pole
manufacturer only. It should be made from hot dip galvanised as per IS 2629/ IS 2633/ IS
standard sand having the suitable spread & cap height as per following specification. Tilt (Arm)
angle must be maintained suitably to achieve lux level as per requirements mentioned in the
illumination design data sheet.
B Class G.I. Pipe (As per IS: 1161/IS: 1239 with Latest amendment) of min. 3 mm thickness and
having diameter suitable for pipe entry of luminaire with Horizontal spread of 1 m to 2 m.
B Class pipe (As per IS:1161/IS:1239 with Latest amendment) of min. 3 mm thickness sleeve
tubing suitable for required size of pole top having 300 m height (Approximately 200 mm
overlapping on pole and remaining 100 mm for adjustment of the luminaire mounting height)
with nuts and bolts for fixing the brackets.
The bottom and top of the bracket's sleeve shall be manufactured in such a way that, it can be
properly fit on the top of the pole/ snapped in tightly on the pole top and bracket's fitment on
poles with nut(s) and bolt(s) as per the requirements.
The drawing(s) shall be got approved from the department. Bracket will also be tested at
manufacturer's works along with the streetlight poles.
Surat Municipal Corporation |South Zone-B| Page 99 of
Tender Notice # DMC/SZ-B/05/2026-2027, Work No :
Brackets With Snap in Design:
Streetlight bracket, single / double arm, shall be manufactured from 3.0 mm GI sheet and
having the spread of 0.5 m to 2.0 m and, angle must be maintained suitably to achieve
uniform lux level on the bridge surface of tar/ asphalt road.
The bottom and top of the bracket's sleeve shall be manufactured in such a way that, it can
be easily snapped in tightly on the pole and bracket's fitment on poles without nut and bolt.
Suitable size G.I. nipple needs to be provided for proper installation of luminaires.
For Brackets to be used for service road, instead of sleeve, suitable size plate and clamp
shall be provided to fix the bracket on pole as per site situation.
The bracket shall be paint as per standard engineering practice as per manufacturer.
Bracket will also be tested at manufacturer's works along with the conical poles.
The drawing(s) needs to be got approved from the department before execution of the work
Cement Concrete Foundations for Streetlight Poles: -
For GI Pipe Pole:
Providing and constructing Cement Concrete foundation for GI pipe poles and Reinforced
Cement Concrete Foundation for hot dip galvanized octagonal / conical streetlight poles:
1:2:4 cement concrete foundation from base plate (with base plate and cable guard pipe and
earthing wire/ strip etc. which included in other items) of 300 mm dia. & 1,500 mm length
for 6 m GI poles.
The item includes excavation and supply of cement, sand, kapachi/ grit etc. by the
Contractor. The Contractor should make necessary arrangement for water required for the
works at his own cost.
Foundation above the ground should be finished with plaster and whitewash and having
sloped to prevent accumulation of water. The site should be cleaned of excess material/
debris after the work is completed, without any extra cost.
For Octagonal and Conical pole:
Reinforced Cement Concrete (RCC) foundation having Grade M20 along with necessary
Foundation Bolt, Nuts, Washers with anchor plate and DWC pipe for cable access etc. shall
be casted having minimum size as shown in the specifications (table) or recommended by
pole manufacturer with necessary plastering and lime wash. Also, J Bolt and Nut shall be
covered with Cement Concrete/Plastering after installation and alignment of pole.
The item includes excavation, 3" PCC M10, necessary reinforcement recommended by pole
manufacturing company, Shuttering and M20 grade CC from M20 grade CC, necessary
Foundation J Bolt (J Bolt, It should be manufactured by OEM of the poles only), Nuts,
Washers with anchor plate and DWC pipe for cable access etc. The Contractor should make
necessary arrangement for curing required for the works at his own cost.
Surat Municipal Corporation |South Zone-B| Page 100 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E Technical Bid Glorina Valley.pdf
Annexure for Upload.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].