| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.4 LAdmitted-Finance KODALIA BHOGPUR KOLAGHAT PURBA MEDINIPUR | KOLAGHAT | PURBA MEDINIPUR | WEST BENGAL | 721151 | -0.05% | ₹7.4 L | L1 | Admitted-Finance |
| 2 | L2₹7.5 LAdmitted-Finance VILL KUNDAY P O B BAGARIA P S KULPI PIN 743332 | 24 PARAGANAS SOUTH | WEST BENGAL | 743332 | +1.00% | ₹7.5 L | L2 | Admitted-Finance |
| 3 | L3₹7.6 LAdmitted-Finance VILL BAGARIA P O B BAGARIA P S KULPI DIST SOUTH 24 PGS PIN 743332 | BAGARIA | SOUTH 24 PARGANAS | WEST BENGAL | 743332 | +2.00% | ₹7.6 L | L3 | Admitted-Finance |
Tender Value
₹7.4 L
EMD Value
₹14,820
Closing Date
28 Feb 2026, 12:00 pmClosed
EE_DHHD
O/O the Executive Engineer, Diamond Harbour Highway Division, P.W.(Roads) Directorate
Repairing of Rajarhat Dighirpar Road from 4.20 Kmp to 7.80 Km (in Stretches) under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas under during the year 2025-2026.
2026_SH_1009000_2
WBPWRD/EE/DHHD/NIT-27/25-26
Open Tender
CIVIL WORKS
14 days
FALTA
Please refer Tender documents.
4 documents required · 4 mandatory
₹14,820
Yes
13 Mar 2026
18 Feb 2026
2 Mar 2026
18 Feb 2026
28 Feb 2026
18 Feb 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE EMGINEER, DIAMOND HARBOUR HIGHWAY DIVISION, P.W.(ROADS) DIRECTORATE.
Name of Work: Repairing of Rajarhat Dighirpar Road from 4.20 Kmp to 7.80 Km (in Stretches) under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas under during the year 2025-2026.
Contract No: WBPWRD/EE/DHHD/NIT-27/25-26/2
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Repairing pot-holes and making up small depressions with ramming or power rolling including screening, cleaning chips or metals and washing,drying as necessary and heating the chips or metal where necessary, cutting pot holes to regular shapes with vertical edges, cleaning the disintegrated materials, heating matrix and applying tack coat (including sides), finishing the top of repaired surface levelled with adjoining area, including cost and carriage of stone aggregates ,matrix and excluding the cost of applying tack coat.( Avg. thickness of pot-holes=67.50mm). With premixed Chips or Bajrees with 54 kg of bitumen per m3 of loose net volume of stone chips using concrete mixer machine. (The payment is to be made on the basis of loose net volume of stone materials consumed in the work). Using Mobile HMP (Light duty) BI01010001010000000000000515BI0100001130 Cu.M. Excess(+) Full Conversion INR
2 Open-Graded Premix Surfacing using Bituminous (Viscosity grade Paving Bitumen / Modified bitumen) Binder and Mobile Hot Mix Plant (Light Duty); Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same using viscosity grade paving bitumen (VG-30) @1.46Kg/m2, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD. [Rate is Exclusive of tack coat ] BI01010001010000000000000515BI0100001131 Sq.M. Excess(+) Full Conversion INR
3 Seal Coat: Providing and laying Premixed Seal Coat (Type B) with approved quality stone grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface, including heating and mixing cleaned stone grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). By Manual Means With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.). Over freshly laid 20 mm P.C. BI01010001010000000000000515BI0100001132 Sq.M. Excess(+) Full Conversion INR
4 Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 888-1978 on the prepared surface cleaned with Hydraulic broom, moistering the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT & H (5th Revision).[Applying tack coat @ 0.25 kg/Sq.M] BI01010001010000000000000515BI0100001133 Sq.M. Excess(+) Full Conversion INR
5 GST @ 18.00% over Sl. No. 1 to Sl. No.4 BI01010001010000000000000515BI0100001134 G.S.T. Excess(+) Full Conversion INR
6 LWC @ 1.00% over Sl. No. 1 to Sl. No. 5 BI01010001010000000000000515BI0100001135 L.W.C. Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
WBF_2911.pdf
Tender Documents • 1.86 MB
BOQ_2476940.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid