| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC | ₹25.4 L | L1 | Accepted-AOC aoc |
| 2 | L2₹26.3 LRejected-Finance | ₹26.3 L | L2 | Rejected-Finance l2 |
| 3 | Rejected-Technical H NO 3 B M J COMPOUND NEAR BENARA FACTORY BODLA AGRA | AGRA | AGRA | UTTAR PRADESH | - | - | Rejected-Technical reject |
| 4 | Rejected-Technical HARDAHA BALUWA VARANASI CHANDAULE | - | - | Rejected-Technical reject |
| Sl No | Description | Qty | Unit | TERRA TECH L2 | shri Laxmi Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | 129.41 | CUM | 63 ₹8,152.83 | 61 ₹7,894.01 |
| 2.00 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | 25.7 | CUM | 5,554 ₹1.4 L | 5,373 ₹1.4 L |
| 3.00 | Cement Concrete in (1:2:4) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 7.8 | CUM | 5,946 ₹46,378.80 | 5,752 ₹44,865.60 |
| 4.00 | Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 10.08 | CUM | 5,369 ₹54,119.52 | 5,194 ₹52,355.52 |
| 5.00 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 67.2 | CUM | 5,478 ₹3.7 L | 5,299 ₹3.6 L |
| 6.00 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 100.38 | SQM | 96 ₹9,636.48 | 93 ₹9,335.34 |
| 7.00 | Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work | 69.34 | SQM | 630 ₹43,684.20 | 610 ₹42,297.40 |
| 8.00 | Laying of reinforeced cement concrete in M20 A20 (1:1.5:3) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 7.49 | CUM | 6,765 ₹50,669.85 | 6,544 ₹49,014.56 |
| 9.00 | Laying of reinforeced cement concrete in M20 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 5.69 | CUM | 6,971 ₹39,664.99 | 6,743 ₹38,367.67 |
| 10.00 | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 4.74 | SQM | 38 ₹180.12 | 37 ₹175.38 |
Tender Value
₹28.5 L
EMD Value
₹57,000
Closing Date
2 Apr 2026, 5:00 pmClosed
EEMGCCD4 AMROHA
EEMGCCD4 AMROHA
Construction Of V.R.B At Km. 4.000 Of Dhakiya Dy. under Project M.G.C. Stage-II IN DIST MORADABAD
2026_UPIDC_1130901_1
09/EE/2025-26
Open Tender
Civil Works - Canal
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹57,000
24 Apr 2026
27 Mar 2026
3 Apr 2026
27 Mar 2026
2 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | |||||
| 2Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | |||||
| 3Cement Concrete in (1:2:4) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | |||||
| 4Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | |||||
| 5Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | |||||
| 6Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | |||||
| 7Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work | |||||
| 8Laying of reinforeced cement concrete in M20 A20 (1:1.5:3) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | |||||
| 9Laying of reinforeced cement concrete in M20 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | |||||
| 10S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.93 MB
TD01.pdf
Tender Documents • 2.70 MB
BOQ_2109837.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid