| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 CrAccepted-AOC 368 MAHESHPUR SECTOR 21 PANCHKULA HR 134112 | PANCHKULA | PANCHKULA | HARYANA | 134112 | ₹10.7 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹11.4 CrRejected-Finance | ₹11.4 Cr | L2 | Rejected-Finance NOT LOWEST |
| 3 | L3₹11.6 CrRejected-Finance | ₹11.6 Cr | L3 | Rejected-Finance NOT LOWEST |
| 4 | L4₹11.8 CrRejected-Finance 303 GHS 88 SECTOR 20 PANCHKULA 134113 HARYANA | PANCHKULA | HARYANA | 134113 | ₹11.8 Cr | L4 | Rejected-Finance NOT LOWEST |
| 5 | L5₹12.2 CrRejected-Finance | ₹12.2 Cr | L5 | Rejected-Finance NOT LOWEST |
| Sl No | Description | Qty | Unit | FIRE ENVO SAFETY ENGINEERS L1 | TRIVENI CONSTRUCTIONS L2 | M M SHAWL Engineers and contractors pvt ltd L7 | M/s Banwari Lal Suresh Kumar L3 | J.D.Builders L6 | Kartik Builders L8 | R D Bansal L4 | aggarwal traders L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | |||||||||||
| 1.10 | Engineering, Procurement & Construction (EPC) of buildings/ structures and HVAC work as defined in Annexure-I & II, complete as detailed in scope of work and other documents of tender, complete all as specified and directed. | 1 | Lump Sum | 7,85,00,000 ₹7.8 Cr | 8,75,00,000 ₹8.8 Cr | 9,90,00,000 ₹9.9 Cr | 8,58,95,000 ₹8.6 Cr | 10,00,00,000 ₹10 Cr | 12,90,00,000 ₹12.9 Cr | 8,65,78,000 ₹8.7 Cr | 9,08,95,000 ₹9.1 Cr |
| 1.20 | S&F for S.S Eye wash station with complete all as specified. | 15 | Each | 35,000 ₹5.3 L | 33,200 ₹5.0 L | 25,800 ₹3.9 L | 28,200 ₹4.2 L | 15,000 ₹2.3 L | 25,000 ₹3.8 L | 45,780 ₹6.9 L | 22,460 ₹3.4 L |
| 1.30 | S&F sink with drainage board made of stainless steel 1 mm thick kitchen or laboratory with plugs washers and wastes includung bedding in cement mortar to dwarf wall or including fixing cantilever brackets and connecting union to pipe over all size 915 mm X 460 mm bowl size 410 mm X330 mm x 160 mm complete all as specified | 1 | Each | 12,000 ₹12,000 | 12,780 ₹12,780 | 12,500 ₹12,500 | 16,740 ₹16,740 | 10,000 ₹10,000 | 12,500 ₹12,500 | 8,500 ₹8,500 | 14,900 ₹14,900 |
| 1.40 | S&F for Provn of cage for nitrogen & oxygen cylinder of size 3.00x2.40x1.20 mtr height complete all as specified and shwon on drg. | 4 | Each | 1,65,000 ₹6.6 L | 1,95,700 ₹7.8 L | 2,25,200 ₹9.0 L | 2,22,000 ₹8.9 L | 1,00,000 ₹4 L | 1,50,000 ₹6 L | 2,15,400 ₹8.6 L | 2,75,600 ₹11.0 L |
| 1.50 | M&L for 25 User's LLDPE septic tank designed to carry sewage and sullage water, excavation in any type of soil, PCC 1:4:8 below foundation, Vent shaft, connection etc, complete all as specified and directed | 1 | Lump Sum | 2,00,000 ₹2 L | 1,95,600 ₹2.0 L | 2,75,000 ₹2.8 L | 2,74,500 ₹2.7 L | 50,000 ₹50,000 | 1,25,000 ₹1.3 L | 2,28,600 ₹2.3 L | 1,95,400 ₹2.0 L |
| 1.60 | M&L for Soakage wells of size 1.2 M dia x 1.5 M effective depth excavation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonry with top ring of M25 concrete including intercepting chamber and screen chamber made of Brick masonary in CM, RCC cover slab in M25/ SFRC cover, interconnecting pipes of RCC/DWC and filled with brick bats complete all as specified and as shown on drawings. | 1 | Lump Sum | 25,00,000 ₹25 L | 2,10,400 ₹2.1 L | 2,48,500 ₹2.5 L | 2,98,400 ₹3.0 L | 75,000 ₹75,000 | 49,500 ₹49,500 | 2,75,300 ₹2.8 L | 2,65,000 ₹2.6 L |
| 1.70 | Supply and fixing for PVC strip curtain 200mmx5mm thick clear with 50% overlap including aluminium channel and other accessories required for installation complete all as specified and directed. | 341 | Sqm | 4,050 ₹13.8 L | 5,240 ₹17.9 L | 6,510 ₹22.2 L | 6,060 ₹20.7 L | 1,500 ₹5.1 L | 5,000 ₹17.1 L | 6,640 ₹22.6 L | 7,210 ₹24.6 L |
| 2.00NOTE: Schedule ‘A’ Part III to XII items which are Prepriced by MES, Bidders shall insert their lump sum amount in the Green coloured field under Col-6 only. | |||||||||||
| 2.01 | Lump sum price worked out by the Contractor for “EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 23,00,000 ₹23 L | 23,50,000 ₹23.5 L | 22,55,000 ₹22.6 L | 25,00,000 ₹25 L | 18,33,434.7 ₹18.3 L | 18,33,434.7 ₹18.3 L | 22,00,000 ₹22 L | 20,24,500 ₹20.2 L |
Tender Value
₹10.2 Cr
EMD Value
₹8.3 L
Closing Date
27 Sept 2025, 6:00 pmClosed
CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM DELHI CANTT-110010
Construction of OTM Accn at AF Stn Ambala Sch A Part I for Bldgs Wks and HVAC Wks on EPC Mode
2024_MES_671059_2
CEWAC/AMB/T-12/2024-25
Open Tender
Civil Works
450 days
GE (P) (AF) AMBALA
As per NIT
8 documents required · 8 mandatory
₹3,000
GE (P) (AF) AMBALA
₹8.3 L
Yes
HQ CE (AF) WAC PALAM DELHI CANTT
31 Oct 2025
4 Sept 2025
29 Sept 2025
4 Sept 2025
27 Sept 2025
18 Sept 2025
11 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.63 MB
BOQ_816688.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid