Loading…
Loading…
Tender Value
₹15.0 L
EMD Value
₹29,943
Closing Date
27 Aug 2026, 5:00 pm3d left
Ex. Engineer, Msd. Highway Divn-II
Ex. Engineer, Msd. Highway Divn-II, C R Das Road, Berhampore, Murshidabad
Repair of Potholes and Damaged pavement in patches on Kandi-Bharatpur-Salar Road from 0.00 Kmp to 9.544 Km and 10.664 Km to 12.996 Km under Murshidabad Highway Division No.II during the year 2026-27
2026_WBPWD_5018215_6
EEMHDII/NIT5/026-27
Open Tender
CIVIL WORKS
Percentage
30 days
Bharatpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹29,943
Yes
13 Aug 2026
13 Aug 2026
31 Aug 2026
13 Aug 2026
27 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and applying tack coat with Cationic bitumen emulsion (RS1) complying with IS:8887 using emulsion pressure distributor on the prepared bituminous/granular /cement concrete pavement surface cleaned with mechanical broom and high pressure air jet (Reference to MORT&H's specification clause 503).
i) On bituminous surface @ 0.25kg /sqm
Using Cationic RS 1 | 2,598.57 | Sqm | 27.48 | ₹71,408.7 |
| 2 | Open graded premix surfaceing using bituminous binder.
Providing, laying and rolling of open-gradedpremix surfacing of 20 mm thickness composed of13.2 mmto 5.6mmaggregates either using viscosity grade bitumen of approved grade to required line,grade and level to serve as wearingcourse on a previously preparedbase, including mixing in a suitable plant, laying and rolling with a smooth wheeled tandemor other approved type roller 8-10 tonne capacity, finished to required level and grades (Reference to MORT&H's specification clause 510).
Case-I : Mechanical method using approved grade Bitumen and HMP of appropriate capacity not less than 75 tonnes/hour. | 1,475.15 | Sqm | 232.89 | ₹3,43,547.68 |
| 3 | Repairing Pot-holes with Bituminous Macadam (Grading-II,for compacted thickness of upto 75mm):-
Filling Pot Holes with Bituminous Macadam using Mobile Hot Mix plant (6-10 TPH) with approved crushed aggregates of specified grading premixed with bituminous binder @3.4% by wt. of the total mix, transported to site and laid in the pot hole prepared before hand by cutting the edges to get a firm vertical face and by removing all the failed and loose materials including dust and applying tack coat evenly on the sides and on the surface as per specification, rolling the filled depression with 8-10 tonne smooth wheeled roller to achieve the desired compaction, including the cost and carriage of stone aggregates and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of all operational staff, quality control except the cost of tack coat complete as per direction of Engineer-in-charge. Payment to be made on the basis of the loose net volume of the stone aggregates used in the work. | 73.02 | Cum | 8,501.28 | ₹6,20,763.47 |
| 4 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using.
Case - II : Type B Providing and laying of premix sand sealcoat with HMP using approved crushed stone chipping andviscosity grade paving bitumen of suitable approved grade. | 2,598.57 | Sqm | 89.68 | ₹2,33,039.76 |
| 5 | Add: GST @ 18% | - | % | 18 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Form_2911_ii.pdf
Tender Documents • 0.50 MB
BOQ_5089084.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].