| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 54 PON NAGAR ARAVAKURICHI KARUR | ARAVAKURICHI | KARUR | TAMIL NADU | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹19,000
Closing Date
29 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Collector/Chairman
IInd Floor, DRDA, Collectorate, Karur
Clean and Green villages in Package No TN 07 25 of Aravakurichi Block under AGAMT II 2021-2022
2022_RDTN_237882_9
Karur District-Aravakurichi Block-AGAMT-II 2021-22
Open Tender
Civil Works - Others
Item Rate
90 days
IInd Floor, DRDA, Collectorate
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,000
Yes
IInd Floor, DRDA, Collectorate, Karur
4 Aug 2022
30 Jun 2022
29 Jul 2022
30 Jun 2022
29 Jul 2022
30 Jun 2022
8 Jul 2022
90 days
Amount
Name of the Work : Providing Drainage With soakpit In PHC Road Manikkam House to Balan House @ Malaikovilur H/O Nagampalli
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm metals including cost and conveyence of all mterials to site
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Supplying and fabricating and placing in position MS or RTS reinforcement works includingcost and conveyance of all materials to site and all labour
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly includingcost and conveyance of all materials to site and all labour
Construction Of Horizontal soakpit sub Estimate
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm metals including cost and conveyence of all mterials to site
Cost of Supplying 40mm boluders including of all materials
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Collection and supply of Sand Filling appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,,
Name of the Work : Providing Fencing and Green cover to nursury raising (MGNREGS) @ Rengapalayam H/O Venjamangudalore East
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jellyincluding cost and conveyence of all mterials to site
Plain Cement concrete 1:2:4 using 20mm HBG jelly includingcost and conveyance of all materials to site and all labour
Supplyo of Cut stone piller 0.15x0.15x2.10 works includingcost and conveyance of all materials to site and all labour
Supply of chain link 2x2 gauge galvanised iron wire includingcost and conveyance of all materials to site and all labour
Providing green shade net filling of all sides includingcost and conveyance of all materials to site and all labour
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats over new iron works using ready mixed enamel paint includingcost and conveyance of all materials to site and all labour
Supply and fixing of steel grill gate includingcost and conveyance of all materials to site and all labour
Name of the Work : Providing Drainage With soakpit In Perumal house to Edumban house @ Natchipalayamputhur H/O Venjamangudalore East
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm metals including cost and conveyence of all mterials to site
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Supplying and fabricating and placing in position MS or RTS reinforcement works includingcost and conveyance of all materials to site and all labour
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly includingcost and conveyance of all materials to site and all labour
Construction Of Horizontal soakpit sub Estimate
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm metals including cost and conveyence of all mterials to site
Cost of Supplying 40mm boluders including of all materials
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Collection and supply of Sand Filling appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,,
Name of the Work : Providing Fencing and Green cover to nursury raising (MGNREGS) @ Rengaraj nagar H/O Velambadi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jellyincluding cost and conveyence of all mterials to site
Plain Cement concrete 1:2:4 using 20mm HBG jelly includingcost and conveyance of all materials to site and all labour
Supplyo of Cut stone piller 0.15x0.15x2.10 works includingcost and conveyance of all materials to site and all labour
Supply of chain link 2x2 gauge galvanised iron wire includingcost and conveyance of all materials to site and all labour
Providing green shade net filling of all sides includingcost and conveyance of all materials to site and all labour
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats over new iron works using ready mixed enamel paint includingcost and conveyance of all materials to site and all labour
Supply and fixing of steel grill gate includingcost and conveyance of all materials to site and all labour
Name of the Work : Providing Drainage With soakpit In Settu House to Rathamani House @ Tamil nagar H/O Velambadi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm metals including cost and conveyence of all mterials to site
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Supplying and fabricating and placing in position MS or RTS reinforcement works includingcost and conveyance of all materials to site and all labour
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly includingcost and conveyance of all materials to site and all labour
Construction Of Horizontal soakpit sub Estimate
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm metals including cost and conveyence of all mterials to site
Cost of Supplying 40mm boluders including of all materials
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Collection and supply of Sand Filling appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,,
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Bharathi Construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .