| 1.00 | 1.0) On completion and submission of Survey work, Soil Testing report.
1.1.2.1) On submission of Feasibility Report.
2.0) On submission of DPR
3.0) Tender documents preparation comprising of the following Preparation of pre-qualification, General Terms & Conditions, Scope of work, Detailed Specifications for civil, Mechanical, Electrical, Instrumentation Automation, Technical data sheets, Price schedule, Pre bid conference.
3.1 After Price bid Opening
Evaluation of technical bids and price bid & recommendations
4.0 Checking and recommendation for approval of SUBMISSIONS made by successful bidder for following :
4.1 Pre structural Design:-
a) Sizing Calculation
b) Process & Instrumentation Drawings.
c) Technical Data Sheets and GA drawing for Mechanical and Electric Equipment’s
d) Plant Layout and GA Drawings
4.2 Structural Civil Drawings
a) Civil GA drawings (the design submitted by the bidder shall be got vetted from any reputed institution by HSVP and consultant shall be only checking the design and hydraulic levels).
4.3 Electrical, Mechanical, Instrumentation & Automation.
a) Automation process write ups.
b) Mechanical GA, Fabrication drawings
c) SLD, Mimic panel & MCC drawings
d) HT Panel, LT Panel & HT to LT conversion, Transformers, Substation Designs& drawing
e) Shop Fabrication Drawings for Electrical and Mechanical Equipments.
f) Working drawings.
g) O&M Manual
Site visit by Technical expert (minimum 02 visits per month) (Out of this 10% amount, 8% shall be releases on pro-rata basis till physical completion of 95% of scope of work
5.0) On successful completion of work and submission of as built drawings duly signed by consultant to HSVP
On successful completion of defect liability period
On Completion and submision of Survey work soil Testing report. | 1 | Job | 10,24,000 ₹10,24,000 |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
12 Jan 2026, 3:00 pmClosed
Kailash Chander Kala Vivek and ravi kumar
Executive Engineer HSVP Division Ambala
RCC STORAGE and SEDIMENTATION TANK RAW WATER PUMPING SUMP and PUMP HOUSE,WATER TREATMENT PLANT COMPRISING OF STILLING CHAMBER, PARSHALL FLUME OR VENTURY FLUME FLASH MIXER FOR RAPID MIXING CLARIFLOCCULATORS FOR FLOCCULATION AND SETTLING SWITH SLUDGE
2026_HBC_495113_1
JOBNO.HSVP/AMB/2025-26/E-566
Open Tender
Civil Works
Ambala City
WITHDRAWL RAPID GRAVITY FILTERS CHLORINATION UNDERGROUND CLEAR WATER TANK PUMP CHAMBER AND REQUISITE PUMPING MACHINERY RISING MAIN FROM PROPOSED S and S TANK TO WTP INCLUDING COST OF TRANSFORMER DG SET ELECTRICAL MECHANICAL INSTRUMENTATION WORKS
2 documents required · 2 mandatory
₹250
₹16,000
Yes
14 Jan 2026
6 Jan 2026
13 Jan 2026
6 Jan 2026
12 Jan 2026
6 Jan 2026
Amount
1.0) On completion and submission of Survey work, Soil Testing report. 1.1.2.1) On submission of Feasibility Report. 2.0) On submission of DPR 3.0) Tender documents preparation comprising of the following Preparation of pre-qualification, General Terms & Conditions, Scope of work, Detailed Specifications for civil, Mechanical, Electrical, Instrumentation Automation, Technical data sheets, Price schedule, Pre bid conference. 3.1 After Price bid Opening Evaluation of technical bids and price bid & recommendations 4.0 Checking and recommendation for approval of SUBMISSIONS made by successful bidder for following : 4.1 Pre structural Design:- a) Sizing Calculation b) Process & Instrumentation Drawings. c) Technical Data Sheets and GA drawing for Mechanical and Electric Equipment’s d) Plant Layout and GA Drawings 4.2 Structural Civil Drawings a) Civil GA drawings (the design submitted by the bidder shall be got vetted from any reputed institution by HSVP and consultant shall be only checking the design and hydraulic levels). 4.3 Electrical, Mechanical, Instrumentation & Automation. a) Automation process write ups. b) Mechanical GA, Fabrication drawings c) SLD, Mimic panel & MCC drawings d) HT Panel, LT Panel & HT to LT conversion, Transformers, Substation Designs& drawing e) Shop Fabrication Drawings for Electrical and Mechanical Equipments. f) Working drawings. g) O&M Manual Site visit by Technical expert (minimum 02 visits per month) (Out of this 10% amount, 8% shall be releases on pro-rata basis till physical completion of 95% of scope of work 5.0) On successful completion of work and submission of as built drawings duly signed by consultant to HSVP On successful completion of defect liability period On Completion and submision of Survey work soil Testing report.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_573582.xls
BOQ • 0.27 MB
CBD.pdf
Additional Documents • 13.73 MB
Download all tender documents and submit your bid