Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | L1 | Accepted-AOC award | |
| 2 | l2₹4.4 L+₹3,858.60 (0.89%)Rejected-Finance | l2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | SANTHOSH KUMAR J L2 | P S RADHAKRISHNA PILLAI L1 |
|---|---|---|---|---|---|
| 1.00new construction of Aerobic composit | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 6.87 | cum | 345 ₹2,369.46 | 341.73 ₹2,347 Lowest |
| 1.00 | 50.6.1.4:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete | 6.71 | cum | 6,136 ₹41,160.29 | 6,134.82 ₹41,152.37 Lowest |
| 1.00 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 1.75 | cum | 6,495 ₹11,398.73 | 6,489.58 ₹11,389.21 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.49 | cum | 7,580 ₹11,279.04 | 7,536.25 ₹11,213.94 Lowest |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 5.95 | cum | 699 ₹4,161.85 | 692.92 ₹4,125.65 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.86 | cum | 8,800 ₹7,603.2 | 8,774.17 ₹7,580.88 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 5.76 | sqm | 370 ₹2,131.2 | 366.85 ₹2,113.06 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 40.46 | sqm | 365 ₹14,767.9 | 351.27 ₹14,212.38 Lowest |
| 1.01 | OD297607/2025-2026:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch
ofcorrugation as
approved by Engineer-in-charge) 0.35 mm (+0.05%), total coatedthickness with zinc coating
120 gramsper sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both
side. of the sheet and polyester top coat 15-18 microns.Sheet should have protective guard film
of 25 microns minimumtoavoid scratchesduring transportation and should be supplied in single
length upto 12 metre or as
desiredby Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws
ofsize
(5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical orcurved surfaces,
excludingthe cost of purlins, rafters and trusses and including cutting tosize and shape wherever
required | 54.72 | sqm | 595 ₹32,558.4 | 590.05 ₹32,287.54 Lowest |
Tender Value
₹4.6 L
EMD Value
₹11,432
Closing Date
21 Oct 2025, 6:00 pmClosed
FASEELA BEEVI A
LID AND EW
Annual Plan-2025-26-Proj No 290 Construction of thumpoor muzhi in Kovoor unnathi
2025_LSGD_808188_5
04/25/AE/LIDEW/MNPY
Open Tender
Civil Works - Roads
Item Rate
270 days
AE LID AND EW MNPLY
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,010
Yes
₹11,432
Yes
8 May 2026
10 Oct 2025
23 Oct 2025
10 Oct 2025
21 Oct 2025
10 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1347728.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1347728.xls
BOQ • 0.32 MB
290sbd.pdf
Tender Documents • 3.98 MB
290pg.pdf
Tender Documents • 0.26 MB
290aft.pdf
Tender Documents • 0.24 MB
290ft.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .