Dy.Minicipal Commissioner - West Zone
Painting On Footpath , Central Verge , Grill On Diff. T P Roads Of Stadium Ward of west zone. (ARC)
337968
2/26-27 (T.N.45)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹10,000
22 Aug 2026
22 Aug 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
2 Tender Estimated Cost
1% oftheTender Cost intheform(Rs.10000.00)
3 Earnest Money (For work upto 1cr. EMD in form of
D.D./PayOrder/LocalMicrCheck/B.G. & for works above
1 cr EMD in form of D.D./PayOrder/B.G.
4 Tender Fee Rs Demand Draf t of Rs.900.00
6 Time - Limit 12months
7 Validity Period 120Days
(i)Last Date of Submission of
8 theTender Dt.01-09-2026 upto 18:00 PM
a) In Sealed cover in duplicate copies by Registered Post A.D,or by
(ii)Mode of Sending Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii)Description essential to
be a) Name of work, Tender Notice No. & Tender No.
b) Date of receiving tender by Corporations.
made on sealed cover
(iv)Mode of quoting rates
in The Price bid shall be submitted online only. It shall
not be submitted Physically.
Schedule of Quantities and
9 Date of Opening Dt 02-09-2026 , 15:00 PM
Submission of EMD. Tender fee and other Documents during office hours:
Place of Submission On Dt.02-09-2026 &12:00 pm West Zone, 2nd Floor, A.M. Office, Dr.
&Opening of Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting
11 Penalty Due to Delay of
work above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per
day (for all tenders amounting above 30 Lakhs) but
SABARMATI WARD -1-
not more then 10% of bill
12 Defect Liability Asper ‘B-1 Form 17 Clouse
The Contractor shall be responsible to make good and remedy at his own expense any defect
which may develop or may be noticed before the period mentioned here under from the certified
date of completion. The Engineer in charge shall give the contractor a notice in writing about
the defects and the shall make good the same within 15 days of receipt of the notice. In case
of failure on the part of the contractor, The Engineer n charge may rectify or remove or re-
execute the work at the risk & Cost of the contractor. The Engineer In Charge shall be entitled
to appropriate the whole or any part of the amount of security deposit towards the expenses, if
any , incurred by him in rectification, removal or re-execution. The defect Liability Period shall
(a) for all works costing upto Rs. 50,000/- (amount put to tender) the period shall be 3 months
from the certified date of completion.
) for all works more than Rs. 50,000 and upto Rs. 1 crore (amount put to tender) the period
shall be 6 months from the certified date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. I Crore, the period shall be 12 months from the
certified date of completion which should include one monsoon. For the purpose of deciding the
monsoon period the 30th September may be treated as the last date.
(d) for buildings works, the period specified in (a), (b) or (c) above OR elapse of monsoon
period following the certified date of completion, whichever is later. For the purpose of deciding
the monsoon period, the 30th September may be treated as the last date.
: Maintenance and repairs of the road during guaranteed period:
The contractor shall maintain and keep on proper condition and repair, at his cost the surface of
the road for 1 year from the date form which the final finishing coatis laid to the satisfaction of
the Concerned Dy. Municipal Commissioner. The decision of the Concerned Dy. Municipal
Commissioner as to the necessity of repairs to the surface of the road shall be final and binding
on the contractor. If the contractor fails to maintain and keep in proper condition and repair the
surfaceof the road during the stipulated period of 1 year, the Concerned Dy. Municipal
Commissioner shall be entitled to carry out the necessary repairs departmentally at the cost of
the contractor. The decision of the Concerned Dy. Municipal Commissioner as to amount of the
expenses incurred in carrying out the repairs shall be final and binding on the contractor. The
Concerned Dy. Municipal Commissioner shall be entitled to appropriate the whole or any part of
the amount of the security deposit towards the expenses, if any, incurred by him in repairing the
(This will apply to a contract where the works are to be executed by the contractor according to
the specifications).
Whenever a work is allotted by Engineering staff,
Time permitted to start whether minor or major of part there of of any
13 amount, the contractor shall be bound to start the
works within 48 hours of intimation of work.
Communication done telephonically via SMS,Via
Whatsapp and through letter /E-mail shall be
considered legal and binding for the same. Failure of
comply to start the works in 48 hours of intimations
SABARMATI WARD -2-
above by contractor the contractor shall be levied
penalty of (1)Rs.1000/-per day (for tenders amounting
upto 10 Lakhs), (2)Rs.2500 per day (for tenders
amounting above 10 Lakhs and upto 30Lakhs),
(3)Rs.5000 per day (for all tenders amounting above
30 Lakhs) .Three times failures by contractor shall
make contractor responsible to be blacklisted unless
and otherwise justified properly in writing/ binding
within 15 days of last notice of penalty.
The staff of the contractor shall wear safety
jackets, hoes, helmets etc. while on duty and any
violation will attractfineofRs. 5,000/-foreach incident.
15 Safety Failure to erect safety signage or trying to carryout
the works with out proper precautions / safety measures as
required will attract a fine of Rs.5,000/- for each incident.
16 Schedule Of Maintanance
Penalty per one
Sr. Department Category Problem SLA Problem per day
SABARMATI WARD -3-
1 Engineering Road>>Engineering Road on 48 Hours
2 Engineering Road>>Engineering Road on 72 Hours
3 Engineering Road>>Engineering Road on 72 Hours
4 Engineering Road>>Engineering Road-other 72 Hours
Contractor's Sign Addl.C.E.
Mobil No:- (west zone)
SABARMATI WARD -4-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
AHMEDABAD MUNICIPAL CORPORATION
WEST ZONE - ENGINEERING DEPARTMENT
Name of Work : Painting On Footpath , Central Verge , Grill On Diff. T P Roads Of Stadium Ward of
west zone. (ARC)
Sr. Quantity Item Rate Unit Amount
1 5000.00 Applying Priming Coat New Steel and Other any surface 19.47 Smt
after and incl. Preparing the surface by / thoroughly
cleaning, oil , grease, dirt and other foreign matter &
Scoured with brushnes fine steel wood scrapers & Sand
paper with ready mixed paint brushing red lead.
2 10000.00 Painting Two Coats on divider and footpath curb surface 51.79 Smt
/ new concrete surface (Painting two coats after filling the
surfac with synthetic enamel paint in all shades on new
plastered concrete surfaces )
3 1000.00 Finishing Wall with weather proof exterior emulsion 64.28 Smt
paint on wall surface (two coats) to give an required
shape even thoroughly brushing the surface to remove all
dirt, and remains of loose powdered materials etc,
4 4100.00 Painting one coats (excl. priming coat) on peviously 30.80 Smt
painted steel & other Metal surfacer with enamel paint,
brushing, interior to give an even shade incl. cleaning the
surface of all dirt, dust and other foreign matter..(
Building SOR - 2015-16 Ch-19, Item No.19.11 Page
5 4100.00 Extra over Above item for every subsequent coat of paint 28.57 Smt
(Item No-19.15)
6 11000.00 White Washingwith lime on wall surface ( two cats) to 6.97 Smt
give an even shade including thoroughly booming the
surface to remove all dirt , dust , mortar drops and other
foreign matter.
Total Amount Rs.
Total Amount Rs.
SABARMATI WARD -5-
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
SABARMATI WARD -6-
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Here in after called “the Employer”)
invites sealed Tender document from reputed and qualified bidders for the construction of
Works detailed in the Table below:-
Sr. No. Name of Works Approximate Bid Security Completion
value of works (Rs.) Period
1 Painting On Footpath , Central 999617.00
Verge , Grill On Diff. T P Roads Of
Stadium Ward of west zone in AMC
2. Tender (a complete set of bidding document) fee shall be Rs.900/- in the form of
Demand Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad, which shall be non refundable. The
fees shall be paidat the time of submitting the tender.
3. Interested bidders shall download the tender documents from AMC’s website
www.egovamc.com. up to Dt. /22 at PM tender fee as mentioned in clause
above shall be paid by the bidder at the time of bid submission.
4. All bids must be accompanied by Bid Security of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL
CORPORATION, Ahmedabad. Bid Security will have to be in any one of the forms as
specified in Clause of ITB (Instructions to Bidders).
5. All Bids must be delivered to Assistant Manager "West Zone, Zonal Office", Dr. Ramanbhai
Patel Bhavan, Usmanpura, Ahmedabad. Not later than PM on Dt. /22.
Seal and Signature of the Bidder Addl. City Engineer
SABARMATI WARD -7-
As per account department(A.M.C.) circular no. 56, Dt.19/09/2016 Bank guarantee of
said work must be of Ahmedabad city branch, which mentioned as bellow.
SABARMATI WARD -8-
(A) Guarantee issued by following bankswill be accepted as SD/EMD on permanentbasis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LYF.
(2)Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up
(1) Commercial Banks :
(1) Kotak Mahindra Bank
(2) RBL Bank (The Ratnakar Bank Ltd.)
(3) IndusInd Bank.
(4) Karur Vysya Bank.
(6) FEDERAL Bank.
(7) SOUTH INDIAN Bank.
(2) Co-Operative Banks of Gujarat
(1) The Kalupur Commercial Co-Operative Bank Ltd.
(2) Rajkot Nagarik Sahakari Bank Ltd.
(3) The Mehsana Urban Co-Operative Bank Ltd.
(4) Nutan Nagarik Sahakari Bank Ltd.
(5) Saurashtra Gramin Bank.
SABARMATI WARD -9-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
SABARMATI WARD - 10 -
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals shall
only apply. Contractor can not stop the work due to on availably of labour force. In case progress
is delayed, contractor shall be penalized 0.1% of Tender amount per day for work done after time
limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills
of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved"
by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to
the following limits:
(i) Length, width and depth (height) -- 0.01 Meter.
(ii) Areas --0.01 Sq. Mt.
(iii) Cubic Contents --0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and
not necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall
be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work
is in the form of a designation containing the number of the specification of the material and
prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
SABARMATI WARD - 11 -
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stone at site of work in a systematic manner. Materials shall be stored in such a manner
as to prevent damage, deterioration or intrusion of foreign matter and to-ensure the preservation
of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in work man like manners per the best techniques for the particular
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion of
29. All necessary safety measures and precaution (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days
(120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish
to the Corporation Security Deposit of 3% (Three percent) of the contract price cheque or Bank
Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
SABARMATI WARD - 12 -
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
(1) ) The work shall be completed within 12 Month.
(2) ) The contractor shall be remain responsible for Workmen’ s compensation if any
when such case occurs. The contractor shall arrange formed iampasant night and
fencing and pagi and shall be responsible for any damage of life and l imb or property if
any happen, during the execution of work. In case of dispute for unseen or
overlooked items the decision of the city Engineer shall be final. The contractor shall
have to give site clean of all rubbish on completion of work and have over the
building with final finishing of the work as directed. All the rejected materials shall
be removed from site within 24 hours by contractor at this rsk and cost.
(3) ) For mixing mortar either for masonry or for plaster or for any other purpose
contractor shall have to prepare through of bigger size and mix the mortar in
the required proportion. In on case he shall be allowed to mix the mortar either on
floor or any finished surfaces.
(4) ) The contractor shall have to make his own arrangement for water required for the
work and shall pay the water charges as per water meter.
(5) ) If any extra item crops up during the progress of work the same shall be carried
out by the contractor and he shall be paid at the rate f ixed by C. E. as per the rate
analysis based on current market rates.
(6) ) If in the interest of the Corporation it is necessary to change either any site or
the design of the propose work the contractor shall carry out the same at his quoted
rates without charges any extra and the contractor will have to carry out the works
and he will be paid at the rate quoted by him and no claim for extra for subsequent
changes may be entertained.
(7) ) Retetion money at the rate of 2 % shall be deducted from every running bill of
the contractor and which will be paid at the t ime of final bill, for works costing More
than Rs. 10 - 00 lakhs.
(8) ) The tender for the work shall remain open for a period ( 120 ) days from the
date of opening of the tenders for this work and that the tenderer shall not be
allowed to withdraw on modify the offer on his own during the period. If any
tenderer withdraw or makes any modifications ( s) or addition ( s) in the terms and
conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at l iberty to forfeit in
full the said earnest money absolutely.
SABARMATI WARD - 13 -
(9) ) As per Circular No. MCR 2176 ( 96 ) 2418 ( ii) GHH dated 31 - 03 - 77 i ssued by
Government of Gujarat contractors are requested to produce their quarry materials for
construction work through legal sources. i .e. only form the quarry lease holders,
permit holder or middle man who satisfies the contractor as to the legality of the
source of purchase by him on these materials.
(10) ) Contractor has to make his own arrangement for procurement of steel and cement.
(11) ) Conditional tender will not be accepted.
(12) ) All tenders are to be submitted in duplicate without which the
(13) ) tenders are l iable to be rejected.
(14) ) Condition of form B 1 Standard Specification of material & code of practice
will be applicable. Form B 1 & B 2 can be is available on website.
Contractor’ s Signature Add. City Engineer
SABARMATI WARD - 14 -
AHMEDABAD MUNICIPAL CORPORATION ENGINEER DEPARTMENT
TECHNICAL SPECIFICATIONS
Item No.1 :- Applying Priming Coat New Steel and Other any surface after and incl. Preparing the surface
by / thoroughly cleaning, oil , grease, dirt and other foreign matter & Scoured with brushnes
fine steel wood scrapers & Sand paper with ready mixed paint brushing red lead.
Mode of measurement
Measurement shall be paid by Smt. basis.
Item No.2 :- Painting Two Coats on divider and footpath curb surface / new concrete surface (Painting
two coats after filling the surfac with synthetic enamel paint in all shades on new plastered
concrete surfaces )
Mode of measurement
Measurement shall be paid by Smt. basis.
Item No.3 :- Finishing Wall with weather proof exterior emulsion paint on wall surface (two coats) to give
an required shape even thoroughly brushing the surface to remove all dirt, and remains of
loose powdered materials etc, complete.
Mode of measurement
Measurement shall be paid by Smt. basis.
Item No.4 :- Painting one coats (excl. priming coat) on peviously painted steel & other Metal surfacer
with enamel paint, brushing, interior to give an even shade incl. cleaning the surface of all
dirt, dust and other foreign matter..( Building SOR - 2015-16 Ch-19, Item No.19.11 Page
Mode of measurement
Measurement shall be paid by Smt. basis.
Item No.6 :- White Washingwith lime on wall surface ( two cats) to give an even shade including
thoroughly booming the surface to remove all dirt , dust , mortar drops and other foreign
Mode of measurement
Measurement shall be paid by Smt. basis.
SABARMATI WARD - 15 -
Contractor’ s Signature Add. City Engineer
SABARMATI WARD - 16 -
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – œrûtK vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj fhJtle
hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t,
ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ
yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk ytJNu.
œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx,
vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf
duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf
duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu
ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe mcbex
fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. dwsht< mhfth ©b,ftuiNÕg ylu htusdth rJCtd îtht XhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2 mraJtjg ,dtk^eldh
<t.15.02.24 lt XhtJ v{btKu yusLme/¢tuLx[fxhtulu îtht ©bgtude ftgœtle studJtR vhevqKo &tg <u mwrlµ< fhJtlwk hnNu.
16. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
SABARMATI WARD - 17 -
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto ctœ
fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu ftbdehe fhtJJtbtk
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb NY
fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk vwKo fhJtbtk
lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu hnuNu.
SABARMATI WARD - 18 -
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall be
placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form a
part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to comply
with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through its
website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
Contractor's Sign Addl.C.E.(westzone)
SABARMATI WARD - 19 -
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 45.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].