Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 LAccepted-Finance GSTIN: 07ADLPJ8941R1ZM | ₹23.2 L | L1 | Accepted-Finance OK |
| 2 | L2₹23.7 LAccepted-Finance GSTIN: 03AAGFA2962D1ZZ, 07AGEPJ5473C1ZL, 08AALFA3781F1ZD, 08ABYFA6585H1ZM, 08BEZPK3944P1ZD, 08CSIPS2954R1ZO, 09ALYPR2598B3ZA, 23AMLPM8467E1ZS | ₹23.7 L | L2 | Accepted-Finance OK |
| 3 | L3₹24.2 LAccepted-Finance GSTIN: 07AFUPJ6829H1ZVHOUSE NO 59 SECOND FLOOR MUNIRKA VILLAGE NEW DELHI 67 | NEW DELHI | DELHI | 110067 | ₹24.2 L | L3 | Accepted-Finance OK |
| 4 | L4₹24.5 LAccepted-Finance GSTIN: 07ANBPN7981R1Z1 | ₹24.5 L | L4 | Accepted-Finance OK |
| 5 | L5₹26.6 LAccepted-Finance GSTIN: 07ADPPT4076MIZO38 ASOLA FATEHPUR BERI NEW DELHI 110074 | SOUTH | DELHI | 110074 | ₹26.6 L | L5 | Accepted-Finance OK |
Tender Value
₹51.1 L
EMD Value
₹1.0 L
Closing Date
27 Mar 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
DIVN. SOUTH EAST ROAD-2, PWD, SUKHDEV VIHAR, NEW DELHI.
Comprehensive maintenance of various roads under SER-2/21 during 2025-26 (SH-Providing and replacing of missing/damaged railing at central verge on various roads under jurisdiction of Sub Division SER-21 Division South East Road-2/21).
2026_PWD_286623_2
83/EE/SER-II/PWD/2025-26
Open Tender
Civil Works - Roads
61 days
NEW DELHI
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹1.0 L
28 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavating holes more than 0.10 cum & up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto1.5 m. All kinds of soil. | |||||
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | |||||
| 3Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns. | |||||
| 4Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | |||||
| 5Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work. | |||||
| 6Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | |||||
| 7Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | |||||
| 8Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | |||||
| 9Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer -in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost). | |||||
| 10Difference GST correction factor 0.973 on existing items of the DSR 2023 | |||||
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_383592.xls
BOQ • 0.39 MB
NIT2ndCALL83.pdf
Tender Documents • 1.49 MB
Download all tender documents and submit your bid