Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹38 L
EMD Value
₹7,600
Closing Date
24 Aug 2026, 6:00 pmClosed
CE Navy Visakhapatnam
Chief Engineer (Navy), Military Engineer Services, Station Road, Visakhapatnam-530 004
CONSULTANCY SERVICES FOR PROVISION OF DEFICIENT SWIMMING POOL AT INS CHILKA
2026_MES_774233_1
82351
Open Tender
Consultancy Services
Item Rate
120 days
Chilka
As per tender
10 documents required · 10 mandatory
₹500
GE Chilka
₹7,600
Yes
31 Aug 2026
23 Jun 2026
31 Aug 2026
23 Jun 2026
24 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Consulting detailed topographical survey at grid interval of 3m C/C which includes allocation of boundary, locating all the existing structures/services etc getting information about under ground cables sewer lines, fire control system etc. from various sources and compilation of available data at site.
Note : Clearance of shrubs/grass is included in above item. | 1 | Ha | - | - |
| 2 | DETAILED SOIL INVESTIGATION:-
Mobilization of equipment to site for detailed soil investigation and shifting them location to location of boreholes and for in-situ tests | 1 | Job | - | - |
| 2.01 | Boring holes 150mm dia in any type of soil including weathered rock & SDR but excluding soft/hard rock/fractured rock upto a depth until hard rock/ fractured rock strata encountered including following activities:-
(a) Conduct of SPT at every 1.5m interval or change of strata whichever occurs earlier.
(b) Collection of undistrubed soil samples (UDS) at every 1.5m interval or change of starta whichever occurs earlier(a minimum gap of 500mm shall be ensured between SPT and collection of UDS).
Note:
(i) Written permission of CWE shall be obtained for deep boreholes when pile foundation is contemplated.
(ii) In case of deep boreholes anticipating pile foundation at least boreholes in all 4 corners of the building shall go upto 6.5m below rock strata. | 50 | RM | - | - |
| 2.02 | Drilling holes in any type of rock (Soft/Hard) using hydraulic drilling machine within the borehole for cutting cores in rock and collection of cores of requisite size and length as per relevant IS standards. Logging core recovery. Drilling shall continue till minimum 5m into hard rock starta. Conduct of following laboratory tests on rock samples/cores collected from boreholes as per relevant Indian Standards [ see IS 2720(all parts) and IS 1498, IS 9143, IS 13030,IS 9221,IS 8764, IS 9179, IS 10050,IS 10082,IS 10782,IS 12608,IS 13047,IS3025]:
(a) Visual Classification;
(b) Density:
(c) Specific gravity:
(d) Hardness;
(e) Slake durebility/ Degree fo weathering;
(f) Uniaxial compression test (crushing strength both saturated and unsaturated.
(g) Point load strength index;
(h) RQD (Rock Quailty Designation)
Note:
(a) Item to be operated only in case of encountering rock in borehole with the writtern permission of GE. | 25 | RM | - | - |
| 2.03 | Conduct of following laboratory test as per relevant Indian Standards [see IS 2720(all parts), IS 1498 and IS 3025] on soil samples collected:
(a) Test on disturbed/undisturbed soil samples:
(i) Visual and engineering classification:
(ii) Sieve analysis and hydrometer analysis:
(iii) Atterberg's limit.(liquid limit, plastic limit and shrinkage limit):
(iv) Specific gravity.
(v) Free swell index
(b) Test on undisturbed soil samples:
(i) Bulk Density and moisture content.
(ii) Unconfined compression test (on remoulded undisturbed sample):
(iii) Swelling pressure (on undisturbed and remoulded sample):
(iv) Determination of C & Ø values using Direct shear (drained/undrained) (On remoulded or undisturbed
sample) or Triaxial compression test (on undistrubed or remouled sample). Or Vane shear test.
Note: - The rate shall be proportional to depth of bore hole. | 5 | Each borehole | - | - |
| 2.04 | Chemical analysis of ground water sample collected at bottom of one boreholes. | 1 | Each | - | - |
| 2.05 | Chemical analysis of soil samples one each from each strata in respect of one borehole. If different strata (s) encountered in any other borehole addition soils samples are to be analysed | 2 | Each | - | - |
| 2.06 | Conduct of california bearing ratio (CBR) Test in accordance with IS 2720 (Part 16) on soil sample collected at subgrade level for road with flexible wearing course. | 1 | Each | - | - |
| 2.07 | Conduct of Plate Load Test to determin "subgrade modulus" in accordance with IS 9214 at subgrade level for road with Rigid wearing course. | 1 | Each | - | - |
| 3Preparation of concept plan, design basis report, Architectural working drawing including 3D view from various angle in preparation of Arch Drgs and services along with proof checking from IIT/NITs. | |||||
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_866953.xls
BOQ • 0.50 MB
TENDERPAGES.pdf
Tender Documents • 0.48 MB
82351_Date_Corrigendum_5.pdf
PDF • 0.48 MB
82351_Date_Corrigendum_3.pdf
PDF • 0.48 MB
82351_Date_Corrigendum_2.pdf
PDF • 0.48 MB
82351_Date_Corrigendum_1.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .