Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAdmitted-Finance | ₹3.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.2 Cr+₹2.3 Cr (59.0%)Admitted-Finance 171 GLOBEL SPACE HUDA GLOBEL SPACE COLONY 125055 | SIRSA | HARYANA | 125055 | ₹6.2 Cr+₹2.3 Cr (59.0%) | L2 | Admitted-Finance |
| 3 | L3₹6.5 Cr+₹2.6 Cr (65.9%)Admitted-Finance 366 GIANI ZAIL SINGH NAGAR ROPAR PB 140001 | ROPAR | ROPAR | PUNJAB | 140001 | ₹6.5 Cr+₹2.6 Cr (65.9%) | L3 | Admitted-Finance |
| 4 | L4₹7.5 Cr+₹3.6 Cr (92.3%)Admitted-Finance | ₹7.5 Cr+₹3.6 Cr (92.3%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ITEC INFRA GLOBAL PVT LTD L1 | vikas construction co L2 | Messrs Tama Fabrication Works L4 | GARG & GARG CO L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | SSI, Design & drawing Including proof checking and Construction of 50.0 Mtr span PSC box Girder major permanent bridge alongwith new Abutments over Nautikhud river at 45.478 Km on Dhami-Kingal road under Deepak Project in Himachal Pradesh State with single span on open foundation having clear width 7.50 mtr between kerbs, crash barrier including load testing of superstructure, all preparatory work, POT & POT cum PTFE bearings, including design, launching/erection of staging works, if required , wearing coat having non skid surface, Strip seal expansion Joints, RCC hand rails, footpaths, kerbs , crash barriers, guard post, drainage system with drainage spouts, 1.5 mtr wide footpath both side, casting of abutment cap, dirt wall, Return wall , backfilling behind the abutment cap and dirt wall up to deck level, painting and all other items of works required necessary to complete construction of bridge including curing excluding approaches of road work and approach slab all specified in particular specification of contract. | 1 | Lump sum | 3,40,00,000 ₹3,40,00,000 Lowest | 5,60,00,000 ₹5,60,00,000 | 6,75,00,000 ₹6,75,00,000 | 5,99,50,000 ₹5,99,50,000 |
| 1.02 | Dismantling of Existing 45 Mtr Toppled PSC Curved super-structure including dismantling of both existing Abutments (old) and disposal of dismantle material over Nautikhud river at 45.478 Km on Dhami-Kingal road under Deepak Project in Himachal Pradesh State | 1 | Lump sum | 49,99,999 ₹49,99,999 | 60,00,000 ₹60,00,000 | 75,00,000 ₹75,00,000 | 47,50,000 ₹47,50,000 Lowest |
Tender Value
₹3.4 Cr
EMD Value
₹4.2 L
Closing Date
26 Jun 2024, 4:30 pmClosed
CHIEF ENGINEER PROJECT DEEPAK
HQ CE (P) DEEPAK, CHAKKAR BARRIER, NEAR HARI NAGAR, SHIMLA
DISMANTLE AND DISP OF EXISTING 45 M TOPPLED PSC CURVED SUPER-STR OF EXISTING RCC BOTH SIDE ABUT AND DESIGN AND NEW CONSTR OF 50 M SPAN PSC BOX GIRDER BR WITH BOTH ABUT OVER NAUTIKHUD NALLAH INCL PROOF CHECK OF D AND D AT KM 45 PT 478 ON DK RD IN HP
2024_BRO_655239_1
CE (P) DPK-01 OF 2024-25
Open Tender
Civil Works
Works
730 days
DHAMI KINGAL ROAD
As per Tender Documents
8 documents required · 8 mandatory
₹0
₹4.2 L
Yes
SHIMLA
23 Jul 2024
21 May 2024
27 Jun 2024
21 May 2024
26 Jun 2024
4 Jun 2024
21 May 2024 - 31 May 2024
25 May 2024
Amount
SSI, Design & drawing Including proof checking and Construction of 50.0 Mtr span PSC box Girder major permanent bridge alongwith new Abutments over Nautikhud river at 45.478 Km on Dhami-Kingal road under Deepak Project in Himachal Pradesh State with single span on open foundation having clear width 7.50 mtr between kerbs, crash barrier including load testing of superstructure, all preparatory work, POT & POT cum PTFE bearings, including design, launching/erection of staging works, if required , wearing coat having non skid surface, Strip seal expansion Joints, RCC hand rails, footpaths, kerbs , crash barriers, guard post, drainage system with drainage spouts, 1.5 mtr wide footpath both side, casting of abutment cap, dirt wall, Return wall , backfilling behind the abutment cap and dirt wall up to deck level, painting and all other items of works required necessary to complete construction of bridge including curing excluding approaches of road work and approach slab all specified in particular specification of contract.
Dismantling of Existing 45 Mtr Toppled PSC Curved super-structure including dismantling of both existing Abutments (old) and disposal of dismantle material over Nautikhud river at 45.478 Km on Dhami-Kingal road under Deepak Project in Himachal Pradesh State
vikas construction co
GARG & GARG CO
Messrs Tama Fabrication Works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 11.69 MB
TBid.pdf
Tender Documents • 0.97 MB
QBID.pdf
Tender Documents • 0.48 MB
OTHERDETAILS.pdf
Additional Documents • 0.10 MB
Drawings.pdf
Tender Documents • 0.65 MB
BOQ_733239.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .