Loading…
Loading…
Tender Value
₹79.0 L
EMD Value
₹1.6 L
Closing Date
14 Sept 2026, 3:00 pm
Executive Engineer, BUILDING DIVISION BUXAR
EE
EE, BUILDING DIVISION BUXAR, BCD
Superintending Engineer, Ara Circle
SE
CONSTRUCTION OF REMAINING PORTION OF ROAD AROUND THE PERIMETER WALL OF CENTRAL JAIL BUXAR. FOR THE YEAR - 2026-2027.
138666
NIT 8/BCD/BUXAR/2026-27
Open Tender
CIVIL
Buxar
• 1) Audited Annual Financial Turnover from Chartered Accountant for the years
2022-2023
2023-2024
2024-2025
• 2) Certificates by Employer (not below the rank of Executive Engineer) for successful completion of works during last five years, specifying
i. Name of work
ii. Employer
iii. Location
iv. Contract amount
v. Date of start
vi. Date of completion
vii. Number of storey
viii. Total built up area of building in contract
• 3) List of Works in hand (Existing Commitment) specifying
i. Name of work
ii. Employer
iii. Location
iv. Contract amount
v. Date of start
vi. Date of completion.
• 4) C.V. of Engineers with
i. Educational qualification certificate
ii. Individual affidavit of Engineer to perform the job if allotted to bidder
• 5) Document showing ownership of plants and equipment needed for successful completion of work :-
i. Automatic Batching plant with accessories
ii. Concrete Mixer with weighing facility
iii. Steel centering and shuttering showing area in square feet
iv. water Tanker
v. Vibrator
• 6) Details of financial availability:-
i. Certificate of any Nationalized Bank extending credit facility up to 10 % of B.O.Q Amount
ii. Self declaration of investing 25 % of B.O.Q Amount.
• 7) Certificates in the form of Affidavit by the bidder for: -
i. Bidder had not abandoned any project which was taken up by bidder
ii. Bidder had never been in Litigation lying in any court of law with employer of previous works
iii. Bidder had no relative or any person directly or indirectly involved in design, execution, supervision and testing of this tendered
• 8) Bidding Capacity statement
Bidding Capacity, BC = A x N x 2 ? B
Where,
A= Maximum ATO at current price level (with 8% annual indexation)
N = Time of completion of this tendered work in years
B = Value of works in hand (Existing Commitment of Bidder)
CIVIL
PERCENTAGE
L1
1
8 documents required · 8 mandatory
₹10,000
Processing Fee: 5900
₹1.6 L
21 Aug 2026
21 Aug 2026
15 Sept 2026
21 Aug 2026
14 Sept 2026
21 Aug 2026
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m all kind of soil
Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete.
Providing designation 100 A one brick on edge soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l,
"Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints ( 10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-30 is @ 340 kg/cum. Nothing extra shall be payable for additional materials components recommended through design mix report in variance with CPWD Cement concrete prepared with batch mixing machine
Centring and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns, etc., for mass concrete.
Un Skilled Labour.
Carriage Cost of Materials Local sand ( 1 km kutcha + 2 km pucca)
Carriage of Materials Coarse Sand (lead -88 km from koilwar)
Carriage Cost of Materials Stone Chips (lead -220km from manpur, gaya)
Carriage Cost of Materials Bricks (lead - 1 km kutcha + 7 km pucca)
Extra Cost of Materials Cement
Extra Cost of Materials Bricks
Item Code
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m all kind of soil
Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete.
Providing designation 100 A one brick on edge soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l,
"Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints ( 10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-30 is @ 340 kg/cum. Nothing extra shall be payable for additional materials components recommended through design mix report in variance with CPWD Cement concrete prepared with batch mixing machine
Centring and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns, etc., for mass concrete.
Un Skilled Labour.
Carriage Cost of Materials Local sand ( 1 km kutcha + 2 km pucca)
Carriage of Materials Coarse Sand (lead -88 km from koilwar)
Carriage Cost of Materials Stone Chips (lead -220km from manpur, gaya)
Carriage Cost of Materials Bricks (lead - 1 km kutcha + 7 km pucca)
Extra Cost of Materials Cement
Extra Cost of Materials Bricks
Estimated Cost :-
Earnest Money :-
Total Rs. :-
Initial security deposits (including earnest money) to be deposited before the Commencement of the work ………………………………………………….
Percentage to be deducted from bills Rs. 5% (Rupees five percent)
Time required for the work from date of written order to commence ……………………………. Monthly.
Date of written other to commence.
Total number of item of work tendered for.
Item Code
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m all kind of soil
Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete.
Providing designation 100 A one brick on edge soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l,
"Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints ( 10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-30 is @ 340 kg/cum. Nothing extra shall be payable for additional materials components recommended through design mix report in variance with CPWD Cement concrete prepared with batch mixing machine
Centring and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns, etc., for mass concrete.
Un Skilled Labour.
Carriage Cost of Materials Local sand ( 1 km kutcha + 2 km pucca)
Carriage of Materials Coarse Sand (lead -88 km from koilwar)
Carriage Cost of Materials Stone Chips (lead -220km from manpur, gaya)
Carriage Cost of Materials Bricks (lead - 1 km kutcha + 7 km pucca)
Extra Cost of Materials Cement
Extra Cost of Materials Bricks
Since* previous bill.
Per cm sq per 100 M
Per Meter Cube
Per Meter Square
Per Meter Cube
Per Meter Square
Per Meter Cube
Per Meter Cube
Per Meter Cube
Thousand
Thousand
Total Value Of Work Done To Date (A)
4. Deduct - amount withheld ---
dated ...............
Subject to such subsidiary orders as may be laid down by the local Government detailed measurements should be recorded only by Executive or Assistant Engineers or by Executive subordinates in-charges of work to whom measurement books have been supplied by the Executive Engineer for the purpose.
All Measurement should be bear taken down in a measurement book Form 23, issued for the purpose, no where else.
Each set of measurement should commencement with entries Starting-
In the case of bills for work done:-
As all payments for work supplies are based on the quantities recorded in the person taking the measurement to record the quantities clearly and accurately. If the measurements are taken in connection with a running contract account on which work has been previously measured he is further responsible (1) that reference to the last set of measurements in recorded and (2) that if the entire job or contract has been completed the fact is recorded prominently just above his initials.
Entries should be record continuously in the measurement book No Blank pages may be left and no page be turn out. Any page left blank inadvertdetly must be cancelled by diagonal lines. The cancellation being attested. See also paragraph or the Public Work Department Code.
No entry may be erased, of a mistake is made it should be correct (and dated) by the responsible officer in the manner prescribed in paragraph 335 of the Public Works Department Code. When any measurements are cancelled, the cancellation, must be supported by the dated initials of the officer ordering the cancellation or by reference to his orders initialed by the officer who made the measurements in either case the reason for cancellation should be provided with an index which should be kept upto date.
Item Code
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m all kind of soil
Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete.
Providing designation 100 A one brick on edge soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l,
"Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints ( 10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-30 is @ 340 kg/cum. Nothing extra shall be payable for additional materials components recommended through design mix report in variance with CPWD Cement concrete prepared with batch mixing machine
Centring and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns, etc., for mass concrete.
Un Skilled Labour.
Carriage Cost of Materials Local sand ( 1 km kutcha + 2 km pucca)
Carriage of Materials Coarse Sand (lead -88 km from koilwar)
Carriage Cost of Materials Stone Chips (lead -220km from manpur, gaya)
Carriage Cost of Materials Bricks (lead - 1 km kutcha + 7 km pucca)
Extra Cost of Materials Cement
Extra Cost of Materials Bricks
BCD BUXAR
Pages recording measurement subject to test check
Item of Work
BUILDING DIVISION BUXAR
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
89299_97746_MARKING CHART_1094.pdf
NIT • 3.92 MB
NIT 8.pdf
NIT • 4.07 MB
BOQ.XLS
NIT • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].